ML070720254

From kanterella
Revision as of 09:34, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
06/12/06 Unistar Nuclear, Calvert Cliffs, Ccnpp Usepr Site Layout and Subsurface Investigation
ML070720254
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/12/2006
From:
UniStar Nuclear
To:
Office of Nuclear Reactor Regulation
References
Download: ML070720254 (11)


Text

UnuStar NU CLIE A R rr u t and Subsurface Investigatio NRC Meeting 6/12/06 06/12/06 I

Agenda

  • Monday:

- Meet NRC at UniStar site HQ

- Presentations on site activities and QA/CAP programs

- Safety briefing

- Narrated van tour of site

- NRC witness site activities

- Conclude

  • Tuesday:

- All meet at site

- Continue with site activity review/discussion

- Meet reps from MD DNR

- NRC exit observations 06/12/06 2

Overview of Site Description and New Plant Layout Study

  • CCNPP Site Description
  • Site Layout Study

- Evaluation categories:

" Environmental

" Land use and Zoning

" Construction Considerations

" Construction Facility Considerations

" Switchyard Considerations

" Security

  • Permanent Facility Considerations
  • Impact to Existing Facilities 06/12/06 3 06/12/06 3

New Plant Layout Study Go/no-go criteria

" Compliance with CWA 316 (a) & (b)

" Minimal impact to threatened and endangered species (tiger beetles, eagles)

" Impact to Transmission Corridors

" Impact to cemeteries

" Proximity to hazardous pipelines

" Unknown subsurface conditions 06/12/06 4 06/12/06 4

Site Layout Study Results (cont.)

  • Narrowed down to two options (north & south)

- Forced draft

- Natural draft

- Hybrid

- Selection criteria

  • Height, land use, plume, salt drift, power needs, cost, noise, etc .......
  • BOP study is in progress South option selected as the base case for CCNPP COLA 06/12/06 5 06/12/06 5

Subsurface Investigation Purpose

- Develop subsurface investigation locations for potential Units 3 and 4 power blocks at Calvert Cliffs, plus switchyard, proposed cooling tower configuration, heavy haul road, and intake and discharge piping locations.

- Developed and implemented under Bechtel's QA Program 06/12/06 6

Subsurface Investigation References

- Basis for boring locations is derived from guidance obtained from relevant elements from:

" Regulatory Guide 1.132

" Regulatory Guide 1.138

" Regulatory Guide 1.198

" Regulatory Guide 1.70 P NQA-1, 1994, Subpart 2.20 06/12/06 7 06/12/06 7

Subsurface Investigation

  • Documents Prepared

- Calculation, "Basis for Subsurface Investigation"

- Core Bore Location Drawings

- Technical Specification

- Detailed Procedures and Workplans 06/12/06 8

Subsurface Investigation

  • Subsurface Investigation Scope

- Standard Penetration Tests (40' to 400')

- Ground Water Observation Wells (50' or 100')

- Cone Penetrometer Tests (50' or 100')

- Field Electrical Resistivity (4 tests, spacing up to 300')

- Borehole Geophysical Logging (400' and some 200')

- Suspension P-S Velocity Logging (400', some 200')

- Bulk Sampling from Test Pits (20 pits)

  • Laboratory Testing of Selected Samples 06/12/06 9

Subsurface Investigation - QA Program Site Characterization is performed under the Bechtel Power Corporation QA program

- Subcontractors are also working under Bechtel's QA program

- QA oversight is provided:

" at start of each work task

" periodically UniStar observes site characterization activities to ensure quality meets UniStar expectations 06/12/06 10 06/12/06 10

Subsurface Investigation - Corrective Action Bechtel is responsible for corrective action program implementation:

- Issues have been identified and corrective actions taken 06/12/06 I1I 06/12/06 11