ML071280113

From kanterella
Jump to navigation Jump to search
Notice of Calvert Cliff Annual Assessment Meeting with Constellation Management
ML071280113
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/08/2007
From: Glenn Dentel
Reactor Projects Branch 1
To:
Dentel, G., RGN-DRP, 603-474-3580
References
MN 07-022
Download: ML071280113 (4)


Text

May 8, 2007 MN No.07-022 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Constellation Energy Group, LLC Facility: Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Docket No: 50-317 and 50-318 Date/Time: May 22, 2007, at 6:30 pm Location: Holiday Inn Express 355 Merrimac Court Prince Frederick, Maryland 20678 (410) 535-6800

Purpose:

The NRC requested an Annual Assessment Meeting with Constellation management to discuss the NRCs assessment of safety performance of Calvert Cliffs Nuclear Power Plant for calendar year 2006. The NRCs assessment is documented in a letter dated March 2, 2007.

Attendees:

NRC: D. Lew, Director, Division of Reactor Projects, Region I G. Dentel, Chief, Projects Branch 1, Division of Reactor Projects, Region I S. Kennedy, Senior Resident Inspector, Calvert Cliffs Nuclear Power Plant B. Bickett, Senior Project Engineer, Division of Reactor Projects M. Davis, Resident Inspector, Calvert Cliffs Nuclear Power Plant Licensee: J. Spina, Vice President J. Pollock, Plant General Manager D. Bauder, Manager, Nuclear Operations H. Daman, Manager, Nuclear Maintenance M. Flaherty, Manager, Engineering Services J. Stanley, Manager, Integrated Work Management Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs assessment letter can be found in ADAMS with an Accession Number of ML070610618.

The NRC slides for the meeting can be accessed with the Accession Number ML071270042.

ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Calvert Cliffs Nuclear Power Plant can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Glenn T. Dentel, Chief - Projects Branch 1 (610) 337-5233 E-mail: GTD@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 18, 2007 via telephone to the NRC meeting contact.

Approved by: /RA By Blake D. Wellling For/

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc w/encl:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel P. Birnie, Esquire, Co-Director, Maryland Safe Energy Coalition R. Hickok, NRC Technical Training Center G. Aburn, SLO (2)

Agenda NRCs Annual Assessment Meeting Calvert Cliffs Nuclear Power Plant May 22, 2007 Introduction ......................................................................................... NRC (3 minutes)

Review of Reactor Oversight Process .................................................. NRC (5 minutes)

Regulatory Summary of Plant Performance ......................................... NRC (7 minutes)

NRC Assessment of Plant Performance Results ................................ NRC (15 minutes)

Constellation's Response and Remarks ................................ Constellation (15 minutes)

NRC Closing Remarks .......................................................................... NRC (5 minutes)

Short Break .................................................................................................... (5 minutes)

NRC available to address public questions ... NRC/Members of the Public (as needed)

Agenda NRCs Annual Assessment Meeting Calvert Cliffs Nuclear Power Plant May 22, 2007 Introduction ..................................................................................................................................................................... NRC (3 minutes)

Review of Reactor Oversight Process ............................................................................................................................. NRC (5 minutes)

Regulatory Summary of Plant Performance ..................................................................................................................... NRC (7 minutes)

NRC Assessment of Plant Performance Results ........................................................................................................... NRC (15 minutes)

Constellation's Response and Remarks .......................................................................................................... Constellation (15 minutes)

NRC Closing Remarks ..................................................................................................................................................... NRC (5 minutes)

Short Break ................................................................................................................................................................................ (5 minutes)

NRC available to address public questions ............................................................................. NRC/Members of the Public (as needed)

Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

K. Farrar, Regional Counsel C. ODaniell, DRA Secretary G. Dentel, DRP - Branch Chief B. Bickett, DRP - SPE S. Kennedy, DRP - Senior Resident Inspector M. Davis, DRP - Resident Inspector C. Newgent, DRP Resident OA M. Gamberoni, Director, DRS K.Heater, DRP Division Secretary, RI K. Gallagher, DRS Division Secretary, RI J. Lamb, RI OEDO D. Pickett, Project Manager, NRR D. Screnci, Senior PAO N. Sheehan, Field PAO N. McNamara, SLO M McLaughlin, SLO PMNS SUNSI Review Complete: BAB4 (Reviewers Initials)

DOCUMENT NAME:C:\FileNet\ML071280113.wpd After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N"

= No copy OFFICE RI/DRP RI/DRP NAME BBickett/BAB4 GDentel/BDW FOR/

DATE 05/07/07 05/ 07/07 OFFICIAL RECORD COPY ML071280110