05/08/2007 Byron NRC Presentation EOC Public Meeting SlidesML071290248 |
Person / Time |
---|
Site: |
Byron |
---|
Issue date: |
05/08/2007 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML071290248 (20) |
|
Similar Documents at Byron |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21166A3722021-06-15015 June 2021 End-of-Cycle Meeting Presentation ML20258A0302020-09-22022 September 2020 Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20209A5322020-07-24024 July 2020 2019 Braidwood and Byron End-of-Cycle Presentation ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18218A1122018-08-0808 August 2018 Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17296A2032017-10-0303 October 2017 Accident Tolerant Fuel Lead Test Assembly Deployment ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17132A1772017-05-25025 May 2017 LAR for Control Room Cooling at Byron and Braidwood Stations ML16334A4642016-12-0505 December 2016 Westinghouse Pre-Application Meeting: License Amendment Request to Modify Byron Station Facility Operating License in Support of the Molybdenum-99 Isotope Production Project - December 5, 2016 ML16327A3702016-11-25025 November 2016 Enclosure 3: Exelon Byron Station Design (Meeting Handout) ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16062A4222016-03-0202 March 2016 Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal ML15342A1012015-12-0909 December 2015 TORMIS Computer Code Methodology Public Meeting Slides ML15232A6832015-08-27027 August 2015 Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request ML15209A9722015-07-30030 July 2015 Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and Braidwood ML15133A4732015-05-20020 May 2015 Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations ML14342A8122014-12-10010 December 2014 Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh Nozzles ML14261A1112014-09-22022 September 2014 2014 NEI Fire Protection Information Forum NRC Public Slides ML14251A4852014-09-10010 September 2014 Byron/Braidwood Auxiliary Feedwater Cross-Tie ML14051A0662014-02-20020 February 2014 2/06/2014, Exelon Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) ML14051A0592014-02-20020 February 2014 2/06/2014, NRC Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) ML13275A0402013-08-20020 August 2013 License Renewal Process and Environmental Scoping Meeting Slides ML13227A3922013-08-14014 August 2013 2012 Byron End-of-Cycle Public Meeting NRC Presentation 2024-04-09
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23229A1722023-08-17017 August 2023 RR Pen-75 Pre-Submittal NRC Meeting Handout ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML22098A0512022-04-11011 April 2022 2 Cycle 25 High Burnup Lead Test Assembly NRC Pre-Submittal Meeting on April 22, 2022 (EPID L-2022-LRM-0022) (Slides) ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21166A3722021-06-15015 June 2021 End-of-Cycle Meeting Presentation ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML20258A0302020-09-22022 September 2020 Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20209A5322020-07-24024 July 2020 2019 Braidwood and Byron End-of-Cycle Presentation ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18218A1122018-08-0808 August 2018 Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 ML18086A8432018-03-27027 March 2018 NUREG-1021, Revision 11 Implementation ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17291B0282017-10-17017 October 2017 Submittal of Slide Package Westinghouse Encore Lead Test Rod Program Byron Unit 2 (Proprietary/Non-Proprietary) ML17296A2032017-10-0303 October 2017 Accident Tolerant Fuel Lead Test Assembly Deployment ML17132A1772017-05-25025 May 2017 LAR for Control Room Cooling at Byron and Braidwood Stations ML16334A4452016-12-0505 December 2016 Pre-submittal Meeting Byron UT RR Presentation ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16062A4222016-03-0202 March 2016 Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal ML15342A1012015-12-0909 December 2015 TORMIS Computer Code Methodology Public Meeting Slides ML15232A6832015-08-27027 August 2015 Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request ML15209A9722015-07-30030 July 2015 Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and Braidwood ML15204A4932015-07-23023 July 2015 Bb Station Requests for Relief for Alternate Examination Frequency ML15204A5052015-07-23023 July 2015 EPRI Tech Basis for Brd-Byr Head RR ML15133A4732015-05-20020 May 2015 Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations ML14342A8122014-12-10010 December 2014 Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh Nozzles ML14261A1112014-09-22022 September 2014 2014 NEI Fire Protection Information Forum NRC Public Slides ML14251A4852014-09-10010 September 2014 Byron/Braidwood Auxiliary Feedwater Cross-Tie ML14051A0592014-02-20020 February 2014 2/06/2014, NRC Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) ML14051A0662014-02-20020 February 2014 2/06/2014, Exelon Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) ML13275A0402013-08-20020 August 2013 License Renewal Process and Environmental Scoping Meeting Slides 2024-04-09
[Table view] |
Text
Byron Annual Assessment Meeting Reactor Oversight Program - CY 2006 Nuclear Regulatory Commission - Region III Byron, IL May 8, 2007
Purpose of Todays Meeting z Provide a public forum for discussion of the licensees performance z NRC will address the licensee performance issues identified in the annual assessment letter z Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions
Region III Organization James Caldwell Regional Administrator Geoff Grant Deputy Regional Administrator Mark Satorius Cynthia Pederson Director Division of Reactor Projects (DRP) Director Division of Reactor Safety (DRS)
Steve West Anne Boland Deputy Director Deputy Director Richard Skokowski Regional Specialists Branch Chief Byron Project Engineer Resident Inspectors Desiree Smith Bruce Bartlett Raymond Ng
NRC Representatives z Bruce Bartlett, Senior Resident Inspector
- (815) 234-5451 z Raymond Ng, Resident Inspector
- (815) 234-5451 z Richard Skokowski, Branch Chief, DRP
- (630) 829-9620
NRC Performance Goals z Safety: Ensure protection of the public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRCs strategic objectives
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Significance Threshold Performance Indicators Green: Baseline Inspection only White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of CY 2006 Licensee Response 70 Regulatory Response 24 Degraded Cornerstone 6 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103
National Summary z Performance Indicator Results (at end of CY 2006)
Green 1843 White 11 Yellow 0 Red 0 z Total Inspection Findings (CY 2006)
Green 676 White 13 Yellow 0 Red 0
Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Radiological Release Controls ~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr
Byron Assessment Results (Jan 1 - Dec 31, 2006) z Safety performance for the 4th quarter at Byron Unit 1 was within the Licensee Response column of the NRC Action Matrix. For the 4th quarter Byron Unit 2 was within the Regulatory Response column of the NRC Action Matrix.
z Unit 2 was within the Regulatory Response column due to the White Performance Indicator in the Mitigating Systems cornerstone.
Safety Significant Findings or PIs z No safety significant findings were identified during this assessment period.
z A White Performance Indicator in the Mitigating Systems Performance Index (MSPI) was identified.
z On February 9, 2007, the NRC completed a supplemental inspection pursuant to Inspection Procedure 95001 due to the White Performance Indicator in the Mitigating Systems conrnerstone. No findings of significance were identified.
Byron Inspection Activities (Jan 1 - Dec 31, 2006) z 10 findings during this assessment period 6 in mitigating systems 2 in barrier integrity 1 in occupational radiation safety 1 in public radiation safety z One additional finding was evaluated separately using the traditional enforcement process
Byron Inspection Activities (Jan 1 - Dec 31, 2006) z Supplemental Inspection 95001 was completed on February 9, 2007 z Unit 1 had a refueling outage from September 10 -
October 23, 2006.
z Unit 2 operated at or near full power throughout this inspection period with minor exceptions.
Byron Annual Assessment Summary (Jan 1 - Dec 31, 2006) z Exelon Nuclear operated Byron Units 1 & 2 in a manner that preserved public health and safety z All cornerstone objectives were met with only one White Performance Indicator identified for Unit 2 Heat Removal System MSPI (Auxiliary Feedwater System) z NRC plans baseline inspections at Byron for the remainder of the assessment period. A supplemental 95001 inspection was completed on February 9, 2007.
Licensee Response and Remarks David Hoots Site Vice President Byron Generating Station
Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:
(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select About NRC > Organization and Functions for Public Affairs
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)