MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] |
Text
-* OHIO DEPARTMENT Ted Strickland, Governor E-4 OF PUBLIC SAFETY EDUCATION SERVICE .PROTECTION Administration Bureau of Motor Vehicles Emergency Management Agency Emergency Medical Services Division Henry GurmBn, Director Nancy J. Dragani Executive Director Emergency Management Agency Offce of Cnminal Justice Services 2855 West Dublin-Granville Road
- Ohio Homeland Security Columbus Ohio 43235-2206 Ohio Investigative Unit (614) 889-7150 Ohio State Highway Patrol www ema Ohio gov June 5,2007 Mr. Roland Lickus, Chief State and Government Affairs for Region Ill Nuclear Regulatory Commission 2443 Warrensville Road, Suite 210 Lisle, Illinois 60532-435 1
Dear Mr. Lickus:
This letter requests permission to observe the NRC inspection related to Radiation Monitoring Instrumentation and Protective Equipment at Davis-Besse scheduled for the week of June 18-22, 2007. Terry McCall of the Ohio Department of Health has been selected by the Utility Radiological Safety Board to be the designated observer. Ms. McCall has not obtained unescorted access authorization; therefore, a plant escort will be necessary. Coordination will be with Mr. Tony Go, lead Regional NRC inspector.
Enclosed is a copy of Ms. McCall's signed NRC/State Protocol Statement.
Sincerely,
&PJd=6 CAROLO'CLAI E State Liaison Officer C0C:ee Enclosure Mission Statement "to save lives. reduce injunes and economic loss. to administer Ohio s motor vehicle laws and to preserve the safety and well being of all citizens with the most cost-effecbve and sewm-onented methods available "
RECEIVED 3UN 11m
'85/29./2007 16:50 614-466-8381 RAD PROTECTINM PAGE 63/64 Protocol Agreement for State Observation of NRC Tnspections NRC Protocol:
The Regional State Liaison Officer (RSLO)will normally be the lead individual rcsponsible for tracking requests for State observation, assuring consistency regarding thcsc requests, and for advising the Regional Administrator on the dispositions of these requests. The appropriate technicaI representative or Division Dircctw will communicate with the State on specific issues cmceming the inspections(s).
Requests for obscrvations of Headquancr-based inspections will also bc coordinated through the RSLO.
Headqumcrs-based inspections should be referred through the RSLO to a technical represcntative designated by the Region.
NRC will process written requests to the Regional Administrator through thc State Liaison Officer (SLO).
Requests should identify the type o f inspection activity and facility the State wishes to observe.
Limits on scope and duration of the observation period may be imposed if, in the view of the Regional Administrator, they compromisethe efficiency or effectiveness of the inspection. Regions should use their discretion as to which. if any, inspections will be excluded from observations.
State will be informed they must not release information concerning the time and purpose of unannounced insped ons.
The Region will make it clear to the licensee that the State views arc not necessarily endorsed by NRC.The Region will also make it clear rhat only NRC has regulatory authority for inspection findings and enforcement actions regarding radiological health and s a f q .
State Protocol:
A State will make advance arrangements with the licensee for site access training and badging (subject to fitness for duty requircmmts). prior to thc actual inspection.
Normally. no morc than one individual will be allowed to observe an NRC inspection.
Thc State will be responsible for detcrmining the technical and professional competence of its representatives who accompany NRC inspectors.
An obsewefs communication with the licensee will be through the appropriate MRC team member, usually the senior resident inspector M rhc team leader.
When informed of an unannounced inspccrion. a State must not release information concerning its time and purpose.
An observer will remain in the company of NRC personnel throughout the coursc of the inspection.
State observation may be terminated by the NRC if the observer's conduct interfens with a fair and orderly inspcction, An observcr will not be provided with proprietary or safepards information. Obsnvers will not remove m y material fromthc site without NRC or licensee approval.
- ____-_ -
,65/29/2007 16: 50 614-466-0381 RAD PROTECTINM PAGE 64/84 2
The State observer, in accompanying the NRC inspectors. does so a his OT hcr own risk.NRC will not be responsible for injuries or mposures to harmful substances which may occur to the accompanying individual during the inspcction and will assume no liability for any incidents associated with the accornpanhent.
The State observer will be expected ta adhme to the same conduct ag NRC inspectors during an inspection accompaniment.
If the State obstrvcr notices any apparent non-confonnance with safety or regulatory requirements during the inspections. hc/she will make those observations promptly known M the NRC team leader or lcad inspector.
Likewise, when overall conclusions OT views of thc State observer aTe substantially different from tbose of the NRC inspectors, the State will advise the tcarn leadm OT lead inspector and forward those views, in writing. to the NRC Region. This will allow NRC to take any necessary iegulatary actions.
Under no circumstances should Starc communications regarding these inspections be rcleased to the public or the licensec before they are rcviewed by the NRC and the inspection report is issued. State communications may be made publicly available. similar to NRC inspection reporrs, after they have been transmitted to and rcviewed by NRC.
Adjacnt State Prorocol:
An adjacent Smtc i s a State within the plume exposurc pathway emergency planning m e (EPZ)(within approximately a IO-miIe radius) of an NRC-Ucetlscd Facility located in another State. A host State is a State in which an NRC-licensed facility i s located. An adjacent State may rcquest permission to observe NRC inspections at an NRC-licensed facility in a host State.
The adjacent State SLO must communicatc hisher request for observation to the Regional Administrator for the region in which the facility is located.
The adjacent State SLO must also communicate hisher request to the host State SLO so that each State is aware.
of the cvrhcr's intentions.
Ifa host State and M adjacent Starc request observation of the same inspection, the Regional Administrator will make the final determination on thc number of State observers who may attend rhe inspection. If there is a necd to limit thc numbers of observers, the Regional Administrator will routinely give prefercnce to the host State observers.
- Adjacent Statc observers will abide by the samc protocol in all aspects of the inspeaion as host States under this agreement.
Date