MONTHYEARIR 05000346/20240032024-11-14014 November 2024 Integrated Inspection Report 05000346/2024003 ML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan 2024-09-06
[Table view] |
Text
May 25, 2012 Charles A. Casto, Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
Subject:
FENOC VIOLATING FEDERAL REGULATIONS (AGAIN)
Dear Mr. Casto:
By letter dated December 2, 2011, NRC Region III issued Confirmatory Action Letter (CAL)
No. 3-11-001 to FirstEnergy Nuclear Operating Company (FENOC) regarding commitments related to cracking identified in the reinforced concrete shield building at Davis-Besse (ADAMS ML11336A355). The first commitment listed in this CAL stated:
FENOC will provide the results of the root cause evaluation and corrective actions to the NRC, including any long-term monitoring requirements, by February 28, 2012.
By letter dated February 27, 2012, FENOC submitted a root cause evaluation to the NRC (ADAMS ML120600056).
By letter dated May 14, 2012, FENOC submitted to the NRC a revised root cause assessment prepared by its contractor (ADAMS ML12138A037). In the first paragraph of this letter, FENOC stated:
Following this submittal [of the root cause evaluation on February 27, 2012], during on-site NRC inspection activities, observations were identified with the content of both the FENOC Root Cause Analysis Report as well as the contractor root cause assessment report used to develop the FENOC Root Cause Analysis Report.
By letter dated May 16, 2012, FENOC submitted to the NRC a revised root cause evaluation (ADAMS ML12142A053). The first paragraph of this letter also repeated, verbatim, the sentence quoted above.
Federal regulation §50.9, Completeness and accuracy of information, requires:
(a) Information provided to the Commission by an applicant for a license or by a licensee or information required by statute or by the Commission's regulations, orders, or
May 25, 2012 Page 2 license conditions to be maintained by the applicant or the licensee shall be complete and accurate in all material respects.
FENOC conceded violating this federal regulation by submitting information pursuant to a Confirmatory Action Letter that was incomplete and/or inaccurate. That this information was incomplete and inaccurate in material respects was again conceded by FENOC when it stated the problems were discovered during on-site NRC inspection activities. Had the information been deemed by the NRC to either be complete and accurate or be incomplete/inaccurate but immaterial during its inspections, the re-submittals of the root cause assessment and root cause evaluation would not have been necessary. The re-submittals under these circumstances constitute prima facie evidence that FENOC violated §50.9.
Alternatively, FENOC own efforts could have identified the incomplete and/or inaccurate information. The federal regulation would still have been violated, but some credit might be warranted for it having been self-identified and corrected.
That does not seem to be the case here. It took NRC efforts to identify the incomplete/inaccurate information and compel its correction. This violation of §50.9 is especially disconcerting because of FENOCs bad track record. For example, by letter dated January 28, 2004, the NRC informed FENOC that its inspections determined (ADAMS ML040280594):
The response [submitted by FENOC] dated November 11, 1998, failed to provide complete and accurate information concerning protective coating deficiencies and foreign material in containment.
By letter dated February 27, 2004, FENOC acknowledged this violation of federal regulations (ADAMS ML040620456). On pages 4 and 5 in Attachment 1 to this letter, FENOC stated:
FENOC took the following actions to ensure future compliance with 10 CFR 50.9 at the DBNPS:
Issued a new company policy stressing the requirements for complete and accurate information, Provided training to personnel on the need for ensuing information is complete and accurate, Established training for new supervisors and employees, which includes responsibilities under 10 CFR 50.9 for complete and accurate information, and Issued a new procedure governing validation, review, and approval of correspondence with the NRC.
These corrective actions - if actually taken - failed to achieve sustained effectiveness.
May 25, 2012 Page 3 That the NRC inspectors uncovered and revealed the incomplete and/or inaccurate information in FENOCs root cause evaluation and assessment reflects well upon the agency. The NRC did not take the submitted information for granted but instead took steps to verify it. Those steps identified the problems corrected by the re-submittals. But NRC inspectors should not figure prominently in the establishment of complete and accurate information. §50.9 clearly places that burden exclusively on the shoulders of the licensees. In this case, FENOC violated §50.9.
We look forward to the NRC taking enforcement action1 against FENOC for having once again violated federal regulations that require it to provide complete and accurate information to the NRC.
Sincerely, David Lochbaum Director, Nuclear Safety Project PO Box 15316 Chattanooga, TN 37415 (423) 468-9272, office (423) 488-8318, cell 1
This letter is expressly NOT a request per 10 CFR 2.206 for the NRC to take enforcement action against FENOC. If NRC wont take the necessary enforcement action clearly warranted by the facts in this case, our 2.206 petition wont alter that inaction.