ML113140272
ML113140272 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 11/09/2011 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Halpin E South Texas |
References | |
IR-12-002 | |
Download: ML113140272 (6) | |
See also: IR 05000498/2012002
Text
UNITED STATES
NUC LE AR RE G ULATO RY C O M M I S S I O N
R E GI ON I V
612 EAST LAMAR BLVD , SU I TE 400
AR LI N GTON , TEXAS 76011-4125
November 9, 2011
Mr. Edward D. Halpin
President and
Chief Executive Officer
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF INSPECTION
(INSPECTION REPORT 05000498/2012002 and 05000499/2012002) AND
REQUEST FOR INFORMATION
Dear Mr. Halpin:
On January 23, 2012, the NRC will begin the on-site portion of the Gas Accumulation
Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray
Systems Temporary Instruction at your South Texas Project Units 1 and 2. This inspection will
be performed in accordance with NRC Temporary Instruction (TI) 2515/177.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
The documents have been divided into two groups.
- The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. This information should be separated by information request number,
especially if provided electronically (e.g., folder with the information request number). This
information should be available to the inspector no later than January 16, 2012. Upon review
of these documents, the inspectors will select additional documentation for review upon
arrival. By January 19, 2012, the inspector will communicate the initial selected samples.
- The second group of documents requested is needed to support our on-site inspection
activities. This set of documents should be available to the inspector on January 23, 2012. It
is also requested that corrective action documents and responses to questions developed
during the inspection be provided to the inspector as the documents are generated.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Robin Savage of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the inspector, Gerond A. George, at 817-276-6562 or by email at
Gerond.George@nrc.gov.
STP Nuclear Operating Company -2-
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Dockets: 50-498; 50-499
Enclosure: Management of Gas Accumulation in Emergency Core Cooling, Decay Heat
Removal, And Containment Spray Systems Temporary Instruction Document
Request
cc w/encl:
via electronic distribution
STP Nuclear Operating Company -3-
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov)
Senior Resident Inspector (John.Dixon@nrc.gov)
Resident Inspector (Binesh.Tharakan@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Christopher.Henderson@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
Inspection Reports/MidCycle and EOC Letters to the following:
ROPreports
Only inspection reports to the following:
RIV/ETA: OEDO (Mark.Franke@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
SUNSI Review Completed: ___Y___ ADAMS: 7 Yes No Initials: __GAG___
7 Publicly Available Non-Publicly Available Sensitive 7 Non-Sensitive
R:\_REACTORS\ST2012002 RFI-GAG ML
RI:EB1 C:EB1
G. George T. Farnholtz
/RA/ /RA/
11/9/11 11/9/11
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT
REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT
REQUEST
Inspection Report: 05000498/2012002 and 05000499/2012002
Inspection Dates: January 23 - 27, 2012
Inspection Procedure: TI 2515/177, Management of Gas Accumulation in Emergency
Core Cooling, Decay Heat Removal, and Containment Spray
Systems
Inspector: Gerond A. George,
817-276-6562
Gerond.George@nrc.gov
The following information should be sent to the Region IV office in hard copy or electronic format
(ims.certrec.com or compact disc, preferred), in care of Gerond A. George, to facilitate the
selection of specific items that will be reviewed during the on-site inspection week. The inspector
will select specific items from the information requested below and then request from your staff
additional documents needed during the on-site inspection weeks. Also, we request that you
categorize the documents in your response with the numbered list below. Please provide
requested documentation electronically if possible. If requested documents are large and only
hard copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the on-site inspection. If you have any questions regarding
this information request, please call the inspector as soon as possible.
I. Information Requested By January 16, 2012
1. List of corrective action program documents (with a short description) associated with GL 2008-01, voids in piping, and pressure transients for the previous three years.
2. List of changes (with a short description and tracking number) to the final safety analysis
report (FSAR), technical specifications, technical specification bases, and technical
requirements manual associated with the resolution of GL 2008-01.
3. List of calculations associated with GL 2008-01, including calculations that have been
changed or created in response to GL 2008-01 (with a short description of the calculation
and the change).
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the
affected system locations (e.g. identify the source, conditions, and expected void
locations). Also include a short description of how each gas intrusion mechanism has
been addressed (eg. plant hardware modification, procedure change).
5. List of the suction piping sections identified as susceptible to gas accumulation (the list
should identify the corresponding system).
-1- Enclosure
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT
REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT
REQUEST
6. List of the discharge piping sections identified as susceptible to gas accumulation (the list
should identify the corresponding system).
7. Copies of isometric drawings of the plant systems within scope of GL 2008-01 (hard-
copies are preferred).
8. Copies of piping and instrumentation diagrams (P&IDs) of the plant systems within scope
of GL 2008-01 (hard-copies are preferred). Please highlight any components that were
part of hardware modifications installed as part of the resolution of GL 2008-01 and all
high point vents that are monitored during void surveillances.
9. Copies of program documents and procedures developed to implement the resolution of
10. List of actions that were completed in response to GL 2008-01.
11. Copies of the modification packages for hardware modifications as part of the resolution of
12. Design basis documents of the plant systems within scope of GL 2008-01.
13. Design basis documents of keep-full systems of the plant systems within scope of GL 2008-01.
14. System walkdown reports associated with the resolution of GL 2008-01.
15. If applicable, provide a list of inaccessible locations where plant walkdowns of the plant
systems within scope of GL 2008-01 have not been completed. Include an explanation of
why each area is considered inaccessible.
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the
results of the last two surveillances for the plant systems within scope of GL 2008-01.
17. Copies of procedures used for filling and venting.
18. Copies of trends of periodic venting results.
19. Copies of the engineering evaluations performed for all identified voids.
20. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the
justification for any deviation from the void acceptance criteria established by the Office of
Nuclear Reactor Regulation (NRR).
21. Copies of any void transport analyses.
22. Copies of vortexing calculations associated with systems under the scope of GL 2008-01.
-2- Enclosure
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT
REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT
REQUEST
23. Copies of self-assessments associated with the implementation of the GL 2008-01
program.
II. Information Requested By January 23, 2012
24. Copies of the selected corrective action program documents.
25. Copies of the selected licensing and design basis document changes.
26. Copies of the selected calculations.
27. Copies of training modules and attendance records that ensure that personnel are aware
of gas-related concerns.
28. Copies of corrective action program implementing procedures.
29. Electronic copies of the current technical specifications, technical specification bases, final
safety analysis report, and technical requirements manual.
Inspector Contact Information:
Gerond A. George
Senior Reactor Inspector
817-276-6562
Gerond.George@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Gerond A. George
612 E. Lamar Blvd., Suite 400
Arlington, TX 76011-4125
-3- Enclosure