MONTHYEARML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle Project stage: Request ML15104A8102015-04-14014 April 2015 NRR E-mail Capture - Palo Verde, Unit 3 - Request for Information Regarding Pressure Boundary Leakage in RCP 2A Pressure Instrumentation Nozzle (MF6083) Project stage: RAI ML15110A4792015-04-15015 April 2015 NRR E-mail Capture - Palo Verde, Unit 3 - Information Regarding Pressure Boundary Leakage in Reactor Coolant Pump 2A Pressure Instrumentation Nozzle for April 15, 2015 Phone Call (MF6083) Project stage: Other ML15113A6362015-04-22022 April 2015 Acceptance of Relief Request 53 Project stage: Acceptance Review ML15113A4972015-04-23023 April 2015 Request for Additional Information Regarding Relief Request 53 Project stage: RAI ML15117A0422015-04-29029 April 2015 Memorandum to File Summarizing 4/24/15 Telephone Conference Granting Verbal Relief for Relief Request 53, Request for Approval of an Alternative to ASME Code, Section XI, Requirements for Flaw Removal Project stage: Other ML15198A2422015-07-15015 July 2015 Transmittal of Updated Proprietary Documents for Relief Request 53 Project stage: Request ML15198A2242015-07-15015 July 2015 Transmittal of Non-Proprietary Documents for Relief Request 53 Project stage: Request ML15198A2262015-07-15015 July 2015 Attachment 3: Calculation CN-PAFM-15-20-NP, Rev. 2, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair Transient Stress and Fracture Mechanics Evaluation for One Cycle Operation. Project stage: Request ML15198A2272015-07-15015 July 2015 Attachment 4: Calculation TR-FSE-15-2-NP, Rev. 1, Palo Verde Nuclear Generating Station Unit 3 Evaluation of Potential Loose Part - Reactor Coolant Pump Instrument Nozzle Weld Fragment. Project stage: Request ML15198A2252015-07-15015 July 2015 Attachment 2: Calculation CN-MRCDA-15-13-NP, Qualification of Palo Verde Unit 3 Reactor Coolant Pump Replacement Instrumentation Nozzle. Project stage: Request ML15209A6662015-08-10010 August 2015 Request for Withholding Information from Public Disclosure - 7/10/15 Affidavit Executed by J. Gresham, Westinghouse, Re Five Proprietary Documents in Support of Relief Request 53 - Approval of an Alternative to Flaw Removal (TAC No Project stage: Withholding Request Acceptance ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal Project stage: Other 2015-04-29
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML24157A3392024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium ML24144A2772024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 and Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] |
Text
10 CFR 50.55a Saps Palo Verde Nuclear Generating Station 102-07077-TNW/DCE P.O. Box 52034 July 15, 2015 Phoenix, AZ 85072 Mail Station 7636 Tel 623 393 5764 A-TN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
References:
- 1. Arizona Public Service Company (APS) letter number 102-07037, Palo Verde Nuclear GeneratingStation Unit 3, Docket No. STN 50-530, Transmittalof ProprietaryDocuments for Relief Request 53, dated April 17, 2015, Agencywide Documents Access and Management System [ADAMS] Accession Number ML15111A289
- 2. APS letter number 102-07034, Palo Verde Nuclear Generating Station Unit 3, Docket No. STN 50-530, American Society of Mechanical Engineers (ASME)
Code,Section XI, Request for Approval of an Alternative to Flaw Removal -
Relief Request 53, dated April 17, 2015, ADAMS Accession Number ML15111A429
- 3. APS letter number 102-07085, Palo Verde Nuclear Generating Station Unit 3, Docket No. STN 50-530, Transmittal of Updated ProprietaryDocuments for Relief Request 53, dated July 15, 2015
Dear Sir:
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Unit 3 Docket No. 50-530 Transmittal of Non-Proprietary Documents for Relief Request 53 On April 17, 2015, pursuant to 10 CFR 50.55a(z)(1), Arizona Public Service Company (APS) submitted References 1 and 2 for Nuclear Regulatory Commission (NRC) approval of Relief Request 53. The letters provided proprietary documents and non-proprietary documents, respectively. Reference 3 provides five updated proprietary versions of the proprietary documents provided in Reference 1.
This letter transmits non-proprietary versions of the documents contained in the Enclosures to References 1 and 3.
There are no commitments made to the NRC by this letter.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Pc Callaway - Di-ablo Canyon - Palo Verde - Wolf Creek
102-07077-TNW/DCE ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Transmittal of Non-Proprietary Documents for Relief Request 53 Page 2 If you have any questions or require additional information, please contact Michael D. Dilorenzo, Nuclear Regulatory Affairs Department Leader, at (623) 393-3495.
Sincerely, Thomas N. Weber Nuclear Regulatory Affairs Department Leader TNW/DCE/akf
Enclosure:
Non-Proprietary Documents for Relief Request 53 cc (w/ enclosure):
M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS
ENCLOSURE Non-Proprietary Documents for Relief Request 53
Enclosure Non-proprietary Documents for Relief Request 53 On April 17, 2015, pursuant to 10 CFR 50.55a(z)(1), Arizona Public Service Company (APS) submitted References 1 and 2 for Nuclear Regulatory Commission (NRC) approval of Relief Request 53. The letters provided proprietary documents and non-proprietary documents, respectively. Reference 3 provides five updated proprietary versions of the proprietary documents provided in Reference 1.
The attachments to this Enclosure provide non-proprietary documents provided in References 1 and 3. The updated proprietary documents in Reference 3 identify the proprietary content portions of the documents that have been removed in Attachments 2 through 6 of this Enclosure. This identification was not provided in the original transmittal of the documents in Reference 1..
The attachment numbers used in this Enclosure correlate to those provided in the enclosures to References 1 and 3. Attachment 1 of this enclosure is a placeholder to preserve the attachment number correlation among the attachments. The original document listed in Attachment 1 was provided in Reference 2 as a non-proprietary version.
Attachment 1 - Westinghouse Document DAR-MRCDA-1 5-6-NP, Rev. 1, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair Attachment 2 - Westinghouse Calculation CN-MRCDA-1 5-13-NP, Rev. 0, Qualificationof Palo Verde Unit 3 ReactorCoolant Pump Replacement InstrumentationNozzle Attachment 3- Westinghouse Calculation CN-PAFM-1 5-20-NP, Rev. 2, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair TransientStress and FractureMechanics Evaluation for One Cycle Operation Attachment 4 - Westinghouse Calculation TR-FSE-1 5-2-NP, Rev. 1, Palo Verde Nuclear GeneratingStation Unit 3 Evaluation of PotentialLoose Part- Reactor Coolant Pump Instrument Nozzle Weld Fragment Attachment 5 - Westinghouse Letter, LTR-ME-1 5-30-NP, Rev. 2, ASME Code Section X1 Reconciliation for Arizona Public Service (APS), Palo Verde Nuclear Generating Station (PVNGS) Unit 3 Replacement Instrument Nozzle Attachment 6- Westinghouse Calculation CN-NPE-06-XXXX-03-NP, Rev. 1, PlantX - StructuralEvaluations of the RCP Pressure Tap Nozzles Attachment 7 - Drawings Referenced in Responses to NRC Questions
- C-8000-101-2017- NP, Rev 2, Wall Static PressureSuction
- STD-009-0009-NP, Rev. 2, Coolant Pumps Weld Joint Identification and FabricationRequirements 1
Enclosure Non-proprietary Documents for Relief Request 53
- DWG 339-0054-NP, Rev. 0, Safe End Mach. Of Pressure Tap Holes and Weld Prep. (Suction)
" C-14473-220-002-NP, Rev. 0, Replacement Pressure Tap Nozzle
" E-14473-220-001 -NP, Rev. 0, Pump Casing-A Pressure Tap Nozzle Modification Assembly
" SE-1 4473-220-003-NP, Rev. 0, Pressure Tap Nozzle Replacement Palo Verde Unit 3
References:
- 1. Arizona Public Service Company (APS) letter number 102-07037, Palo Verde Nuclear GeneratingStation Unit 3, Docket No. STN 50-530, Transmittal of ProprietaryDocuments for Relief Request 53, dated April 17, 2015, Agencywide Documents Access and Management System
[ADAMS] Accession Number ML15111A289
- 2. APS letter number 102-07034, Palo Verde Nuclear Generating Station Unit 3, Docket No. STN 50-530, American Society of Mechanical Engineers (ASME) Code, Section Xl, Request for Approval of an Alternative to Flaw Removal-- Relief Request 53, dated April 17, 2015, ADAMS Accession Number ML15111A429
- 3. APS letter number 102-07085, Palo Verde Nuclear GeneratingStation Unit 3, Docket No. STN 50-530, Transmittalof Updated Documents for Relief Request 53, dated July 15, 2015 2
Enclosure Non-proprietary Documents for Relief Request 53 Attachment 1 Westinghouse Document DAR-MRCDA-15-6-NP, Rev. 1, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair Note:
This attachment was inserted for the sake of preserving the correlation between the attachment numbers of this Enclosure and those of the referenced letters. No document is attached.