ML17290A550

From kanterella
Revision as of 13:43, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Re Changes to Refueling Platform Load Limits by Adding New Values Resulting from Installation of Upgraded Refueling Mast (GE Model NF500)
ML17290A550
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/29/1993
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17290A549 List:
References
NUDOCS 9308050154
Download: ML17290A550 (2)


Text

s a

~ ~

CONTROLLED COPY REFUELING OPERATIONS 3/4.9.6 REFUELING PLATFORH LIMITING CONOITION FOR OPERATION 3.9.6 The refueling platform shall be OPERABLE and used for handling fuel assemblies or control rods within the reactor pressure vessel.

APPLICABILITY: Ouring handling of fuel assemblies or control rods within the reactor pressure vessel.

ACTION:

With the requirements for refueling platform OPERABILITY not satisfied, suspend use of any inoperable refueling platform equipment from opet:ations involving the handling of control rods and fuel assemblies within the reactor pressure vessel after placing the load in a safe condition.

SURYEILLANCE REQUIREMENTS 4.9.6 Each refueling platform crane or hoist used for handling of control rods or fuel assemblies within the reactor pressure vessel shall be demonstrated OPERABLE within 7 days prior to the start of such operations with that crane or hoist by:

P'emonstrating a a operation of the overload cutoff on the main hoist~My the load rior .t assess/sos tvoo ( I'asn pe T

/gnfocE.
k. Oemonstrating operation of the on the frame

+~ends. P re'mr

  • C. Oemonstrating operation of the uptravel electrical stop on the frame mounted and monorail hoists when uptravel brings the top of active fuel assembly to 7 feet 6 inches below the minimum fuel storage pool water level.
d. Oemonstrating operation of the downtravel electrical cutoff on the main hoist when grapple hook down travel reaches 54 feet 2 inches below track (~554 inches as indicated).

c~<~< b %re.

e. Oemonstrating operation of the slack cable cutoff on the~ain ""

hoist when the load is . t cY~oo IA<~>>d 7<T

~

s Demonstrating operation of the loaded interlock on the main

. ~CcCleug erSO(S5+3 ~

S hoist gal'(m< the load g, Oemonstrating operation of the redundant loaded interlock on the main hoist~eR-the load sgx,ccdILl'h ~~<~9 prier 4

..t.),J..y .. 4x, Z. ~.--L.>

mmo Aio rcsl 4;res ~ r eiD r 4, Ke ldasa.k i.xrtc hsapp lo sO WASHINGTON NUC LEAR - UNIT 2 3/4 9-8 i 9308050f54 930729 PDR ADOCK 05000397 PDR Y l s;, 'are chas:s ara P

lsPl:r LI,

' N'g, sidO

e A

t 4

h a -0 'V J