Ltr 10/26/17 Byron Station Follow-Up to Disputed Violation of NRC Inspection Report 05000454/2017009; 05000455/2017009 (DRS-D.Szwarc)
ML17300B053
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/26/2017
From: Robert Daley
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
EA-17-138 IR 2017009
Download: ML17300B053 (2)


See also: IR 05000454/2017009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

October 26, 2017

EA-17-138

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BYRON STATION FOLLOW-UP TO DISPUTED VIOLATION OF NRC

INSPECTION REPORT 05000454/2017009; 05000455/2017009

Dear Mr. Hanson:

This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement

of disputed violation of NRC Inspection Report 05000454/2017009; 05000455/2017009.

Specifically, on August 28, 2017, the NRC acknowledged your letter sent to the NRC, dated

July 31, 2017, that contested a Non-Cited Violation documented in our inspection report issued

on June 29, 2017. The contested Non-Cited Violation is Failure to Perform 10 CFR 50.59

Evaluation for Updated Final Safety Analysis Report Change.

The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt

of a licensees points of contention, as described in Section 2.2.7 of the NRC Enforcement

Manual, Part I. However, the NRC review of this disputed violation is expected to take longer

than 90 days because of ongoing activities related to the subject of this disputed violation. We

will inform you as soon as we complete our evaluation.

This letter will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

cc: Distribution via LISTSERV

Letter to Bryan C. Hanson from Robert C. Daley dated October 26, 2017

SUBJECT: BYRON STATION FOLLOW-UP TO DISPUTED VIOLATION OF NRC

INSPECTION REPORT 05000454/2017009; 05000455/2017009

DISTRIBUTION:

Theresa Clark

RidsNrrDorlLpl3

RidsNrrPMByron Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Kenneth OBrien

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML17300B053

OFFICE RIII RIII RIII RIII

NAME DSzwarc:cl RDaley RSkokowski

DATE 10/825/17 10/26/17 10/25/17

OFFICIAL RECORD COPY