|
---|
Category:PRESERVICE & INSERVICE INSPECTION & TEST REPTS
MONTHYEARML19260E3101980-01-28028 January 1980 Surveillance Insp & Test Criteria, for Inservice Insp Requirement ML19260E3091980-01-28028 January 1980 Part D, Surveillance Requirements for Reserve Shutdown Sys & Rupture Gas Sys, for Inservice Insp Requirements ML19260E3061980-01-28028 January 1980 Part C, Surveillance Requirements for Pcrv Penetration Interspace Pressurization Sys,Pcrv Penetration Purge Gas Sys & Core Support Floor & Vent Column Sys, for Inservice Insp Requirements ML19260E3031980-01-28028 January 1980 Part B, Surveillance Requirements for Pcrv Penetration Overpressure Protection Sys, for Inservice Insp Requirements ML19260E3021980-01-28028 January 1980 Part a, Surveillance Requirements for Pcrv Overpressure Protection Sys, for Inservice Insp Requirements ML19260E3011980-01-28028 January 1980 Inservice Insp & Testing Program,Surveillance Requirements Review for Pcrv Auxiliary Sys, for Inservice Insp Requirements ML19260E2991980-01-28028 January 1980 Draft Revision 2, Inservice Insp & Testing,Proposed Tech Spec Surveillance Requirements,Pcrv Auxiliary Sys 11, for Inservice Insp Requirements 1980-01-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20196G6731997-07-0101 July 1997 Informs Commission That Decommissioning Process Has Been Completed at PSC of Colorado Fsvngs,Unit 1 Located in Town of Platteville in Weld County,Co ML20141K9961997-05-0505 May 1997 Safety Evaluation Supporting Amend 89 to License DPR-34 ML20140E1121997-04-10010 April 1997 Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20134D1661997-01-30030 January 1997 Rev 1,Vol 6 to Final Survey Rept,Final Survey of Group E (Book 2A of 2) ML20137S6111996-12-31031 December 1996 Annual Rept Pursuant to Section 13 or 15(d) of Securities Exchange Act 1934, for Fy Ended Dec 1996 ML20134G6401996-10-29029 October 1996 Rev 0,Volume 6,Books 1 & 2 of 2 to Final Survey of Group E ML20134G6171996-10-29029 October 1996 Rev 2,Volume 1,Books 1 & 2 of 2 to Final Survey Description & Results ML20134G7271996-10-29029 October 1996 Rev 0,Volume 11,Book 1 of 1 to Final Survey of Group J ML20134G6861996-10-29029 October 1996 Rev 0,Volume 8,Books 1 & 2 of 2 to, Final Survey of Group G ML20134G6321996-10-26026 October 1996 Rev 1,Volume 5,Books 2 & 3 of 3 to Final Survey of Group D ML20133D7831996-10-22022 October 1996 Preliminary Rept - Orise Support of NRC License Insp at Fsv on 960930-1003 ML20116A4661996-07-19019 July 1996 Fsv Final Survey Exposure Rate Measurements ML20112J6861996-05-31031 May 1996 June 1996 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning.Rept Covers Period of 960216-0531 ML20112C1531996-05-17017 May 1996 Fsv Final Survey Exposure Rate Measurements ML20101G5521996-03-21021 March 1996 Confirmatory Survey Activities for Fsv Nuclear Station PSC Platteville,Co, Final Rept ML20097E3201996-01-31031 January 1996 Nonproprietary Fort St Vrain Technical Basis Documents for Piping Survey Instrumentation ML20095K4131995-12-26026 December 1995 Rev 3 to Decommissioning Plan ML20095H7211995-12-20020 December 1995 Revs to Fort St Vrain Decommissioning Fire Protection Plan Update ML20095K9751995-12-15015 December 1995 Fort St Vrain Project Update Presentation to NRC, on 951207 & 15 ML20096C1671995-12-13013 December 1995 Rev 4 to Decommissioning Fire Protection Plan ML20094M1651995-11-30030 November 1995 Nonproprietary Fsv Technical Basis Documents for Piping Survey Implementation ML20092F3461995-09-14014 September 1995 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning, Covering Period of 950516-0815.W/ ML20137H3531994-12-31031 December 1994 Partially Withheld, Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, App D,Comments by Mkf & Westinghouse Team & Responses ML20137S2331994-12-31031 December 1994 Rept of Independent Counsel Investigation Concerning Issues at Fort St Vrain Nuclear Generating Station Decommissioning Project, Dec 1994 ML20029C6031993-12-31031 December 1993 1993 Annual Rept Public Svc Co of Colorado. W/940405 Ltr ML20058Q3791993-12-21021 December 1993 Rev 1 to Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20045B3641993-06-30030 June 1993 June 1993 Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning. ML20045A4291993-06-0303 June 1993 LER 93-003-00:on 930505,new Source of Natural Gas Introduced within 0.5 Miles of ISFSI & Reactor Bldg W/O Prior NRC Approval.Caused by Field Routing of Natural Gas Pipe.Well Isolated by Well operator.W/930603 Ltr ML20077D1631993-05-10010 May 1993 Enforcement Conference, in Arlington,Tx ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20128D7191992-12-0101 December 1992 Safety Evaluation Approving Exemption from Requirement of 10CFR50.54(q) to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise at Plant ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20127F5691992-11-0303 November 1992 Informs Commission of Intent to Issue Order Approving Plant Decommissioning Plan & Corresponding Amend to License DPR-34 ML20101E5761992-05-31031 May 1992 Monthly Defueling Operations Rept for May 1992 for Fort St Vrain ML20096E8221992-04-30030 April 1992 Monthly Operating Rept for Apr 1992 for Fort St Vrain.W/ ML20095E9601992-04-17017 April 1992 Rev to Fort St Vrain Proposed Decommissioning Plan ML20100R7431992-03-31031 March 1992 Monthly Operating Rept for Mar 1992 for Fort St Vrain.W/ ML20090L0621992-02-29029 February 1992 Monthly Operating Rept for Feb 1992 for Fort St Vrain Unit 1 ML20092D0081992-01-31031 January 1992 Monthly Operating Rept for Jan 1992 for Fort St Vrain Nuclear Generating Station ML20102B2241992-01-22022 January 1992 Fort St Vrain Station Annual Rept of Changes,Tests & Experiments Not Requiring Prior Commission Approval Per 10CFR50.59, for Period 910123-920122 ML20094N6701991-12-31031 December 1991 Public Svc Co Annual Financial Rept for 1991 ML20091J6251991-12-31031 December 1991 Monthly Operating Rept for Dec 1991 for Fort St Vrain.W/ ML20094D6711991-11-30030 November 1991 Monthly Operating Rept for Nov 1991 for Fort St Vrain Unit 1 ML20090M1871991-11-20020 November 1991 FOSAVEX-91 Scenario for 1991 Plant Exercise of Defueling Emergency Response Plan ML20086D6891991-11-15015 November 1991 Proposed Decommissioning Plan for Fort St Vrain Nuclear Generating Station ML20085N1451991-11-0505 November 1991 Revised Ro:Operability Date of 910830 for Electric Motor Driven Fire Water Pump P-4501 Not Met.Pump Not Actually Declared Operable Until 911025.Caused by Unforseen Matl & Testing Problems.Equivalent Pump Available ML20086C5451991-10-31031 October 1991 Monthly Operating Rept for Oct 1991 for Fort St Vrain.W/ ML20085H6611991-10-10010 October 1991 Assessment of Mgt Modes for Graphite from Reactor Decommissioning ML20091D7671991-10-0101 October 1991 Rev B to Engineering Evaluation of Prestressed Concrete Reactor Vessel & Core Support Floor Structures for Proposed Sys 46 Temp Change ML20085D9861991-09-30030 September 1991 Monthly Operating Rept for Sept 1991 for Fort St Vrain.W/ 1997-07-01
[Table view] |
Text
-
'
- Enclosure (2) to P-80014 FORT ST. VRAIN
.
INSERVICE INSPECTION AND TESTING PROGRAM SURVEILLANCE REQUIREMENTS REVIEW FOR THE PCRV AUXILIARY SYSTEM (11)
.
1960 274 EE-11-0001 Rev. 1 January 28, 1980 8002150 Y2d
- . !.
EE-ll-0001 Rev. 1 p.1 REPORT EE-11-0001 FORT ST. VRAIN INSERVICE INSPECTION AND TESTING PROGRAM SURVEILLANCE REQUIREMENTS REVIEW FOR THE PCRV AUXILIARY SYSTEMS AND RESERVE SHUTDOWN SYSTEM.
A review was performed of the current surveillance re-quirements for the PCRV auxiliary systems and for the reserve shutdown system. The reserve shutdown system is included in this report, since the rupture gas system which actuates the reserve shutdown hoppers is a part of the PCRV auxiliary systems. As a result of this review, additional or modified surveillance requirements may have been recommended to meet the criteria established for the Fort St. Vrain inservice inspection and testing program, which has been presented to the Nuclear Regulatory Commission. In some cases, the review resulted in modifying some specific requirements which have been proposed with the program.
This report consists of four parts, each one dedicated to the review of parts of the system which have specific functions:
Part A: PCRV overpressure protection Part B: PCRV penetration interspace overpressure protection Part C: PCRV penetration interspace pressurizing, purging, and venting Part D: Reserve shutdown hopper pressurization.
Each part of this report is written to reflect the same systematic approach which was used to perform the review. The safety functions are analyzed, the corresponding surveillance classes are determined and the applicable surveillance criteria are outlined. Then, the review deals with the operational readiness of the s-ystem, of the active components and of the instrumentation and controls,followed by the review of the structural integrity. For each item, the current surveillance requirements are identified, whether explicitly called for in the plant technical specifications or implicitly performed in the process of testing some other feature. These requirements were analyzed and their adequacy is discussed, followed by a recommendation either to retain these requirements or to. add new requirements. The applicable requirements of the proposed ASME Code Section XI Division 2, Draft are then identified and the review terminates by a discussion of the differences of the current and/or recommended surveillance with the proposed code requirements.
1960 275
- -
EE-11-0001 Rev. 1 p.2 A list of the reference documents used in the course of the review is given individually for each part of this report.
Some items, such as PPS instrumentation, component supports, and valve actuation supply, have been omitted in this review, since they will be covered in other reports.
An evaluation which discusses PCRV safety valve isolation is attached to this report. In addresses NRC priority item 6 of NRC letter dated October 5, 1979 and lays the basis for the recommended surveillance requirements for the PCRV overpressure protection system shutoff valves.
.
1960 276