ML18101A192

From kanterella
Revision as of 10:22, 21 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Rept for June 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
ML18101A192
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/30/1994
From: Morroni M
Public Service Enterprise Group
To:
Shared Package
ML18101A190 List:
References
NUDOCS 9408260299
Download: ML18101A192 (1)


Text

  • CORRECTED COPY OPERATING DATA REPORT W

~

Docket No:

Date:

50-311 07/10/94 Completed by: Mike Morroni Telephone: 339-2122 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period June 1994
3. Licensed Thermal Power (MWt) 3411
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity(Gross MWe) 1149
7. Maximum Dependable Capa9ity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA
9. Power Level to Which Restricted, if any (Net MWe) -N/A
10. Reasons for Restrictions, if any N/A.

This Month Year to Date Cumulative

11. Hours in Reporting Period 720 4343 111456
12. No. of Hrs. Rx. was Critical 652.65 4198.68 73478.24
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator on-Line 577.05 4039.3 70928.82
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1846245.6 *11916470.4 *174379409.8 Gross Elec. Energy Generated (MWH) 582860 3837320 74383838
18. Net Elec. Energy Gen. (MWH) 551889 3650335 70777612
19. Unit Service Factor 80.1 93 63.6
20. Unit Availability Factor 80.1 93 63~6
21. Unit Capacity Factor (using MDC Net) 69.3 76 57.4
22. Unit Capacity Factor (using DER Net) 68.7 75.4 57
23. Unit Forced Outage Rate 6.9 4.8 21.8
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

Refueling outage scheduled to start October 15. 1994 and last 60 days.

25. If shutdown at end of Report Period, Estimated Date of startup:

NA 8-l-7.R2

(~ ---- ~

I 9408260299 940818 PDR ADOCK 05000311 R PDR