ML18101A193

From kanterella
Revision as of 10:22, 21 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
ML18101A193
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/31/1994
From: Morroni M
Public Service Enterprise Group
To:
Shared Package
ML18101A190 List:
References
NUDOCS 9408260301
Download: ML18101A193 (1)


Text

~ CORRECTED COPY ~

,., OPERATING DATA REPORT ~

Docket No: 50-311 Date: 08/10/94 Completed by: Mike Morroni Telephone: 339-2122 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period July 1994
3. Licensed Thermal Power {MWt) 3411
4. Nameplate Rating {Gross MWe) 1170
5. Design Electrical Rating {Net MWe) 1115
6. Maximum Dependable Capacity{Gross MWe) 1149
7. Maximum Dependable Capacity {Net MWe) 1106
8. If Changes Occur in Capacity Ratings {items 3 through 7) since Last Report, Give Reason NA
9. Power Level to Which Restricted, if any {Net MWe) N/A
10. Reasons for Restrictions, if any N/A.

This Month Year to Date Cumulative

11. Hours in Reporting Period 744 5087 112200
12. No. of Hrs. Rx. was Critical 525.08 4723.76 74003.32
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator On-Line 477.77 4517.07 71406.59
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated

{MWH) 1582257.6 *13498728.0 *175961667.4 Gross Elec. Energy Generated

{MWH) 495560 4332880 74879398

18. Net Elec. Energy Gen. {MWH) 466128 4116463 71243740
19. Unit Service Factor 64.2 88.8 63.6
20. Unit Availability Factor 64.2 88.8 63.6
21. Unit capacity Factor

{using MDC Net) 56.6 73.2 57.4

22. Unit Capacity Factor

{using DER Net) 56.2 72.6 56.9

23. Unit Forced Outage Rate 35.8 9.4 21.9
24. Shutdowns scheduled over next 6 months {type, date and duration of each)

Refueling outage scheduled to start October 15. 1994 and last 60 da s.

25. If shutdown at end of Report Period, Estimated Date of Startup:

NA 8-1-7.R2 9408260301 940818 PDR ADOCK 05000311 R PDR