Category:CORRESPONDENCE-LETTERS
MONTHYEARML1129708341981-10-23023 October 1981 Forwards Annual Financial Rept for 1980 & Schedule Showing Cash Flow Generated in 1980 & Projected Flow for 1981,per Reg Guide 9.4 ML19350C6911981-03-26026 March 1981 Requests Change of Title & Address To:Commissioner of Health,Mn Dept of Health,717 Delaware St.Minneapolis,Mn 55440 ML19338F0721980-10-0101 October 1980 Requests That Application Filed by Util 791019 & Notice Published in Fr on 800826 Be Amended to Reflect Fact That Util Is Seeking Issuance of OL Only for Unit 1.Lists Three Items for Correction in Amended Notice ML19320B9001980-07-0707 July 1980 Ack Receipt of NRC 800616 Ltr W/Encl Show Cause Order Issued to Applicants.Phone Number & New Address Submitted for Further Correspondence ML19318D0811980-07-0101 July 1980 Forwards Response to NRC 800616 Ltr & Order to Show Cause Why License CPPR-157 Should Not Be Revoked.No Objection Raised ML19323G0601980-05-27027 May 1980 Responds to 800320 Ltrs to Union Electric & Ks Gas & Electric Re QA Programs for Design Const & Fire Protection. Responds to NRC Questions Offered on Generic Basis ML19259B4611979-12-19019 December 1979 Requests Assistance in Responding to Constituent D Haenke ML19249D3981979-07-26026 July 1979 Discusses 790724 Decision by Facility Owners to Cancel Project & Requests Further Action Be Terminated ML19242A3681979-07-26026 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Wi Public Svc Commission 790306 Denial of Project Would Prevent Completing Plant in Time to Meet Projected Needs for Power ML19249A8541979-07-25025 July 1979 Forwards Northern States Power 790724 News Release Announcing Decision by co-owners to Cancel Project.Requests Termination of Proceedings ML19208D0431979-07-25025 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Requests Termination of Proceedings in Docket. Press Release & Certificate of Svc Encl ML19249A0651979-07-24024 July 1979 Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications ML19225B2471979-07-18018 July 1979 Requests Substitution of Hh Voigt for Ae Upton on NRC 790713 Distribution List ML19242D5311979-07-12012 July 1979 Submits 790710 News Release Re Future of Facility.No Final Decision Has Been Made ML19247B2961979-07-0505 July 1979 Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts ML19242B1141979-06-29029 June 1979 Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification ML19276G8091979-06-26026 June 1979 Notifies of Change of Address,Effective Immediately ML19261D7921979-06-19019 June 1979 Requests Timely Notification of Any OL Proceedings within Jurisdiction of Mo Public Svc Commission,To Facilitate State Participation ML19247A3181979-06-14014 June 1979 Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breaker Are Used or Planned for Use at Facility ML20136B1041979-06-0505 June 1979 Notifies of Typographical Errors in Licensee Joint Motion for Summary Disposition of Radon Issues.Certificate of Svc Encl ML19259C0491979-06-0101 June 1979 Requests NRC Concurrence Re Use of ASME Section III Code Case N-242,Matls Certification. ML19273B6981979-05-30030 May 1979 Confirms Plan to Discuss & Resolve Matters Re Fuel Rod Bowing Effects in Snupps FSAR ML19270H1321979-05-23023 May 1979 Responds to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.Lists Computer Codes Used in Analyses ML19270H1031979-05-22022 May 1979 Responds to IE Bulletin 79-04 Re Incorrect Weights for Velan Swing Check Valves.Incorrect Valve Weights Not Used.No Mod Required ML19224D3561979-05-17017 May 1979 Confirms 790629 Deadline for Response to IE Bulletins 78-12,78-12A & 78-12B ML19259C4341979-05-11011 May 1979 Responds to IE Bulletin 79-03 Re Use of Fusion Welded Pipe Spools Mfg by Youngstown Welding & Engineering Co.No Such Pipe Spools Have Been Shipped to Facility ML19269E3061979-05-10010 May 1979 Responds to IE Bulletin 79-03.To Date,There Have Been No Pipe Spools of Any Type Fabricated for or Shipped to Facilities ML20062H0791979-04-16016 April 1979 Forwards Annual Financial Rept 1978 ML19263D6931979-03-21021 March 1979 Response to IE Bulletin 78-12A:Westinghouse Is Pressure Vessel supplier.C-E Will Not Provide Needed Info Until Aug 1979,so Util Requests Submission Extension to 790930 to Allow Time for Review ML19317D1301979-03-0909 March 1979 Forwards Findings of Fact,Conclusions of Law & 790306 Order of Wi Public Svc Commission Re Denial of Application for Certificate of Public Convenience, & Necessity for Const Permit.Certificate of Sve Encl ML19270F9611979-03-0101 March 1979 Withdraws Requested Partial Exemption from 10CFR21.Revised Regulations Providing Exemptions for Commercial Grade Items Make Request Unnecessary ML19289D1871979-02-19019 February 1979 Forwards Financial Qualifications, Consisting of Revised Pages A-6 Through A-17 to Exhibit a of Ltr NLNRC-86,dtd 780825.Attachment 2 W/Suppl Info to Ltr NLNRC-80 Dtd 780420 Is Not Encl.Certificate of Svc Encl ML19269C2711979-01-22022 January 1979 Comments on Matl Re Permit for Transmission Lines.Submits Info Indicating High Density of Archaeological Sites within Area of Mississippi River & Vicinity of Chippewa River.Seeks Addl Info for Thorough Archaeological Reconnaissance ML20062G1541978-12-15015 December 1978 Discusses Snupps Fsar.Advises That Snupps Utils Plan to Submit Standardized Portion of FSAR in Oct 1979.Most Significant Changes from Design Described in PSAR Are Associated W/Fire Protec ML20147J2571978-12-0606 December 1978 Emphasizes Importance of Sumbitting Accurate & Complete Info to NRC by Licensees & Applicants.Info Submitted Must Be Substantiated by Data & Calculations.Licensee Must Notify NRC of Any Inaccuracies or Enforcement Action Will Result ML20062E4811978-11-27027 November 1978 Responds to IE Bulletin 78-12 Re Atypical Weld Matl in Reactor Vessel Pressure Welds.States That Reactor Vessel Not Yet Manufactured ML20062E2311978-11-24024 November 1978 Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055 ML20062D3751978-11-0808 November 1978 Forwards Recent NRC Memos Re Pipe Support Base Plate Design. Problem Applies to Subj Facil.(W/Encl ANO:7811020332 & 7811020336) ML20062C8701978-11-0606 November 1978 Forwards IE Circular 78-18 ML20062D1291978-10-25025 October 1978 Review of Proj Is Proc on Sched.Will Be Holding Hearing to Determine Whether Plant Is Needed Beginning 781211.W/encl Cert of Svc ML20062B2981978-10-16016 October 1978 Discusses Exhibit 14.Interrogatories Contain Ltr from Atty Er Jackson to Fg Kripps of Northern States Power Co Giving Jackson Opinion as to Ownership of Lands Condemned on Site of Proposed Facility.Svc List Encl ML20062B5081978-10-10010 October 1978 Confirms That 781003 Ecology Action of Oswego Petition Filed W/Permission of Northern Thunder,Inc ML20062A4551978-10-0202 October 1978 Forwards from Northern States Pwr Co to Pub Svc Comm of Wi Announcing Scheduled Oper Date for Subj Facil Is Apr 1986.W/o Ltr ML20147D5561978-09-29029 September 1978 Forwards pre-constr & Constr Schedules for Tyrone Energy Park ML20147F3951978-09-0808 September 1978 Fowards Northern Thunder Motion to Postpone Filing of Direct Testimony.Unless Objections Raised,Insp of Documents Will Be Postponed Until Presiding Officer Rules on Northern Thunder Motion ML20011A5501978-05-0303 May 1978 Requests Mod of Max Depth Requirement for Snupps Containment Structures for Areas Adjacent to Two Electrical Penetration Banks Located in Reactor Bldg,Third Through Sixth Lifts Adjacent to Auxiliary Bldg ML20011A5351978-02-13013 February 1978 Requests NRC Confirm Design Requirements for Util Containment Structures as Soon as Possible Because of Impact on Const 1981-03-26
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML1129708341981-10-23023 October 1981 Forwards Annual Financial Rept for 1980 & Schedule Showing Cash Flow Generated in 1980 & Projected Flow for 1981,per Reg Guide 9.4 ML19350C6911981-03-26026 March 1981 Requests Change of Title & Address To:Commissioner of Health,Mn Dept of Health,717 Delaware St.Minneapolis,Mn 55440 ML19338F0721980-10-0101 October 1980 Requests That Application Filed by Util 791019 & Notice Published in Fr on 800826 Be Amended to Reflect Fact That Util Is Seeking Issuance of OL Only for Unit 1.Lists Three Items for Correction in Amended Notice ML19320B9001980-07-0707 July 1980 Ack Receipt of NRC 800616 Ltr W/Encl Show Cause Order Issued to Applicants.Phone Number & New Address Submitted for Further Correspondence ML19318D0811980-07-0101 July 1980 Forwards Response to NRC 800616 Ltr & Order to Show Cause Why License CPPR-157 Should Not Be Revoked.No Objection Raised ML19323G0601980-05-27027 May 1980 Responds to 800320 Ltrs to Union Electric & Ks Gas & Electric Re QA Programs for Design Const & Fire Protection. Responds to NRC Questions Offered on Generic Basis ML19249D3981979-07-26026 July 1979 Discusses 790724 Decision by Facility Owners to Cancel Project & Requests Further Action Be Terminated ML19242A3681979-07-26026 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Wi Public Svc Commission 790306 Denial of Project Would Prevent Completing Plant in Time to Meet Projected Needs for Power ML19208D0431979-07-25025 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Requests Termination of Proceedings in Docket. Press Release & Certificate of Svc Encl ML19249A8541979-07-25025 July 1979 Forwards Northern States Power 790724 News Release Announcing Decision by co-owners to Cancel Project.Requests Termination of Proceedings ML19249A0651979-07-24024 July 1979 Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications ML19225B2471979-07-18018 July 1979 Requests Substitution of Hh Voigt for Ae Upton on NRC 790713 Distribution List ML19242D5311979-07-12012 July 1979 Submits 790710 News Release Re Future of Facility.No Final Decision Has Been Made ML19247B2961979-07-0505 July 1979 Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts ML19242B1141979-06-29029 June 1979 Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification ML19276G8091979-06-26026 June 1979 Notifies of Change of Address,Effective Immediately ML19261D7921979-06-19019 June 1979 Requests Timely Notification of Any OL Proceedings within Jurisdiction of Mo Public Svc Commission,To Facilitate State Participation ML19247A3181979-06-14014 June 1979 Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breaker Are Used or Planned for Use at Facility ML20136B1041979-06-0505 June 1979 Notifies of Typographical Errors in Licensee Joint Motion for Summary Disposition of Radon Issues.Certificate of Svc Encl ML19259C0491979-06-0101 June 1979 Requests NRC Concurrence Re Use of ASME Section III Code Case N-242,Matls Certification. ML19273B6981979-05-30030 May 1979 Confirms Plan to Discuss & Resolve Matters Re Fuel Rod Bowing Effects in Snupps FSAR ML19270H1321979-05-23023 May 1979 Responds to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.Lists Computer Codes Used in Analyses ML19270H1031979-05-22022 May 1979 Responds to IE Bulletin 79-04 Re Incorrect Weights for Velan Swing Check Valves.Incorrect Valve Weights Not Used.No Mod Required ML19224D3561979-05-17017 May 1979 Confirms 790629 Deadline for Response to IE Bulletins 78-12,78-12A & 78-12B ML19259C4341979-05-11011 May 1979 Responds to IE Bulletin 79-03 Re Use of Fusion Welded Pipe Spools Mfg by Youngstown Welding & Engineering Co.No Such Pipe Spools Have Been Shipped to Facility ML19269E3061979-05-10010 May 1979 Responds to IE Bulletin 79-03.To Date,There Have Been No Pipe Spools of Any Type Fabricated for or Shipped to Facilities ML20062H0791979-04-16016 April 1979 Forwards Annual Financial Rept 1978 ML19263D6931979-03-21021 March 1979 Response to IE Bulletin 78-12A:Westinghouse Is Pressure Vessel supplier.C-E Will Not Provide Needed Info Until Aug 1979,so Util Requests Submission Extension to 790930 to Allow Time for Review ML19317D1301979-03-0909 March 1979 Forwards Findings of Fact,Conclusions of Law & 790306 Order of Wi Public Svc Commission Re Denial of Application for Certificate of Public Convenience, & Necessity for Const Permit.Certificate of Sve Encl ML19270F9611979-03-0101 March 1979 Withdraws Requested Partial Exemption from 10CFR21.Revised Regulations Providing Exemptions for Commercial Grade Items Make Request Unnecessary ML19289D1871979-02-19019 February 1979 Forwards Financial Qualifications, Consisting of Revised Pages A-6 Through A-17 to Exhibit a of Ltr NLNRC-86,dtd 780825.Attachment 2 W/Suppl Info to Ltr NLNRC-80 Dtd 780420 Is Not Encl.Certificate of Svc Encl ML20062G1541978-12-15015 December 1978 Discusses Snupps Fsar.Advises That Snupps Utils Plan to Submit Standardized Portion of FSAR in Oct 1979.Most Significant Changes from Design Described in PSAR Are Associated W/Fire Protec ML20062E4811978-11-27027 November 1978 Responds to IE Bulletin 78-12 Re Atypical Weld Matl in Reactor Vessel Pressure Welds.States That Reactor Vessel Not Yet Manufactured ML20062D1291978-10-25025 October 1978 Review of Proj Is Proc on Sched.Will Be Holding Hearing to Determine Whether Plant Is Needed Beginning 781211.W/encl Cert of Svc ML20062B5081978-10-10010 October 1978 Confirms That 781003 Ecology Action of Oswego Petition Filed W/Permission of Northern Thunder,Inc ML20062A4551978-10-0202 October 1978 Forwards from Northern States Pwr Co to Pub Svc Comm of Wi Announcing Scheduled Oper Date for Subj Facil Is Apr 1986.W/o Ltr ML20011A5501978-05-0303 May 1978 Requests Mod of Max Depth Requirement for Snupps Containment Structures for Areas Adjacent to Two Electrical Penetration Banks Located in Reactor Bldg,Third Through Sixth Lifts Adjacent to Auxiliary Bldg ML20011A5351978-02-13013 February 1978 Requests NRC Confirm Design Requirements for Util Containment Structures as Soon as Possible Because of Impact on Const 1981-03-26
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML19318D0811980-07-0101 July 1980 Forwards Response to NRC 800616 Ltr & Order to Show Cause Why License CPPR-157 Should Not Be Revoked.No Objection Raised ML19208D0431979-07-25025 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Requests Termination of Proceedings in Docket. Press Release & Certificate of Svc Encl ML19249A8541979-07-25025 July 1979 Forwards Northern States Power 790724 News Release Announcing Decision by co-owners to Cancel Project.Requests Termination of Proceedings ML19225B2471979-07-18018 July 1979 Requests Substitution of Hh Voigt for Ae Upton on NRC 790713 Distribution List ML19242D5311979-07-12012 July 1979 Submits 790710 News Release Re Future of Facility.No Final Decision Has Been Made ML19276G8091979-06-26026 June 1979 Notifies of Change of Address,Effective Immediately ML20136B1041979-06-0505 June 1979 Notifies of Typographical Errors in Licensee Joint Motion for Summary Disposition of Radon Issues.Certificate of Svc Encl ML19317D1301979-03-0909 March 1979 Forwards Findings of Fact,Conclusions of Law & 790306 Order of Wi Public Svc Commission Re Denial of Application for Certificate of Public Convenience, & Necessity for Const Permit.Certificate of Sve Encl ML20062B5081978-10-10010 October 1978 Confirms That 781003 Ecology Action of Oswego Petition Filed W/Permission of Northern Thunder,Inc ML20062A4551978-10-0202 October 1978 Forwards from Northern States Pwr Co to Pub Svc Comm of Wi Announcing Scheduled Oper Date for Subj Facil Is Apr 1986.W/o Ltr 1980-07-01
[Table view] |
Text
.
TE R A
.. ,3 .
_
D N - C'1? r-+ ,c...,r,r.;r... s S H AW, PITTM AN, PoTTs & TROW B RI DGE e8CO M STREET.N.W.
W AS H I N G TO N, 0. C. 2 O O 3 6 mAusAr 3.*Cfts stEvCN 6 wCLTZER '2 0 2 # 3 3 e- ** O 0 situ a.,E=.Aar.L cE E.-EN m wAm3.
-
2 E. ALs C M A.C,1, .O * .
3EA= 3. Av uc a
-~ CNou
-so,E.-
,s O c E ff
\@ l "f .
~
-
- "M,* ,**A N
~C
"L2' w, ~ ,- .E N n~d','GAMt".
O . H.u.vQwL E N.
~ 4 . u ,c ; ,, , ,
' ' ' ' ' " - * " ' ' " ~ ' '
ac o,E n~oge
- s. s a. e
,/N q _
aOCO M .em a.t .w.~E
.
.Qi C.M E a.n r o.C.
..eo A.L.E.N
~ , .
- 1.0 S euC E
- C Mv 8CM'LL LAv 4 4 4. FAMRANO * *1 TCLEX QhV LE 5u t a. NiCMOLSo me. 4. M Af1 A s F vmAveE30-OiA2 / d m A m ri N 3.emALL ve C'O me A s. *E m m a N S r = 6 9-2 8 5 3 'S M Aw LAW w SHI s A v E. s 4*CMAROLeEmo
- s. m E N C ALL sO s A,M4.N Em.a JN sti E E sNLL. s 2. l' *C M .eD ' -
CA8 LE ' 5 Maw LAer*
es;* y S Ame A A A w. SO S SC TTI S EO mo t v. a t.E N. ,4.
3 E O mO E 3. O mow LEY, s m.
wsCuaEL 3.MAFS
(
1, \ g7,y
""'"
g
-
C w as. gm ADFO RO 4 Ev mCLO S fee 3 A. uPLE rwone AS m. usC O~ wsCm Su s Aw 3. F ALn SG D\ $. p ,
sO M N =e.1 M A AC M raE3O=As=En NA7wAmeEL
- S NE E 3. s m servC N w. wCAs $g*3 J yd E:*A*o8- "oSuao was.AvoENeuC4 A ALAAM= Qs. L .ALw EissaacCN D iscp D\ N COQNSEL E RN E S T L S LA n t. . A. *sbu Aw m sAmm -
CARLETON S..ONES ALAN m vuS*EM j f =O wa s a. B A A YE 4 sAmeCSme.SyncEm sOMM L. CA N A. . #.
swikip s. e* Anv Ev I
gV j l j { '
- SMELDONs. attSEL m ar L. miC M ac AN L ft w
.O.m me .C.
Ar .A.
- eC.U.C.Lo.s C oM C M.o m Lf EwSveeS w.e e.m.s S C E. . .
s.
s AMES YMOM AS LENMa#T July 12, 1979 a sso, aOmsTTE D sse O. C.
Richard S. Sal: man, Esquire Ivan W. Smith, Esquire Chairman Chairman Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Board U.S. Nuclear Regulatory Cc= mission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 In the Matter of Northern States Power Company, et al.
(Tyrone Energy Park, Unit 1)
Docket No. STN 50-484 Centlemen-Please find enclosed a copy of a news relea- issued on July 10, 1979, by Northern States Power Company, a Minnesota corporation, with respect to the future of Tyrone Energy Park and the recommendation which the Company's Board of Directors has made to its wholly owned subsidiary, Northern States Power Company, a Wisconsin corporation.
We will keep you advised of any further developments wnich change the status of the Tyrone E:1ergy Park project.
Respectfully submitted, A /
.
,
Thomas A. Baxter Counsel for Acplicants TAB:iah Enclosure
-A cc: Service List b'w M # '
79081502&y 8
yI vc y- v.
7 (c 7y v-UNITED STATES OF AMERICA - F-
\o \@ dir--Y
-
NUCLEAR REGULATCRY COMMISSION .i, eg.
^ $ fry @3f
\q cfksgV.s <-
.
In ene Matter of .L._.._ )c s<
's ey ~vp s s
- . . . ~ . "
) \N / .ggL O
NORTHERN STATES PCWER CCMPANY, )
ET AL. ) Docket No. STN 50-484
)
(Tyrone Energy Park, Unit 1) )
SERVICE LIST Richard S. Salran, Esqaire, Chai=an Peter A. Peshek, Escuire Atric Safety and Licensing Appeal Ecard State Public In e mncr -
U.S. N'rlear Regulatcrf Carcission 114 East, State Capitcl Washingten, D.C. 20555 Madiscn, Wisconsin 53702 Michael C. Farra , Esqaire Atric Safety a:xi Licensirg Appeal Scard Mr. Thras Galacen U.S. 2,tclear Regulatcry Carcissicn Ecute 2, Scx 64 Wah i gren, D.C. 20555 Turtle lake, Wisconsin 54889 Dr. W. R ed Johnson Jccelyn Par wangler Clsen, Escuire Atric Safety and Licensing Anceal Scard Srecit. Assistant Attorney Gene-al U.S. Nuclear Regulatcry Carcissicn Minnesota Pollution Ccn~_.cl Agency Washing n , D.C. 20555 If35 W. Country Pcad 32 Reseville, Minnescta 55113 Ivan t' Snie , Esqaire, Chai.ran Atcrea.c 3afety and Lice-sirg hd Richard Ihrig, Escuire U.S. Nuclear Pegulatory Ccercission c/c William Mitchell Ccliege of L2w Washington, D.C. 20555 875 Su:rit Avenue St. Paul, Mimescta 55105 Cr. George C. A-derscn Oceancgraphy reparrent, WB-10 Michael J. Cain, Esquire University of Washing = Bureau of Lecal Serrices Seattle, Washingtcn 98195 Cepar ent of Natural Re ;curces 3cx 7921 Mr. Laster Fcrnblid, Jr. Madison, Wisccasin 53707 Accntic Safety and Licensing Scard U.S. Nuclear Regulatcry Ccnrcissicn Steven M. Sc'- _, Esqaire Washing:cn, D.C. 20555 Chief Counse.
Public Se-vice Ccnrciscicn of Wisccnsin Stephen H. Lewis, Esquira ui ' l Farc State Cffice Buildi.g Office of de Executive Legal Die- 4802 Shebcygan Avenue U.S. Nuclear Regulatcry Carissicn M
- mn, Wiscensin 53702 Washington, D.C. 20555 Mr. Stanley Cider Cccketi .g arxi Service Secticn J c/c Durand Pcst aster Office of de Secrecar! ?frcne, Wisconsin 54726 U.S. 2.tclear Regulatcrj Ccrrissicn Nashington, D.C. 20555 o
s i 1, A., - *
.a--.,v 'y,&
MEDlA FROM
~"
= NORTHERN STATRS PO'i/SCOh]PANY ADypp v 13
.9 %
,
I\ .- L. %
~ ~' '
1 414 NIC O L L E T MA L L QuN N y POLIS. Min.V.'5 5 4 01 J a: - .
6 For additional informat:.cn contact: ,,3 iTI9 > _-
y'; '-
.
,4 d{g.
.
.
64
'
,
,;
Beth Allen gg,c2 Communications Representative V
cj$ p'.
61 . 4N
't
<-
612/330-7679 .
gg0SD d\O FCR IMMEDIATE RELEASE
~
'10-79 7-NSP CLARIFIZS .
TYRONE FUTURE Donald W. McCarthy, Northern States Power Co. (NSP) board chairman and president, said today that no final decision has been made en the future cf the Tyrene Er.ergy Park nuclear plant proposed for western Wisccnsin.
Clarif"1ing a Julv. 10 Minneapolis Tribune article, McCarthy .
noted tha* che final decision rests with the co-cwners of the proposed 1,10C-megawatt pcwer plant. Those cwners are. NSP-u scensin of Eau Claire, W :. s c . ; Dairyland Pcwer Cooperative of La Crosse, Wisc.; Cocperative Power Associaticr of Edina, Minn.:
and Lake Superior Distric Power Cc. cf Ashland, Wisc.
McCarthy said, "The future of the facility has been under study since the Wisccnsin Publ:.c Service Commission denied the prcject's a pplic a t :.c n for a certiricate of need last " arch. . (That decision has been appealed by the co-owners in Eau Claire County
'
Circuit Cour t . )
"The main concern in evalua ting the prc;ect "as been the .
prospects for 1 cencing and br.ng:.ng *_he plant into serv _ce when s ,
it's needed to serve the cc-cwners' custcmers, he added. .
.
__
6903Sti
_2_
-
-
McCarthy noted that NSP-Minnesota's Board of Directors has recommended that the NSP-Wisconsin's board authorize that ccmcanv.'s
.
management to proceed with negotiations with the other co-cwners concerning the prcject's cancellation.
- ..
"During the past four months," McCarthy centinued, "NSP-Wisconsin, in accordance with the Wisccasin commission's order, has been
- study ing the possibility of a coal-fired unit to meet future elec-tric needs if the T"1rane project is not pursued. An advance plan cn future generating plants recently filed by the ccm,rany includes this proposal." (NSP-Wisconsin is a wholl.v cwned subsidiarv. of NSP-Minnesota.)
The Tyrone project's co-owners are expected to meet in late ,
July. A decisicn is expected at that time, McCarthy said.
=t
.
8
. e
**)6%**ti
.; a &E
=
b