ML19249B392

From kanterella
Revision as of 07:08, 8 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 79-087/03L-0:on 790731,operators Twice Received Control Rod Sequence Fault Alarm.Caused by Faulty Integrated Circuit in Auxiliary Power Supply of Command Logic String.Circuit Replaced & Proper Operation Verified
ML19249B392
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/27/1979
From: Hitchens D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19249B386 List:
References
LER-79-087-03L, LER-79-87-3L, NUDOCS 7909040364
Download: ML19249B392 (2)


Text