ML19211C766

From kanterella
Revision as of 10:13, 5 September 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 79-128/03L-0:on 791210,during Emergency Ventilation Sys Test,Charcoal Filter Bank in Unit 1-1 Failed to Meet Efficiency Limit in Modes 1-4.Caused by Leakage Between Filter Plate & Assembly Due to Insufficient Gasket Pressure
ML19211C766
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1980
From: Bernard Thomas
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19211C763 List:
References
LER-79-128-03L, LER-79-128-3L, NUDOCS 8001140462
Download: ML19211C766 (2)


Text

,,o (1 71)LICENSEE EVENT REPORT CONTnot BLOCx: l lll _ ll(PLEASE PRINT OR TYPE ALL REQUIRED INFOHMATION) lo lil lO ] H j D l B l S l 1 l@l 0l 0l -l 0l 0 Nl Pl Fl -l 0] 31GL4l 1l 1l 1l 1 @l ll@7 8 9 LLCCP.SE E CODE I4 M LICENSE NVYdLH h 2ti UCt.NSE T v FE JG 57 L A T bd yn] l Lj@l 0 l 5 l 0 l- l 0 l 3 l 4 l 6 j@!1 l 2 ]1 l0 l 7 l 9 !@l 0 l 1 l 0 l 8 l 8 l 0 l@

CON'T o i M b3 EVENT OATE 14 h REPORT D ATE tiJ s i 8 L0 t> 1 DOCK E T ?.UMB EM EVENT DESCRIPTION AND FROBABLE CONSEQUENCES h l During the performance of ST 5067.02, Emergency Ventilation System (EVS) 18 Month or lO 2l Special Test, the charcoal filter bank in EVS Unit 1-1 failed to meet the efficiency lo 3l11mit as required by T.S. 3/4.6.5.1 while in Modes 1 thru 4.

Being in Mode 5 at the J o 4 time of the finding, the station did not enter an action statement. This is being lo 5 j o 6l reported to document a ec- ponent failure. There was no danger to the health and _

l safety of the public or station personnel. The redundant EVS Train 1-2 was operable lo 7!had it been required.(NP-33-7 9-149) 0 a 7 8 9 COVP.VALVE S Y S TE *.f CAUSE CAUSE CODE COOE SUBCODE COYPONENT CODE SUBCODE SUBCODElSlHl@ lE @ l Bl@ l Bl Ll 0] Wl El R]h W@ [Z_j @

O 9 7 8 9 la if 12 f3 Id 19 20 SEQU E N T I AL.

OCCUR R E r.CE REPORT HEVISION L EP RO EVENT YE AR REPORT NO, CODE TYPE NO.@ gEP,l 7l 9)[__jl1 2 8j yl0l3llL ll-lW_ 21 21 23 24/6 27 28 2')30 31 32 ACTI% FUTUcE

[FFECT S H U T Dr : .' ."J ATT ACHY ENT NPRD-4 PRIVE COMP.

COVPCNfvT TAKE'.A C i t rA ONPLANT YETHUD HOURS SUBUITTED F OH M :,Utt SU FPLI E R MANUFACTUNEH

[B jg]4g Zlg Zl@[ 0l 0l 0ll Yl@j@lA j@lB 0 l 7 l 5 lg

, h Jo 31 40 41 42 43 44 4/JJ J CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h

[The cause of the low filter efficiency was leakage between the filter plate and the i o!ilij jassembly. This leakage was due to insuf ficient pressure applied to the gasket.

I g,17llUnder Maintenance Work Order 79-3756, the nuts holding the plate were torqued to 75 in-lbs.

The unit then successfully met the requirements of ST 5067.02 on li 3 IliI41 l December 17, 1979.

80 7 8 9 ST A S%POV.En OTHER STATUS DISCOV H DISCOVETlY OECCRIPTIqN test limit lNAlBl@lUnabletomeet liIsl W @ l0l_0 0 @l""""**COYTENT *AC TiviTY LOCATION OF RELEASE RELE ASTD OF PELE ASE AMOUNT OF ACTIVITY

_ Q lZ @ y@l NA ll NAl7 8 9 10 11 44 45 80 PERSONNEL FRPOSURES NUYBER TYPE DESCRIPTION ~

l lu d I010l01@lZl@l N^*" unSONNEl'ImuL S

'DoSCR,PTiON@

Nuv.ERlli la l 1010 l '01@l NA q qc B0 1 j pl7 8 9 it i2 ,l/J j{J LOSS OF OR OAVAGE TO FACILITY h TYPE DE SCHIP TION

%./lW@lNA i 9 go 7 tl 9 10* * " " istuE @oYs'CnipIioN @

.l NAllllllllll lj 2 n 68 69 80 g 7 8 9 10 419-259-5000, Ext. 235 DVR 79-195' Y O 08 PHONE:*NAME OF PREPARER.

h001140 % {

e-- 'g s.TOLEDO EDISON COMPANY DAVIS-BESSE UUCLEAR POWER STATION UNIT ONE SUPPLE'4 ENTAL INFORMATION FOR LER MP-33-79-149 DATE OF EVENT: December 10, 1979

.FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE:

Emergency Ventilation System (EVS) 1-1 Charcoal Bank

  1. 2 F19-1 C-2 leakage 4'Conditions Prior to Occurrence: The unit was in Mode 5, with Power (MWT) = 0, and Load (Gross MWE) = 0.

Description of Occurrence: While performing ST 5067.02, EVS 18 Month or Special Test, the charcoal filter bank in the EVS Unit 1-1 (F19-1, C2) failed to meet ST 5067.02 Acceptance Criteria 7.1 (i.e., the charcoal bank capable of removing 2L 99% of the halogenated hydrocarbon refrigerant test gas with 8000 cfm + 10% of air flow).

Since the station was in Mode 5 at the time of the event, the unit did not enter an action statement. This is being reported as documentation of a component failure.

Designation of Apparent Cause of Occurrence: The cause of the low filter efficiency was leakage located between the filter plate and assembly.

Leakage was due to in-sufficient plate / assembly pressure applied to the gaskets which may have been induced by normal vibration.

Analysis of Occurrence: There was no danger to the health and safety of the public or to station personnel. The unit was in Mode 5, the redundant EVS Train 1-2 was operable, and there was no fuel in the spent fuel pool.

, Corrective Action: The nuts of the filter cells were torqued under Maintenance Work Order 79-3756 on December 17, 1979.

This provided the necessary seal. On December 17, 1979, ST 5067.02 was performed successfully. A procedure change will be made to prevent similar occurrences by requiring that the nuts to the filter cells be torqued to 75 in-lbs and a light source leak test be performed following the removal and re-assembly of the filter. This ST 5067.02, EVS 18 Month or Special Test, is always used following any EVS work to ensure operability af ter maintenance.

Failure Data: There have been no previous similar reportable occurrences.

LER #79-128 1 7 4 0'. ,2 6.%