ML19224D798

From kanterella
Revision as of 06:07, 5 September 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 79-012/03L-0 on 790503:vessel Water Temp Increased to 220 F W/Primary Containment Integrity Not Established.Caused by Omission in Operating Procedures.Setpoint of Interlock Verified & Procedures Revised
ML19224D798
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/30/1979
From: Mike Williams
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19224D794 List:
References
LER-79-012-03L, LER-79-12-3L, NUDOCS 7907170057
Download: ML19224D798 (1)


Text