|
---|
Category:License-Operator License Exam
MONTHYEARML22224A1902022-08-12012 August 2022 Notification of NRC Initial Operator Licensing Examination 05000368/2023301 ML0619503772006-01-12012 January 2006 1-2006 - Draft Written Exam Comments ML0037167442000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CCP01 - Shift Lead Charging Pump ML0037166572000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin JPM A-1-2 ML0037166622000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin RO JPM A-1-1 ML0037166662000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-1-1 ML0037166722000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-4 ML0037166772000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM A-2 ML0037167372000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CVCS1 - Perform Emerg Boration _Bamt Gravity Feed ML0037167422000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM AFW01 - SG Feed Using AFW Pump 2p75 ML0037167472000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CEA03 - Test Rx Trip Circuit Breaker ML0037167502000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Aacsu - Su Aacg Locally Manually ML0037167522000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM H2001 - H2 Recombiner 2M55B Funct Test ML0037167582000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM PZR02 - Equalize RCS and Pzr Boron ML0037167602000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM RCP02 - Restor CCW to RCPs ML0037167622000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Swcsp - Shift Stator Water Cooling Pumps ML0037255901999-12-19019 December 1999 ANO, Unit 1, Initial Examinations, Draft Operating Submittal 2022-08-12
[Table view] Category:Draft
MONTHYEARML22224A1902022-08-12012 August 2022 Notification of NRC Initial Operator Licensing Examination 05000368/2023301 ML0619503772006-01-12012 January 2006 1-2006 - Draft Written Exam Comments ML0423000682004-09-0101 September 2004 Section 3.0, Aging Management Reviews Results - ANO-2 SER Final Draft W/Open and Confirmatory Items ML0423000912004-09-0101 September 2004 Section 3.1, Aging Management of Reactor Vessel, Internals, and Reactor Coolant System - ANO-2 SER Final W/Open and Confirmatory Items ML0423001282004-09-0101 September 2004 Section 3.2, Aging Management of Engineered Safety Features Systems - ANO-2 SER Final W/Open and Confirmatory Items ML0423001342004-09-0101 September 2004 Section 3.3, Aging Management of Auxiliary Systems - ANO-2 SER Final W/Open and Confirmatory Items ML0423001482004-09-0101 September 2004 Section 3.4, Aging Management of Steam and Power Conversion Systems - ANO-2 SER Final W/Open and Confirmatory Items ML0423001532004-09-0101 September 2004 Section 3.5, Aging Management of Structures and Component Supports - ANO-2 SER Final W/Open and Confirmatory Items ML0423001572004-09-0101 September 2004 Section 3.6, Aging Management of Electrical and Instrumentation and Controls - ANO-2 SER Final W/Open and Confirmatory Items ML0037166722000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-4 ML0037166572000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin JPM A-1-2 ML0037166622000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin RO JPM A-1-1 ML0037166662000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-1-1 ML0037166772000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM A-2 ML0037167372000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CVCS1 - Perform Emerg Boration _Bamt Gravity Feed ML0037167422000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM AFW01 - SG Feed Using AFW Pump 2p75 ML0037167442000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CCP01 - Shift Lead Charging Pump ML0037167472000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CEA03 - Test Rx Trip Circuit Breaker ML0037167502000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Aacsu - Su Aacg Locally Manually ML0037167522000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM H2001 - H2 Recombiner 2M55B Funct Test ML0037167582000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM PZR02 - Equalize RCS and Pzr Boron ML0037167602000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM RCP02 - Restor CCW to RCPs ML0037167622000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Swcsp - Shift Stator Water Cooling Pumps ML0037255901999-12-19019 December 1999 ANO, Unit 1, Initial Examinations, Draft Operating Submittal 2022-08-12
[Table view] |
Text
JPM- ANO-2-JPM-NRC-LEAKRATE01 PAGE 1 OF 5 ADMIN JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE: SYSTEM/DUTY AREA:
Reactor Coolant System (RCS)
TASK: Determine RCS Leakrate and declare EAL.
JTA#: KA VALUE RO: N/A SRO: 4.0 KA
REFERENCE:
2.4.29 APPROVED FOR ADMINISTRATION TO:
RO: SRO: X TASK LOCATION:
INSIDE CR:
X OUTSIDE CR:
BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate SIMULATOR:
Perform LAB: POSITION EVALUATED:
RO: SRO: ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB: TESTING METHOD:
SIMULATE: PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE(S):
2203.016, Excess RCS Leakage, Rev. 008-03-0,Technical Specifications, 1903.010 Rev 36, EXAMINEE'S NAME:
SSN: EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-LEAKRATE01 PAGE 2 OF 5 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Full power. 2203.016, Excess RCS Leakage, entered and completed through Step 5.
TASK STANDARD:
Determined the RCS leak rate and EAL declaration.
TASK PERFORMANCE AIDS:
1903.010, 2203.016, and Technical Specifications.
EXAMINER'S NOTE:
Ensure an RCS leak rate of 56 gpm to CCW is triggered and two Charging Pumps are running.
JPM- ANO-2-JPM-NRC-LEAKRATE01 PAGE 3 OF 5 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Determine EAL Classification per 1903.010."
CRITICAL ELEMENTS (C):
1, 2 PERFORMANCE CHECKLIST STANDARDS (Circle One)(C)1.Determine RCS leak rate greater than 44 gpm.
Determined RCS leak rate to be greater than 44 gpm by any of the
following methods;
- Checked PZR level stable and used charging and let down
mismatch minus controlled
bleed off.
- Manually calculated RCS leak rate using 2103.005 exhibit 1.
N/A SAT UNSAT (C)2.Determine an Alert Emergency action level.
Referred to 1903.010 and determined an Alert based on 2.2 RCS leakage
greater than 44 gpm.
N/A SAT UNSAT END JPM- ANO-2-JPM-NRC-LEAKRATE01 PAGE 4 OF 5 ADMIN JOB PERFORMANCE MEASURE QUESTION 1:
ANSWER:
JPM- ANO-2-JPM-NRC-LEAKRATE01 PAGE 5 OF 5 ADMIN JOB PERFORMANCE MEASURE EXAMINEE'S COPY INITIAL CONDITIONS:
Full power.
2203.016 entered and completed through Step 5.
INITIATING CUE:
The SS/CRS directs, "Determine EAL Classification per 1903.010."