ML003716758
| ML003716758 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/24/2000 |
| From: | NRC Region 4 |
| To: | |
| References | |
| -RFPFR | |
| Download: ML003716758 (6) | |
Text
JPM-ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 8 DATE:
SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Equalize RCS and PZR Boron JTA#: 20105030401 KA VALUE RO: 3.7 SRO: 3.5 KA
REFERENCE:
010 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 6 Minutes REFERENCE(S): OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME: SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: 100% Power Operation. A power escalation has been completed.
Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
TASK STANDARD: Spray Valve (2CV-4651)isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS: OP 2103.005 section 7.0 and AOP 2203.028.
SIMULATOR SETUP: Run CASE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position.
The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them):
Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized.
T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light)
T5 2 HS-4651-5 false (red light)
JPM-ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."
CRITICAL ELEMENTS (C): 2, 3, 4, 5 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.
Verify spray valve, 2CV-4651, isolation valves 2CV-4655 AND 2CV-4656 are OPEN.
On panel 2C04 verified red lights ON, green lights OFF for 2CV-4655 and 2CV-4656.
N/A SAT UNSAT (C) 2.
Place RCP A spray valve MAN/AUTO select switch (2HS-4651B) to MANUAL.
On panel 2C04, rotated 2HS-4651B in the CCW direction to MANUAL.
N/A SAT UNSAT (C) 3.
Energize all available Backup Heaters.
On panel 2C04 placed the following handswitches to ON:
Place 2HS-4643 to ON Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater handswitches.
N/A SAT UNSAT EXAMINERS NOTE:
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.
(C) 4.
Open 2CV-4651, RCP A spray valve partially.
On panel 2C04 WHEN RCS pressure starts increasing, throttled 2CV-4651 to the open position.
N/A SAT UNSAT EXAMINERS NOTE:
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.
JPM-ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 5.
Close PZR Spray Block Valves.
On panel 2C04, placed handswitch for 2CV-4655 and 2CV-4656 to "CLOSE".
Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656.
N/A SAT UNSAT END
JPM-ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:
ANSWER:
JPM-ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."