|
---|
Category:License-Operator License Exam
MONTHYEARML22224A1902022-08-12012 August 2022 Notification of NRC Initial Operator Licensing Examination 05000368/2023301 ML0619503772006-01-12012 January 2006 1-2006 - Draft Written Exam Comments ML0037167442000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CCP01 - Shift Lead Charging Pump ML0037166572000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin JPM A-1-2 ML0037166622000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin RO JPM A-1-1 ML0037166662000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-1-1 ML0037166722000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-4 ML0037166772000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM A-2 ML0037167372000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CVCS1 - Perform Emerg Boration _Bamt Gravity Feed ML0037167422000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM AFW01 - SG Feed Using AFW Pump 2p75 ML0037167472000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CEA03 - Test Rx Trip Circuit Breaker ML0037167502000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Aacsu - Su Aacg Locally Manually ML0037167522000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM H2001 - H2 Recombiner 2M55B Funct Test ML0037167582000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM PZR02 - Equalize RCS and Pzr Boron ML0037167602000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM RCP02 - Restor CCW to RCPs ML0037167622000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Swcsp - Shift Stator Water Cooling Pumps ML0037255901999-12-19019 December 1999 ANO, Unit 1, Initial Examinations, Draft Operating Submittal 2022-08-12
[Table view] Category:Draft
MONTHYEARML22224A1902022-08-12012 August 2022 Notification of NRC Initial Operator Licensing Examination 05000368/2023301 ML0619503772006-01-12012 January 2006 1-2006 - Draft Written Exam Comments ML0423000682004-09-0101 September 2004 Section 3.0, Aging Management Reviews Results - ANO-2 SER Final Draft W/Open and Confirmatory Items ML0423000912004-09-0101 September 2004 Section 3.1, Aging Management of Reactor Vessel, Internals, and Reactor Coolant System - ANO-2 SER Final W/Open and Confirmatory Items ML0423001282004-09-0101 September 2004 Section 3.2, Aging Management of Engineered Safety Features Systems - ANO-2 SER Final W/Open and Confirmatory Items ML0423001342004-09-0101 September 2004 Section 3.3, Aging Management of Auxiliary Systems - ANO-2 SER Final W/Open and Confirmatory Items ML0423001482004-09-0101 September 2004 Section 3.4, Aging Management of Steam and Power Conversion Systems - ANO-2 SER Final W/Open and Confirmatory Items ML0423001532004-09-0101 September 2004 Section 3.5, Aging Management of Structures and Component Supports - ANO-2 SER Final W/Open and Confirmatory Items ML0423001572004-09-0101 September 2004 Section 3.6, Aging Management of Electrical and Instrumentation and Controls - ANO-2 SER Final W/Open and Confirmatory Items ML0037166722000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-4 ML0037166572000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin JPM A-1-2 ML0037166622000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin RO JPM A-1-1 ML0037166662000-04-24024 April 2000 Init EXAM-4-2000-Draft Admin SRO JPM A-1-1 ML0037166772000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM A-2 ML0037167372000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CVCS1 - Perform Emerg Boration _Bamt Gravity Feed ML0037167422000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM AFW01 - SG Feed Using AFW Pump 2p75 ML0037167442000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CCP01 - Shift Lead Charging Pump ML0037167472000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM CEA03 - Test Rx Trip Circuit Breaker ML0037167502000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Aacsu - Su Aacg Locally Manually ML0037167522000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM H2001 - H2 Recombiner 2M55B Funct Test ML0037167582000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM PZR02 - Equalize RCS and Pzr Boron ML0037167602000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM RCP02 - Restor CCW to RCPs ML0037167622000-04-24024 April 2000 Init EXAM-4-2000-Draft JPM Swcsp - Shift Stator Water Cooling Pumps ML0037255901999-12-19019 December 1999 ANO, Unit 1, Initial Examinations, Draft Operating Submittal 2022-08-12
[Table view] |
Text
JPM- ANO-2-JPM-NRC-CCP01 PAGE 1 OF 5 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 6 DATE:
SYSTEM/DUTY AREA: Pressurizer Level Control System TASK: Shifting Lead Charging Pump JTA#: 20045510401 KA VALUE RO: 3.5 SRO: 3.7 KA
REFERENCE:
011 A2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 5 Minutes REFERENCE(S): OP 2104.002 Rev 038-01-0 EXAMINEE'S NAME: SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JPM- ANO-2-JPM-NRC-CCP01 PAGE 2 OF 5 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: WCO has requested Charging Pump 2P36B be stopped to perform oil level check. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK STANDARD: Shift lead charging pump.
TASK PERFORMANCE AIDS: OP 2104.002 SIMULATOR SETUP: Select "B" as lead charging pump and trigger 2P36C Plunger Break CVC2P36CBRK. 2P36C aligned to green bus.
JPM- ANO-2-JPM-NRC-CCP01 PAGE 3 OF 5 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Shift lead charging pump to 2P36C using OP 2104.002 Section 8.1. Seal water pump has been running for 15 minutes."
CRITICAL ELEMENTS (C): 2 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Place selected pump handswitch On 2C09, placed 2HS-4853-2 to N/A SAT UNSAT to START. START. Observed red light ON and green light OFF.
(C) 2. Check Charging Flow goes up ~44 On 2C09, checked Charging Flow N/A SAT UNSAT gpm. (2FIS-4863) and reports flow indicates 60 gpm.
- 3. Did not get expected response, Placed 2HS-4853-2 to AUTO or N/A SAT UNSAT therefore secure 2P36C. STOP. Observed red light OFF and green light ON.
EXAMINEERS CUE:
Act as CRS and direct examinee to select 2P36A as lead charging pump.
- 4. Place selected pump handswitch On 2C09, placed 2HS-4832-1 to N/A SAT UNSAT to START. START. Observed red light ON and green light OFF.
- 5. Check Charging Flow goes up ~44 On 2C09, checks Charging Flow N/A SAT UNSAT gpm. (2FIS-4863) flow indicates ~88 gpm.
- 6. Place Charging Pump Select On 2C09, placed Charging Pump N/A SAT UNSAT Switch (2HS-4868) to selected lead Select handswitch (2HS-4868) to pump. PMP B&C position.
- 7. Verify previous lead pump stops. Checked 2P36B stopped. Observed N/A SAT UNSAT red light OFF and green light ON.
- 8. Check Charging Flow lowers On 2C09, checks Charging Flow N/A SAT UNSAT
~44 gpm. (2FIS-4863) flow indicates ~44 gpm.
- 9. Place selected pump handswitch On 2C09, placed 2HS-4832-1 to N/A SAT UNSAT to AUTO. AUTO.
END
JPM- ANO-2-JPM-NRC-CCP01 PAGE 4 OF 5 JOB PERFORMANCE MEASURE QUESTION ANSWER
JPM- ANO-2-JPM-NRC-CCP01 PAGE 5 OF 5 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
WCO has requested Charging Pump 2P36B be stopped to perform oil level checks.
INITIATING CUE:
The SS/CRS directs, "Shift lead charging pump to 2P36C using OP 2104.002 Section 8.1. Seal water pump has been running for 15 minutes."