JPM- ANO-2-JPM-NRC-CVCS1 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 0 DATE:

SYSTEM/DUTY AREA: Chemical and Volume Control System TASK: Perform Emergency Boration (using BAMT gravity feed).

JTA#: 20045060601 KA VALUE RO: 3.9 SRO: 3.7 KA

REFERENCE:

004 A4.07 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 5 minutes REFERENCE(S): AOP 2203.032 Rev 007-00-0 EXAMINEE'S NAME: SSN: - -

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

__________ Start Time ____________ Stop Time __________ Total Time SIGNED__________________________________ DATE: _____________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-CVCS1 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Mode 3. A Shutdown Margin is calculated following a reactor trip.

Shutdown margin is found to be less than required.

TASK STANDARD: Greater than or equal to 40 gallons per minute of boric acid solution being injected into the RCS using BAMT Gravity Feed.

TASK PERFORMANCE AIDS: AOP 2203.032 Steps 2 through 6.

JPM- ANO-2-JPM-NRC-CVCS1 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."

CRITICAL ELEMENTS (C): 2, 3 , 5 PERFORMANCE CHECKLIST STANDARD (Circle One)

1. Verify at least one charging Pump On panel 2C09, verified CCP(s) N/A SAT UNSAT (CCP) running. running.

POSITIVE CUE: Observed red light ON; green light Red light(s) ON. OFF above at least one of the Flow is greater than 40 gpm. following handswitch(es):

2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863).

(C) 2. Align boric acid supply to CCP On panel 2C09, opened 2CV-4920-1 N/A SAT UNSAT suction by opening at least one and/or 2CV-4921-1 Boric Acid Makeup (BAM) Tank Gravity Feed Valve(s) to CCP Observed red light ON and green light suction: OFF above handswitch(es):

Red light(s) ON.

NEGATIVE CUE:

Green light(s) ON.

(C) 3. Close Volume Control Tank (VCT) On panel 2C09, closed 2CV-4873-1. N/A SAT UNSAT Outlet valve (2CV-4873-1).

Observed green light ON; red light POSITIVE CUE: OFF above VCT Outlet valve Green light ON. handswitch (2HS-4873-1).

NEGATIVE CUE:

Red light ON.

JPM- ANO-2-JPM-NRC-CVCS1 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

4. Check Reactor Makeup Water On panel 2C09, verified 2CV-4927 N/A SAT UNSAT Flow Control valve (2CV-4927) closed.

closed.

Observed green light ON; red light POSITIVE CUE: OFF above Reactor Makeup Water Green light ON. Flow Controller (2FIC-4927).

NEGATIVE CUE:

Red light ON.

(C) 5. Check charging header flow On panel 2C09 (upright portion), N/A SAT UNSAT indicator (2FIS-4863). observed flow greater than 40 gpm on 2FIS-4863.

POSITIVE CUE:

Flow is: 44 gpm (1 CCP) 88 gpm (2 CCP) 132 gpm (3 CCP)

END

JPM- ANO-2-JPM-NRC-CVCS1 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:

ANSWER:

JPM- ANO-2-JPM-NRC-CVCS1 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Mode 3. A Shutdown Margin is calculated following a reactor trip.

Shutdown margin is found to be less than required.

INITIATING QUE:

The SS/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."