JPM-ANO-2-JPM-NRC-CVCS1 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 0 DATE:
SYSTEM/DUTY AREA: Chemical and Volume Control System TASK: Perform Emergency Boration (using BAMT gravity feed).
JTA#: 20045060601 KA VALUE RO: 3.9 SRO: 3.7 KA
REFERENCE:
004 A4.07 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 5 minutes REFERENCE(S): AOP 2203.032 Rev 007-00-0 EXAMINEE'S NAME: SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
__________ Start Time
____________ Stop Time
__________ Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-NRC-CVCS1 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: Mode 3. A Shutdown Margin is calculated following a reactor trip.
Shutdown margin is found to be less than required.
TASK STANDARD: Greater than or equal to 40 gallons per minute of boric acid solution being injected into the RCS using BAMT Gravity Feed.
TASK PERFORMANCE AIDS: AOP 2203.032 Steps 2 through 6.
JPM-ANO-2-JPM-NRC-CVCS1 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."
CRITICAL ELEMENTS (C): 2, 3, 5 PERFORMANCE CHECKLIST STANDARD (Circle One) 1.
Verify at least one charging Pump (CCP) running.
POSITIVE CUE:
Red light(s) ON.
Flow is greater than 40 gpm.
On panel 2C09, verified CCP(s) running.
Observed red light ON; green light OFF above at least one of the following handswitch(es):
2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863).
N/A SAT UNSAT (C) 2.
Align boric acid supply to CCP suction by opening at least one Boric Acid Makeup (BAM) Tank Gravity Feed Valve(s) to CCP suction:
2CV-4920-1 2CV-4921-1 POSITIVE CUE:
Red light(s) ON.
NEGATIVE CUE:
Green light(s) ON.
On panel 2C09, opened 2CV-4920-1 and/or 2CV-4921-1 Observed red light ON and green light OFF above handswitch(es):
2HS-4920-1 for 2CV-4920-1 2HS-4921-1 for 2CV-4921-1 N/A SAT UNSAT (C) 3.
Close Volume Control Tank (VCT)
Outlet valve (2CV-4873-1).
POSITIVE CUE:
Green light ON.
NEGATIVE CUE:
Red light ON.
On panel 2C09, closed 2CV-4873-1.
Observed green light ON; red light OFF above VCT Outlet valve handswitch (2HS-4873-1).
N/A SAT UNSAT
JPM-ANO-2-JPM-NRC-CVCS1 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One) 4.
Check Reactor Makeup Water Flow Control valve (2CV-4927) closed.
POSITIVE CUE:
Green light ON.
NEGATIVE CUE:
Red light ON.
On panel 2C09, verified 2CV-4927 closed.
Observed green light ON; red light OFF above Reactor Makeup Water Flow Controller (2FIC-4927).
N/A SAT UNSAT (C) 5.
Check charging header flow indicator (2FIS-4863).
POSITIVE CUE:
Flow is: 44 gpm (1 CCP) 88 gpm (2 CCP) 132 gpm (3 CCP)
On panel 2C09 (upright portion),
observed flow greater than 40 gpm on 2FIS-4863.
N/A SAT UNSAT END
JPM-ANO-2-JPM-NRC-CVCS1 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:
ANSWER:
JPM-ANO-2-JPM-NRC-CVCS1 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Mode 3. A Shutdown Margin is calculated following a reactor trip.
Shutdown margin is found to be less than required.
INITIATING QUE:
The SS/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."