ML003716747
| ML003716747 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/24/2000 |
| From: | NRC Region 4 |
| To: | |
| References | |
| -RFPFR | |
| Download: ML003716747 (8) | |
Text
JPM-ANO-2-JPM-NRC-CEA03 PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 0 DATE:
SYSTEM/DUTY AREA: Control Element Drive Mechanism Control System TASK: Test a Reactor Trip Circuit Breaker.
JTA#: 20015320201 KA VALUE RO: 4.3 SRO: 4.3 KA
REFERENCE:
012 A4.06 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: Simulate SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 8 minutes REFERENCE(S): OP 2105.009 SUPP. 1 020-01-0 EXAMINEE'S NAME: SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED __________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-NRC-CEA03 PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: Preparations for a Reactor startup are in progress. Mode 3. OP 2105.009 Supplement 1 Section 1.0 is completed. OP 1015.003B-26 is complete. An operator is standing by in the CEDM room.
TASK STANDARD: Reactor trip circuit breaker TCB-2 and TCB-6 operated in accordance with OP 2105.009 Supplement 1.
TASK PERFORMANCE AIDS: OP 2105.009 Supplement 1, Sections 2.1 and 2.2.,
TCB Close Key.
SIMULATOR SETUP: TCB 9 closed. TCB 6 is open. Mode 3 plant conditions.
JPM-ANO-2-JPM-NRC-CEA03 PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Perform the Reactor Trip Circuit Breaker Test for TCB-6 only, using OP 2105.009 Supplement 1.0 Sections 2.1 and 2.2. Leave TCB-6 closed. "
CRITICAL ELEMENTS (C): 2, 4, 9,11,16 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.
Verify undervoltage (UV) trip device position for Reactor Trip Circuit Breakers TCB-6.
POSITIVE CUE:
CEDM Room operator reports UV Trip Device armatures for TCB-6 are in contact with air gap adjusting screw.
Contacted operator in CEDM room.
Requested verification of position of UV trip device armatures for TCB-6.
N/A SAT UNSAT (C) 2.
Close TCB-6.
POSITIVE CUE:
TCB-2 and TCB-6 red lights ON.
NEGATIVE CUE:
TCB-6 green lights ON.
On panel 2C23, inserted key in ESF reset push button keylock.
Placed key in UNLOCK position.
Depress TCB-6 reset push button.
On panel 2C23 or panel 2C14, verified red light ON for TCB-6.
Placed key in LOCK position and removed key.
N/A SAT UNSAT 3.
Hold 2HS/TEST switch in UV Bypass position (for TCB-6).
POSITIVE CUE:
CEDM Room operator reports 2HX/TEST switch is in the Bypass Position.
Contacted operator in CEDM room.
Requested 2HX/TEST switch be held in the Bypass position.
N/A SAT UNSAT (C) 4.
Depress Manual Reactor Trip push button (2HS-9071-2).
On panel 2C03, depressed push button 2HS-9071-2.
N/A SAT UNSAT
JPM-ANO-2-JPM-NRC-CEA03 PAGE 4 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 5.
Verify TCB-6 open.
POSITIVE CUE:
Green Lights ON for TCB-6 NEGATIVE CUE:
Red lights ON for TCB-6 On panel 2C14, verified TCB-6 opens.
Verified by green lights ON for TCB-6.
N/A SAT UNSAT 6.
Verify annunciator 2K12-A10 actuates.
POSITIVE CUE:
2K12-A10 is actuated.
On annunciator panel 2K12, acknowledged that 2K12-A10 actuated.
N/A SAT UNSAT 7.
Verify undervoltage (UV) trip device position for Reactor Trip Circuit Breakers TCB-6.
POSITIVE CUE:
CEDM Room operator reports UV Trip Device armatures for TCB-6 are in contact with air gap adjusting screw.
Contacted operator in CEDM room.
Requested verification of position of UV trip device armatures for TCB-6.
N/A SAT UNSAT 8.
Contact CEDM Room operator to release 2HS/TEST switch.
POSITIVE CUE:
CEDM Room operator reports that 2HS/TEST switch is released Contact CEDM Room operator to release 2HS/TEST switch.
N/A SAT UNSAT
JPM-ANO-2-JPM-NRC-CEA03 PAGE 5 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 9.
Close TCB-6.
POSITIVE CUE:
Red lights ON for TCB-6 NEGATIVE CUE:
Green lights ON for TCB-6 On panel 2C23, inserted key in ESF reset push button keylock.
Placed key in UNLOCK position.
Depress TCB-6 reset push button.
On panel 2C23 or panel 2C14, verified red light ON for TCB-6.
Placed key in LOCK position and removed key.
N/A SAT UNSAT 10.
Hold 2HS/TEST switch in Shunt Bypass position (for TCB-6).
POSITIVE CUE:
CEDM Room operator reports 2HX/TEST switch is in the Bypass Position.
Contacted operator in CEDM room.
Requested 2HX/TEST switch be held in the Bypass position.
N/A SAT UNSAT (C) 11.
Depress Manual Reactor Trip push button (2HS-9071-2).
On panel 2C03, depressed push button 2HS-9071-2.
N/A SAT UNSAT 12.
Verify TCB-6 opens.
POSITIVE CUE:
Green Lights ON for TCB-6 NEGATIVE CUE:
Red lights ON for TCB-6 On panel 2C14, verified TCB-6 opens.
Verified by green lights ON for TCB-6.
N/A SAT UNSAT 13.
Verify annunciator 2K12-A10 actuates.
POSITIVE CUE:
2K12-A10 is actuated.
On annunciator panel 2K12, acknowledged that 2K12-A10 actuated.
N/A SAT UNSAT
JPM-ANO-2-JPM-NRC-CEA03 PAGE 6 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 14.
Contact CEDM Room operator to release 2HS/TEST switch.
POSITIVE CUE:
CEDM Room operator reports that 2HS/TEST switch is released Contact CEDM Room operator to release 2HS/TEST switch.
N/A SAT UNSAT 15.
Verify undervoltage (UV) trip device position for Reactor Trip Circuit Breakers TCB-6.
POSITIVE CUE:
CEDM Room operator reports UV Trip Device armatures for TCB-6 are in contact with air gap adjusting screw.
Contacted operator in CEDM room.
Requested verification of position of UV trip device armatures for TCB-6.
N/A SAT UNSAT (C) 16.
Close TCB-6.
POSITIVE CUE:
Red lights ON for TCB-2 NEGATIVE CUE:
Green lights ON for TCB-6 On panel 2C23, inserted key in ESF reset push button keylock.
Placed key in UNLOCK position.
Depress TCB-6 reset push button.
On panel 2C23 or panel 2C14, verified red light ON for TCB-6.
Placed key in LOCK position and removed key.
N/A SAT UNSAT EVALUATORS NOTE: The simulator does not model K426. When the examinee attempts to open the door to 2C14, give them the positive cue below.
17.
Reset Reflash unit K426 in 2C14.
POSITIVE CUE:
Reflash unit K426 is reset Opens back door to 2C14 to locate K426. Presses reset pushbutton on K426.
N/A SAT UNSAT END
JPM-ANO-2-JPM-NRC-CEA03 PAGE 7 OF 8 JOB PERFORMANCE MEASURE QUESTION:
ANSWER:
JPM-ANO-2-JPM-NRC-CEA03 PAGE 8 OF 8 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM TASK INITIAL CONDITIONS Preparations for a Reactor startup are in progress. Mode 3. OP 2105.009 Supplement 1 Section 1.0 is completed. OP 1015.003B-26 is complete. An operator is standing by in the CEDM room.
INITIATING CUE:
The SS/CRS directs, "Perform the Reactor Trip Circuit Breaker Test for TCB-6 only, using OP 2105.009 Supplement 10.0 section 2.1 and 2.2. Leave TCB-6 closed. "