JPM- ANO-2-JPM-NRC-H2001 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 7 DATE:
SYSTEM/DUTY AREA: Hydrogen Recombiner and Purge System TASK: Perform initial actions for hydrogen recombiner functional test (semi-annual on 2M55B)
JTA#: 20285050201 KA VALUE: RO: 4.0 SRO: 4.0 KA
REFERENCE:
028 000 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 20 minutes REFERENCE(S): OP 2104.044-025-02-0 EXAMINEE'S NAME: SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-H2001 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: OP 2104.044 Supplement 2 is completed through step 2.1.
TASK STANDARD: OP 2104.044 Supplement 2 is completed through Step 2.7 TASK PERFORMANCE AIDS: OP 2104.044 Supplement 2, calculator
JPM- ANO-2-JPM-NRC-H2001 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Perform the Semi-Annual Hydrogen Recombiner Functional Test for 2M55B using OP 2104.044 Supplement 2 starting with Step 2.2."
CRITICAL ELEMENTS (C): 3, 7, 9 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 2. Verify PWR ADJ potentiometer set at On panel 2C184, observed PWR ADJ N/A SAT UNSAT zero. potentiometer set at 000 (digital readout at 000).
OR On panel 2C184, turned potentiometer counter-clockwise to 000 (digital readout at 000).
(C) 3. Close POWER OUT switch. On panel 2C184, placed POWER OUT N/A SAT UNSAT switch to ON.
- 4. Determine recombiner temperature Obtained recombiner temperature N/A SAT UNSAT indication correction factor. indication correction from Attachment C.
- 5. Determine containment temperature. Obtained containment temperature data N/A SAT UNSAT from PMS or SPDS computer temperature indication for T5605-5 and PROVIDE THE FOLLOWING IF T5606-6.
PMS OR SPDS COMPUTER OOS ONLY: Data recorded.
POSITIVE CUE:
From the PMS computer: Average Containment Temperature T5605-5 = 121.46°F; calculated per Attachment C step 1.0.
T5606-6 = 128.19°F.
Source of data circled on data sheet.
- 6. Determine Control Room temperature. Obtained Control Room temperature and N/A SAT UNSAT PROVIDE THE FOLLOWING instrument number.
INFORMATION, WHEN ASKED:
POSITIVE CUE: Recorder Control Room temperature and Control Room temperature is 70°F and instrument number on Attachment C.
instrument number is DT034.
(C) 7. Calculate recombiner temperature Calculated temperature correction factor N/A SAT UNSAT correction factor. per Attachment C Step 3.0.
JPM- ANO-2-JPM-NRC-H2001 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 8. Record temperature correction factor Recorded temperature correction factor N/A SAT UNSAT on data sheet. on data sheet.
(C) 9. Record start time and turn Recorded start time and on panel 2C184, N/A SAT UNSAT potentiometer slowly clockwise until turned potentiometer clockwise until 48 KW is indicated. 48 KW indicated on KW meter.
END
JPM- ANO-2-JPM-NRC-H2001 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:
ANSWER:
JPM- ANO-2-JPM-NRC-H2001 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
OP 2104.044 Supplement 2 is completed through step 2.1.
INITIATING CUE:
The SS/CRS directs, "Perform the Semi-Annual Hydrogen Recombiner Functional Test for 2M55B using OP 2104.044 Supplement 2 starting with Step 2.2."