JPM- ANO-2-JPM-NRC-H2001 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 7 DATE:

SYSTEM/DUTY AREA: Hydrogen Recombiner and Purge System TASK: Perform initial actions for hydrogen recombiner functional test (semi-annual on 2M55B)

JTA#: 20285050201 KA VALUE: RO: 4.0 SRO: 4.0 KA

REFERENCE:

028 000 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 20 minutes REFERENCE(S): OP 2104.044-025-02-0 EXAMINEE'S NAME: SSN: - -

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-H2001 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: OP 2104.044 Supplement 2 is completed through step 2.1.

TASK STANDARD: OP 2104.044 Supplement 2 is completed through Step 2.7 TASK PERFORMANCE AIDS: OP 2104.044 Supplement 2, calculator

JPM- ANO-2-JPM-NRC-H2001 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Perform the Semi-Annual Hydrogen Recombiner Functional Test for 2M55B using OP 2104.044 Supplement 2 starting with Step 2.2."

CRITICAL ELEMENTS (C): 3, 7, 9 PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify PWR AVAILABLE light ON. On panel 2C184, observed PWR N/A SAT UNSAT AVAILABLE light ON.
2. Verify PWR ADJ potentiometer set at On panel 2C184, observed PWR ADJ N/A SAT UNSAT zero. potentiometer set at 000 (digital readout at 000).

OR On panel 2C184, turned potentiometer counter-clockwise to 000 (digital readout at 000).

(C) 3. Close POWER OUT switch. On panel 2C184, placed POWER OUT N/A SAT UNSAT switch to ON.

4. Determine recombiner temperature Obtained recombiner temperature N/A SAT UNSAT indication correction factor. indication correction from Attachment C.
5. Determine containment temperature. Obtained containment temperature data N/A SAT UNSAT from PMS or SPDS computer temperature indication for T5605-5 and PROVIDE THE FOLLOWING IF T5606-6.

PMS OR SPDS COMPUTER OOS ONLY: Data recorded.

POSITIVE CUE:

From the PMS computer: Average Containment Temperature T5605-5 = 121.46°F; calculated per Attachment C step 1.0.

T5606-6 = 128.19°F.

Source of data circled on data sheet.

6. Determine Control Room temperature. Obtained Control Room temperature and N/A SAT UNSAT PROVIDE THE FOLLOWING instrument number.

INFORMATION, WHEN ASKED:

POSITIVE CUE: Recorder Control Room temperature and Control Room temperature is 70°F and instrument number on Attachment C.

instrument number is DT034.

(C) 7. Calculate recombiner temperature Calculated temperature correction factor N/A SAT UNSAT correction factor. per Attachment C Step 3.0.

JPM- ANO-2-JPM-NRC-H2001 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

8. Record temperature correction factor Recorded temperature correction factor N/A SAT UNSAT on data sheet. on data sheet.

(C) 9. Record start time and turn Recorded start time and on panel 2C184, N/A SAT UNSAT potentiometer slowly clockwise until turned potentiometer clockwise until 48 KW is indicated. 48 KW indicated on KW meter.

END

JPM- ANO-2-JPM-NRC-H2001 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:

ANSWER:

JPM- ANO-2-JPM-NRC-H2001 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

OP 2104.044 Supplement 2 is completed through step 2.1.

INITIATING CUE:

The SS/CRS directs, "Perform the Semi-Annual Hydrogen Recombiner Functional Test for 2M55B using OP 2104.044 Supplement 2 starting with Step 2.2."