JPM-ANO-2-JPM-NRC-H2001 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 7 DATE:
SYSTEM/DUTY AREA: Hydrogen Recombiner and Purge System TASK: Perform initial actions for hydrogen recombiner functional test (semi-annual on 2M55B)
JTA#: 20285050201 KA VALUE: RO: 4.0 SRO: 4.0 KA
REFERENCE:
028 000 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 20 minutes REFERENCE(S): OP 2104.044-025-02-0 EXAMINEE'S NAME: SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-NRC-H2001 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: OP 2104.044 Supplement 2 is completed through step 2.1.
TASK STANDARD: OP 2104.044 Supplement 2 is completed through Step 2.7 TASK PERFORMANCE AIDS: OP 2104.044 Supplement 2, calculator
JPM-ANO-2-JPM-NRC-H2001 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Perform the Semi-Annual Hydrogen Recombiner Functional Test for 2M55B using OP 2104.044 Supplement 2 starting with Step 2.2."
CRITICAL ELEMENTS (C): 3, 7, 9 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1.
Verify PWR AVAILABLE light ON.
On panel 2C184, observed PWR AVAILABLE light ON.
N/A SAT UNSAT
- 2.
Verify PWR ADJ potentiometer set at zero.
On panel 2C184, observed PWR ADJ potentiometer set at 000 (digital readout at 000).
OR On panel 2C184, turned potentiometer counter-clockwise to 000 (digital readout at 000).
N/A SAT UNSAT (C)
- 3.
Close POWER OUT switch.
On panel 2C184, placed POWER OUT switch to ON.
N/A SAT UNSAT
- 4.
Determine recombiner temperature indication correction factor.
Obtained recombiner temperature indication correction from Attachment C.
N/A SAT UNSAT
- 5.
Determine containment temperature.
PROVIDE THE FOLLOWING IF PMS OR SPDS COMPUTER OOS ONLY:
POSITIVE CUE:
From the PMS computer:
T5605-5 = 121.46°F; T5606-6 = 128.19°F.
Obtained containment temperature data from PMS or SPDS computer temperature indication for T5605-5 and T5606-6.
Data recorded.
Average Containment Temperature calculated per Attachment C step 1.0.
Source of data circled on data sheet.
N/A SAT UNSAT
- 6.
Determine Control Room temperature.
PROVIDE THE FOLLOWING INFORMATION, WHEN ASKED:
POSITIVE CUE:
Control Room temperature is 70°F and instrument number is DT034.
Obtained Control Room temperature and instrument number.
Recorder Control Room temperature and instrument number on Attachment C.
N/A SAT UNSAT (C)
- 7.
Calculate recombiner temperature correction factor.
Calculated temperature correction factor per Attachment C Step 3.0.
N/A SAT UNSAT
JPM-ANO-2-JPM-NRC-H2001 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 8.
Record temperature correction factor on data sheet.
Recorded temperature correction factor on data sheet.
N/A SAT UNSAT (C)
- 9.
Record start time and turn potentiometer slowly clockwise until 48 KW is indicated.
Recorded start time and on panel 2C184, turned potentiometer clockwise until 48 KW indicated on KW meter.
N/A SAT UNSAT END
JPM-ANO-2-JPM-NRC-H2001 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:
ANSWER:
JPM-ANO-2-JPM-NRC-H2001 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
OP 2104.044 Supplement 2 is completed through step 2.1.
INITIATING CUE:
The SS/CRS directs, "Perform the Semi-Annual Hydrogen Recombiner Functional Test for 2M55B using OP 2104.044 Supplement 2 starting with Step 2.2."