JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 1 of 6 SYSTEM/DUTY AREA: Stator Water Cooling System TASK: Shift Stator Water Cooling Pumps JTA #: None KA VALUE RO: 3.9 SRO: 3.4 KA
REFERENCE:
045 2.1.30 APPROVED FOR ADMINISTRATION TO: NLO: X RO: X SRO: X TASK LOCATION:
INSIDE CR:
OUTSIDE CR: X BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: Simulate SIMULATOR:
LAB:
POSITION EVALUATED:NLO:
RO: SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR: PLANT SITE: X LAB:
TESTING METHOD:
SIMULATE: X PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 5 minutes REFERENCE(S): OP 2106.004 Rev.012-01-0 EXAMINEES NAME: SSN: - -
EVALUATORS NAME: DATE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
__________Start Time
__________ Stop Time
__________ Total Time Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
SIGNED: DATE:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 2 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.
TASK STANDARD: 2P-25A has been started and 2P-25B has been secured.
TASK PERFORMANCE AIDS: OP 2106.004, Section 7.2
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 3 of 6 INITIATING CUE:
The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.
CRITICAL ELEMENTS (C): 1, 2 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 1.
Place 2P-25A/B select switch (2HS-9784) to B-RUN A-RES.
POSITIVE CUE:
For 2P-25B, red light on; green light off.
NEGATIVE CUE:
For 2P-25B, green light on; red light off.
On panel 2C140, rotated 2HS-9784 CCW to B-RUN A-RES.
Observed 2P-25B pump indication red light on; green light off.
N/A SAT UNSAT (C) 2.
Push the Reserve Coolant Pump Cutout pushbutton.
POSITIVE CUE:
For 2P-25A, green light on; red light off.
NEGATIVE CUE:
For 2P-25A, red light on; green light off.
At panel 2C140, pushed the Reserve Coolant Pump Cutout pushbutton.
Observed the 2P-25A pump running status lights.
N/A SAT UNSAT 3.
Verify the following readings are normal:
- Pump discharge pressure (2PI-9799)
- Stator Inlet Flow (2FIS-9722)
- Stator Inlet Pressure (2PI-9798)
POSITIVE CUE:
2PI-9799 shows 120 psig.
2FIS-9722 shows between 510 and 525 gpm.
2PI-9798 shows 60 psig.
Verified pressures and flow to be normal.
N/A SAT UNSAT
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 4 of 6 PERFORMANCE CHECKLIST STANDARDS (Circle One) 4.
Notify control room of pump shift and pump status.
Using the plant telephone, notified the control room that 2P-25B is running.
N/A SAT UNSAT END STOP TIME:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 5 of 6 Question:
Answer:
JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 6 of 6 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.
INITIATING CUE:
The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.