Init EXAM-4-2000-Draft JPM Swcsp - Shift Stator Water Cooling Pumps
ML003716762
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/24/2000
From:
NRC Region 4
To:
References
-RFPFR
Download: ML003716762 (6)


Text

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 1 of 6 SYSTEM/DUTY AREA: Stator Water Cooling System TASK: Shift Stator Water Cooling Pumps JTA #: None KA VALUE RO: 3.9 SRO: 3.4 KA

REFERENCE:

045 2.1.30 APPROVED FOR ADMINISTRATION TO: NLO: X RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: NLO: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: X LAB:

TESTING METHOD: SIMULATE: X PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 5 minutes REFERENCE(S): OP 2106.004 Rev.012-01-0 EXAMINEES NAME: SSN: - -

EVALUATORS NAME: DATE:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

__________Start Time __________ Stop Time __________ Total Time Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

SIGNED: DATE:

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 2 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.

TASK STANDARD: 2P-25A has been started and 2P-25B has been secured.

TASK PERFORMANCE AIDS: OP 2106.004, Section 7.2

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 3 of 6 INITIATING CUE:

The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.

CRITICAL ELEMENTS (C): 1, 2 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Place 2P-25A/B select switch On panel 2C140, rotated 2HS-9784 N/A SAT UNSAT (2HS-9784) to B-RUN A-RES. CCW to B-RUN A-RES.

Observed 2P-25B pump indication POSITIVE CUE: red light on; green light off.

For 2P-25B, red light on; green light off.

NEGATIVE CUE:

For 2P-25B, green light on; red light off.

(C) 2. Push the Reserve Coolant Pump At panel 2C140, pushed the Reserve N/A SAT UNSAT Cutout pushbutton. Coolant Pump Cutout pushbutton.

POSITIVE CUE:

For 2P-25A, green light on; red Observed the 2P-25A pump running light off. status lights.

NEGATIVE CUE:

For 2P-25A, red light on; green light off.

3. Verify the following readings are Verified pressures and flow to be N/A SAT UNSAT normal: normal.

- Pump discharge pressure (2PI-9799)

- Stator Inlet Flow (2FIS-9722)

- Stator Inlet Pressure (2PI-9798)

POSITIVE CUE:

2PI-9799 shows 120 psig.

2FIS-9722 shows between 510 and 525 gpm.

2PI-9798 shows 60 psig.

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 4 of 6 PERFORMANCE CHECKLIST STANDARDS (Circle One)

4. Notify control room of pump shift Using the plant telephone, notified N/A SAT UNSAT and pump status. the control room that 2P-25B is running.

END STOP TIME:

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 5 of 6 Question:

Answer:

JOB PERFORMANCE MEASURE JPM-#- ANO-2-JPM-NRC-SWCSP REV. 00 PAGE 6 of 6 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Predictive maintenance would like to take vibration readings on B stator water cooling pump (2P-25B). 2P-25A is running.

INITIATING CUE:

The SS/CRS directs, Shift Stator Water Cooling Pumps from 2P-25A to 2P-25B using OP 2106.004 Section 7.2.