ML003716677
| ML003716677 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/24/2000 |
| From: | NRC Region 4 |
| To: | |
| References | |
| -RFPFR | |
| Download: ML003716677 (6) | |
Text
JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT:
2 REV #:
000 DATE:
SYSTEM/DUTY AREA:
Equipment Control TASK:
Evaluate Containment Atmospheric Conditions (using computer - normal operations).
JTA#:
21035010201 KA VALUE RO:
3.0 SRO:
3.4 KA
REFERENCE:
2.2.12 APPROVED FOR ADMINISTRATION TO:
RO:
X SRO:
X TASK LOCATION:
INSIDE CR:
X OUTSIDE CR:
BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate SIMULATOR:
Perform LAB:
POSITION EVALUATED:
RO:
SRO:
ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:
TESTING METHOD:
SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE(S):
OP 2104.033 Rev 039-01-0 EXAMINEE'S NAME:
SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED:
DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
100% steady state power operations. The PMS computer is available.
TASK STANDARD:
Containment atmospheric conditions have been evaluated in accordance with Technical Specifications.
TASK PERFORMANCE AIDS:
OP 2104.033, Supplement 4 ; calculator EXAMINER'S NOTE:
JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Perform an evaluation of containment atmospheric conditions using OP 2104.033 Supplement 4."
CRITICAL ELEMENTS (C): 3, 5, 6, 7 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.
Verify computer points available.
POSITIVE CUE:
All required computer points available.
On SPDS terminal or on the PMS computer, verified the following computer points available:
- T5605-5
- T5606-6 and at least three of the following:
- P5601-1 through
- P5601-4 N/A SAT UNSAT 2.
Record containment temperature.
POSITIVE CUE:
Containment temperatures are:
T5605-5 116.9F T5606-6 115.7F On SPDS terminal or on the PMS computer, displayed following containment temperature points:
T5605-5 T5606-6 Recorded containment temperature readings in OP 2104.033 Supplement 4 Step 2.1.
N/A SAT UNSAT (C) 3.
Calculate average containment temperature.
Used formula provided in OP 2104.033 Supplement 4 and readings from SPDS or PMS computer to calculate average containment temperature.
Recorded average containment temperature on OP 2104.033 Supplement 4 Step 2.1.
N/A SAT UNSAT 4.
Record containment pressure.
POSITIVE CUE:
Containment pressures are:
P5601-1 14.1 psia P5602-2 14.2 psia P5603-3 14.2 psia P5604-4 14.1 psia On SPDS terminal 2C69 or on the PMS computer, displayed at least three of the following containment pressure points:
P5601-1 P5603-3 P5602-2 P5604-4 Recorded containment pressure readings in OP 2104.033 Supplement 4 Step 2.2.
N/A SAT UNSAT
JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 5.
Calculate average containment pressure.
Used table provided in OP 2104.033 Supplement 4 Step 2.2 and readings from SPDS or from PMS computer to calculate average containment pressure.
Recorded average containment pressure on OP 2104.033 Supplement 4 Step 2.2.
N/A SAT UNSAT (C) 6.
Plot average containment pressure vs average containment temperature.
Plotted calculated parameters on OP 2104.033 Supplement 4, Figure 1.
N/A SAT UNSAT (C) 7.
Compare containment Atmospheric parameters to Technical Specification requirements.
Used containment pressure-temperature point plotted on Figure 4-1 to determine if containment atmospheric conditions are within the region of acceptable operations.
Completed OP 2104.033 Supplement 4 Section 3.0 to indicate Technical Specification 3.6.1.4 compliance.
N/A SAT UNSAT END
JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE QUESTION 1:
ANSWER:
JPM-ANO-2-JPM-NRC-CNTMT01 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: 100% steady state power operations. The PMS computer is available.
INITIATING CUE:
The SS/CRS directs, "Perform an evaluation of containment atmospheric conditions using OP 2104.033 Supplement 4."