Init EXAM-4-2000-Draft JPM A-2
ML003716677
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/24/2000
From:
NRC Region 4
To:
References
-RFPFR
Download: ML003716677 (6)


Text

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 1 OF 6 ADMIN JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Equipment Control TASK: Evaluate Containment Atmospheric Conditions (using computer - normal operations).

JTA#: 21035010201 KA VALUE RO: 3.0 SRO: 3.4 KA

REFERENCE:

2.2.12 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): OP 2104.033 Rev 039-01-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 2 OF 6 ADMIN JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

100% steady state power operations. The PMS computer is available.

TASK STANDARD:

Containment atmospheric conditions have been evaluated in accordance with Technical Specifications.

TASK PERFORMANCE AIDS:

OP 2104.033, Supplement 4 ; calculator EXAMINER'S NOTE:

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 3 OF 6 ADMIN JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Perform an evaluation of containment atmospheric conditions using OP 2104.033 Supplement 4."

CRITICAL ELEMENTS (C): 3, 5, 6, 7 PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify computer points available. On SPDS terminal or on the PMS N/A SAT UNSAT computer, verified the following POSITIVE CUE: computer points available:

All required computer points - T5605-5 available. - T5606-6 and at least three of the following:

- P5601-1 through

- P5601-4

2. Record containment temperature. On SPDS terminal or on the PMS N/A SAT UNSAT computer, displayed following POSITIVE CUE: containment temperature points:

Containment temperatures are:

T5605-5 T5606-6 T5605-5 116.90F T5606-6 115.70F Recorded containment temperature readings in OP 2104.033 Supplement 4 Step 2.1.

(C) 3. Calculate average containment Used formula provided in N/A SAT UNSAT temperature. OP 2104.033 Supplement 4 and readings from SPDS or PMS computer to calculate average containment temperature.

Recorded average containment temperature on OP 2104.033 Supplement 4 Step 2.1.

4. Record containment pressure. On SPDS terminal 2C69 or on the N/A SAT UNSAT PMS computer, displayed at least POSITIVE CUE: three of the following containment Containment pressures are: pressure points:

P5601-1 14.1 psia P5601-1 P5603-3 P5602-2 14.2 psia P5602-2 P5604-4 P5603-3 14.2 psia P5604-4 14.1 psia Recorded containment pressure readings in OP 2104.033 Supplement 4 Step 2.2.

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 4 OF 6 ADMIN JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5. Calculate average containment Used table provided in OP 2104.033 N/A SAT UNSAT pressure. Supplement 4 Step 2.2 and readings from SPDS or from PMS computer to calculate average containment pressure.

Recorded average containment pressure on OP 2104.033 Supplement 4 Step 2.2.

(C) 6. Plot average containment pressure Plotted calculated parameters on N/A SAT UNSAT vs average containment OP 2104.033 Supplement 4, Figure 1.

temperature.

(C) 7. Compare containment Used containment N/A SAT UNSAT Atmospheric parameters to pressure-temperature point plotted Technical Specification on Figure 4-1 to determine if requirements. containment atmospheric conditions are within the region of acceptable operations.

Completed OP 2104.033 Supplement 4 Section 3.0 to indicate Technical Specification 3.6.1.4 compliance.

END

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 5 OF 6 ADMIN JOB PERFORMANCE MEASURE QUESTION 1:

ANSWER:

JPM- ANO-2-JPM-NRC-CNTMT01 PAGE 6 OF 6 ADMIN JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: 100% steady state power operations. The PMS computer is available.

INITIATING CUE:

The SS/CRS directs, "Perform an evaluation of containment atmospheric conditions using OP 2104.033 Supplement 4."