ML060610466

From kanterella
Revision as of 23:35, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Inspection/Activity Plan, 03-01/2006 - 09/30/2007
ML060610466
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB5
To:
Virginia Electric & Power Co (VEPCO)
Shared Package
ML060610404 List:
References
IR-06-001
Download: ML060610466 (2)


Text

North Anna Inspection / Activity Plan 03/01/2006

-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 10:37:37 Report 22 3 PSB1-RP-RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 03/13/2006 03/17/2006 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/13/2006 03/17/2006 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 03/13/2006 03/17/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/13/2006 03/17/2006 1, 2 71151 IP Performance Indicator Verification 2 EB3-ISI-U1 INSERVICE INSPECTION Baseline Inspections 03/20/2006 03/24/2006 1 7111108P IP Inservice Inspection Activities - PWR 1 EB3SGISI-U1 SG ISI Baseline Inspections 03/20/2006 03/24/2006 1 7111108P IP Inservice Inspection Activities - PWR 3 PSB1-RP-RP BASELINE OCCUPATIONAL WK2 Baseline Inspections 03/27/2006 03/31/2006 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/27/2006 03/31/2006 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 03/27/2006 03/31/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/27/2006 03/31/2006 1, 2 71151 IP Performance Indicator Verification 1 EB3-HS-HEAT SINK Baseline Inspections 05/01/2006 05/05/2006 1, 2 7111107B IP Heat Sink Performance 3 OL PREP-INITIAL EXAM PREP Not Applicable 05/01/2006 05/05/2006 1 V23257 NORTH ANNA/MAY 2006 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM WEEK 1 Not Applicable 05/22/2006 05/26/2006 1 V23257 NORTH ANNA/MAY 2006 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM WEEK 2 Not Applicable 06/05/2006 06/09/2006 1 V23257 NORTH ANNA/MAY 2006 EXAM AT POWER FACILITIES 4 EB1-MODS-MODIFICATIONS/10CFR50.59 Baseline Inspections 06/12/2006 06/16/2006 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/12/2006 06/16/2006 1, 2 7111117B IP Permanent Plant Modifications 1 ISFSI-O-60855.1 - OPERATION OF AN ISFSI Other Routine 07/03/2006 07/07/2006 1 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 3 PS2-EP-EP EXERCISE Baseline Inspections 12/04/2006 12/08/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 12/04/2006 12/08/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/04/2006 12/08/2006 1, 2 71151 IP Performance Indicator Verification 4 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 12/11/2006 12/15/2006 1, 2 7111121 IP Component Design Bases Inspection 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/08/2007 01/12/2007 1, 2 7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

North Anna Inspection / Activity Plan 03/01/2006

-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 10:37:37 Report 22 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111121 IP Component Design Bases Inspection 1 EB3-ISI-U2 INSERVICE INSPECTION Baseline Inspections 03/26/2007 03/30/2007 2 7111108P IP Inservice Inspection Activities - PWR 1 EB3SGISI-U2 STEAM GENERATOR ISI Baseline Inspections 04/02/2007 04/06/2007 2 7111108P IP Inservice Inspection Activities - PWR 4 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 04/02/2007 04/06/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 04/16/2007 04/20/2007 1, 2 71152B IP Identification and Resolution of Problems 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Baseline Inspections 04/08/2007 04/13/2007 2 71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 1 PSB1-RP-RP PUBLIC PRE-INSP VISIT/ISFSI Baseline Inspections 05/14/2007 05/16/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas 4 PSB1-RP-RP PUBLIC BASELINE INSPECTION Baseline Inspections 06/11/2007 06/15/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 06/11/2007 06/15/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 06/11/2007 06/15/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 06/11/2007 06/15/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 06/11/2007 06/15/2007 1, 2 71151 IP Performance Indicator Verification 1 PS2-EP-EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111402 IP A lert and Notification System Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/06/2007 08/10/2007 1, 2 71151 IP Performance Indicator Verification 1 EB3-ISI-U1 INSERVICE INSPECTION Baseline Inspections 09/17/2007 09/21/2007 1 7111108P IP Inservice Inspection Activities - PWR 1 EB3SGISI-U1 STEAM GENERATOR ISI Baseline Inspections 09/24/2007 09/28/2007 1 7111108P IP Inservice Inspection Activities - PWR 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)

Baseline Inspections 09/30/2007 10/05/2007 1 71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.