Sequoyah Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 12:34:12 Report 22 1 2515/169-TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 1 EB3-MR-MR EFFECTIVENESS Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111112B IP Maintenance Effectiveness 3 PS2-EP-EP EXERCISE Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/28/2006 09/01/2006 1, 2 71151 IP Performance Indicator Verification 3 OL RQ-REQUAL INSPECTION Baseline Inspections 10/16/2006 10/20/2006 1, 2 7111111B IP Licensed Operator Requalification Program 4 EB1-MODS-MODIFICATIONS/10CFR50.59 Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments 1 EB3-ISI-U2-INSERVICE INSPECTION Baseline Inspections 12/04/2006 12/08/2006 2 7111108P IP Inservice Inspection Activities - PWR 2 EB3TI150-2515/150 U-2: RPV & VHP NOZZLES Safety Issues 12/04/2006 12/08/2006 2 2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB3SGISI-U2 STEAM GENERATOR ISI Baseline Inspections 12/11/2006 12/15/2006 2 7111108P IP Inservice Inspection Activities - PWR 1 PSB1-RP-ACCESS CONTROL Baseline Inspections 12/11/2006 12/15/2006 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas 3 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Safety Issues 12/17/2006 12/22/2006 2 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02
]5 OL PREP-INITIAL EXAM PREP Not Applicable 03/19/2007 03/23/2007 1 V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES 2 EB3-HS-HEAT SINK Baseline Inspections 03/26/2007 03/30/2007 1, 2 7111107B IP Heat Sink Performance 5 OL EXAM-INITIAL EXAM WEEK 1 Not Applicable 04/09/2007 04/13/2007 1 V23243 SEQUOYAH/APRIL 2007 EXAM AT POWER FACILITIES 5 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/14/2007 05/18/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/18/2007 06/22/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/09/2007 07/13/2007 1, 2 7111121 IP Component Design Bases Inspection 1 PS2-EP-EP INSP Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111402 IP A lert and Notification System Testing This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Sequoyah Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 12:34:12 Report 22 1 PS2-EP-EP INSP Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 05/21/2007 05/25/2007 1, 2 71151 IP Performance Indicator Verification 1 60855.1-OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 1 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 3 RPB6-PIR-BIENNIAL PI&R INSPECTION Baseline Inspections 07/23/2007 07/27/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 08/06/2007 08/10/2007 1, 2 71152B IP Identification and Resolution of Problems 1 PSB1-RP-RP OCCUPATIONAL PRE-INSP VISIT/ISFSI Baseline Inspections 09/04/2007 09/06/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 10/01/2007 10/05/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/01/2007 10/05/2007 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 10/01/2007 10/05/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/01/2007 10/05/2007 1, 2 71151 IP Performance Indicator Verification 1 EB3TI150-2515/150 U-1: RPV & VHP NOZZLES Safety Issues 10/15/2007 10/19/2007 1 2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
Safety Issues 10/21/2007 10/26/2007 1 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02
]1 EB3ISI-U1 ISI Baseline Inspections 10/22/2007 10/26/2007 1 7111108P IP Inservice Inspection Activities - PWR 3 PSB1-RP-RP OCCUPATIONAL BASELINE INSP WK 2 Baseline Inspections 10/22/2007 10/26/2007 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/22/2007 10/26/2007 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 10/22/2007 10/26/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/22/2007 10/26/2007 1, 2 71151 IP Performance Indicator Verification 2 OL PREP-INITIAL EXAM PREP Not Applicable 01/07/2008 01/11/2008 1 V23276 SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES 2 OL EXAM-INITIAL EXAM Not Applicable 01/28/2008 02/01/2008 1 V23276 SEQUOYAH/JANUARY 2008 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.