MONTHYEARML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report ML24030A9092024-04-10010 April 2024 Issuance of Amendment Nos. 224 and 207, Regarding Revision to Technical Specification 3.4.14 (Reactor Coolant System) Pressure Isolation Valve Leakage Surveillance Requirement 3.4.14.1 ML24079A0062024-04-10010 April 2024 – Proposed Alternative to the Requirements of ASME Code of Operation and Maintenance of Nuclear Power Plants for Pressure Isolation Valve Testing Frequency ML24096A1322024-04-0505 April 2024 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing and Order (EPID L-2024-LLA-0043) - Letter NL-24-0128, License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency2024-04-0404 April 2024 License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0112, Request for Revision to NRC Staff Assessment of Vogtle Site Updated Seismic Hazards2024-03-28028 March 2024 Request for Revision to NRC Staff Assessment of Vogtle Site Updated Seismic Hazards NL-24-0098, Report on Status of Decommissioning Funding2024-03-28028 March 2024 Report on Status of Decommissioning Funding 2024-09-09
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000424/20233012023-06-30030 June 2023 NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML22118A7302022-04-28028 April 2022 NRC Operator License Examination Report 05200025/2022301 and 0520026/2022301 ML22070A0892022-03-0707 March 2022 Reissue - Vogtle Electric Generating Plant Unit 3 & 4 - NRC Operator License Examination Report 05200025/2021301 and 05200026/2021301 IR 05000424/20213012022-01-13013 January 2022 NRC Operator License Examination Report 05000424/2021301 and 05000425/2021301 ML21312A1912021-11-0505 November 2021 License Examination Report 5200025/2021301 ML20127H9862020-05-0606 May 2020 NRC Operator License Examination Report 5200025/2020301 IR 05000424/20193012019-08-14014 August 2019 NRC Operator License Examination Report 05000424/2019301 and 05000425/2019301 ML19215A0112019-08-0303 August 2019 Il T22 NRC Post-Exam Comment ML18142B4542018-05-22022 May 2018 NRC Operator License Examination Report 5200025/2018302 ML17289A2332017-10-13013 October 2017 NRC Examination Report 05000424/2017301 and 05000425/2017301 IR 05000424/20153012015-11-24024 November 2015 NRC Operator License Examination Report 05000424/2015301 and 05000425/2015301 IR 05000424/20143012014-07-16016 July 2014 Er 05000424-14-301 & 05000425-14-301, 05/12-15/2014, Vogtle, Units 1 & 2, Operator License Examinations IR 05000424/20133012013-06-27027 June 2013 Er 05000424-13-301, 05000425-13-301; 04/15/2013 & 05/02/2013, and 05/10/2013; Vogtle Electric Generating Plant Units 1 and 2; Operator License Examinations ML12249A2372012-09-0404 September 2012 Fairness Review (Fje 31AUG12) ML1216302872012-06-0707 June 2012 Er 05000424-12-301, 05000425-12-301, on March 26 - April 13, 2012, and April 20, 2012, Vogtle Electric Generating Plant Units 1 and 2, Operator License Examinations ML1212805692012-05-0707 May 2012 Vogtle Initial Exam 2012-301 Final SRO Written Exam ML1212805732012-04-26026 April 2012 Initial Exam 2012-301 Post Exam Comments IR 05000424/20113012011-05-12012 May 2011 Er 05000424-11-301, 05000425-11-301, on March 16 - 24, 2011, and April 1, 2011, Vogtle Electric Generating Plant Units 1 and 2, Operator License Examinations ML1032106432010-11-17017 November 2010 Notification of Licensed Operator Initial Examination 05000424-11-301 and 05000425-11-301 IR 05000424/20093012009-08-0707 August 2009 IR 05000424-09-301; IR 05000425-09-301, on 06/01/09 - 06/08/09, Vogtle Electric Generating Plan, Units 1 and 2 IR 05000424/20073012007-09-14014 September 2007 Er 05000424-07-301 and 05000425-07-301, on 07/30/2007 - 08/03/2007, and 08/15/2007, Vogtle Electric Generating Plant, Units 1 and 2; Licensed Operator Examinations 2023-06-30
[Table view] |
Text
September 14, 2007Southern Nuclear Operating Company, Inc.ATTN:Mr. T. Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA. 30830SUBJECT:VOGTLE ELECTRIC GENERATING PLANT - NRC EXAMINATION REPORT 05000424/2007301 AND 05000425/2007301
Dear Mr. Tynan:
During the period of July 30 - August 3, 2007, the Nuclear Regulatory Commission (NRC)administered operating examinations to employees of your company who had applied for licenses to operate the Vogtle Electric Generating Plant Units 1 and 2. At the conclusion of the examination, the examiners discussed the examination questions and preliminary findings withthose members of your staff identified in the enclosed report. The written examination was administered by your staff on August 15, 2007. Six reactor operator (RO) and five senior reactor operator (SRO) applicants passed both thewritten and operating examinations. There were no post examination comments submitted.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Should you have any questions concerning this letter, please contact me at (404) 562-4607.
Sincerely,
\\RA\\Robert C. Haag, ChiefOperations Branch Division of Reactor SafetyDocket Nos.: 50-424, 50-425License Nos.: NPF-68, NPF-81
Enclosure:
(See page 2)
SNC2Enclosure: Report Details
REGION IIDocket Nos.:50-424, 50-425License Nos.:NPF-68, NPF-81 Report No.:05000424/2007301 and 05000425/2007301 Licensee:Southern Nuclear Operating Company, Inc.
Facility:Vogtle Electric Generating Plant Location:7821 River RoadWaynesboro, GA 30830Dates:Operating Tests - July 30 - August 3, 2007Written Examination - August 15, 2007Examiners:E. Lea, Chief, Senior Operations ExaminerG. Laska, Senior Operations Engineer D. Muller, Reactor Engineer, NRR C. Kuntz, Operations Engineer (In training)Approved by:Robert C. Haag, ChiefOperations Branch Division of Reactor Safety Enclosure SUMMARY OF FINDINGSER 05000424/2007301, ER 05000425/2007301; 7/30 - 8/3/2007, and 8/15/2007, Vogtle ElectricGenerating Plant, Units 1 and 2; Licensed Operator Examinations.The NRC examiners conducted operator licensing initial examinations in accordance with theguidance in NUREG-1021, Revision 9, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements of 10 CFR
§55.41, §55.43, and §55.45.The NRC administered the operating tests during the period of July 30 - August 3, 2007. Members of the Vogtle Electric Generating Plant training staff administered the written examination on August 15, 2007. The written examinations and the operating tests were developed by the Vogtle Electric Generating Plant training staff.Six Reactor Operators (RO) and five Senior Reactor Operators (SRO) passed both theoperating test and written examination. All of the applicants were issued operator licenses commensurate with the level of examination administered. There were no post examination comments.
No findings of significance were identified.
Enclosure Report Details4.OTHER ACTIVITIES 4OA5Operator Licensing Initial Examinations a.Inspection ScopeThe Vogtle training staff developed the written examinations and the operating tests.
The NRC examination team reviewed the proposed written examinations and operating tests to determine whether they were developed in accordance with NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Revision 9.
Examination changes, agreed upon between the NRC and the licensee, were made according to NUREG-1021 and incorporated into the final version of the examination materials. The examiners reviewed the licensee's examination security measures while preparingand administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, "Integrity of examinations and tests." The examiners evaluated six RO and five SRO applicants who were being assessedunder the guidelines specified in NUREG-1021. The examiners administered the operating tests during the period of July 30 - August 3, 2007. Members of the Vogtle training staff administered the written examinations on August 15, 2007. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the Vogtle Electric Generating Plant Units 1 and 2, met the requirements specified in 10 CFR 55, "Operators' Licenses." b.FindingsNo findings of significance were identified.
The NRC determined that the details provided by the licensee for the writtenexaminations and the walkthrough and simulator tests were within the range of acceptability expected for a proposed examination. Six RO and five SRO applicants passed both the written examinations and operatingtests. Each applicant was issued an operator license commensurate with the level of examination administered. There were no post examination comments concerning the examination. The writtenexaminations, question references, and answers may be accessed in the ADAMS system (ADAMS Accession Numbers ML072540769 and ML072540789).Copies of all individual examination reports were sent to the facility Training Manager forevaluation and determination of appropriate remedial training.
Enclosure 4OA6MeetingsExit Meeting SummaryOn August 3, the examination team discussed generic issues with Mr. R. Brown andmembers of his staff. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.PARTIAL LIST OF PERSONS CONTACTEDLicensee personnelR. Brown, Training and Emergency Preparedness ManagerJ. Robinson, Operations Manager D. Scukanec, Training & Emergency Preparedness, Operations Training Supervisor T. Thompson, Operations Training Instructor S. Waldrup, Operations Support Superintendent J. Williams, Site Support ManagerNRC PersonnelB. Anderson, Resident Inspector