Category:Letter
MONTHYEARIR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) 2024-09-04
[Table view] |
See also: IR 05000324/2010301
Text
Progress Energy FEB 192010 SERIAL: BSEP 10-0025 U. S. Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, DC 20555-0001
Subject: Brunswick
Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating
License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Operating
Test and Written Examination
Reference
Materials
for Licensed Operator Initial Examination
50-325/2010-301
and 50-324/2010-301
Reference:
Letterfrom
Malcolm T. Widmann (NRC) to Benjamin C. Waldrep (CP&L),"Brunswick
Steam Electric Plant -Notification
of Licensed Operator Initial Examination
05000325/2010301
and 05000324/2010301," dated December 4, 2009, ADAMS Accession
Number ML093380120
Dear Mr. Reyes: In accordance
with the guidelines
in Revision 9, Supplement
1, of NUREG-1021,"Operator
Licensing
Examination
Standards
for Power Reactors," Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., is providing
the examination
reference
materials
supporting
the operating
test which is scheduled
to be administered
during the weeks of April 5 and April 12, 2010, and the written examination
scheduled
to be administered
during the week of April 19, 2010, respectively.
In accordance
with the schedule contained
in the NRC's letter datedDecember
4, 2009, a list of the examination
materials
and reference
materials
is provided in Enclosure
1.Copies of Examiner Standard Forms and Checklists
from ES-201 and ES-401 are provided in Enclosure
2. A copy of the written examination
is provided in Enclosure
3. Copies of the simulator
dynamic scenarios
and Job Performance
Measures (JPMs) are provided in Enclosure
4. Copies of the reference
materials
are provided in Enclosure
5 (i.e., on a CD-ROM).Enclosures
2, 3, 4, and 5 are being provided only to Mr. Richard Baldwin, the assigned NRC chief examiner, with his copy of this letter. In accordance
with Revision 9, Supplement
1, of NUREG- 1021, Section ES-20 1, "Initial Operator Licensing
Examination
Process," please ensure that the examination
materials
and reference
materials
are withheld from public disclosure
until after the examination
is complete.Progress Energy Carolinas, Inc.Brunswick
Nuclear Plant PO Box 10429 Southport, NC 28461
-q t.Mr. Luis A. Reyes, Regional Administrator
BSEP 10-0025 / Page 2 No regulatory
commitments
are contained
in this letter. Please refer any questions regarding
this submittal
to Mr. Bob Bolin, Nuclear Operations
Training Instructor, at (910) 457-3078, or Mr. Lenny Beller, Superintendent.-
Operations
Training, at (910) 457-2073.Sincerely, Phyllis N. Mentel Manager -Support Services Brunswick
Steam Electric Plant WRM/wrm Enclosures:
1. List of Examination
Materials
and Reference
Materials 2. Examiner Standard Forms and Checklists
3. Written Examination
Questions 4. Simulator
Scenarios
and Job Performance
Measures (JPMs)5. Reference
Materials (CD-ROM)
Mr. Luis.A. Reyes, Regional Administrator
BSEP 10-0025 / Page 3 cc (with Enclosures
1 through 5): U. S. Nuclear Regulatory
Commission, Region II ATTN: Mr. Rick Baldwin Senior Operations
Engineer Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931
cc (without Enclosure
1 Only): U. S. Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, DC 20555-0001
U. S. Nuclear Regulatory
Commission, Region II ATTN: Mr. Malcolm T. Widmann Chief, Operations
Branch Sam Nunn Atlanta Federal Center.61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931
U. S. Nuclear Regulatory
Commission
ATTN: Mr. Philip B. O'Bryan, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869
U. S. Nuclear Regulatory
Commission (Electronic
Copy Only)ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A)11555 Rockville
Pike Rockville, MD 20852-2738
Chair -North Carolina Utilities
Commission
P.O. Box 29510 Raleigh, NC 27626-0510
$ II BSEP 10-0025 Enclosure
1 Page 1 of 2 List of Examinations
Materials
and Reference
Materials The following
documents, developed
in accordance
with NUREG- 1021, Revision 9, Supplement
1, "Operator
Licensing
Examination
Standards
for Power Reactors," are provided in Enclosure
2: Form ES-301-1 Administrative
Topics Outline Form ES-301-2 Control Room/In-Plant
Systems Outline Form ES-301-3 Operating
Test Quality Checklist Form ES-301-4 Simulator
Scenario Quality Checklist Form ES-301-5 Transient
and Event Checklist Form ES-301-6 Competencies
Checklist Form ES-401-6 Written Examination
Quality Checklist Enclosure
3 provides the proposed written examination (i.e., 75 "common" questions, 25 senior reactor operator (SRO) questions).
Enclosure
4 provides the Simulator
Dynamic Scenarios
(5) and Job Performance
Measures (i.e., Administrative, In-plant, and Simulator).
Enclosure
5 provides the following
reference
materials
on two CD-ROMs: Index of Provided Procedures
Abnormal Operating
Procedures (AOP)Administrative
Instructions (Al)Administrative
Procedures (AP)Alternate
Safe Shutdown (ASSD)Annunciator
Procedures (APP)Brunswick
Big Notes Calibration
Procedures (CAL)Emergency
Procedures (EMG)Emergency
Operating
Procedures (EOP)Engineering
Procedures (ENP)Environmental
and Radiation
Control Procedures (E&RC and EVC)Fuel Handling Procedures (FH)Fire Protection
Procedures (FPP)General Plant Procedures (GP)Maintenance
Procedures (NMNT)Measuring
Test Equipment
Procedures (MTE)Nuclear Generation
Group Procedures (NGGC)Operating
Procedures (OP)Operating
Instructions
(01)Operating
Work Packages (OWP)Periodic Tests (PT)Plant Emergency
Procedures (PEP)Plant Surveillance
Test Procedures (PST)
BSEP 10-0025 Enclosure
1 Page 2 of 2 Pre-Fire Plans (PFP)Regulatory
Procedures (LIC and REG)Security Procedures (SEC)System Descriptions (SD)Training Procedures (TRN)Technical
Specifications
Technical
Specifications
Bases Technical
Requirements
Manual Offsite Dose Calculation