DCL-10-044, Withdrawal of License Amendment Request 10-01, Revision to Technical Specification 3.8.1, AC Sources - Operating

From kanterella
Revision as of 10:18, 11 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Withdrawal of License Amendment Request 10-01, Revision to Technical Specification 3.8.1, AC Sources - Operating
ML101250465
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/23/2010
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-10-044, OL-DPR-80, OL-DPR-82
Download: ML101250465 (1)


Text

Pacific Gas and Electric CompanyJames R. Becker Site Vice President April 23, 2010 PG&E Letter DCL-10-044 Diablo Canyon Power Plant Mail Code 104/5/601 P 0. Box 56 Avila Beach, CA 93424 805.545.3462 Internal:

691.3462 Fax: 805.545.6445 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Withdrawal of License Amendment Request 10-01 Revision to Technical Specification 3.8.1, "AC Sources -Operating" Pursuant to 10 CFR 2.107 Pacific Gas and Electric Company (PG&E) hereby withdraws License Amendment Request (LAR) 10-01 "Revision to Technical Specification 3.8.1, 'AC Sources -Operating,"'

dated February 24, 2010.Recent inspection activity has revealed discrepancies with the current licensing basis (CLB) associated with this LAR. The discrepancies have led to differing interpretations of the CLB. PG&E intends to resolve these discrepancies by obtaining prior NRC approval of proposed changes to applicable sections of the Final Safety Analysis Report Update and Technical Specification Bases. PG&E intends to resubmit this LAR with an additional request for approval of this proposed clarifying licensing basis description.

PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.This letter includes no revisions to existing regulatory commitments.

If you have any questions or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720.Sincerely, James R. Becker lmpl/3386/N50307101 cc: Gary W. Butner, California Department of Public Health Elmo E. Collins, NRC Region IV Michael S. Peck, NRC, Senior Resident Inspector Alan B. Wang, NRC Project Manager, Office of NRR Diablo Distribution 40C)l A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak -Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek