IR 05000327/2012403

From kanterella
Revision as of 00:31, 29 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000327-12-403 and 05000328-12-403, 2/10/2012, Sequoyah Nuclear Plant
ML12090A680
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/28/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: James Shea
Tennessee Valley Authority
References
IR-12-403
Download: ML12090A680 (4)


Text

March 28, 2012

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2012403 AND 05000328/2012403

Dear Mr. Shea:

On February 10, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 9, 2012, with Mr. J. Carlin and other members of your staff. A re-exit meeting was conducted by telephone on March 2, 2012, with Mr. J. Carlin and other Sequoyah staff members

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission

=s rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter

=s enclosure will not be available for public inspection.

Based on the results of this inspection, no findings were identified.

Enclosure (s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled. TVA 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related Information BWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/ Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-327, 50-328 License Nos. DPR-77, DPR-79

Enclosure: Inspection Report 05000327/2012403 and 05000328/2012403 w/Attachment: Supp Info (OUO) cc w/encl.: (See page 3)

X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED TVA 3 cc w/Encl: G. M. Cook Manager Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 Mark Findlay General Manager, Security Operations Tennessee Valley Authority 1101 Market Street, EB 10B-C Chattanooga, TN 37402-2801

F. A. Little Manager Site Security Operations Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000