ML12178A210
ML12178A210 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 11/17/2011 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML12178A210 (558) | |
Text
Table of Contents15-iWATTS BARTABLE OF CONTENTS SectionTitle Page15.0ACCIDENT ANALYSES15.1CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS15.1-115.1.1OPTIMIZATION OF CONTROL SYSTEMS15.1-315.1.2INITIAL POWER CONDITIONS ASSUMED IN ACCIDENT ANALYSES15.1-315.1.2.1POWER RATING15.1-3 15.1.2.2INITIAL CONDITIONS15.1-4 15.1.2.3POWER DISTRIBUTION15.1-4 15.1.3TRIP POINTS AND TIME DELAYS TO TRIP ASSUMED IN ACCIDENT ANALYSES15.1-515.1.4INSTRUMENTATION DRIFT AND CALORIMETRIC ERRORS - POWER RANGE NEUTRON FLUX15.1-615.1.5ROD CLUSTER CONTROL ASSEMBLY INSERTION CHARACTERISTIC15.1-615.1.6REACTIVITY COEFFICIENTS15.1-7 15.1.7FISSION PRODUCT INVENTORIES15.1-8 15.1.7.1RADIOACTIVITY IN THE CORE15.1-8 15.1.7.2RADIOACTIVITY IN THE FUEL PELLET CLAD GAP15.1-815.1.8RESIDUAL DECAY HEAT15.1-8 15.1.8.1FISSION PRODUCT DECAY ENERGY15.1-9 15.1.8.2DECAY OF U-238 CAPTURE PRODUCTS15.1-9 15.1.8.3RESIDUAL FISSIONS15.1-10 15.1.8.4DISTRIBUTION OF DE CAY HEAT FOLLOWING LOSS OF COOLANT ACCIDENT15.1-1015.1.9COMPUTER CODES UTILIZED15.1-11 15.1.9.1FACTRAN15.1-11 15.1.9.2LOFTRAN15.1-11 15.1.9.3LEOPARD15.1-12 15.1.9.4TURTLE15.1-12 15.1.9.5TWINKLE15.1-12 15.1.9.6VIPRE-0115.1-13 15.1.9.7LOFTTR15.1-1315.2CONDITION II - FAULTS OF MODERATE FREQUENCY15.2-1 15-iiTable of ContentsWATTS BARTABLE OF CONTENTS SectionTitle Page15.2.1UNCONTROLLED ROD CLUSTER CONTROL ASSEMBLY BANK WITHDRAWAL FROM A SUBCRITICAL CONDITION15.2-215.2.1.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-215.2.1.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-3 15.2.
1.3CONCLUSION
S15.2-5 15.2.2UNCONTROLLED ROD CLUS TER CONTROL ASSEMBLY BANK WITHDRAWAL AT POWER15.2-515.2.2.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-515.2.2.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-6 15.2.
2.3CONCLUSION
S15.2-9 15.2.3ROD CLUSTER CONTROL ASSEMBLY MISALIGNMENT15.2-915.2.3.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-915.2.3.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-11 15.2.
3.3CONCLUSION
S15.2-13 15.2.4UNCONTROLLED BORON DILUTION15.2-13 15.2.4.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-1315.2.4.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-14 15.2.
4.3CONCLUSION
S15.2-15 15.2.5PARTIAL LOSS OF FORCED REACTOR COOLANT FLOW15.2-1715.2.5.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-1715.2.5.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-18 15.2.
5.3CONCLUSION
S15.2-19 15.2.6STARTUP OF AN INACTIVE REACTOR COOLANT LOOP15.2-19 15.2.6.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-1915.2.
6.2CONCLUSION
S15.2-19 15.2.7 LOSS OF EXTERNAL ELECTRICAL LOAD AND/OR TURBINE TRIP15.2-2015.2.7.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-2015.2.7.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-21 15.2.
7.3CONCLUSION
S15.2-23 15.2.8LOSS OF NORMAL FEEDWATER15.2-23 15.2.8.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-2315.2.8.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-24 15.2.
8.3CONCLUSION
S15.2-27 Table of Contents15-iiiWATTS BARTABLE OF CONTENTS SectionTitle Page15.2.9COINCIDENT LOSS OF ONSITE AND EXTERNAL (OFFSITE)
AC POWER TO THE STATION - LOSS OF OFFSITE POWER TO THE STATION AUXILIARIES15.2-2715.2.10EXCESSIVE HEAT REMOVAL DUE TO FEEDWATER SYSTEMMALFUNCTIONS15.2-2815.2.10.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-2815.2.10.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-28 15.2.
10.3CONCLUSION
S15.2-30 15.2.11EXCESSIVE LOAD INCREASE INCIDENT15.2-31 15.2.11.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-3115.2.11.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-31 15.2.
11.3CONCLUSION
S15.2-33 15.2.12ACCIDENTAL DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM15.2-3315.2.12.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-3315.2.12.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-33 15.2.
12.3CONCLUSION
S15.2-34 15.2.13ACCIDENTAL DEPRESSURIZA TION OF THE MAIN STEAM SYSTEM15.2-3415.2.13.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-3415.2.13.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-35 15.2.
13.3CONCLUSION
S15.2-37 15.2.14INADVERTENT OPERATION OF EMERGENCY CORE COOLING SYSTEM15.2-3715.2.14.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-3715.2.14.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-38 15.2.
14.3CONCLUSION
S15.2-42 15.2.15CHEMICAL AND VOLUME CONT ROL SYSTEM MALFUNCTIONDURING POWER OPERATION15.2-4215.2.15.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.2-4215.2.15.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.2-43 15.2.
15.3CONCLUSION
S15.2-4415.3CONDITION III - INFREQUENT FAULTS15.3-115.3.1LOSS OF REACTOR COOLANT FROM SMALL RUPTURED PIPESOR FROM CRACKS IN LARG E PIPES WHICH ACTUATE THEEMERGENCY CORE COOLING SYSTEM15.3-1 15-ivTable of ContentsWATTS BARTABLE OF CONTENTS SectionTitle Page15.3.1.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.3-115.3.1.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.3-2 15.3.1.3REACTOR COOLANT SYSTEM PIPE BREAK RESULTS15.3-3 15.3.
1.4CONCLUSION
S - THERMAL ANALYSIS15.3-5 15.3.2MINOR SECONDARY SYSTEM PIPE BREAKS15.3-5 15.3.2.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.3-515.3.2.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.3-5 15.3.
2.3CONCLUSION
S15.3-5 15.3.3INADVERTENT LOADING OF A FUEL ASSEMBLY INTO ANIMPROPER POSITION15.3-615.3.3.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.3-615.3.3.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.3-6 15.3.
3.3CONCLUSION
S15.3-7 15.3.4COMPLETE LOSS OF FORCED REACTOR COOLANT FLOW15.3-7 15.3.4.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.3-715.3.4.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.3-9 15.3.
4.3CONCLUSION
S15.3-10 15.3.5WASTE GAS DECAY TANK RUPTURE15.3-10 15.3.5.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.3-1015.3.5.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.3-10 15.3.6SINGLE ROD CLUSTER CONT ROL ASSEMBLY WITHDRAWALAT FULL POWER15.3-1015.3.6.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.3-1015.3.6.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.3-11 15.3.
6.3CONCLUSION
S15.3-1215.4CONDITION IV - LIMITING FAULTS15.4-115.4.1MAJOR REACTOR COOLANT SYSTEM PIPE RUPTURES (LOSS OF COOLANT ACCIDENT)15.4-115.4.1.1THERMAL ANALYSIS15.4-215.4.1.2HYDROGEN PRODUCTION AND ACCUMULATION15.4-1215.4.2MAJOR SECONDARY SYSTEM PIPE RUPTURE15.4-1215.4.2.1MAJOR RUPTURE OF A MAIN STEAM LINE15.4-12 15.4.2.2MAJOR RUPTURE OF A MAIN FEEDWATER PIPE15.4-19 15.4.3STEAM GENERATOR TUBE RUPTURE15.4-23 Table of Contents15-vWATTS BARTABLE OF CONTENTS SectionTitle Page15.4.3.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.4-2315.4.3.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.4-26 15.4.
3.3CONCLUSION
S15.4-32 15.4.4SINGLE REACTOR COOLANT PUMP LOCKED ROTOR15.4-3215.4.4.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.4-3215.4.4.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.4-33 15.4.
4.3CONCLUSION
S15.4-35 15.4.5FUEL HANDLING ACCIDENT15.4-35 15.4.5.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.4-3515.4.5.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.4-35 15.4.6RUPTURE OF A CONTROL R OD DRIVE MECHANISM HOUSING (ROD CLUSTER CONTROL ASSEMBLY EJECTION)15.4-3615.4.6.1IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION15.4-3615.4.6.2ANALYSIS OF EFFECTS AND CONSEQUENCES15.4-39 15.4.
6.3CONCLUSION
S15.4-4415.5ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS15.5-115.5.1ENVIRONMENTAL CONSEQUENCES OF A POSTULATED LOSS OF AC POWER TO THE PLANT AUXILIARIES15.5-115.5.2ENVIRONMENTAL CONSEQUENCES OF A POSTULATED WASTE GAS DECAY TANK RUPTURE15.5-215.5.3ENVIRONMENTAL CONSEQUENCES OF A POSTULATED LOSS OF COOLANT ACCIDENT15.5-315.5.4ENVIRONMENTAL CONSEQUENCES OF A POSTULATEDMAIN STEAM LINE BREAK15.5-2015.5.5ENVIRONMENTAL CONSEQUENCES OF A POSTULATED STEAM GENERATOR TUBE RUPTURE15.5-2115.5.6ENVIRONMENTAL CONSEQUENCES OF A POSTULATED FUEL HANDLING ACCIDENT15.5-2215.5.6.1FUEL HANDLING ACCIDENT BASED ON REGULATORYGUIDE 1.2515.5-2315.5.6.2FUEL HANDLING ACCIDENT BASED ON REGULATORYGUIDE 1.18315.5-2415.5.6.3FUEL HANDLING ACCIDENT RESULTS15.5-25 15.5.7ENVIRONMENTAL CONSEQUENCES OF A POSTULATEDROD EJECTION ACCIDENT15.5-26 15-viTable of ContentsWATTS BARTABLE OF CONTENTS SectionTitle Page15A DOSE MODELS USED TO EVALUATE THE ENVIRONMENTALCONSEQUENCES OF ACCIDENTS15A.1INTRODUCTION15A-115A.2ASSUMPTIONS15A-1 15A.3GAMMA DOSE AND BETA DOSE15A-1 15A.4THYROID INHALATION DOSE15A-2 List of Tables15-viiWATTS BARLIST OF TABLES SectionTitleTABLE 15.1-1NUCLEAR STEAM SUPPLY POWER RATINGSTABLE 15.1-2
SUMMARY
OF INITIAL CONDITIONS AND COMPUTER CODES USEDTABLE 15.1-3TRIP POINTS AND TIME DELAYS TO TRIP ASSUMED IN ACCIDENT ANALYSESTABLE 15.1-4DETERMINATION OF MA XIMUM OVERPOWER TRIP POINT POWER RANGE NEUTRON FLUX CHANNEL - BASED ON NOMINAL SETPOINT CONSIDERING INHERENT INSTRUMENTATION ERRORS DELETED BY AMENDMENT 71TABLE 15.1-5CORE AND GAP ACTIVI TIES BASED ON FULL POWER OPERATION FOR 1000 DAYS FULL POWER: 3565 MWTTABLE 15.1-6DELETED BY AMENDMENT 97TABLE 15.2-1TIME SEQUENCE OF EVEN TS FOR CONDITION II EVENTSTABLE 15.2-2DELETED BY AMENDMENT 63.
TABLE 15.2-3DELETED BY AMENDMENT 80TABLE 15.2-4DELETED BY AMENDMENT 80TABLE 15.2-5DELETED BY AMENDMENT 80 TABLE 15.2-6TIME SEQUENCE OF EV ENTS FOR CVCS MALFUNCTIONTABLE 15.3-1SMALL BREAK LOCA AN ALYSIS TIME SEQUENCE OF EVENTSTABLE 15.3-2SMALL BREAK LOCA FUEL CLADDING RESULTSTABLE 15.3-3TIME SEQUENCE OF EVEN TS FOR CONDITION III EVENTSTABLE 15.4-1TIME SEQUENCE OF EVEN TS FOR CONDITION IV EVENTSTABLE 15.4-2DELETED BY AMENDMENT 97TABLE 15.4-3DELETED BY AMENDMENT 97 TABLE 15.4-4DELETED BY AMENDMENT 97TABLE 15.4-5DELETED BY AMENDMENT 97TABLE 15.4-6EQUIPMENT REQUIRED FO LLOWING A HIGH ENERGY LINE BREAKTABLE 15.4-7LIMITING CORE PARAMETE RS USED IN STEAM BREAK DNB ANALYSISTABLE 15.4-8DELETED BY AMENDMENT 80TABLE 15.4-9TIME SEQUENCE OF EVENTS FOR FEEDLINE BREAKTABLE 15.4-10
SUMMARY
OF RESULTS FOR LOCKED ROTOR TRANSIENTSTABLE 15.4-11DELETED BY AMENDMENT 80 15-viiiList of TablesWATTS BARLIST OF TABLES SectionTitleTABLE 15.4-12PARAMETERS USED IN THE ANALYSIS OF THE ROD CLUSTER CONTROL ASSEMBLY EJECTION ACCIDENTTABLE 15.4-13PARAMETERS RECOMMENDED FOR DETERMINING RADIOACTIVITY RELEASES FO R ROD EJECTION ACCIDENTTABLE 15.4-14LARGE-BREAK LOCA CONTAINMENT DATA (ICE CONDENSER CONTAINMENT) USED FOR CALCULATION OF CONTAINMENT PRESSURE FOR WATTS BAR UNIT 2TABLE 15.4-15LARGE-BREAK CONTAINM ENT DATA - HEAT SINKS DATA (ICE CONDENSER CONTAINMENT)TABLE 15.4-16MASS AND ENERGY RELEASE RATES USED FOR CALCULATION OF CONTAINMENT PRESSURE FOR WATTS
BAR UNIT 2TABLE 15.4-17WATTS BAR UNIT 2 BEST-ESTIMATE LARGE-BREAK LOCA SEQUENCE OF EVENTS FOR LIMITING PCT TRANSIENTTABLE 15.4-18APEAK CLAD TEMPERATU RE INCLUDING ALL PENALTIES AND BENEFITS, BEST-ESTMATE LARGE-BREAK LOCA (BE LBLOCA) FOR WATTS BAR UNIT 2TABLE 15.4-18BWATTS BAR UNIT 2 BEST-ESTIMATE LARGE-BREAK LOCA RESULTSTABLE 15.4-19PLANT OPERATING RANGE ANALYZED BY THE BEST-ESTIMATE LARGE-BREAK LOCA ANALYSIS FOR WATTS BAR UNIT 2TABLE 15.4-20OPERATOR ACTION TIMES FOR DESIGN-BASIS STEAM GENERATOR TUBE RUPTURE ANALYSISTABLE 15.4-21STEAM GENERATOR TUBE RUPTURE ANALYSIS SEQUENCE OF EVENTSTABLE 15.4-22STEAM GENERATOR TU BE RUPTURE ANALYSIS MASS RELEASE RESULTS TOTAL MASS FLOW (POUNDS)TABLE 15.4-23MINIMUM INJECTED SAF ETY INJECTION FLOW USED IN BEST-ESTIMATE LARGE-BR EAK LOCA ANALYSIS FOR WATTS BAR UNIT 2TABLE 15.5-1PARAMETERS USED IN LO SS OF A. C. POWER ANALYSESTABLE 15.5-2DOSES FROM LOSS OF A/C POWER TABLE 15.5-3PARAMETERS USED IN WA STE GAS DECAY TANK RUPTURE ANALYSESTABLE 15.5-4WASTE GAS DECAY TANK INVENTORY (ONE UNIT) (REGULATORY GUIDE 1.24 ANALYSIS)TABLE 15.5-5DOSES FROM GAS DECAY TANK RUPTURE List of Tables15-ixWATTS BARLIST OF TABLES SectionTitleTABLE 15.5-6PARAMETERS USED IN LOCA ANALYSISTABLE 15.5-7ICE CONDENSER ELEMEN TAL AND PARTICULATE IODINE REMOVAL EFFICIENCY(1,2)TABLE 15.5-8EMERGENCY GAS TREA TMENT SYSTEM FLOW RATES (SHEET 1 OF 1)TABLE 15.5-8AEMERGENCY GAS TREATMENT SYSTEM FLOW RATES (UNIT 2)TABLE 15.5-9DOSES FROM LO SS-OF-COOLANT ACCIDENTTABLE 15.5-10DELETED BY AMENDMENT 80TABLE 15.5-11DELETED BY AMENDMENT 80TABLE 15.5-12PARAMETERS USED IN ANALYSIS OF RECIRCULATION LOOP LEAKAGE FOLLOWING A LOCATABLE 15.5-13DOSES FROM RECIRCULATION LOOP LEAKAGE FOLLOWING A LOCATABLE 15.5-14ATMOSPHERIC DILUTI ON FACTORS AT THE CONTROL BUILDINGTABLE 15.5-15DELETED BY AMENDMENT 97 TABLE 15.5-16PARAMETERS USED IN STEAM LINE BREAK ANALYSISTABLE 15.5-17DOSES FROM MA IN STEAM LINE BREAKTABLE 15.5-18PARAMETERS USED IN STEAM GENERATOR TUBE RUPTURE ANALYSISTABLE 15.5-19DOSES FROM STEA M GENERATOR TUBE RUPTURETABLE 15.5-20PARAMETERS USED IN FUEL HANDLING ACCIDENT ANALYSISTABLE 15.5-20APARAMETERS USED IN FUEL HANDLING ACCIDENT ANALYSISTABLE 15.5-21NUCLEAR CHARACTERISTICS OF HIGHEST RATED DISCHARGED ASSEMBLY USED IN THE ANALYSISTABLE 15.5-22DELETED BY AMENDMENT 80TABLE 15.5-23DOSES FROM A FUEL H ANDLING ACCIDENT (FHA) (REM)TABLE 15.5-24DELETED BY AMENDMENT 80 TABLE 15.5-25DELETED BY AMENDMENT 80 TABLE 15A-1PHYSICAL DATA FOR ISOTOPESTABLE 15A-2ACCIDENT ATMOSPHERIC DILUTION FACTORS (SEC/M3) 15-xList of TablesWATTS BARLIST OF TABLES SectionTitleTHIS PAGE INTENTIONALLY BLANK List of Figures15-xiWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.1-1LLUSTRATION OF OVERTEMPERATURE AND OVERPOWER T PROTECTIONFIGURE 15.1-2RCCA POSITION VERSUS TIME ON REACTOR TRIP FIGURE 15.1-3NORMALIZED RCCA REACTIVITY WORTH VERSUS ROD INSERTION FRACTIONFIGURE 15.1-4NORMALIZED RCCA BANK REACTIVITY WORTH VERSUS TIME FROM ROD RE LEASEFIGURE 15.1-5DOPPLER POWER COE FFICIENT USED IN ACCIDENT ANALYSISFIGURE 15.1-6RESIDUAL DECAY HEAT FIGURE 15.1-7DELETED BY AMENDMENT 97FIGURE 15.1-8FUEL ROD CROSS SECTIONFIGURE 15.2-1UNCONTROLLED RCCA BANK WITHDRAWAL FROM SUBCRITICALFIGURE 15.2-2UNCONTROLLED RCCA BANK WITHDRAWAL FROM SUBCRITICALFIGURE 15.2-3UNCONTROLLED RCCS BANK WITHDRAWAL FROM A SUBCRITICALFIGURE 15.2-3AUNCONTROLLED RCCS BANK WITHDRAWAL FROM A SUBCRITICALFIGURE 15.2-4UNCONTROLLED ROD WITHDRAWAL FROM FULL POWER, MINIMUM FEEDBACK 110 PC M/SEC WITHDRAWAL RATEFIGURE 15.2-5UNCONTROLLED ROD WITHDRAWAL FROM FULL POWER, MINIMUM FEEDBACK 110 PC M/SEC WITHDRAWAL RATEFIGURE 15.2-6UNCONTROLLED ROD WITHDRAWAL FROM FULL POWER, MINIMUM FEEDBACK 1 PCM/SEC WITHDRAWAL RATEFIGURE 15.2-7UNCONTROLLED ROD WITHDRAWAL FROM FULL POWER, MINIMUM FEEDBACK 1 PCM/SEC WITHDRAWAL RATEFIGURE 15.2-8UNCONTROLLED ROD WI THDRAWAL FROM 100% POWER, EFFECT OF REACTIVITY INSERTION RATE ON MINIMUM DNBRFIGURE 15.2-9UNCONTROLLED ROD WI THDRAWAL FROM 60% POWER, EFFECT OF REACTIVITY INSERTION RATE ON MINIMUM
DNBRFIGURE 15.2-10UNCONTROLLED ROD WITHDRAWAL FROM 10% POWER, EFFECT OF REACTIVITY INSERTION RATE ON MINIMUM DNBR 15-xiiList of FiguresWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.2-11PRESSURIZER PRESSURE TRANSIENT, NUCLEAR POWER, CORE AVERAGE TEMPERATURE, AND CORE HEAT FLUX TRANSIENT FOR DROPPED RCCA ASSEMBLYFIGURE 15.2-12REACTOR VESSEL FLOW TRANSIENT FOUR PUMPS IN OPERATION, ONE PUMP COASTING DOWNFIGURE 15.2-13LOOP FLOW TRANSIENT FOUR PUMPS IN OPERATION ONE PUMP COASTING DOWNFIGURE 15.2-14DELETED BY AMENDMENT 89FIGURE 15.2-15HOT CHANNEL HEAT FLUX TRANSIENT FOUR PUMPS IN OPERATION, ONE PUMP COASTING DOWNFIGURE 15.2-16NUCLEAR POWER TRANSIENT FOUR PUMPS IN OPERATION ONE PUMP COASTING DOWNFIGURE 15.2-17DNBR VERSUS TIME FOUR PUMPS IN OPERATION ONE PUMP COASTING DOWNFIGURE 15.2-18ADELETED BY AMENDMENT 97FIGURE 15.2-18BDELETED BY AMENDMENT 97FIGURE 15.2-18CDELETED BY AMENDMENT 97FIGURE 15.2-18DDELETED BY AMENDMENT 97FIGURE 15.2-18EDELETED BY AMENDMENT 97FIGURE 15.2-19LOSS OF LOAD ACCIDENT WITH PRESSURIZER SPRAY AND POWER-OPERATED RELIEF VALVESFIGURE 15.2-20LOSS OF LOAD ACCIDENT WITH PRESSURIZER SPRAY AND POWER-OPERATED RELIEF VALVESFIGURE 15.2-21LOSS OF LOAD ACCIDENT WITH PRESSURIZER SPRAY AND POWER-OPERATED RELIEF VALVESFIGURE 15.2-22LOSS OF LOAD ACCIDENT WITH PRESSURIZER SPRAY AND POWER-OPERATED RELIEF VALVESFIGURE 15.2-23LOSS OF LOAD ACCIDENT WITHOUT PRESSURIZER SPRAY AND POWER-OPERATED RELIEF VALVESFIGURE 15.2-24LOSS OF LOAD ACCIDENT WITHOUT PRESSURIZER SPRAY AND POWER-OPERATED RELIEF VALVESFIGURE 15.2-25LOSS OF LOAD ACCIDENT WITHOUT PRESSURIZER SPRAY AND POWER-OPERATED RELIEF VALVESFIGURE 15.2-26LOSS OF LOAD ACCIDENT WITHOUT PRESSURIZER SPRAY AND POWER-OPERATED RELIEF VALVES List of Figures15-xiiiWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.2-27ALOSS OF NORMAL FEEDWATER NUCLEAR POWER VERSUS TIMEFIGURE 15.2-27BLOSS OF NORMAL FEEDWATER CORE HEAT FLUX VERSUS TIMEFIGURE 15.2-27CLOSS OF NORMAL FEEDWATERTOTAL RCS FLOW VERSUS TIMEFIGURE 15.2-27DLOSS OF NORMAL FEEDWATER REACTOR COOLANT SYSTEM TEMPERATURE TRANSIENT VERSUS TIMEFIGURE 15.2-27EDELETED BY AMENDMENT 72FIGURE 15.2-27FLOSS OF NORMAL FE EDWATER PRESSURIZER PRESSURE VERSUS TIMEFIGURE 15.2-27GLOSS OF NORMAL FEEDWATER PRESSURIZER WATER VOLUME VERSUS TIMEFIGURE 15.2-27HLOSS OF NORMAL FEEDWATER STEAM GENERATOR PRESSURE VERSUS TIMEFIGURE 15.2-27ILOSS OF NORMAL FE EDWATER STEAM GENERATOR MASS VERSUS TIMEFIGURE 15.2-28ASINGLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH MANUAL ROD CONTROL - NUCLEAR POWER VERSUS TIMEFIGURE 15.2-28BSINGLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH MANUAL ROD CONTROL - CORE HEAT FLUX VERSUS TIMEFIGURE 15.2-28CSINGLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH MANUAL ROD CONTROL- CORE AVERAGE TEMP VERSUS TIMEFIGURE 15.2-28DSINGLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH MANUAL ROD CONTROL - PRESSURIZER PRESSURE VERSUS TIMEFIGURE 15.2-28ESINGLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH MANUAL ROD CONTROL -DNBR VERSUS TIMEFIGURE 15.2-28FMULTIPLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH
MANUAL ROD CONTROL -NUCLEAR POWER VERSUS TIME 15-xivList of FiguresWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.2-28GMULTIPLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH MANUAL ROD CONTROL -CORE HEAT FLUX VERSUS TIMEFIGURE 15.2-28HMULTIPLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH MANUAL ROD CONTROL - CORE AVERAGE TEMP VERSUS TIMEFIGURE 15.2-28IMULTIPLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH MANUAL ROD CONTROL - PRESSURIZER PRESSURE VERSUS TIMEFIGURE 15.2-28JMULTIPLE FEEDWATER CONTROL VALVE MALFUNCTION, EXCESS FEEDWATER WITH MANUAL ROD CONTROL -DNBR VERSUS TIMEFIGURE 15.2-29TYPICAL TRANSIEN T-10% STEP LOAD INCREASE, BEGINNING OF LIFE , MANUAL REACTOR CONTROLFIGURE 15.2-30TYPICAL TRANSIEN T-10% STEP LOAD INCREASE, BEGINNING OF LIFE, MANUAL REACTOR CONTROLFIGURE 15.2-31TYPICAL TRANSIENT-10%
STEP LOAD INCREASE, END OF LIFE, MANUAL REACTOR CONTROLFIGURE 15.2-32TYPICAL TRANSIENT-10%
STEP LOAD INCREASE, END OF LIFE, MANUAL REACTOR CONTROLFIGURE 15.2-33TYPICAL TRANSIEN T-10% STEP LOAD INCREASE, BEGINNING OF LIFE, AUTO MATIC REACTOR CONTROLFIGURE 15.2-34TYPICAL TRANSIEN T-10% STEP LOAD INCREASE, BEGINNING OF LIFE, AUTO MATIC REACTOR CONTROLFIGURE 15.2-35TYPICAL TRANSIENT-10%
STEP LOAD INCREASE, END OF LIFE, AUTOMATIC REACTOR CONTROLFIGURE 15.2-36TYPICAL TRANSIENT-10%
T STEP LOAD INCREASE, END OF LIFE, AUTOMATIC REACTOR CONTROLFIGURE 15.2-37ACCIDENTAL DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEMFIGURE 15.2-38ACCIDENTAL DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEMFIGURE 15.2-39ACCIDENTAL DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEMFIGURE 15.2-40VARIATION OF KEFF WITH CORE AVERAGE TEMPERATUREFIGURE 15.2-41DELETED BY AMENDMENT 97 List of Figures15-xvWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.2-42AINADVERTENT OPERATION OF EMERGENCY CORE COOLING SYSTEM - NUCLEAR POWER AND CORE AVERAGE TEMPERATURE RESPONSEFIGURE 15.2-42BINADVERTENT OPERATION OF EMERGENCY CORE COOLING SYSTEM - PRESSURIZER PRESSURE AND PRESSURIZER
WATER VOLUME RESPONSEFIGURE 15.2-42CINADVERTENT OPERATION OF EMERGENCY CORE COOLING SYSTEM - MAXIMUM EMERGENCY CORE COOLING SYSTEM FLOW RATEFIGURE 15.2-42DDELETED BY AMENDMENT 97FIGURE 15.2-42EDELETED BY AMENDMENT 97FIGURE 15.2-42FDELETED BY AMENDMENT 97FIGURE 15.2-43ADELETED BY AMENDMENT 90FIGURE 15.2-43BDELETED BY AMENDMENT 90FIGURE 15.2-44CVCS MALFUNCT IONNUCLEAR POWER VS. TIMEFIGURE 15.2-45CVCS MALFUNCTION RCS AVERAGE TEMPERATURE VERSUS TIMEFIGURE 15.2-46CVCS MALFUNCTION PRESSURIZER PRESSURE VERSUS TIMEFIGURE 15.2-47CVCS MALFUNCTION PRESSURIZER WATER VOLUME VERSUS TIMEFIGURE 15.3-1CODE INTERFACE DESCRIPTION FOR SMALL BREAK MODELFIGURE 15.3-2APUMPED SAFETY INJECTION FLOWRATE VS. RCS PRESSURE (SPILLING TO RCS PRESSURE)FIGURE 15.3-2BPUMPED SAFETY INJECTION FLOW RATE VS. RCS PRESSURE (SPILLING TO CONT AINMENT PRESSURE)FIGURE 15.3-3REACTOR COOLANT SYSTEM PRESSURE FOR LIMITING 4-INCH BREAKFIGURE 15.3-4CORE MIXTURE LEVEL FOR LIMITING 4-INCH BREAKFIGURE 15.3-5CLADDING TEMPERATURE TRANSIENT AT PEAK CLADDINGTEMPERATURE ELEVATION FOR LIMITING4-INCH BREAKFIGURE 15.3-6CORE OUTLET STEAM FLOW FOR LIMITING 4-INCH BREAKFIGURE 15.3-7CLADDING SURFACE HE AT TRANSFER COEFFICIENT AT PEAK CLADDINGTEMPERATURE ELEVATION FOR LIMITING 4-INCH BREAK 15-xviList of FiguresWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.3-8FLUID TEMPERATURE AT PEAK CLADDING TEMPERATURE ELEVATION FOR LIMITI NG 4-INCH BREAKFIGURE 15.3-8BDELETED BY AMENDMENT 89FIGURE 15.3-8CDELETED BY AMENDMENT 89FIGURE 15.3-8DDELETED BY AMENDMENT 89FIGURE 15.3-8EDELETED BY AMENDMENT 89FIGURE 15.3-8FDELETED BY AMENDMENT 89FIGURE 15.3-8GDELETED BY AMENDMENT 89FIGURE 15.3-8HDELETED BY AMENDMENT 89FIGURE 15.3-8IDELETED BY AMENDMENT 89FIGURE 15.3-8JDELETED BY AMENDMENT 89FIGURE 15.3-8KDELETED BY AMENDMENT 89FIGURE 15.3-8LDELETED BY AMENDMENT 89FIGURE 15.3-8MDELETED BY AMENDMENT 89FIGURE 15.3-8NDELETED BY AMENDMENT 89FIGURE 15.3-9CORE POWER TRANSIENT FIGURE 15.3-10HOT ROD AXIAL POWER SHAPEFIGURE 15.3-11REACTOR COOLANT SYSTEM PRESSURE FOR 2-INCH BREAKFIGURE 15.3-11ACORE MIXTURE LEVEL TRANSIENT FOR 2-INCH BREAKFIGURE 15.3-11BCLADDING TEMPERATURE TRANSIENT AT PEAK CLADDING TEMPERATURE ELEVATION FOR 2-INCH BREAKFIGURE 15.3-11CCORE OUTLET STEAM FLOW RATE FOR 2-INCH BREAKFIGURE 15.3-11DCLADDING SURFACE HEAT TRANSFER COEFFICIENT AT PEAK CLADDING TEMPERATURE ELEVATION FOR 2-INCH BREAKFIGURE 15.3-11EFLUID TEMPERATURE AT PEAK CLADDING TEMPERATURE ELEVATION FOR 2-INCH BREAKFIGURE 15.3-12REACTOR COOLANT SYSTEM PRESSURE FOR 3-INCH BREAKFIGURE 15.3-12ACORE MIXTURE LEVEL TRANSIENT FOR 3-INCH BREAKFIGURE 15.3-12BCLAD TEMPERATURE TR ANSIENT AT PEAK TEMPERATURE ELEVATION FOR 3-INCH BREAKFIGURE 15.3-12CCORE OUTLET STEAM FLOW RATE FOR 3-INCH BREAKFIGURE 15.3-12DCLAD SURFACE HEAT TRANSFER COEFFICIENT AT PEAK CLAD TEMPERATURE ELEVATION FOR 3-INCH BREAK List of Figures15-xviiWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.3-12EFLUID TEMPERATURE AT PEAK CLAD TEMPERATURE ELEVATION FOR 3-INCH BREAKFIGURE 15.3-13REACTOR COOLANTSYSTEM PRESSURE FOR 6-INCH BREAKFIGURE 15.3-13ACORE MIXTURE LEVEL TRANSIENT FOR 6-INCH BREAKFIGURE 15.3-13BCLADDING TEMPERATURE TRANSIENT AT PEAK CLADDING TEMPERATURE ELEVATION FOR 6-INCH BREAKFIGURE 15.3-13CCORE OUTLET STEAM FLOW RATE FOR 6-INCH BREAKFIGURE 15.3-13DCLADDING SURFACE HEAT TRANSFER COEFFICIENT AT PEAK CLADDING TEMPERATURE ELEVATION FOR 6-INCH BREAKFIGURE 15.3-13EFLUID TEMPERATURE AT PEAK CLADDING TEMPERATURE ELEVATION FOR 6-INCH BREAKFIGURE 15.3-14REACTOR COOLANT SY STEM PRESSURE FOR 8.75-INCH BREAKFIGURE 15.3-14ACORE MIXTURE LEVEL TRANSIENT FOR 8.75-INCH BREAKFIGURE 15.3-14BCORE OUTLET STEAM FL OW RATE FOR 8.75-INCH BREAKFIGURE 15.3-15INTERCHANGE BETWEEN REGION 1 AND REGION 3 ASSEMBLYFIGURE 15.3-16INTERCHANGE BETWEEN REGION 1 AND REGION 2 ASSEMBLY, BURNABLE POISON RODS BEING RETAINED BY THE REGION 2 ASSEMBLYFIGURE 15.3-17INTERCHANGE BETWEEN REGION 1 AND REGION 2 ASSEMBLY, BURNABLE POISON RODS BEING TRANSFERRED TO THE REGION 1 ASSEMBLYFIGURE 15.3-18ENRICHMENT ERROR: A REGION 2 ASSEMBLY LOADED INTO THE CORE CENTRAL POSITIONFIGURE 15.3-19LOADING A REGION 2 ASSEMBLY INTO A REGION 1 POSITION NEAR CORE PERIPHERYFIGURE 15.3-20REACTOR VESSEL FLOW TRANSIENT COMPLETE LOSS OF FLOW - UNDERVOLTAGE FOUR PUMPS IN OPERATION, FOUR PUMPS COASTING DOWNFIGURE 15.3-21DELETED BY AMENDMENT 80FIGURE 15.3-22DELETED BY AMENDMENT 97FIGURE 15.3-23HOT CHANNEL HEAT FLUX TRANSIENT COMPLETE LOSS OF FLOW-UNDERVOLTAGE; FOUR PUMPS IN OPERATION, FOUR PUMPS COASTING DOWN 15-xviiiList of FiguresWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.3-24NUCLEAR POWER TRAN SIENT COMPLETE LOSS OF FLOW-UNDERVOLTAGE; FOUR PUMPS IN OPERATION, FOUR PUMPS COASTING DOWNFIGURE 15.3-25DNBR VERSUS TIMECOMPLETE LOSS OF FLOW-UNDERVOLTAGE FOUR PUMPS IN OPERATION, FOUR PUMPS COASTING DOWNFIGURE 15.3-26DELETED BY AMENDMENT 97FIGURE 15.4-1DELETED BY AMENDMENT 97FIGURE 15.4-1ADELETED BY AMENDMENT 97FIGURE 15.4-1BDELETED BY AMENDMENT 97FIGURE 15.4-2DELETED BY AMENDMENT 97FIGURE 15.4-3DELETED BY AMENDMENT 97FIGURE 15.4-4DELETED BY AMENDMENT 97 FIGURE 15.4-5DELETED BY AMENDMENT 97FIGURE 15.4-6DELETED BY AMENDMENT 97FIGURE 15.4-7DELETED BY AMENDMENT 97 FIGURE 15.4-8DELETED BY AMENDMENT 97FIGURE 15.4-9VARIATION OF REACTIVITY WITH POWER AT CONSTANT CORE AVERAGE TEMPERATUREFIGURE 15.4-10DELETED BY AMENDMENT 89FIGURE 15.4-11ATRANSIENT RESPONSE TO STEAM LINE BREAK WITH SAFETY INJECTION AND OFFSITE POWER (CASE A)FIGURE 15.4-11BTRANSIENT RESPONSE TO STEAM LINE BREAK WITH SAFETY INJECTION AND OFFSITE POWER (CASE A)FIGURE 15.4-11CTRANSIENT RESPONSE TO STEAM LINE BREAK WITH SAFETY INJECTION AND OFFSITE POWER (CASE A)FIGURE 15.4-12ATRANSIENT RESPONSE TO STEAM LINE BREAK WITHOUT OFFSITE POWERNUCLEAR POWER AND REACTIVITY VERSUS TIMEFIGURE 15.4-12BTRANSIENT RESPONSE TO STEAM LINE BREAK WITHOUT OFFSITE POWER CORE AVERAGE TEMPERATURE AND RCS PRESSURE VERSUS TIMEFIGURE 15.4-12CTRANSIENT RESPONSE TO STEAM LINE BREAK WITHOUT OFFSITE POWER FAULTED LOOP STEAM FLOW VERSUS TIME List of Figures15-xixWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.4-13APRESSURIZER PRESSURE AND WATER VOLUME TRANSIENTS FOR MAIN FEED LINE RUPTURE WITH OFFSITE POWERFIGURE 15.4-13BREACTOR COOLANT TEM PERATURE TRANSIENTS MAIN FEEDLINE RUPTURE WITH OFFSITE POWERFIGURE 15.4-13CSTEAM GENERATOR PRESSURE AND WATER MASS TRANSIENTS FOR MAIN FEED LINE RUPTURE WITH OFFSITE POWERFIGURE 15.4-14APRESSURIZER PRESSURE AND WATER VOLUME TRANSIENTS FOR MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWERFIGURE 15.4-14BREACTOR COOLANT TEMPERATURE TRANSIENTS FOR MAIN FEEDLINE RUPTURE WI THOUT OFFSITE POWERFIGURE 15.4-14CSTEAM GENERATOR PRESSURE AND WATER MASS TRANSIENTS FOR MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWERFIGURE 15.4-15RCS PRESSURE TRANSIENT; FOUR PUMPS IN OPERATION, ONE LOCKED ROTORFIGURE 15.4-16DELETED BY AMENDMENT 80FIGURE 15.4-17REACTOR VESSEL FLOW TRANSIENT; FOUR PUMPS IN OPERATION, ONE LOCKED ROTORFIGURE 15.4-18LOOP FLOW TRANSIENT; FOUR PUMPS IN OPERATION, ONE LOCKED ROTORFIGURE 15.4-19CORE HEAT FLUX TRANSIENT; FOUR PUMPS IN OPERATION, ONE LOCKED ROTORFIGURE 15.4-20NUCLEAR POWER TRANSIENT; FOUR PUMPS IN OPERATION, ONE LOCKED ROTORFIGURE 15.4-21CLAD INNER TEMPERATURE TRANSIENT; FOUR PUMPS IN OPERATION, ONE LOCKED ROTORFIGURE 15.4-22DELETED BY AMENDMENT 80FIGURE 15.4-23DELETED BY AMENDMENT 80FIGURE 15.4-24NUCLEAR POWER TRAN SIENT; BOL HFP ROD EJECTION ACCIDENTFIGURE 15.4-25HOT SPOT FUEL AND CLAD TEMPERATURE VERSUS TIME; BOL HFP ROD EJECTION ACCIDENTFIGURE 15.4-26NUCLEAR POWER TRAN SIENT; EOL HZP ROD EJECTION ACCIDENT 15-xxList of FiguresWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.4-27HOT SPOT FUEL AND CLAD TEMPERATURE VERSUS TIME; EOL HZP ROD EJECTION ACCIDENTFIGURE 15.4-28REACTOR COOLANT SYSTEM INTEGRATED BREAK FLOW FOLLOWING A ROD EJECTION ACCIDENTFIGURE 15.4-29DELETED BY AMENDMENT 97FIGURE 15.4-30DELETED BY AMENDMENT97FIGURE 15.4-31DELETED BY AMENDMENT9FIGURE 15.4-32DELETED BY AMENDMENT 97FIGURE 15.4-33DELETED BY AMENDMENT 97FIGURE 15.4-34DELETED BY AMENDMENT 97FIGURE 15.4-35DELETED BY AMENDMENT 97FIGURE 15.4-36DELETED BY AMENDMENT 97FIGURE 15.4-37DELETED BY AMENDMENT 97FIGURE 15.4-38DELETED BY AMENDMENT 97FIGURE 15.4-39DELETED BY AMENDMENT 97FIGURE 15.4-40ADELETED BY AMENDMENT 97FIGURE 15.4-40BWATTS BAR UNIT 2 LOWER BOUND CONTAINMENT PRESSUREFIGURE 15.4-40CWATTS BAR UNIT 2 CONTAINMENT TEMPERATURESFIGURE 15.4-40DWATTS BAR UNIT 2 LOWER COMPARTMENT STRUCTURAL HEAT REMOVAL RATEFIGURE 15.4-40EWATTS BAR UNIT 2 ICE BED HEAT REMOVAL RATEFIGURE 15.4-40FWATTS BAR UNIT 2 SUMP HEAT REMOVAL RATEFIGURE 15.4-40GWATTS BAR UNIT 2 SUMP HEAT REMOVAL RATEFIGURE 15.4-40HCONTAINMENT LOWER COMPARTMENT PRESSURE, MAXIMUM SAFEGUARDS, UPFLOW BARREL/BAFFLE REGIONFIGURE 15.4-40ICOMPARTMENT TEMPERATURES, MAXIMUM SAFEGUARDS, UPFLOW BARREL/BAFFLE REGIONFIGURE 15.4-40JLOWER COMPARTMENT STRUCTURAL HEAT REMOVAL RATE, MAXIMUM SAFEGUARDS , UPFLOW BARREL/BAFFLE REGIONFIGURE 15.4-40KICE BED HEAT REM OVAL RATE, MAXIMUM SAFEGUARDS, UPFLOW BARREL/BAFFLE REGION List of Figures15-xxiWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.4-40LHEAT REMOVAL BY SUMP, MAXIMUM SAFEGUARDS, UPFLOW BARREL/BAFFLE REGIONFIGURE 15.4-40MHEAT REMOVAL BY SPRAY, MAXIMUM SAFEGUARDS, UPFLOW BARREL/BAFFLE REGIONFIGURE 15.4-41AWATTS BAR UNIT 2 LIMI TING PCT CASE HOTSPOT PCT AT THE LIMITING ELEVATIONFIGURE 15.4-41BWATTS BAR UNI 2 LIMITING PCT CASE WC/T PCTFIGURE 15.4-42WATTS BAR UNIT 2 LIMITING PCT CASE BREAK FLOWFIGURE 15.4-43WATTS BAR UNIT 2 LIMITIG PCT CASE PRESSUIZER PRESSUEFIGURE 15.4-44WATTS BAR UNIT 2 LI MITING PCT CASE BROKEN AND INTACT LOOP VOID FRACTIONFIGURE 15.4-45WATTS BAR UNIT 2 LIMI TING PCT CASE VAPOR FLOW AT TOP OF CORE AVERAGE CHANNELFIGURE 15.4-46WATTS BAR UNIT 2 LIMI TING PCT CASE VAPOR FLOW AT TOP OF HOT ASSEMBLY CHANNELFIGURE 15.4-47WATTS BAR UNIT 2 LI MITING PCT CASE LOWER PLENUM COLLAPSED LIQUID LEVELFIGURE 15.4-48WATTS BAR UNIT 2 LIMITING PCT CASE LOOP 2 ACCUMULATOR FLOWFIGURE 15.4-49WATTS BAR UNIT 2 LIMI TING PCT CASE LOOP 2 SAFETY INJECTION FLOWFIGURE 15.4-50WATTS BAR UNIT 2 LI MITING PCT CASE CORE AVERAGE CHANNEL COLLAPSED LIQUID LEVELFIGURE 15.4-51WATTS BAR UNIT 2 LIMITING PCT CASE LOOP 2 DOWNCOMER COLLAPSED LIQUID LEVELFIGURE 15.4-52WATTS BAR UNIT 2 LIMITING PCT VESSEL FLUID MASSFIGURE 15.4-53WATTS BAR UNIT 2 LI MITING PCT CASE PCT LOCATIONFIGURE 15.4-54WATTS BAR UNIT 2 LI MITING PCT CASE LIQUID AND SATURATION TEMPERATURE AT BOTTOM OF DOWNCOMERFIGURE 15.4-55WATTS BAR UNIT 2 LIMI TING PCT CASE PCT FOR ALL RODSFIGURE 15.4-56WATTS BAR UNIT 2 BELOCA ANALYSIS AXIAL POWER SHAPE OPERATING SPACE ENVELOPEFIGURE 15.4-57DELETED BY AMENDMENT 97FIGURE 15.4-58DELETED BY AMENDMENT 97FIGURE 15.4-59DELETED BY AMENDMENT 97FIGURE 15.4-60DELETED BY AMENDMENT 97 15-xxiiList of FiguresWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.4-61DELETED BY AMENDMENT 97FIGURE 15.4-62DELETED BY AMENDMENT 97FIGURE 15.4-63DELETED BY AMENDMENT 97FIGURE 15.4-64DELETED BY AMENDMENT 97FIGURE 15.4-65DELETED BY AMENDMENT 97FIGURE 15.4-66DELETED BY AMENDMENT 97FIGURE 15.4-67DELETED BY AMENDMENT 97FIGURE 15.4-68ADELETED BY AMENDMENT 97FIGURE 15.4-68BDELETED BY AMENDMENT 97FIGURE 15.4-68CDELETED BY AMENDMENT 97FIGURE 15.4-68DDELETED BY AMENDMENT 97FIGURE 15.4-68EDELETED BY AMENDMENT 97FIGURE 15.4-68FDELETED BY AMENDMENT 97FIGURE 15.4-68GDELETED BY AMENDMENT 97FIGURE 15.4-68HDELETED BY AMENDMENT 97FIGURE 15.4-68IDELETED BY AMENDMENT 97FIGURE 15.4-68JDELETED BY AMENDMENT 97FIGURE 15.4-68KDELETED BY AMENDMENT 97FIGURE 15.4-68LDELETED BY AMENDMENT 97FIGURE 15.4-68MDELETED BY AMENDMENT 97FIGURE 15.4-68NDELETED BY AMENDMENT 97FIGURE 15.4-69DELETED BY AMENDMENT 97FIGURE 15.4-70DELETED BY AMENDMENT 97FIGURE 15.4-71DELETED BY AMENDMENT 97FIGURE 15.4-72DELETED BY AMENDMENT 97FIGURE 15.4-73DELETED BY AMENDMENT 97FIGURE 15.4-74DELETED BY AMENDMENT 97FIGURE 15.4-75DELETED BY AMENDMENT 97FIGURE 15.4-76DELETED BY AMENDMENT 97FIGURE 15.4-77DELETED BY AMENDMENT 97FIGURE 15.4-78DELETED BY AMENDMENT 97FIGURE 15.4-79DELETED BY AMENDMENT 97FIGURE 15.4-80DELETED BY AMENDMENT 97 List of Figures15-xxiiiWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.4-81DELETED BY AMENDMENT 97FIGURE 15.4-82DELETED BY AMENDMENT 97FIGURE 15.4-83DELETED BY AMENDMENT 97FIGURE 15.4-84DELETED BY AMENDMENT 97FIGURE 15.4-85DELETED BY AMENDMENT 97FIGURE 15.4-86DELETED BY AMENDMENT 97FIGURE 15.4-87DELETED BY AMENDMENT 97FIGURE 15.4-88DELETED BY AMENDMENT 97FIGURE 15.4-89DELETED BY AMENDMENT 97FIGURE 15.4-90DELETED BY AMENDMENT 97FIGURE 15.4-91DELETED BY AMENDMENT 97FIGURE 15.4-92DELETED BY AMENDMENT 97FIGURE 15.4-93DELETED BY AMENDMENT 97FIGURE 15.4-94DELETED BY AMENDMENT 97FIGURE 15.4-95DELETED BY AMENDMENT 97FIGURE 15.4-96ADELETED BY AMENDMENT 97FIGURE 15.4-96BDELETED BY AMENDMENT 97FIGURE 15.4-96CDELETED BY AMENDMENT 97FIGURE 15.4-96DDELETED BY AMENDMENT 97FIGURE 15.4-96EDELETED BY AMENDMENT 97FIGURE 15.4-96FDELETED BY AMENDMENT 97FIGURE 15.4-96GDELETED BY AMENDMENT 97FIGURE 15.4-97ASTEAM GENERATOR TUBE RUPTURE ANALYSIS PRESSURIZER LEVELFIGURE 15.4-97BSTEAM GENERATOR TUBE RUPTUE ANALYSIS RCS PRESSUREFIGURE 15.4-97CSTEAM GENERATOR TUBE RUPTUE ANALYSIS -SECONDARY PRESSUREFIGURE 15.4-97DSTEAM GENERATOR TUBE RUPTUE ANALYSIS -INTACT LOOP HOT AND COLD LEG TEMPERATURESFIGURE 15.4-97ESTEAM GENERATOR TUBE RUPTUE ANALYSIS -RUPTURED LOOP HOT AND COLD LEG TEMPERATURESFIGURE 15.4-97FSTEAM GENERATOR TUBE RUPTUE ANALYSIS - DIFFERENTIAL PRESSURE BETWEEN RCS AND RUPTURED SG 15-xxivList of FiguresWATTS BAR LIST OF FIGURES SectionTitleFIGURE 15.4-97GSTEAM GENERATOR TUBE RUPTUE ANALYSIS - PRIMARY TO SECONDARY BREAK FLOW RATEFIGURE 15.4-97HSTEAM GENERATOR TUBE RUPTUE ANALYSIS - RUPTURED SG WATER VOLUME*FIGURE 15.4-97ISTEAM GENERATOR TUBE RUPTUE ANALYSIS - RUPTURED SG WATER MASSFIGURE 15.4-97JSTEAM GENERATOR TUBE RUPTUE ANALYSIS - RUPTURED SG MASS RELEASE RATE TO THE ATMOSPHEREFIGURE 15.4-97KSTEAM GENERATOR TUBE RUPTUE ANALYSIS - INTACT SGS MASS RELEASE RATE TO THE ATMOSPHEREFIGURE 15.4-97LSTEAM GENERATOR TUBE RUPTUE ANALYSIS - BREAK FLOW FLASHING FRACTIONFIGURE 15.4-97MDELETED BY AMENDMENT 97FIGURE 15.5-1SCHEMATIC OF LEAKAGE PATH FIGURE 15.5-2DELETED BY AMENDMENT 80FIGURE 15.5-3DELETED BY AMENDMENT 97FIGURE 15.5-4DELETED BY AMENDMENT 97 CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-1WATTS BARWBNP-107026_TVA_WB_FSAR_Section_15.pdf15.0 ACCIDENT ANALYSESThe ANS classification of plant conditions divides plant conditions into four categories in accordance with anticipated frequency of occurrence and potential radiological consequences to the public. The four categories are as follows:Condition I: Normal Operation and Operational Transients Condition II: Faults of Moderate Frequency Condition III: Infrequent Faults Condition IV: Limiting Faults The basic principle applied in relating design requirements to each of the conditions is that the most probable occurrences should yield the least radiological risk to the public and those extreme situations having the potential for the greatest risk to the public shall be those least likely to occur. Where applicable, Reactor Trip System and engineered safeguards functioning is assumed to the extent allowed by considerations such as the single failure criterion, in fulfilling this principle.In the evaluation of the radiological consequences associated with initiation of a spectrum of accident conditions numerous assumptions must be postulated. In many instances these assumptions are a product of extremely conservative judgments. This is due to the fact that many physical phenomena, in particular fission product transport under accident conditions, are presently not understood to the extent that accurate predictions can be made. Therefore, the set of assumptions postulated would predominantly determine the accident classification.This chapter addresses the accident conditions listed in Table 15-1 of the NRC Standard Format and Content Guide, Regulatory Guide 1.70, Revision 3, which apply to WBN.15.1 CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTSCondition I occurrences are those which are expected frequently or regularly in the course of power operation, refueling, maintenance, or maneuvering of the plant. As such, Condition I occurrences are accommodated with margin between any plant parameter and the value of that parameter which would require either automatic or manual protective action. Condition I occurrences occur frequently or regularly. Therefore, they must be considered from the point of view of affecting the consequences of fault conditions (Condition II, III, and IV). In this regard, analysis of each fault condition described is generally based on a conservative set of initial conditions corresponding to the most adverse set of conditions which can occur during Condition I operation.
15.1-2CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107Typical Condition I events are listed below:
(1)Steady-state and shutdown operations (a) Power operation (>5% to 100% of full power)(b) Startup (critical, 0% to <5% of full power)(c) Hot shutdown (subcritical, residual heat removal system isolated)(d) Cold shutdown (subcritical, residual heat removal system in operation) (e) Refueling (reactor vessel head open)
(2)Operation with permissible deviations Various deviations which may occur during continued operation as permitted by the plant Technical Specifications must be considered in conjunction with other operational modes. These include: (a)Operation with components or systems out of service (such as power operation with a reactor coolant pump out of service) (b)Leakage from fuel with cladding defects (c)Radioactivity in the reactor coolant (i)Fission products (ii)Activation products (iii)Tritium (d)Operation with steam generator leaks up to the maximum allowed by the Technical Specifications (e)Testing as allowed by the Technical Specifications (3)Operational transients (a)Plant heatup and cooldown (up to 100°F/hour for the reactor coolant system; 200°F/hour for the pressurizer)(b)Step load changes (up to +10%)(c)Ramp load changes (up to 5%/minute)(d)Load rejection up to and including design load rejection transient CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-3WATTS BARWBNP-107 15.1.1 Optimization of Control SystemsA setpoint study was performed to simulate performance of the reactor control and protection systems. In this study, emphasis was placed on the development of a control system to automatically maintain prescribed conditions in the plant even under the most conservative set of reactivity parameters with respect to both system stability and transient performance.For each mode of plant operation, a group of optimum controller setpoints was determined. In areas where the resultant setpoints were different, compromises based on the optimum overall performance were made and verified. A consistent set of control system parameters was derived, satisfying plant operational requirements throughout the core life and for power levels between 15 and 100%.The study was comprised of an analysis of the following control systems: rod cluster control assembly, steam dump, steam generator level, pressurizer pressure and pressurizer level.15.1.2 Initial Power Conditions Assumed In Accident Analyses15.1.2.1 Power RatingTable 15.1-1 lists the principle power rating values which are used in analyses performed in this section. Two ratings are given:
(1)The guaranteed Nuclear Steam Supply System thermal power output rating. This power output includes the thermal power generated by the reactor coolant pumps.
(2)The Engineered Safety Features design rating. The Westinghouse supplied Engineered Safety Features are designed for thermal power higher than the guaranteed value in order not to preclude realization of future potential power capability. This higher thermal power value is designated as the Engineered Safety Features design rating. This power output includes the thermal power generated by the reactor coolant pumps. Where initial power operating conditions are assumed in accident analyses, the "guaranteed Nuclear Steam Supply System thermal power output" plus allowance for errors in steady state power determination is assumed. Where demonstration of adequacy of the containment and Engineered Safety Features is concerned, the "Engineered Safety Features design rating" plus allowance for error is assumed. The thermal power values used for each transient analyzed are given in Table 15.1-2.
15.1-4CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-10715.1.2.2 Initial ConditionsFor accident evaluation, the initial conditions are obtained by adding the maximum steady state errors to rated values. The following steady state errors are considered:For most accidents which are departure from nucleate boiling (DNB) limited, nominal values of initial conditions are assumed. The allowance on power, temperature, and pressure are determined on a statistical basis and are included in the DNB limit ratio (DNBR) as described in reference [27]. This procedure is known as the Revised Thermal Design Procedure (RTDP). The minimum measured flow value is used in all RTDP transients.Note that the signs of the errors used in the accident analyses are typically opposite of the signs describing the instrument uncertainties; e.g., an instrument error of +50, defined as indicated value of 50 greater than actual value, may be applied in the analysis as -50, i.e., the analysis assumes that the actual value may be 50 less than the nominal value.For accidents which are not DNB limited or for which the RTDP is not employed, the initial conditions are obtained by adding the bounding steady-state errors to nominal values in such a manner to maximize the impact on the limiting parameter. The thermal design flow value, which is the minimum measured flow minus measurement uncertainty, is used for such analyses.The thermal design ratings are given in Table 15.1-1.
15.1.2.3 Power DistributionThe transient response of the reactor system is dependent on the initial power distribution. The nuclear design of the reactor core minimizes adverse power distribution through the placement of control rods and operation instructions. The power distribution may be characterized by the radial factor FH and the total peaking factor F q. The peaking factor limits are given in the Core Operating Limits Report.For transients which may be DNB-limited the radial peaking factor is of importance. The radial peaking factor increases with decreasing power level due to rod insertion.
This increases in FH is included in the core limits illustrated in Figure 15.1-1. All 1.Core power
+ 2% allowance for calorimetric error2.Average reactor coolantsystem temperature
+ 6.0°F allowance for deadband and measurement error (bounds an instrument uncertainty of + 5°F and instrument bias of -1°F)3.Pressurizer pressure+70/-50 psi allowance for steady state fluctuations and measurement error (bounds an instrument uncertainty of + 50 psi and instrument bias of -20 psi)
CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-5WATTS BARWBNP-107transients that may be DNB limited are assumed to begin with a value of FH consistent with the initial power level defined in the Technical Specifications.The axial power shape used in the DNB calculations is discussed in Section 4.4.3.2.2.
For transients which may be overpower-limited the total peaking factor F q is of importance. The value of F q may increase with decreasing power level such that full power hot spot heat flux is not exceeded (i.e., F q x Power = design hot spot heat flux). All transients that may be overpower-limited are assumed to begin with a value of F q consistent with the initial power level as defined in the Technical Specifications.The value of peak kW/ft can be directly related to fuel temperature. For transients which are fast with respect to the fuel rod thermal time constant, for example, rod ejection, a detailed heat transfer calculation is made.15.1.3 Trip Points And Time Delays To Trip Assumed In Accident Analyses A reactor trip signal acts to open two trip breakers connected in series feeding power to the control rod drive mechanisms. The loss of power to the mechanism coils causes the mechanisms to release the rod cluster control assemblies which then fall by gravity into the core. There are various instrumentation delays associated with each trip function, including delays in signal actuation, in opening the trip breakers, and in the release of the rods by the mechanisms. The total delay to trip is defined as the time delay from the time that trip conditions are reached to the time the rods are free and begin to fall. Limiting trip setpoints assumed in accident analyses and the time delay assumed for each trip function are given in Table 15.1-3. Reference is made in that table to overtemperature and overpower T trip shown in Figure 15.1-1.Accident analyses which assume the steam generator low-low water level trip signal to initiate protection functions may be affected by the Trip Time Delay (TTD) (Reference 23) system, which was developed to reduce the incidence of unnecessary feedwater-related reactor trips.The TTD imposes a system of pre-determined delays upon the steam generator low-low level reactor trip and auxiliary feedwater initiation. The values of these delays are based upon (1) the prevailing power level at the time the low-low level trip setpoint is reached, and by (2) the number of steam generators in which the low-low level trip setpoint is reached. The TTD delays the reactor trip and auxiliary feedwater actuation in order to provide time for corrective action by the operator or for natural stabilization of shrink/swell water level transients. The TTD is primarily designed for low power or startup operations.The difference between the limiting trip point assumed for the analysis and the nominal trip point represents an allowance for instrumentation channel error and setpoint error.
During preoperational start-up tests, it is demonstrated that actual instrument errors and time delays are equal to or less than the assumed values. Additionally, protection system channels are calibrated and instrument response times determined periodically in accordance with the plant Technical Specifications.
15.1-6CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107 15.1.4 Instrumentation Drif t And Calorimetric Errors - Power Range Neutron FluxThe instrumentation drift and calorimetric errors used in establishing the power range high neutron flux setpoint are presented in References [22] & [28].The calorimetric error is the error assumed in the determination of core thermal power as obtained from secondary plant measurements. The total ion chamber current (sum of the top and bottom sections) is calibrated (set equal) to this measured power on a periodic basis.The secondary power is obtained from measurement of feedwater flow, feedwater inlet temperature to the steam generators and steam pressure. High accuracy instrumentation is provided for these measurements with accuracy tolerances much tighter than those which would be required to control feedwater flow.15.1.5 Rod Cluster Control A ssembly Insertion CharacteristicThe rate of negative reactivity insertion following a reactor trip is a function of the acceleration of the rod cluster control assemblies and the variation in rod worth as a function of rod position. With respect to accident analyses, the critical parameter is the time of insertion up to the dashpot entry or approximately 85% of the rod cluster travel. The most limiting insertion time to dashpot entry used for accident analyses is 2.7 seconds. The normalized rod cluster control assembly position versus time curve assumed in accident analyses is shown in Figure 15.1-2.Figure 15.1-3 shows the fraction of total negative reactivity insertion for a core where the axial distribution is skewed to the lower region of the core. An axial distribution which is skewed to the lower region of the core can arise from an unbalanced xenon distribution. There is inherent conservatism in the use of this curve in that it is based on a skewed flux distribution which would exist relatively infrequently. For cases other than those associated with unbalanced xenon distributions, significant negative reactivity would have been inserted due to the more favorable axial distribution existing prior to trip.The normalized rod cluster control assembly negative reactivity insertion versus time curve corresponding to an insertion time to dashpot entry of 2.7 seconds is shown in Figure 15.1-4. The curve shown in this figure was obtained from Figures 15.1-2 and 15.1-3. A total negative reactivity insertion following a trip of 4% k/k is assumed in the transient analyses except where specifically noted otherwise. This assumption is conservative with respect to the calculated trip reactivity worth available as shown in Table 4.3-3.The normalized rod cluster control assembly negative reactivity insertion versus time curve for an axial power distribution skewed to the bottom (Figure 15.1-4) is the most limiting of those transient analyses for which a point kinetics core model is used.
Where special analyses require use of three dimensional or axial one dimensional core models, the negative reactivity insertion resulting from the reactor trip is calculated directly by the reactor kinetics code and is not separable from the other reactivity CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-7WATTS BARWBNP-107feedback effects. In this case, the rod cluster control assembly position versus time of Figure 15.1-2 is used as code input.
15.1.6 Reactivity CoefficientsThe transient response of the reactor system is dependent on reactivity feedback effects, in particular the moderator temperature coefficient and the Doppler power coefficient. These reactivity coefficients and their values are discussed in detail in Chapter 4.In the analysis of certain events, conservatism requires the use of large reactivity coefficient values whereas in the analysis of other events, conservatism requires the use of small reactivity coefficient values. Some analyses such as loss of reactor coolant from cracks or ruptures in the reactor coolant system do not depend on reactivity feedback effects. The values used are given in Table 15.1-2; reference is made in that table to Figure 15.1-5 which shows the upper and lower bound Doppler power coefficients as a function of power, used in the transient analysis. The justification for use of conservatively large versus small reactivity coefficient values are treated on an event by event basis. To facilitate comparison, individual sections in which justification for the use of large or small reactivity coefficient values is to be found are referenced below:Condition II EventsSection1.Uncontrolled Rod Cluster Control Assembly Bank Withdrawal From a Subcritical Condition 15.2.12.Uncontrolled Rod Cluster Control Assembly Bank Withdrawal at Power 15.2.23.Rod Cluster Control Assembly Misalignment15.2.34.Uncontrolled Boron Dilution15.2.4 5.Partial Loss of Forced Reactor Coolant Flow15.2.5 6.Startup of an Inactive Reactor Coolant Loop15.2.6 7.Loss of External Electrical Load and/or Turbine Trip15.2.7 8.Loss of Normal Feedwater15.2.8 9.Coincident Loss of Onsite and External (Offsite) AC Power to the Station - Loss of Offsite Power to the Station Auxiliaries 15.2.910.Excessive Heat Removal Due to Feedwater System Malfunctions 15.2.1011.Excessive Load Increase Incident15.2.1112.Accidental Depressurization of the Reactor Coolant System 15.2.1213.Accidental Depressurization of the Main Steam System 15.2.13 15.1-8CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-10715.1.7 Fission Product Inventories 15.1.7.1 Radioactivity in the CoreThe average core fission product-inventory is calculated by the ORIGEN-S Subcode within the SCALE-4.2 [2] computer code. The inventories of fission products important from a health hazard point of view are given in Table 15.1-5. The isotopes included in Table 15.1-5 are the isotopes controlling from considerations of inhalation dose (iodines) and from direct dose due to immersion (noble gases).
15.1.7.2 Radioactivity in the Fuel Pellet Clad GapThe calculation of the maximum core fission product-inventories are also calculated by the ORIGEN-S computer code and are the basis for determining the gap activities used in single fuel assembly accident analyses. The gap activities are consistent with the guidance of Safety Guide 25 [3]: 10% of the total noble gases other than Kr-85 and 30% of Kr-85. For an accident analysis involving a fuel assembly, 10% of the total radioactive iodine in the rods at the time of the accident is also in the gap.The radioactivity in the reactor coolant as well as in the volume control tank, pressurizer, and waste gas decay tanks are given in Chapter 11 along with the data on which these computations are based.
15.1.8 Residual Decay HeatResidual heat in a subcritical core consists of:
(1)Fission product decay energy, (2)Decay of neutron capture products, and (3)Residual fissions due to the effect of delayed neutrons.14.Inadvertent Operation of Emergency Core Cooling System During Power Operation 15.2.14Condition III Events1.Complete Loss of Forced Reactor Coolant Flow 15.3.4 2.Single Rod Cluster Control Assembly Withdrawal at Full Power 15.3.6Condition IV Events1.Major Rupture of a Main Steam Line15.4.2.1 2.Major Rupture of a Main Feedwater Pipe 15.4.2.2 3.Steam Generator Tube Rupture 15.4.3 4.Single Reactor Coolant Pump Locked Rotor 15.4.4 5.Rupture of a Control Rod Drive Mechanism Housing (Rod Cluster Control Assembly Ejection) 15.4.6 CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-9WATTS BARWBNP-107These constituents are discussed separately in the following paragraphs.15.1.8.1 Fission Product Decay EnergyFor short times (10 3 seconds) after shutdown, data on yields of short half life isotopes is sparse. Very little experimental data is available for the X-ray contributions and even less for the -ray contribution. Several authors have compiled the available data into a conservative estimate of fission product decay energy for short times after shutdown, notably Shure
[7] and Dudziak
[8]. Of these two selections, Shure's curve is the highest, and it is based on the data of Stehn and Clancy[10] and Obenshain and Foderaro
[11].The fission product contribution to decay energy which has been assumed in the accident analyses is the curve of Shure increased by 20% for conservatism unless otherwise stated in the sections describing specific accidents. This curve with the 20% factor included is shown in Figure 15.1-6.
15.1.8.2 Decay of U-238 Capture ProductsBetas and gammas from the decay of U-239 (23.5 minute half-life) and Np-239 (2.35 day half-life) contribute significantly to the heat generation after shutdown. The cross section for production of these isotopes and their decay schemes is relatively well known. For long irradiation times their contribution can be written as:where: P 1/P 0 =the energy from U-239 decay P 2/P 0 =the energy from Np-239 decayt =the time after shutdown (seconds)
c(1+) =the ratio of U-238 captures to total fissions = 0.6 (1 + 0.2) =the decay constant for U-239 = 4.91 x 10
-4 second-1 =the decay constant for Np-239 = 3.41 x 10
-6 second-1 =total -ray energy from U-239 decay = 0.06 Mev =total -ray energy from Np-239 decay = 0.30 Mev P 1 P 0 E 1 E 1+200 Mev-----------------------
-c 1+e-1 t watts/watt
=P 2 P 0 E 2 E 2+200Mev-----------------------
-c 1+ 2 1 2------------------
e 2 t-e 1 t-e 2 t-+-watts/watt
= 1 2 E 1 E 2 15.1-10CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107 =total -ray energy from U-239 decay = 1/3 x 1.18 Mev =total -ray energy from Np-239 decay = 1/3 x 0.43 Mev(Two-thirds of the potential -energy is assumed to escape by the accompanying neutrinos.)This expression with a margin of 10% has been assumed in the accident analysis unless otherwise stated in the sections describing specific accidents and is shown in Figure 15.1-6. The 10% margin, compared to 20% for fission product decay, is justified by the availability of the basic data required for this analysis. The decay of other isotopes, produced by neutron reactions other than fission, is neglected.
15.1.8.3 Residual FissionsThe time dependence of residual fission power after shutdown depends on core properties throughout a transient under consideration. Core average conditions are more conservative for the calculation of reactivity and power level than actual local conditions as they would exist in hot areas of the core. Thus, unless otherwise stated in the text, static power shapes were assumed in the analyses and these are factored by the time behavior of core average fission power calculated by a point model kinetics calculation with six delayed neutron groups.For the purpose of illustration, only one delayed neutron group calculation, with a constant shutdown reactivity of negative 4% K is shown in Figure 15.1-6.15.1.8.4 Distribution of Decay Heat Fol lowing Loss of Coolant AccidentDuring a small break LOCA the core is rapidly shutdown by rod cluster control assembly insertion and a large fraction of the heat generation to be considered comes from fission product decay gamma rays. This heat is not distributed in the same manner as steady state fission power. Local peaking effects which are important for the neutron dependent part of the heat generation do not apply to the gamma-ray contribution. The steady state factor of 97.4% which represents the fraction of heat generated within the clad and pellet drops to 95% for the hot rod in a small break loss of coolant accident.For example, for an Appendix K Small Break Loss Of Coolant Accident (SBLOCA) analysis, shortly after RCCA insertions a bout 30% of the heat generated in the fuel rods is from gamma-ray absorption. The gamma power shape is less peaked than the steady state fission power shape, reducing the energy deposited in the hot rod at the expense of adjacent colder rods. A conservative estimate of this effect is a reduction of 10% of the gamma-ray contribution or 3% of the total. Since the water density is considerably reduced at this time, an average of 98% of the available heat is deposited in the fuel rods, the remaining 2% being absorbed by water, thimbles, sleeves and grids. The net effect is a factor of 0.95 rather than 0.974, to be applied to the heat production in the hot rod.For the BELOCA analysis, the energy deposition modeling is performed as described in Section 8 of Reference [47] in FSAR Chapter 15.4.
E 1 E 2 CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-11WATTS BARWBNP-10715.1.9 Computer Codes UtilizedSummaries of some of the principal computer codes used in transient analyses are given below. Other codes, in particular, are very specialized codes in which the modeling has been developed to simulate one given accident, such as those used in the analysis of the reactor coolant system pipe rupture (Section 15.4), and which consequently have a direct bearing on the accident itself, are summarized or referenced in their respective accident analyses sections. The codes used in the analyses of each transient have been listed in Table 15.1-2.15.1.9.1 FACTRANFACTRAN calculates the transient temperature distribution in a cross section of a metal clad U0 2 fuel rod and the transient heat flux at the surface of the clad using as input the nuclear power and the time-dependent coolant parameters (pressure, flow, temperature, and density). The code uses a fuel model which exhibits the following features simultaneously:
(1)A sufficiently large number of radial space increments to handle fast transients such as rod ejection accidents.
(2)Material properties which are functions of temperature and a sophisticated fuel-to-clad gap heat transfer calculation.
(3)The necessary calculations to handle post-DNB transients, film boiling heat transfer correlations, Zircaloy-water reaction and partial melting of the materials.The gap heat transfer coefficient is calculated according to an elastic pellet model (refer to Figure 15.1-8). The thermal expansion of the pellet is calculated as the sum of the radial (one-dimensional) expansions of the rings. Each ring is assumed to expand freely. The cladding diameter is calculated based on thermal expansion and internal and external pressures.If the outside radius of the expanded pellet is smaller than the inside radius of the expanded clad, there is no fuel-clad contact and the gap conductance is calculated on the basis of the thermal conductivity of the gas contained in the gap. If the pellet's outside radius so calculated is larger than the clad inside radius (negative gap), the pellet and the clad are pictured as exerting upon each other a pressure sufficiently important to reduce the gap to zero by elastic deformation of both. The contact pressure determines the gap heat transfer coefficient.FACTRAN is further discussed in Reference [12].15.1.9.2 LOFTRANLOFTRAN is used for studies of transient response of a pressurized water reactor system to specified perturbations in process parameters. LOFTRAN simulates a multi-loop system containing reactor vessel, hot and cold leg piping, steam generator (tube and shell sides) and the pressurizer. The pressurizer heaters, spray, relief and 15.1-12CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107safety valves are also considered in the program. Point model neutron kinetics, and reactivity effects of the moderator, fuel, boron and rods are included. The secondary side of the steam generator utilizes a homogeneous, saturated mixture for the thermal transients and a water level correlation for indication and control. The reactor protection system is simulated to include reactor trips on neutron flux, overpower and overtemperature reactor coolant T, high and low pressure, low flow, and high pressurizer level. Control systems are also simulated including rod control, steam dump, feedwater control and pressurizer pressure control. The safety injection system including the accumulators is also modeled.LOFTRAN is suited to both accident evaluation and control studies as well as parameter sizing.LOFTRAN also has the capability of calculating the transient value of DNB ratio based on the input from the core limits illustrated on Figure 15.1-1. The core limits represent the minimum value of DNBR as calculated for typical or thimble cell.LOFTRAN is further discussed in Reference [15].15.1.9.3 LEOPARDLEOPARD determines fast and thermal neutron spectra, using only basic geometry and temperature data. The code optionally computes fuel depletion effects for a dimensionless reactor and recomputes the spectra before each discrete burnup step.LEOPARD is further described in Reference [16].15.1.9.4 TURTLETURTLE is a two-group, two-dimensional neutron diffusion code featuring a direct treatment of the nonlinear effects of xenon, enthalpy, and Doppler. Fuel depletion is allowed.TURTLE was written for the study of azimuthal xenon oscillations, but the code is useful for general analysis. The input is simple, fuel management is handled directly, and a boron criticality search is allowed.TURTLE is further described in Reference [17].15.1.9.5 TWINKLETWINKLE is a multi-dimensional spatial neutron kinetics code patterned after steady-state codes used for reactor core design. The code uses an implicit finite-difference method to solve the two-group transient neutron diffusion equations in one, two and three dimensions. The code uses six delayed neutron groups and contains a detailed multi-region fuel-clad-coolant heat transfer model for calculating pointwise Doppler and moderator feedback effects. The code handles up to 2000 spatial points, and performs its own steady state initialization. Aside from basic cross-section data and thermal-hydraulic parameters, the code accepts as input basic driving functions such as inlet temperature, pressure, flow, boron concentration, control rod motion, and CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-13WATTS BARWBNP-107others. Various edits include channelwise power, axial offset, enthalpy, volumetric surge, pointwise power, and fuel temperatures.TWINKLE is used to predict the kinetic behavior of a reactor for transients which cause a major perturbation in the spatial neutron flux distribution.TWINKLE is further described in Reference [18].
15.1.9.6 VIPRE-01VIPRE-01 is described in Section 4.4.3.4.
15.1.9.7 LOFTTRThe steam generator tube rupture (SGTR) analyses were performed for Watts Bar using the analysis methodology developed in WCAP-10698
[24] and Supplement 1 to WCAP-10698.
[25] The methodology was developed by the SGTR Subgroup of the Westinghouse Owners Group (WOG) and was approved by the NRC in Safety Evaluation Reports (SERs) dated December 17, 1985 and March 30, 1987. The LOFTTR2 program, an updated version of the LOFTTR1 program, was used to perform the SGTR analysis for Watts Bar. The LOFTTR1 program was developed as part of the revised SGTR analysis methodology and was used for the SGTR evaluations.[24][25] However, the LOFTTR1 program was subsequently modified to accomodate steam generator overfill and the revised program, designated as LOFTTR2, and was used for the evaluation of the consequences of overfill in WCAP-11002.[26] The LOFTTR2 program is identical to the LOFTTR1 program, with the exception that the LOFTTR2 program has the additional capability to represent the transition from two regions (steam and water) on the secondary side to a single water region if overfill occurs, and the transition back to two regions again depending upon the calculated secondary conditions. Since the LOFTTR2 program has been validated against the LOFTTR1 program, the LOFTTR2 program is also appropriate for performing licensing basis SGTR analyses. The specific Watts Bar LOFTTR2 analysis utilizing this methodology is described in 15.4.3.REFERENCES (1)Deleted by Amendment 80.
(2)SCALE-4.2: A Modular Code System for Performing Standardized Computer Analyses for Licensing Evaluation, Volumes I-III, NUREG/CR-0200, Rev. 5 (ORNL/NUREG/CSD-2/R5), March 1997 (ORIGEN-S Subsection)
(3)Safety Guide 25, Assumptions Used For Evaluating The Potential Radiological Consequences Of A Fuel Handling Accident In The Fuel Handling And Storage Facility For Boiling and Pressurized Water Reactors.
(4)Toner, D. F. and Scott, J. S., "Fission-Product Release from UO", Nuc. Safety 3 No. 2, 15-20, December 1961.
15.1-14CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107 (5)Belle, J., "Uranium Dioxide Properties and Nuclear Applications," Naval Reactors, Division of Reactor Development United States Atomic Energy Commission, 1961.
(6)Booth. A. H., "A Suggested Method for Calculating the Diffusion of Radioactive Rare Gas Fission Products From UO Fuel Elements," DCI-27, 1957.(7)Shure, K., "Fission Product Decay Energy" in Bettis Technical Review, WAPD-BT-24, p. 1-17, December 1961.
(8)Shure, K. and Dudziak, D. J., "Calculating Energy Released by Fission Products," Trans. Am. Nucl. Soc. 4 (1) 30 (1961).
(9)Deleted by Amendment 65.
(10)Stehn, J.R. and Clancy, E. F., "Fission-Product Radioactivity and Heat Generation" and "Proceedings of the Second United Nations International Conference on the Peaceful Uses of Atomic Energy, Geneva, 1958," Volume 13, pp. 49-54, United Nations, Geneva, 1958.
(11)Obershain, F. E. and Foderaro, A. H., "Energy from Fission Product Decay," WAPD-P-652, 1955.
(12)Hargrove, H. G., "FACTRAN, a FORTRAN IV Code for Thermal Transients in a UO2 Fuel Rod," WCAP-7908, December 1989.
(13)Deleted by Amendment 72.
(14)Deleted by Unit 1 UFSAR Amendment 0.
(15)Burnett, T. W. T., et al., "LOFTRAN Code Description," WCAP-7907-P-A (Proprietary), WCAP-7907-A (Non-Proprietary) April 1984.
(16)Barry, R. F., "LEOPARD, A Spectrum Dependent Non-Spatial Depletion Code for the IBM-7094," WCAP-3269-26, September 1963.
(17)Barry, R. F. and Altomare, S., "The TURTLE 24.0 Diffusion Depletion Code," WCAP-7213-P-A (Proprietary) and WCAP-7758-A (Non-Proprietary), January 1975.
(18)Risher, D. H., Jr. and Barry, R. F., "TWINKLE - A Multi-Dimensional Neutron Kinetics Computer Code," WCAP-7979-P-A (Proprietary) and WCAP-8028-A (Non-Proprietary), January 1975.
(19)Deleted by Amendment 80.
(20)Deleted by Amendment 80.
CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-15WATTS BARWBNP-107 (21)Haessler, R. L. et al, "Methodology for The Analysis of the Dropped Rod Event," WCAP-11394-P-A (Proprietary) and WCAP-11395-A (Non-Proprietary), January 1990.
(22)Reagan, J. R. and Tuley, C. R., "Westinghouse Setpoint Methodology for Protection Systems, Watts Bar Units 1 and 2, Eagle 21 Version," WCAP-12096, Rev. 5, May 1993 (Proprietary). UNIT 1 ONLY.
(23)Miranda, S., et.al., "Steam Generator Low Water Level Protection System Modifications to Reduce Feedwater Related Trips," WCAP-11325-P-A, Revision 1, February 1988.
(24)Lewis, Huang, Behnke, Fittante, Gelman, "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill," WCAP-10698-P-A [PROPRIETARY]/WCAP-10750-A [NON-PROPRIETARY], August 1987.
(25)Lewis, Huang, Rubin, "Evaluation of Offsite Radiation Doses for a Steam Generator Tube Rupture Accident," Supplement 1 to WCAP-10698-P-A
[PROPRIETARY]/Supplement 1 to WCAP-10750-A [NON-PROPRIETARY], March 1986.
(26)Lewis, Huang, Rubin, Murray, Roidt, Hopkins, "Evaluation of Steam Generator Overfill Due to a Steam Generator Tube Rupture Accident," WCAP-11002 [PROPRIETARY]/WCAP-11003 [NON-PROPRIETARY],
February 1986.
(27)Friedland, A. J. and S. Ray, "Revised Thermal Design Procedure," WCAP-11397-P-A (PROPRIETARY) and WCAP-11398-A (NON-PROPRIETARY), April 1989.
(28)WCAP "Westinghouse Setpoint Methodology for Protection Systems, Watts Bar Unit 2, Eagle 21 Version, WCAP-17044-P, (Unit 2 Only).
15.1-16CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107Table 15.1-1 Nuclear Steam Supply Power RatingsGuaranteed Nuclear Steam Supply System thermal power output3425 MWt The Engineered Safety (Features) Design Rating (ESDR)(initial design maximum calculated turbine rating is 3579 MWt)3650 MWtThermal power generated by thereactor coolant pumps14 MWtGuaranteed core thermal power3411 MWt CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-17WATTS BARWBNP-107Table 15.1-2 Summary Of Initial Conditions And Computer Codes Used (Page 1 of 4)FAULTS COMPUTER CODES UTILIZEDREACTIVITY COEFFICIENTSASSUMED FOR: MODERATOR MODERATORTEMPERATURE DENSITY (k/°F) (k/gm/cc)DOPPLERINITIAL NSSS THERMAL POWER OUTPUT ASSUMED 1 (MWt)CONDITION II Uncontrolled RCC Assembly Bank Withdrawal from Subcritical
ConditionTWINKLE, FACTRAN, VIPRE-01Refer to Section 15.2.1.2 (Part 2)--Least negative Doppler power coefficient-Doppler defect
= 960 pcm3411 (critical @ 0.0fraction of Nominal
[FON])Uncontrolled RCC Assembly Bank Withdrawal at PowerLOFTRAN---0.00 and 0.43lower and upper 23425RCC Assembly MisalignmentVIPRE-01, LOFTRAN---0.00upper 23425Uncontrolled Boron DilutionNANANANA0 and 3425 Partial Loss of Forced Reactor Coolant FlowLOFTRAN, VIPRE-01---0.00upper 23475Startup of an Inactive Reactor Coolant LoopN/A---N/AN/AN/ALoss of External Electrical Load and/or Turbine TripLoss of Normal Feedwater/ Loss of Off-Site Power to the Station Auxiliaries LOFTRAN LOFTRAN ------0.00 upper 2upper 234253475Excessive Heat Removal Due to Feedwater System Malfunctions 3LOFTRAN---0.43lower 23425Excessive Load Increase IncidentN/A---N/AN/AN/AAccidental Depressurization of the Reactor Coolant SystemLOFTRAN0.00upper 23425 15.1-18CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107 CONDITION II (Cont'd)Accidental Depressurization of the Main Steam SystemAccident evaluated; bounded by major rupture of a steam pipeAccidental Depressurization of the Reactor Coolant SystemLOFTRAN0.00upper 23425Inadvertent Operation of ECCS During Power OperationLOFTRAN ---0.00 and 0.43lower and upper 23475 5 CONDITION IIILoss of Reactor Coolant from Small Ruptured Pipes or from Cracks in Large Pipes which Actuates Emergency Core
CoolingNOTRUMP, LOCTA-IV 3411 5Inadvertent Loading of a Fuel Assembly into an Improper
PositionLEOPARD, TURTLE---MinimumNA 3425Complete Loss of Forced Reactor Coolant FlowVIPRE-01, FACTRAN, LOFTRAN---0.00upper 23475Waste Gas Decay TankNA---NANA3579Single RCC Assembly Withdrawal at Full PowerTURTLE, THINC,LEOPARD---NANA3425Table 15.1-2 Summary Of Initial Conditions And Computer Codes Used (Continued) (Page 2 of 4)FAULTS COMPUTER CODES UTILIZEDREACTIVITY COEFFICIENTSASSUMED FOR: MODERATOR MODERATORTEMPERATURE DENSITY (k/°F) (k/gm/cc)DOPPLERINITIAL NSSS THERMAL POWER OUTPUT ASSUMED 1 (MWt)
CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-19WATTS BARWBNP-107 CONDITION IVMajor Rupture of Pipes Containing Reactor Coolant Up to and Including Double-ended Rupture of the Largest Pipe in the Reactor Coolant System (Loss of Coolant Accident)WCOBRA/TRAC, HOTSPOT, LOTIC2--0.00Function of fuel temperature.3475Major Rupture of a Steam Pipe LOFTRAN, VIPRE-01, Function of moderator density; see Section 15.2.13 (Figure 15.2-40)Note 33425 (critical @ 0.0fraction of nominal
[FON]).Major Rupture of a Main Feedwater PipeLOFTRAN---0.00upper 23425Steam Generator Tube RuptureLOFTTR20 pcm/
°F @ 100 RTPFigure 15.1-7upper 23427 Single Reactor Coolant Pump Locked RotorLOFTRAN, VIPRE-01, FACTRAN---0.00upper 23475Fuel Handling Accident NANANA3579Rupture of a Control Rod Drive Mechanism Housing (RCCA
Ejection)TWINKLE, FACTRANRefer to Section 15.4.6---Least negativeDoppler defect, see Table 15.4-123411 (HZP 0)Table 15.1-2 Summary Of Initial Conditions And Computer Codes Used (Continued) (Page 3 of 4)FAULTS COMPUTER CODES UTILIZEDREACTIVITY COEFFICIENTSASSUMED FOR: MODERATOR MODERATORTEMPERATURE DENSITY (k/°F) (k/gm/cc)DOPPLERINITIAL NSSS THERMAL POWER OUTPUT ASSUMED 1 (MWt) 15.1-20CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107 1 The values provided do not include the power uncertainty that is applied either directly (non-RTDP) or statistically (RTDP events).2 Refer to Figure 15.1-5.
3 Refer to Figure 15.4-9.
.4 LOCA M/E based on Engineering Safety Design Rating (ESDR) of 3650 MWt.
5 Severalof these analyses are cons ervatively based upon a core power of 3459 MWt and NSSS power of 3475 MWt, based upon a redefinition of the 2% power uncertainty (2% to 0.6%), which bounds a core power of 3411 MWt and NSSS power of 3425 MWt.Table 15.1-2 Summary Of Initial Conditions And Computer Codes Used (Continued) (Page 4 of 4)FAULTS COMPUTER CODES UTILIZEDREACTIVITY COEFFICIENTSASSUMED FOR: MODERATOR MODERATORTEMPERATURE DENSITY (k/°F) (k/gm/cc)DOPPLERINITIAL NSSS THERMAL POWER OUTPUT ASSUMED 1 (MWt)
CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-21WATTS BARWBNP-107Table 15.1-3 Trip Points And Time Delays To Trip Assumed In Accident AnalysesTrip FunctionLimiting Trip Point Assumed in Analysis Time Delay (Seconds)Power Range High Neutron Flux, High Setting118%0.5Power Range High Neutron Flux, Low Setting35%0.5Overtemperature TVariable (see Figure 15.1-1)8.0*Overpower TVariable (see Figure 15.1-1)8.0*High Pressurizer Pressure2445 psig2.0 Low Pressurizer Pressure1910 psig2.0
- Total time delay (including RTD time response and trip circuit channel electronics delay) from the time the temperature difference in the coolant loops exceeds the trip setpoint until the rods are free to fall.Low Reactor Coolant Flow (from loop flow detectors)87% loop flow1.2Undervoltage Trip68%1.5Turbine TripNot applicable1.0 Low-Low Steam Generator Level0% of narrow range span 2.0 + TTD
- High-High Steam Generator Level, Turbine Trip, and Feedwater Isolation100% of narrow range level span 2.5* Trip Time Delay (TTD) is applicable only below 50% RTP.
15.1-22CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107Table 15.1-4 Determination Of Maximum Overpower Trip Point Power Range Neutron Flux Channel - Based On Nominal Setpoint Considering Inherent Instrumentation Errors Deleted By Amendment 71 CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS 15.1-23WATTS BARWBNP-107Table 15.1-5 Core And Gap Activities Based On Full Power Operation For 1000 Days Full Power: 3565 MWtIsotopeCuries/AssemblyTotal Curies in Core KR-83m KR-85m Kr-85 Kr-87 Kr-88 Kr-89 Xe-131m Xe-133mXe-133 Xe-135m XE-135Xe-138 I-131 I-132 I-133 I-134 I-1355.96E+041.24E+05 5.35E+032.49E+053.45E+05 4.29E+055.43E+033.19E+04 9.92E+052.10E+053.33E+05 8.64E+054.90E+057.18E+05 1.01E+061.12E+069.65E+051.15E+072.39E+07 1.03E+064.81E+076.66E+07 8.28E+071.05E+066.16E+06 1.91E+084.05E+076.43E+07 1.67E+089.46E+071.39E+08 1.95E+082.16E+081.86E+08 15.1-24CONDITION I - NORMAL OPERATION AND OPERATIONAL TRANSIENTS WATTS BARWBNP-107Table 15.1-6 Deleted by Amendment 97 Condition I - Normal Operation and Operational Transients15.1-25WATTS BAR WBNP-107Figure 15.1-1 llustration of Overtemperature and Overpower T Protection
15.1-26Condition I - Normal Operation and Operational TransientsWATTS BAR WBNP-107Figure 15.1-2 RCCA Position Versus Time On Reactor Trip Condition I - Normal Operation and Operational Transients15.1-27WATTS BAR WBNP-107Figure 15.1-3 Normalized RCCA Reactivity Worth Versus Rod Insertion Fraction 15.1-28Condition I - Normal Operation and Operational TransientsWATTS BARWBNP-107Figure 15.1-4 Normalized RCCA Bank Reactivi ty Worth Versus Time from Rod Re lease Condition I - Normal Operation and Operational Transients15.1-29WATTS BAR WBNP-107Figure 15.1-5 Doppler Power Coefficient Used In Accident Analysis 15.1-30Condition I - Normal Operation and Operational TransientsWATTS BARWBNP-107Figure 15.1-6 Residual Decay Heat Condition I - Normal Operation and Operational Transients15.1-31WATTS BARWBNP-107Figure 15.1-7 Deleted by Amendment 97 15.1-32Condition I - Normal Operation and Operational TransientsWATTS BAR WBNP-107Figure 15.1-8 Fuel Rod Cross Section CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-1WATTS BARWBNP-107 15.2 CONDITION II - FAU LTS OF MODERATE FREQUENCYThese faults, at worst, result in the reactor trip with the plant being capable of returning to operation. By definition, these faults (or events) do not propagate to cause a more serious fault, i.e., Condition III or IV category. In addition, Condition II events are not expected to result in fuel rod failures or reactor coolant system (RCS) overpressurization. For the purposes of this report, the following faults have been grouped into this category:
(1)Uncontrolled rod cluster control assembly bank withdrawal from a subcritical condition.
(2)Uncontrolled rod cluster control assembly bank withdrawal at power.
(3)Rod cluster control assembly misalignment.
(4)Uncontrolled boron dilution.
(5)Partial loss of forced reactor coolant flow.
(6)Startup of an inactive reactor coolant loop.
(7)Loss of external electrical load and/or turbine trip.
(8)Loss of normal feedwater.
(9)Loss of offsite power to the station auxiliaries (station blackout).
(10)Excessive heat removal due to feedwater system malfunctions.
(11)Excessive load increase incident.
(12)Accidental depressurization of the reactor coolant system.
(13)Accidental depressurization of the main steam system.
(14)Inadvertent operation of emergency core cooling system during power operation.An evaluation of the reliability of the reactor protection system actuation following initiation of Condition II events is presented in Reference [1] for the relay protection logic. Standard reliability engineering techniques were used to assess likelihood of the trip failure due to random component failures. Common mode failures were also qualitatively investigated. It was concluded from the evaluation that the likelihood of no trip following initiation of Condition II events is extremely small (2 x 10
-7 derived for random component failures).The solid state protection system design has been evaluated by the same methods as used for the relay system and the same order of magnitude of reliability is provided.
15.2-2CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107The worst common mode failure which is postulated to occur is the failure to scram the reactor after an anticipated transient has occurred. A series of generic studies, References [2] and [11], on anticipated transients without scram (ATWS) showed acceptable consequences would result provided that the turbine trips and auxiliary feedwater flow is initiated in a timely manner. The effects of ATWS events are not considered as part of the design basis for transients analyzed in Chapter 15. The final NRC ATWS rule [12] requires that We stinghouse-designed pl ants install ATWS mitigation system circuitry (AMSAC) to initiate a turbine trip and actuate auxiliary feedwater flow independent of the reactor protection system. The Watts Bar AMSAC design is described in Section 7.7.1.12.The time sequence of events during applicable Condition II events is shown in Table 15.2-1.15.2.1 Uncontrolled Rod Cluster Control Assembly Bank Withdrawal from a Subcritical Condition 15.2.1.1 Identification of Ca uses and Accident DescriptionA rod cluster control assembly (RCCA) withdrawal accident is defined as an uncontrolled addition of reactivity to the reactor core caused by withdrawal of RCCAs resulting in a power excursion. Such a transient could be caused by a malfunction of the reactor control or rod control systems. This could occur with the reactor either subcritical, hot zero power or at power. The "at power" case is discussed in Section 15.2.2.Although the reactor is normally brought to power from a subcritical condition by means of RCCA withdrawal, initial startup procedures with a clean core call for boron dilution. The maximum rate of reactivity increase in the case of boron dilution is less than that assumed in this analysis (see Section 15.2.4). The RCCA drive mechanisms are wired into preselected bank configurations which are not altered during reactor life. These circuits prevent the RCCAs from being automatically withdrawn in other than their respective banks. Power supplied to the banks is controlled such that no more than two banks can be withdrawn at the same time and only in their proper withdrawal sequence. The RCCA drive mechanisms are of the magnetic latch type and coil actuation is sequenced to provide variable speed travel. The maximum reactivity insertion rate analyzed in the detailed plant analysis is that occurring with the simultaneous withdrawal of the combination of two sequential control banks having the maximum combined worth at maximum speed.The neutron flux response to a continuous reactivity insertion is characterized by a very fast rise terminated by the reactivity feedback effect of the negative Doppler coefficient.
This self limitation of the power excursion is of primary importance since it limits the power to a tolerable level during the delay time for protective action. Should a continuous RCCA withdrawal accident occur, the transient will be terminated by the following automatic features of the reactor protection system:
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-3WATTS BARWBNP-107 (1)Source Range High Neutron Flux Reactor Trip - actuated when either of two independent source range channels indicates a neutron flux level above a preselected manually adjustable setpoint. This trip function may be manually bypassed only after an intermediate range flux channel indicates a flux level above a specified level. It is automatically reinstated when both intermediate range channels indicate a flux level below a specified level.
(2)Intermediate Range High Neutron Flux Reactor Trip - actuated when either of two independent intermediate range channels indicates a neutron flux level above a preselected manually adjustable setpoint. This trip function may be manually bypassed only after two of the four power range channels are reading above approximately 10% of full power and is automatically reinstated when three of the four channels indicate a power level below this value.(3)Power Range High Neutron Flux Reactor Trip (Low Setting) - actuated when two out of the four power range channels indicate a power level above approximately 25% of full power. This trip function may be manually bypassed when two of the four power range channels indicate a power level above approximately 10% of full power and is automatically reinstated only after three of the four channels indicate a power level below this value.
(4)Power Range High Neutron Flux Reactor Trip (High Setting) - actuated when two out of the four power range channels indicate a power level above a preset setpoint. This trip function is always active.
(5)Power Range High Positive Neutron Flux Rate Trip - actuated when the positive rate of change of neutron flux on two out of four nuclear power range channels indicate a rate above the preset setpoint. This trip function is always active.In addition, control rod stops on high intermediate range flux level (one of two) and high power range flux level (one out of four) serve to discontinue rod withdrawal and prevent actuation of the intermediate range flux level trip and the power range flux level trip, respectively.
15.2.1.2 Analysis of Effects and ConsequencesMethod of AnalysisThe analysis of the uncontrolled RCCA bank withdrawal from subcritical accident is performed in three stages: first an average core nuclear power transient calculation, then an average core heat transfer calculation, and finally a DNBR calculation. The average core nuclear power calculation is performed using spatial neutron kinetics methods, TWINKLE
[3], to determine the average power generation with time, including the various total core feedback effects, i.e., Doppler reactivity and moderator reactivity.
The average heat flux and temperature transients are determined by performing a fuel rod transient heat transfer calculation in FACTRAN
[4]. The average heat flux is next used in VIPRE-01 (described in Section 4.4.3.4) for the transient DNBR calculation.
15.2-4CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107In order to give conservative results for a startup accident, the following assumptions are made concerning the initial reactor conditions:
(1)Since the magnitude of the power peak reached during the initial part of the transient for any given rate of reactivity insertion is strongly dependent on the Doppler coefficient, conservative values (low absolute magnitude) as a function of power are used. See Section 15.1.6 and Table 15.1-2.
(2)Contribution of the moderator reactivity coefficient is negligible during the initial part of the transient because the heat transfer time between the fuel and the moderator is much longer than the neutron flux response time. However, after the initial neutron flux peak, the succeeding rate of power increase is affected by the moderator reactivity coefficien
- t. A conservative value which is appropriate for beginning of core life at hot zero power, is used in the analysis to yield the maximum peak heat flux.
(3)The reactor is assumed to be at hot zero power. This assumption is more conservative than that of a lower initial system temperature. The higher initial system temperature yields a larger fuel-water heat transfer coefficient, larger specific heats, and a less negative (smaller absolute magnitude) Doppler coefficient all of which tend to reduce the Doppler feedback effect thereby increasing the neutron flux peak. The initial effective multiplication factor is assumed to be 1.0 since this results in the worst nuclear power transient.
(4)Reactor trip is assumed to be initiated by power range high neutron flux (low setting). The most adverse combination of instrument and setpoint errors, as well as delays for trip signal actuation and rod cluster control assembly release, is taken into account. A 10% increase is assumed for the power range flux trip setpoint raising it from the nominal value of 25% to 35%. Previous results, however, show that rise in the neutron flux is so rapid that the effect of errors in the trip setpoint on the actual time at which the rods are released is negligible. In addition, the reactor trip insertion characteristic is based on the assumption that the highest worth RCCA is stuck in its fully withdrawn position. See Section 15.1.5 for RCCA insertion characteristics.
(5)The maximum positive reactivity insertion rate assumed is greater than that for the simultaneous withdrawal of the combination of the two sequential control banks having the greatest combined worth at maximum speed (45 inches/minute). Control rod drive mechanism design is discussed in Section 4.2.3.(6)The initial power level was assumed to be below the power level expected for any shutdown condition. The combination of highest reactivity insertion rate and lowest initial power produces the highest peak heat flux.
(7)The most limiting axial and radial power shapes, associated with having the two highest combined worth sequential control banks in their high worth position, are assumed in the DNB analysis.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-5WATTS BARWBNP-107 (8)Two reactor coolant pumps are assumed to be in operation.ResultsThe calculated sequence of events for this accident is shown on Table 15.2-1.Figures 15.2-1 through 15.2-3 show the transient behavior for the indicated reactivity insertion rate with the accident terminated by reactor trip at 35% nominal power. This insertion rate is greater than that for the two highest worth sequential control banks, both assumed to be in their highest incremental worth region. Figure 15.2-1 shows the nuclear power transient. The nuclear power overshoots the full power nominal value but this occurs for only a very short time period. Hence, the energy release and the fuel temperature increases are relatively small. The heat flux response, of interest for DNB considerations, is shown on Figure 15.2-2. The beneficial effect of the inherent thermal lag in the fuel is evidenced by a peak heat flux less than the peak nuclear power value. Figures 15.2-3 and 15.2-3a show the response of the hot spot average fuel and cladding temperatures. The average fuel temperature increases to a value lower than the nominal full power value. The minimum DNBR remains above the limiting value at all times.
15.2.1.3 ConclusionsIn the event of a RCCA withdrawal accident from the subcritical condition, the core and the reactor coolant system are not adversely affected, since the combination of thermal power and the coolant temperature result in a DNBR greater than the limiting value.
Thus, no cladding damage and no release of fission products to the reactor coolant system is predicted as a result of DNB.15.2.2 UNCONTROLLED ROD CLUSTER CONTROL ASSEMBLY BANK WITHDRAWAL AT POWER 15.2.2.1 Identification of Ca uses and Accident DescriptionUncontrolled rod cluster control assembly (RCCA) bank withdrawal at power results in an increase in the core heat flux. Since the heat extraction from the steam generator lags behind the core power generation until the steam generator pressure reaches the relief or safety valve setpoint, there is a net increase in the reactor coolant temperature.
Unless terminated by manual or automatic action, the power mismatch and resultant coolant temperature rise would eventually result in DNB. Therefore, in order to avert damage to the fuel clad the reactor protection system is designed to terminate any such transient before the DNBR falls below the limiting value.The automatic features of the reactor protection system which prevent core damage following the postulated accident include the following:
(1)Power range neutron flux instrumentation actuates a reactor trip if two out of four channels exceed an overpower setpoint.
15.2-6CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107 (2)Reactor trip is actuated if any two out of four T channels exceed an overtemperature T setpoint. This setpoint is automatically varied with axial power imbalance, coolant temperature and pressure to protect against DNB.
(3)Reactor trip is actuated if any two out of four T channels exceed an overpower T setpoint.
(4)A high pressurizer pressure reactor trip actuated from any two out of four pressure channels which is set at a fixed point. This set pressure is less than the set pressure for the pressurizer safety valves.
(5)A high pressurizer water level reactor trip actuated from any two out of three level channels which is set at a fixed point.In addition to the above listed reactor trips, there are the following RCCA withdrawal blocks: (1)High neutron flux (one out of four)
(2)Overpower T (two out of four)
(3)Overtemperature T (two out of four)The manner in which the combination of overpower and overtemperature T trips provide protection over the full range of reactor coolant system conditions is described in Chapter 7. Figure 15.1-1 presents allowable reactor coolant loop average temperature and T for the design power distribution and flow as a function of primary coolant pressure. The boundaries of operation defined by the overpower T trip and the overtemperature T trip are represented as "protection lines" on this diagram. The protection lines are drawn to include all adverse instrumentation and setpoint errors so that under nominal conditions trip would occur well within the area bounded by these lines. The utility of this diagram is in the fact that the limit imposed by any given DNBR can be represented as a line. The DNB lines represent the locus of conditions for which the DNBR is above the limiting value. All points below and to the left of a DNB line for a given pressure have a DNBR greater than the limiting value. The diagram shows that DNB is prevented for all cases if the area enclosed with the maximum protection lines is not traversed by the applicable DNBR line at any point.The area of permissible operation (power, pressure and temperature) is bounded by the combination of reactor trips: high neutron flux (fixed setpoint); high pressure (fixed setpoint); low pressure (fixed setpoint); overpower and overtemperature T (variable setpoints).
15.2.2.2 Analysis of Effects and ConsequencesMethod of AnalysisThis transient is analyzed by the LOFTRAN
[5] Code. This code simulates the neutron kinetics, reactor coolant system, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generator, and steam generator safety valves. The code CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-7WATTS BARWBNP-107computes pertinent plant variables including temperatures, pressures, and power level. The core limits as illustrated in Figure 15.1-1 are used as input to LOFTRAN to determine the minimum DNBR during the transient. In order to obtain conservative values of DNBR the following assumptions are made:
(1)Nominal initial conditions of core power, reactor coolant average temperature, and reactor coolant pressure, are assumed in accordance with RTDP methodology
[18].(2)Reactivity Coefficients - Two cases are analyzed: (a)Minimum Reactivity Feedback. A least negative moderator coefficient of reactivity is assumed corresponding to the beginning of core life. A variable Doppler power coefficient with core power is used in the analysis. A conservatively small (in absolute magnitude) value is assumed.(b)Maximum Reactivity Feedback. A conservatively large positive moderator density coefficient and a large (in absolute magnitude) negative Doppler power coefficient are assumed.
(3)The reactor trip on high neutron flux is assumed to be actuated at a conservative value of 118% of nominal full power. The T trips include all adverse instrumentation and setpoint errors, while the delays for the trip signal actuation are assumed at their maximum values.
(4)The RCCA trip insertion characteristics are based on the assumption that the highest worth assembly is stuck in its fully withdrawn position.
(5)The maximum positive reactivity insertion rate is greater than that for the simultaneous withdrawal of the combination of the two control banks having the maximum combined worth at maximum speed. The effect of RCCA movement on the axial core power distribution is accounted for by causing a decrease in overtemperature T trip setpoints proportional to a decrease in margin to DNB.ResultsThe calculated sequence of events for this accident is shown on Table 15.2-1.Figures 15.2-4 and 15.2-5 show the response of neutron flux, pressurizer pressure, average coolant temperature, and DNBR to a rapid RCCA withdrawal incident starting from full power. Reactor trip on high neutron flux occurs shortly after the start of the accident. Since this is rapid with respect to the thermal time constants of the plant, small changes in Tavg and pressure result and a large margin to DNB is maintained.The response of neutron flux, pressure, average coolant temperature, and DNBR for a slow control rod assembly withdrawal from full power is shown in Figures 15.2-6 and 15.2-8CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-10715.2-7. Reactor trip on overtemperature T occurs after a longer period of time than for the rapid RCCA withdrawal incident and t he rise in temperature is consequently larger.Following reactor trip, the plant approaches a stabilized condition at hot standby; normal plant operating procedures may then be followed. The operating procedures call for operator action to control RCS boron concentration and pressurizer level using the chemical and volume control system (CVCS), and to maintain steam generator level through control of the main or auxiliary feedwater system. Any action required of the operator to maintain the plant in a stabilized condition is in a time frame in excess of ten minutes following reactor trip.Figure 15.2-8 shows the minimum DNBR as a function of reactivity insertion rate from initial full power operation for the minimum and maximum reactivity feedback. It can be seen that two reactor trip functions provide protection over the whole range of reactivity insertion rates. These are the high neutron flux and overtemperature T trip functions. The minimum DNBR is never less than the limiting value.Figures 15.2-9 and 15.2-10 show the minimum DNBR as function of reactivity insertion rate for RCCA withdrawal incidents starting at 60% and 10% power, respectively. The results are similar to the 100% power case except, as the initial power is decreased, the range over which the overtemperature T trip is effective increases. In neither case does the DNBR fall below its minimum limit.The shape of the curves of minimum DNB ratio versus reactivity insertion rate in the referenced figures is due both to reactor core and coolant system transient response and to protection system action in initiating a reactor trip.Referring to Figure 15.2-8, for example, it is noted that (1)For high reactivity insertion rates (i.e., between 4.0 x 10
-4 k/k/sec and 8.0 x 10-4 k/k/sec) reactor trip is initiated by the high neutron flux trip. The neutron flux level in the core rises rapidly for these insertion rates while core heat flux and coolant system temperature lag behind due to the thermal capacity of the fuel and coolant system fluid. Thus, the reactor is tripped prior to significant increase in heat flux or water temperature with resultant high minimum DNB ratios remaining above the limiting value during the transient. As reactivity insertion rate decreases, core heat flux and coolant temperatures can remain more nearly in equilibrium with the neutron flux; minimum DNB ratio during the transient thus decreases with decreasing insertion rate.
(2)The overtemperature T reactor trip circuit initiates a reactor trip when measured coolant loop T exceeded a setpoint based on measured RCS average temperature and pressure. This trip circuit is described in detail in Chapter 7; however, it is important in this context to note that the average temperature contribution to the circuit is lead-lag compensated in order to decrease the effect of the thermal capacity of the RCS in response to power increases.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-9WATTS BARWBNP-107 (3)With further decrease in reactivity insertion rate, the overtemperature T and high neutron flux trips become equally effective in terminating the transient (e.g., at approximately 4.0 x 10
-4 k/k/sec reactivity insertion rate).For reactivity insertion rates between approximately 4.0x10
-4 k/k/sec to 5.0x10-4 k/k/sec, the effectiveness of the overtemperature Ttrip increases (in terms of increased minimum DNBR) due to the fact that with lower insertion rates the power increase rate is slower, the rate of rise of average coolant temperature is slower and the system lags and delays become less significant.
(4)For reactivity insertion rates less than approximately 5.0 x 10
-5 k/k/sec, the rise in the reactor coolant temperature is sufficiently high so that the steam generator safety valve setpoint is reached prior to trip. Opening of these valves, which act as an additional heat load of the RCS, sharply decreases the rate of rise of RCS average temperature. This decrease in rate of rise of the average coolant system temperature during the transient is accentuated by the lead-lag compensation causing the overtemperature T trip setpoint to be reached later with resulting lower minimum DNBRs.Figures 15.2-8, 15.2-9, and 15.2-10 illustrate minimum DNBR calculated for minimum and maximum reactivity feedback.
15.2.2.3 ConclusionsThe high neutron flux and overtemperature T trip channels provide adequate protection over the entire range of possible reactivity insertion rates, i.e., the minimum value of DNBR is always larger than the limiting value.15.2.3 ROD CLUSTER CONTRO L ASSEMBLY MISALIGNMENT 15.2.3.1 Identification of Ca uses and Accident Description Rod cluster control assembly (RCCA) misalignment accidents include:
(1)One or more dropped RCCAs within the same group; (2)A dropped RCCA bank; (3)Statically misaligned RCCAEach RCCA has a position indicator channel where the information is sent to monitors in the main control room. The monitors display the position of the assembly. The displays of assembly positions are grouped for the operator's convenience. Fully inserted assemblies are further indicated by a rod at bottom signal, which actuates a local alarm and a main control room annunciator. Group demand position is also 15.2-10CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107indicated. The assemblies are always moved in preselected banks and the banks are always moved in the same preselected sequence.
Each bank of RCCAs is divided into two groups except Shutdown Banks C and D which have one group each. The rods comprising a group operate in paralled through multiplexing thyristors. The two groups in a bank move sequentially such that the first group is always within one step of the second group in the bank. A definite sequence of actuation of the stationary gripper, movable gripper, and lift coils of a mechanism is required to withdraw or insert the RCCA attached to the mechanism. Since the stationary gripper, movable gripper, and lift coils associated with the RCCAs of a rod group are driven in parallel, any single failure which would cause rod withdrawal would affect just that one group. Mechanical failures are in the direction of insertions, or immobility.
A dropped RCCA or RCCA bank is detected by:
(1)Sudden drop in the core power level is seen by the nuclear instrumentation system;(2)Asymmetric power distribution as seen on out of core neutron detectors or core exit thermocouples; (3)Rod at bottom signal; (4)Rod deviation alarm (control banks only);
(5)Rod position indication; (6)Power Distribution Monitoring System.
Misaligned RCCAs are detected by:
(1)Asymmetric power distribution as seen on out of core neutron detectors or core exit thermocouples; (2)Rod deviation alarm (control banks only);
(3)Rod position indicators; (4)Power Distribution Monitoring System.The resolution of the rod position indicator channel is 12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.If one or more rod position indicator channels should be out of service, detailed plant instructions are followed to assure the alignment of the non-indicated RCCAs. The CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-11WATTS BARWBNP-107operator is also required to take action as required by the Technical Specifications. Plant instructions call for use of the Power Distribution Monitoring System to confirm indication of assembly misalignment.
15.2.3.2 Analysis of Effects and ConsequencesMethod of Analysis (a)One or More Dropped RCCAs from the Same GroupFor evaluation of the dropped RCCA event, the transient system response is calculated using the LOFTRAN
[5] code. The code simulates the neutron kinetics, reactor coolant system, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generator, and steam generator safety valves. The code computes pertinent plant variables including temperatures, pressures, and power level.Statepoints are calculated and nuclear models are used to obtain a hot channel factor consistent with the primary system conditions and reactor power. By incorporating the primary conditions from the transient and the hot channel factor from the nuclear analysis, the DNB design basis is shown to be met using the VIPRE-01 code. The transient response, nuclear peaking factor analysis, and DNB design basis confirmation are performed in accordance with the methodology described in Section 4.4.3.4.Results (a)One or More Dropped RCCAsSingle or multiple dropped RCCAs within the same group result in a negative reactivity insertion. Power may be reestablished either by reactivity feedback or control bank withdrawal. Manual rod control (or with control stops) cases are bounded by automatic control because the reactivity insertions can only result from reactivity feedback and no power overshoot caused by control bank withdrawal can occur.
For a dropped RCCA event in the automatic rod control mode, the rod control system detects the drop in power and initiates control bank withdrawal. Power overshoot may occur due to this action by the automatic rod controller after which the control system will insert the control bank to restore nominal power. Figure 15.2-11 shows a typical transient response to a dropped RCCA (or RCCAs) in automatic control. Uncertainties in the initial condition are included in the DNB evaluation as described in Reference [13].
15.2-12CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107For evaluation of the dropped rod event, transient system conditions at the limiting point in the transient (i.e., statepoints) are calculated. No credit for any direct trip due to the dropped rod(s) is taken in the analysis.[13] The analysis also assumes no automatic power reduction features are actuated by the dropped rod(s). The statepoints are provided for conditions which cover the range of reactivity parameters expected to occur during core life. The minimum calculated pre rod drop hot channel factor is verified to be greater than the design value for each core cycle, demonstrating that in all cases, the minimum DNBR remains above the limiting value.(b)Dropped RCCA BankA dropped RCCA bank typically results in a reactivity insertion greater than 500 pcm. The transient will proceed as described in part "a" above. The statepoint hot channel factor is used along with the transient statepoints and the dropped rod limit lines to confirm that the DNB design basis is met following a dropped rod event with no direct trip due to the dropped rods and no automatic power reduction features.(c)Statically Misaligned RCCAThe most severe misalignment sit uations with respect to DNBR at significant power levels arise from cases in which one RCCA is fully inserted, or where bank D is fully inserted with one RCCA fully withdrawn. Multiple-independent alarms, including a bank insertion limit alarm, alert the operator well before the postulated conditions are approached. The bank can be inserted to its insertion limit with any one assembly fully withdrawn without the DNBR falling below the limit value.The insertion limits in the Technical Specifications may vary from time to time depending on a number of limiting criteria. It is preferable, therefore, to analyze the misaligned RCCA case at full power for a position of the cont rol bank as deeply inserted as the criteria on minimum DNBR and power peaking factor will allow. The full power insertion limits on control bank D must then be chosen to be above that position and will usually be dictated by other criteria. Detailed results will vary from cycle to cycle depending on fuel arrangements.For this RCCA misalignment, with bank D inserted to its full power insertion limit and one RCCA fully withdrawn, DNBR does not fall below the limiting value. This case is analyzed assuming the initial reactor power, pressure, and RCS temperatures are at their nominal values including uncertainties but with the increased radial peaking factor associated with the misaligned RCCA.DNB calculations have not been performed specifically for RCCAs missing from other banks; however, power shape calculations have been done as required for the RCCA ejection analysis. Inspection of the power shapes shows that the DNB and peak kW/ft situation is less severe than the bank D case discussed above assuming insertion limits on the other banks equivalent to a bank D full-in insertion limit.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-13WATTS BARWBNP-107For RCCA misalignments with one RCCA fully inserted, the DNBR does not fall below the limiting value. This case is analyzed assuming the initial reactor power, pressure, and RCS temperatures are at their nominal values, including uncertainties but with the increased radial peaking factor associated with the misaligned RCCA.Violation of the DNB design basis does not occur for the RCCA misalignment incident and thus the ability of the primary coolant to remove heat from the fuel rod is not reduced. The peak fuel temperature corresponds to a linear heat generation rate based on the radial peaking factor penalty associated with the misaligned RCCA and the design axial power distribution. The resulting linear heat generation is well below that which would cause fuel melting.
15.2.3.3 ConclusionsFor cases of dropped RCCAs or dropped banks, the DNBR remains greater than the limit value; therefore, the DNB design basis is met.For all cases of any RCCA fully inserted, or bank D inserted to its rod insertion limits with a single RCCA in that bank fully withdrawn (static misalignment), the DNBR remains greater than the limiting value.15.2.4 UNCONTROLLED BORON DILUTION 15.2.4.1 Identification of Ca uses and Accident DescriptionReactivity can be added to the core by feeding primary grade water into the RCS via the reactor makeup portion of the CVCS. Boron dilution is a manual operation under strict administrative controls with procedures calling for a limit on the rate and duration of dilution. A boric acid blend system is provided to permit the operator to match the boron concentration of reactor coolant makeup water during normal charging to that in the RCS. The CVCS is designed to limit, even under various postulated failure modes, the potential rate of dilution to a value which, after indication through alarms and instrumentation, provides the operator sufficient time to correct the situation in a safe and orderly manner.The opening of the primary makeup water control valve provides makeup to the RCS which can dilute the reactor coolant. Inadvertent dilution from this source can be readily terminated by closing the control valve. In order for makeup water to be added to the RCS at pressure, at least one charging pump must be running in addition to a primary makeup water pump.The rate of addition of unborated makeup water to the RCS when it is not at pressure is limited by the capacity of the primary water makeup pumps. Normally, only one primary water supply pump is operating while the other is on standby. However, these pumps will be deenergized when the primary water storage tank is being bypassed. The primary makeup water will be supplied from the demineralized water and cask decontamination system. With the RCS at pressure, the maximum delivery rate is limited by the control valve.
15.2-14CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107The boric acid from the boric acid tank is blended with primary grade water in the blender and the composition is determined by the preset flow rates of boric acid and primary grade water on the control board. In order to dilute, two separate operations are required:
(1)The operator must switch from the automatic makeup mode to the dilute or alternate dilute mode.
(2)The start handswitch must be actuated.Omitting either step would prevent dilution.
Information on the status of the reactor coolant makeup is continuously available to the operator. Lights are provided on the control board to indicate the operating condition of the pumps in the CVCS. Alarms are actuated to warn the operator if boric acid or demineralized water flow rates deviate from preset values as a result of system malfunction. The signals initiating these alarms will also cause the closure of control valves terminating the addition to the RCS.
15.2.4.2 Analysis of Effects and Consequences15.2.4.2.1 Method of AnalysisBoron dilution during refueling, startup, and power operation is considered in this analysis. Table 15.2-1 contains the time sequence of events for this accident.15.2.4.2.2 Dilution During RefuelingAn uncontrolled boron dilution accident cannot occur during refueling. This accident is prevented by administrative controls which isolate the RCS from the potential source of unborated water.Various combinations of valves will be closed during refueling operations. These valves will block the flow paths which could allow unborated makeup to reach the RCS. Any makeup which is required during refueling will be borated water supplied from the refueling water storage tank (RWST) by the RHR pumps. The operating procedures specify the various valve combinations.15.2.4.2.3 Dilution During StartupIn this mode, the plant is being taken from one long-term mode of operation (hot standby) to another (power). Typically, the plant is maintained in the startup mode only for the purpose of startup testing at the beginning of each cycle. During this mode of operation, rod control is in manual. All normal actions required to change power level, either up or down, require operator initiation. Conditions assumed for the analysis are as follows:
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-15WATTS BARWBNP-107 (1)At operating temperature and pressure, dilution flow is limited by the maximum delivery of three charging pumps, 235 gpm. However, one of the charging pumps, the positive displacement pump, has been abandoned and no longer contributes to the dilution flow. The assumption of three charging pumps contributing to the flow is conservative.
(2)A minimum RCS water volume of 8,451 ft
- 3. This corresponds to the active RCS volume excluding the pressurizer and the reactor vessel upper head.
(3)The initial boron concentration is assumed to be 1,600 ppm, which is a conservative maximum value for the critical concentration at the condition of hot zero power, rods to insertion limits, and no xenon.
(4)The critical boron concentration following reactor trip is assumed to be 1,400 ppm, corresponding to the hot zero power, all rods inserted (minus the most reactive RCCA), no xenon condition. The 200 ppm change from the initial condition noted above is a conservative minimum value.
15.2.4.2.4 Dilution at PowerIn this mode, the plant may be operated in either automatic or manual rod control.
Conditions assumed for the analysis are as follows:
(1)At operating temperature and pressure, dilution flow is limited by the maximum delivery of three charging pumps, 235 gpm. However, one of the charging pumps, the positive displacement pump, has been abandoned and no longer contributes to the dilution flow. The assumption of three charging pumps contributing to the flow is conservative.
(2)A minimum RCS water volume of 8,451 ft
- 3. This corresponds to the active RCS volume excluding the pressurizer and the reactor vessel upper head.
(3)The initial boron concentration is assumed to be 1,500 ppm, which is a conservative maximum value for the critical concentration at the condition of hot full power, rods to insertion limits, and no xenon.
(4)The critical boron concentration following reactor trip is assumed to be 1,250 ppm, corresponding to the hot zero power, all rods inserted (minus the most
reactive RCCA), no xenon condition. The 250 ppm change from the initial conditions noted above is a conservative minimum value.
15.2.4.3 Conclusions15.2.4.3.1 For Dilution During RefuelingDilution during refueling cannot occur due to administrative controls (see Section 15.2.4.2). The operator has prompt and definite indication of any boron dilution from the audible count rate instrumentation. High count rate is alarmed in the reactor containment and the control room. In addition, a source range high flux level is 15.2-16CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107alarmed in the control room. The count rate increase is proportional to the subcritical multiplication factor.15.2.4.3.2 For Dilution During StartupThis mode of operation is a transitory operational mode in which the operator intentionally dilutes and withdraws control rods to take the plant critical. During this mode, the plant is in manual control with the operator required to maintain a high awareness of the plant status. For a normal approach to criticality, the operator must manually initiate a limited dilution and subsequently manually withdraw the control rods, a process that takes several hours. The Technical Specifications require that the operator determine the estimated critical position of the control rods prior to approaching criticality, thus assuring that the reactor does not go critical with the control rods below the insertion limits. Once critical, the power escalation must be sufficiently slow to allow the operator to manually block the source range reactor trip after receiving P-6 from the intermediate range.The accidental dilution increase causes a more rapid power escalation such that insufficient time would be available following P-6 to manually block the source range reactor trip. Failure to perform this manual action results in a reactor trip and immediate shutdown of the reactor. Continued dilution decreases the shutdown margin such that criticality could eventually be regained.For dilution during startup, there are more than 15 minutes available for operator action from the time of alarm (reactor trip on source range high flux) to loss of shutdown
margin.15.2.4.3.3 For Dilution Following Reactor Shutdown Following reactor shutdown, when in hot standby, hot shutdown, and subsequent cold shutdown condition, and once below the P-6 interlock setpoint, and 10 4 counts per second, the high flux at shutdown alarm setting will be automatically adjusted downward as the count rate reduces.Surveillance testing will ensure that the alarm setpoint is operable. The operator does not depend entirely on this alarm setpoint but has audible indication of increasing neutron flux from the audible count rate drawer and visual indication from counts per second meters for each channel on the main control board and source range drawer.15.2.4.3.4 For Dilution During Full Power OperationWith the reactor in automatic rod control, the power and temperature increase from boron dilution results in insertion of the control rods and a decrease in the available shutdown margin. The rod insertion limit alarms (LOW and LOW-LOW settings) alert the operator that a dilution event is in progress. There are more than 15 minutes available for operator action from the time of alarm (LOW-LOW rod insertion limit) to loss of shutdown margin.With the reactor in manual control and no operator action taken to terminate the transient, the power and temperature rise will cause the reactor to reach the CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-17WATTS BARWBNP-107overtemperature T trip setpoint resulting in a reactor trip. The boron dilution transient in this case is essentially the equivalent to an uncontrolled RCCA bank withdrawal at power. The reactivity insertion rate for a boron dilution accident is conservatively estimated to be about 0.6 pcm/sec, which yields the longest time to reach reactor trip. There are more than 15 minutes available for operator action from the time of alarm (overtemperature T) to loss of shutdown margin.For all cases, the reactor will be in a stable condition following termination of the dilution flow. The operator will then initiate reboration to recover the shutdown margin, using the CVCS. If the reactor has tripped, operating procedures call for operator action to control pressurizer level using the CVCS and to maintain steam generator level through control of the main or auxiliary feedwater system. Any action required of the operator to maintain the plant in a stabilized condition are in a time frame in excess of ten minutes following reactor trip.15.2.5 PARTIAL LOSS OF FORCED REACTOR COOLANT FLOW 15.2.5.1 Identification of Ca uses and Accident DescriptionA partial loss of coolant flow accident can result from a mechanical or electrical failure in a reactor coolant pump, or from a fault in the power supply to the pump or pumps supplied by a reactor coolant pump bus. If the reactor is at power at the time of the accident, the immediate effect of loss of coolant flow is a rapid increase in the coolant temperature. This increase could result in DNB with subsequent fuel damage if the reactor is not tripped promptly.Normal power for the reactor coolant pumps is supplied through individual electrical boards from a transformer connected to the generator. When a generator trip occurs, the boards are automatically transferred to a transformer supplied from external power lines, and the pumps will continue to provide forced coolant flow to the core. Following a turbine trip where there are no electrical faults or a thrust bearing failure which requires tripping the generator from the network, the generator remains connected to the network for approximately 30 seconds. The reactor coolant pumps remain connected to the generator thus ensuring full flow for approximately 30 seconds after the reactor trip before any transfer is made. Since each pump is on a separate board, a single board fault would not result in the loss of more than one pump.The necessary protection against a partial loss of coolant flow accident is provided by the low primary coolant flow reactor trip which is actuated by two out of three low flow signals in any reactor coolant loop. Above approximately 48% power (Permissive 8), low flow in any loop will actuate a reactor trip. Between approximately 10% power (Permissive 7) and the power level corresponding to Permissive 8, low flow in any two loops will actuate a reactor trip.Following a RCP trip, if the cause of the shutdown is immediately resolved, a restart of the pump may be attempted if reactor power is reduced to less than 10% and there is ample time to meet the Technical Specifications Limiting Condition for Operation (LCO) action statement.
15.2-18CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107 15.2.5.2 Analysis of Effects and ConsequencesMethod of AnalysisA partial loss of flow involving the loss of one pump with four loops in operation has been analyzed.This transient is analyzed by three digital computer codes. First the LOFTRAN
[5] Code is used to calculate the loop and core flow transients, the time of reactor trip based on the loop flow transient the nuclear power transient, and the primary system pressure and coolant temperature transients. The FACTRAN Code[4] is then used to calculate the heat flux transient based on the nuclear power and flow from LOFTRAN. Finally, the VIPRE-01 Code (see Section 4.4.3.4) is used to calculate the DNBR during the transient based on the heat flux from FACTRAN and flow from LOFTRAN. The DNBR transient presented represents the minimum of the typical or thimble cell.Initial ConditionsInitial reactor power, pressure, and RCS temperature are assumed to be at their nominal values. Uncertainties in the initial conditions are included in the safety analysis DNBR limit as described in Reference [18]. The minimum measured flow value is also included.Reactivity CoefficientsThe least negative moderator temperature coefficient is assumed since this results in the maximum core power during the initial part of the transient when the minimum DNBR is reached.Flow CoastdownThe flow coastdown analysis is based on a momentum balance around each reactor coolant loop and across the reactor core. This momentum balance is combined with the continuity equation, a pump momentum balance and the pump characteristics and is based on high estimates of system pressure losses.ResultsThe calculated sequence of events for the limiting case analyzed is shown on Table 15.2-1. Figures 15.2-12, 15.2-13, and 15.2-15 through 15.2-17 show the transient response for the loss of power to one reactor coolant pump with four loop operation. The DNBR never goes below the design basis limit.Following reactor trip, the plant will come to a stabilized condition at hot standby with one or more reactor coolant pumps in operation. Normal operating procedures may then be followed. The operating procedures would call for operator action to control RCS boron concentration and pressurizer level using the CVCS, and to maintain steam generator level through control of the main or auxiliary feedwater system. Any action required of the operator to maintain the plant in a stabilized condition will be in a time frame in excess of ten minutes following reactor trip.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-19WATTS BARWBNP-107 15.2.5.3 ConclusionsThe analysis has demonstrated for the partial loss of forced reactor coolant flow that the DNBR will not decrease below the design basis limit at any time during the transient.
15.2.6 Startup of an Inactive Reactor Coolant Loop 15.2.6.1 Identification of Ca uses and Accident DescriptionIf a Watts Bar Plant unit were to operate with one pump out of service, there would be reverse flow through the inactive loop due to the pressure difference across the reactor vessel. The cold leg temperature in an inactive loop is identical to the cold leg temperature of the active loops (the reactor core inlet temperature). If the reactor is operated at power with an inactive loop, and assuming the secondary side of the steam generator in the inactive loop is not isolated, there is a temperature drop across the steam generator in the inactive loop. With the reverse flow, the hot leg temperature of the inactive loop is lower than the reactor core inlet temperature.Starting an idle reactor coolant pump without first bringing the inactive loop hot leg temperature close to the core inlet temperature would result in the injection of cold water into the core. This injection would cause a reactivity insertion and subsequent power increase due to the moderator density reactivity feedback effect.Based on the expected frequency of occurrence, the Startup of an Inactive Loop event is classified as a condition II event (an incident of moderate frequency) as defined by the American Nuclear Society Nuclear Safety Criteria for the Design of Stationary PWR Plants.Sequence of Events and System Operation Following the startup of the inactive reactor coolant pump, the flow in the inactive loop will accelerate to full flow in the forward direction over a period of several seconds. Since the Technical Specifications require all reactor coolant pumps to be operating while in modes 1 and 2, the maximum initial core power level for the Startup of an Inactive Loop transient is approximately 0 MWt. Under these conditions, there can be no significant reactivity insertion because the RCS is initially at a nearly uniform temperature. Furthermore, the reactor will initially be subcritical by the Technical Specification requirement. Thus, there will be no increase in core power, and no automatic or manual protective action is required. [This analysis is normally run at high power levels for (N-1) loop operation plants. WBN design does not currently include this operating configuration.]
15.2.6.2 ConclusionsThe Startup of an Inactive Loop event results in an increase in reactor vessel flow while the reactor remains in a subcritical condition. No analysis is required to show that the minimum DNBR limit is satisfied for this event.
15.2-20CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107Startup of an RCP at less than 10% power is allowed as a corrective measure taken during a recovery phase after a partial loss of forced reactor coolant event, and is not the same as the startup of an inactive loop. Refer to Section 15.2.5.1.
15.2.7 LOSS OF EXTERNAL ELECTRICAL LOAD AND/OR TURBINE TRIP 15.2.7.1 Identification of Ca uses and Accident DescriptionMajor load loss on the plant can result from loss of external electrical load or from a turbine trip. For either case offsite power is available for the continued operation of plant components such as the reactor coolant pumps. This analysis, along with the Loss of Normal Feedwater (Section 15.2.8) and Complete Loss of Forced Reactor Coolant Flow (Section 15.3.4) addresses the case of loss of offsite power to the station auxiliaries (Section 15.2.9).For a turbine trip, the reactor will be tripped directly (unless below approximately 50% power) from a signal derived from the turbine autostop oil pressure or turbine throttle valve position. The automatic steam dump system will accommodate the excess steam generation. Reactor coolant temperatures and pressure do not significantly increase if the steam dump system and pressurizer pressure control system are functioning properly. If the turbine condenser is not available, the excess steam generation will be dumped to the atmosphere. Additionally, main feedwater flow will be lost if the turbine condenser is not available. For this situation feedwater flow will be maintained by the auxiliary feedwater system.For a loss of external electrical load without subsequent turbine trip, no direct reactor trip signal would be generated. A continued steam load of approximately 5% would exist after total loss of external electrical load because of the steam demand of plant auxiliaries.Onsite power supplies plant auxiliaries during plant operation, e.g., the reactor coolant pumps. Safeguards loads are supplied from offsite power or, alternatively, from emergency diesels. Reactor protection system equipment is supplied from the 120V AC vital instrument power supply system, which in turn is supplied from the vital inverters; the inverters are supplied from a DC bus energized from vital batteries or rectified AC from safeguards buses. Thus, for postulated loss of load and subsequent turbine generator overspeed, any overfrequency condition is not seen by safety related pump motors, reactor protection system equipment, or other safeguards loads. Any increased frequency to the reactor coolant pump motors will result in slightly increased flowrate and subsequent additional margin to safety limits.Should a safety limit be approached, protection would be provided by high pressurizer pressure and overtemperature T trip. Power and frequency relays associated with the reactor coolant pump provide no additional safety function for this event. Following a complete loss of load the maximum turbine overspeed would be approximately 8% to 9%, resulting in an overfrequency of less than 6 Hz. This resulting overfrequency is not expected to damage the sensors (non-NSSS) in any way. However, it is noted that frequent testing of this equipment is required by the Technical Specifications. Any degradation in their performance could be ascertained at that time.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-21WATTS BARWBNP-107In the event the steam dump valves fail to open following a large loss of load, the steam generator safety valves may lift and the reactor may be tripped by the high pressurizer pressure signal, the high pressurizer water level signal, the overtemperature T signal or the low-low steam generator water level signal. The sudden reduction in steam flow will result in an increase in pressure and temperature in the steam generator shell. As a result, the heat transfer rate in the steam generator is reduced causing the reactor coolant temperature to rise, which causes coolant expansion, pressurizer insurge, and RCS pressure rise. The pressurizer safety valves and steam generator safety valves are, however, sized to protect the RCS and steam generator against overpressure for all load losses without assuming the operation of the steam dump system, pressurizer spray, pressurizer power-operated relief valves, automatic rod cluster control assembly control nor direct reactor trip on turbine trip.The steam generator safety valve capacity is sized to remove the steam flow at the Engineer Safety Features Rating (105% of steam flow at rated power) from the steam generator without exceeding 110% of the steam system design pressure. The pressurizer safety valve capacity is sized based on a complete loss of heat sink with the plant initially operating at the maximum calculated turbine load along with operation of the steam generator safety valves. The pressurizer safety valves are then able to maintain the RCS pressure within 110% of the RCS design pressure without direct or immediate reactor trip action.A more complete discussion of overpressure protection can be found in Reference [9].
15.2.7.2 Analysis of Effects and ConsequencesMethod of AnalysisIn this analysis, the behavior of the unit is evaluated for a complete loss of steam load from full power without direct reactor trip primarily to show the adequacy of the pressure relieving devices and also to demonstrate core protection margins.The total loss of load transients are analyzed by employing the detailed digital computer program LOFTRAN
[5], which is described in Section 15.1. The program simulates the neutron kinetics, RCS, presssurizer, pressurizer relief and safety valves, pressurizer spray, steam generator, and variables including temperatures, pressures, and power level.Typical assumptions are:
(1)Initial Operating Conditions (a) DNB case - The initial reactor power, pressurizer pressure, and RCS temperature are assumed at their nominal values, consistent with steady-state full-power operation, in accordance with the RTDP methodology [Reference 18]. Minimum measured RCS flow is also assumed for the DNB evaluation case in accordance with the RTDP methology. (b) RCS Overpressure Case - The initial reactor power and RCS 15.2-22CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107temperatures are assumed at their maximum values consistent with steady-state full-power operation including allowances for calibration and instrument errors. The initial RCS pressure is assumed at a minimum value (pressurizer pressure - 50 psi allowance for steady-state fluctuations and measurement error) consistent with steady-state full-power operation including allowances for calibration and instrument errors. Thermal design RCS flow is assumed, ensuring minimum primary-to-secondary heat transfer. This results in the maximum power difference for this load loss, and the minimum margin to core protection limits at the initiation of the accident.
(2)Moderator and Doppler Coefficients of Reactivity - the total loss of load is analyzed assuming beginning-of-life conditions. The least negative moderator temperature coefficients at beginning-of-life is used. A conservatively large (absolute value) Doppler power coefficient is used for all cases.(3)Reactor Control - it is conservatively assumed that the reactor is in manual control.(4)Steam Release - no credit is taken for the operation of the steam dump system or steam generator power-operated relief valves. The steam generator pressure rises to the safety valve setpoints where steam release through safety valves occurs to limit the secondary steam pressure.
(5)Pressurizer Spray and Powe r-Operated Relief Valves: (a)DNB Case - Full credit is taken for the effect of pressurizer spray and power-operated relief valves in reducing or limiting the coolant pressure.(b)RCS Overpressure Case - No credit is taken for the effect of pressurizer spray and power-operated relief valves in reducing or limiting the coolant pressure.
(6)Feedwater Flow - main feedwater flow to the steam generators is assumed to be lost at the time of loss of external electrical load.Reactor trip is actuated by the first reactor protection system trip setpoint reached with no credit taken for the direct reactor trip on turbine trip.ResultsThe transient responses for a total loss of load from full power operation are shown for each case, in Figures 15.2-19 through 15.2-26. The calculated sequence of events for the accident is shown in Table 15.2-1.Figures 15.2-19 and 15.2-22 show the transient responses for the total loss of steam load at beginning-of-life with a zero moderator temperature coefficient assuming full credit for the pressurizer spray and pressurizer power-operated relief valves. No credit CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-23WATTS BARWBNP-107is taken for the steam dump. The reactor is tripped by the OTT signal trip channel. The minimum DNBR is well above the limiting value.The total loss of load accident was also studied assuming the plant to be initially operating at full power, including uncertainty, with no credit taken for the pressurizer spray, pressurizer power-operated relief valves, or steam dump. The reactor is tripped on the high pressurizer pressure signal. Figures 15.2-23 through 15.2-26 show the RCS overpressurization transient with a zero moderator coefficient. In this case the pressurizer safety valves and main steam safety valves are actuated and maintain the system pressure below 110% of their respective design values.Reference [9] presents additional results of analysis for a complete loss of heat sink including loss of main feedwater. This analysis shows the overpressure protection that is afforded by the pressurizer and steam generator safety valves.
15.2.7.3 ConclusionsResults of the analyses, including those in Reference [9], show that the plant design is such that a total loss of external electrical load without a direct or immediate reactor trip presents no hazard to the integrity of the RCS or the main steam system. Pressure relieving devices incorporated in the two systems are adequate to limit the maximum pressures to within the design limits.The integrity of the core is maintained by operation of the reactor protection system, i.e., the DNBR will be maintained above the limiting value.
15.2.8 LOSS OF NORMAL FEEDWATER 15.2.8.1 Identification of Ca uses and Accident DescriptionA loss of normal feedwater (from pump failures, valve malfunctions, or loss of offsite AC power) results in a reduction in capability of the secondary system to remove the heat generated in the reactor core. If the reactor were not tripped during this accident, core damage would possibly occur from a sudden loss of heat sink. If an alternative supply of feedwater were not supplied to the plant, residual heat following reactor trip would heat the primary system water to the point where water relief from the pressurizer occurs. Significant loss of water from the RCS could conceivably lead to core damage. Since the plant is tripped well before the steam generator heat transfer capability is reduced, the primary system variables never approach a DNB condition.The following provides the necessary protection against a loss of normal feedwater:
(1)Reactor trip on low-low water level in any steam generator.
(2)Two motor driven auxiliary feedwater pumps which are started on: (a)Low-low level in any steam generator (b)Trip of both turbine driven main feedwater pumps 15.2-24CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107 (c)Any safety injection signal (d)Loss of offsite power (e)Manual actuation (3)One turbine driven auxiliary feedwater pump is started on: (a)Low-low level in any two steam generators (b)Trip of both turbine driven main feedwater pumps (c)Any safety injection signal (d)Loss of offsite power (e)Manual actuationRefer to Section 10.4.9 for the design of the auxiliary feedwater system.
The motor driven auxiliary feedwater pumps are supplied by the emergency diesel generators if a loss of offsite power occurs and the turbine-driven pump utilizes steam from the secondary system. Both type pumps are designed to start and deliver full flow within one minute even if a loss of all ac power occurs simultaneously with loss of normal feedwater. The turbine exhausts the secondary steam to the atmosphere. The auxiliary feedwater pumps take suction from the condensate storage tank for delivery to the steam generators.The analysis shows that, following a loss of normal feedwater, the auxiliary feedwater system is capable of removing the stored and residual heat, thus preventing water relief from the pressurizer and subsequently a loss of water from the reactor core.
15.2.8.2 Analysis of Effects and ConsequencesMethod of AnalysisA detailed analysis using the LOFTRAN
[5] Code is performed in order to obtain the plant transient following a loss of normal feedwater. The simulation describes the plant thermal kinetics, RCS including the natural circulation, pressurizer, steam generators and feedwater system. The digital program computes pertinent variables including the steam generator level, pressurizer water level, and reactor coolant average temperature.Two cases are examined for a loss of normal feedwater event. The first is the case where offsite ac power is maintained, and the second is the case where offsite ac power is lost, which results in reactor coolant pump coastdown as described in Section 15.2.5.2.The case where offsite ac power is lost is limiting with respect to water relief from the pressurizer and loss of water from the reactor core.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-25WATTS BARWBNP-107Assumptions (1)The initial steam generator water level (in all steam generators) at the time of reactor trip is at a conservatively low level. The low-low steam generator level trip setpoint is conservatively assumed to 0.0% of narrow range span.
(2)The plant is initially operating at 102% of the Nuclear Steam Supply System design rating. The heat added to the RCS by the reactor coolant pumps is assumed, as applicable.
(3)The core residual heat generation is based on the 1979 version of ANS 5.1
[14] based upon long term operation at the initial power level. The decay of U-238 capture products is included as an integral part of this expression.
(4)A heat transfer coefficient in the steam generator associated with RCS natural circulation for the case where offsite power is lost.
(5)Two motor-driven auxiliary feedwater pumps are available one minute after the accident. (Failure of the turbine-driven auxiliary feedwater pump is assumed since this failure provides minimum auxiliary feedwater flow.)
(6)Constant auxiliary feedwater flow equal to 820 gpm from the two motor-driven auxiliary feedwater pumps is delivered to four steam generators.
(7)Auxiliary feedwater temperature is 120°F.
(8)Secondary system steam relief is achieved through the self-actuated safety valves. Note that steam relief will, in fact, be through the power-operated relief valves or condenser dump valves for most cases of loss of normal feedwater. However, for the sake of analysis these have been assumed unavailable.
(9)LONF and LOOP cases run with both positive and negative initial average RCS temperature uncertainty (+/-6°F) and pressurizer pressure uncertainty (+70/-50 psi) have indicated that the case with negative temperature and pressurizer pressure uncertainties is conservative in terms of maximum pressurizer water volume.
(10)The pressurizer heaters and sprays are assumed operable during the transient. Heaters cause expansion of the pressurizer water while sprays reduce pressurizer pressure allowing a greater coolant in surge. Both scenarios conservatively maximize the pressurizer water inventory.
(11)The CVCS is not assumed to function for this event as operation of the system is a benefit with respect to long term core decay heat removal. Note, however, that charging pump operation will increase the reactor coolant inventory if the letdown isolation valve closes due to subsequent loss of instrument air. This scenario was examined to determine if the operators 15.2-26CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107have sufficient time to terminate the net mass addition to the reactor coolant system to preclude water relief through the pressurizer safety valves. The heaters were assumed to operate as-designed on pressure effects.The loss of normal feedwater analysis is performed to demonstrate the adequacy of the reactor protection and engineered safeguards systems (e.g., the auxiliary feedwater system) in removing long term decay heat and preventing excessive heatup of the RCS with possible loss of RCS water.As such, the assumptions used in this analysis are designed to minimize the energy removal capability of the system and to maximize the possibility of water relief from the coolant system by maximizing the coolant system expansion, as noted in the assumptions listed above.One such assumption is the loss of external (offsite) ac power. This assumption results in coolant flow decay down to natural circulation conditions reducing the steam generator heat transfer coefficient. Following a loss of offsite ac power, the first few seconds of a loss of normal feedwater transient will be virtually identical to the transient response (including DNBR and neutron flux versus time) presented in Section 15.3.4 for the complete loss of forced reactor coolant flow incident.A separate case was run with charging flow initiated on a loss of offsite power signal. The addition of charging flow would provide a benefit regarding primary side temperature increase (post-trip heatup), and hence should not be credited to demonstrate the heat removal capacity of the auxiliary feedwater system. Therefore, the loss of normal feedwater event as presented herein is appropriate in terms of demonstrating auxiliary feedwater system heat removal capacity.Further, this case did not result in the filling of the pressurizer prior to ten minutes following the initiation of the event. Thus, there is sufficient time available for the operator to terminate the net mass addition to the reactor coolant system to preclude water relief through the pressurizer safety valves. This case is analyzed similar to the inadvertent operation of the emergency core cooling system (ECCS) event, where operator action is required to terminate the ECCS flow, thereby, precluding water relief through the pressurizer safety valves. Also, as mentioned above, the loss of normal feedwater cases bound this case relative to demonstrating the long-term heat removal capacity of the auxiliary feedwater system.Additional sensitivities were performed to determine if it was more conservative to model the pressurizer power operated relief valves as operable or inoperable. ResultsFigures 15.2-27a through 15.2-27i show the significant plant parameter transients following a loss of normal feedwater where offsite power is lost. The calculated sequence of events for this accident is listed in Table 15.2-1.Following the reactor and turbine trip from full load, the water level in the steam generators will fall due to the reduction of steam generator void fraction and because CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-27WATTS BARWBNP-107steam flow through the safety valves continues to dissipate the stored and generated heat. One minute following the initiation of the low-low level trip, both of the motor-driven auxiliary feedwater pumps are automatically started and are at full speed, reducing the rate of water level decrease.The capacity of the auxiliary feedwater pumps is such that the water level in the steam generators does not recede below the lowest level at which sufficient heat transfer area is available to dissipate core residual heat without water relief from the RCS relief or safety valves.From Figure 15.2-27g, it can be seen that at no time is there water relief from the pressurizer. If the auxiliary feed delivered is greater than that of two motor-driven pumps, if the initial NSSS power is less than 100% of the NSSS design rating plus applicable uncertainty or if the steam generator water level in one or more steam generators is above the low-low level trip point at the time of trip, then the results of this transient will be bounded by the analysis presented.The plant will slowly approach a stabilized condition at hot standby with auxiliary feedwater removing decay heat. The plant may be maintained at hot standby or further cooled through manual control of the auxiliary feed flow. The operating procedures also call for operator action to control RCS boron concentration and pressurizer level using the CVCS and to maintain steam generator level through control of the auxiliary feedwater system. Any action required of the operator to maintain the plant in a stabilized condition is in a time frame in excess of ten minutes following reactor trip.
15.2.8.3 ConclusionsResults of the analysis show that a loss of normal feedwater does not adversely affect the core, the RCS, or the steam system since the auxiliary feedwater capacity is such that the reactor coolant water is not relieved from the pressurizer relief or safety valves, and the water level in the steam generators receiving feedwater is maintained above the tubesheets.15.2.9 COINCIDENT LOSS OF ONSITE AND EXTERNAL (OFFSITE) AC POWER TO THE STATION - LOSS OF OFFSITE POWER TO THE STATION AUXILIARIESA complete loss of all offsite power (no-emergency AC power) may result in the loss of all power to the plant auxiliaries, i.e., the reactor coolant pumps, condensate pumps, etc. The loss of power may be caused by a complete loss of the offsite grid accompanied by a turbine generator trip at the station, or by a loss of the onsite AC distribution system. See analysis contained in Sections 15.2.7, 15.2.8 and 15.3.4. For a LOOP event, the Emergency Diesel Generators (EDG) are available to supply AC power to support plant safe shutdown. A Station Blackout (SBO) event differs from a LOOP in that for the SBO Unit, both Emergency Diesel Generators are lost or are not available on the SBO unit for the SBO coping period (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />). The non-SBO unit is assumed to have a single failure such only that one EDG is available to support safe shutdown. A SBO event is beyond the design basis for Watts Bar. Section 4.41 of WB-DC-40-64 describes the plant's ability to mitigate this multiple failure scenario as required by 10 CFR 50.63.
15.2-28CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-10715.2.10 EXCESSIVE HEAT REMO VAL DUE TO FE EDWATER SYSTEM MALFUNCTIONS15.2.10.1 Identification of Causes and Accident DescriptionAdditions of excessive feedwater cause increases in core power by decreasing reactor coolant temperature. Such transients are attenuated by the thermal capacity of the secondary plant and of the RCS. The overpower-overtemperature protection (overtemperature T, and overpower T trips) prevents any power increase which could lead to a DNBR less than the limiting value.Excessive feedwater flow could be caused by a full opening of one or more feedwater control valves due to a feedwater control system malfunction or an operator error. At power, this excess flow causes a greater load demand on the RCS due to increased subcooling in the steam generator. With the plant at no-load conditions, the addition of cold feedwater may cause a decrease in RCS temperature and thus a reactivity insertion due to the effects of the negative moderator coefficient of reactivity.
Continuous addition of excessive feedwater is prevented by the steam generator high-high level trip, which closes the feedwater control and isolation valves.
15.2.10.2 Analysis of Effects and ConsequencesMethod of AnalysisThe excessive heat removal due to a feedwater system malfunction transient is analyzed by the detailed digital computer code LOFTRAN
[5]. This code simulates a multi-loop system, neutron kinetics, the pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generator, and steam generator safety valves. The code computes pertinent plant variables including temperatures, pressures, and power level. Excessive feedwater addition due to a control system malfunction or operator error which allows one or more feedwater control valves to open fully is considered. The most limiting cases are as follows:1. aAccidental opening of one feedwater control valve with the reactor at zero load. bAccidental opening of all feedwater control valves with the reactor at zero load.2. aAccidental opening of one feedwater control valve with the reactor at full power. bAccidental opening of all feedwater control valves with the reactor at full power.The plant response following a feedwater system malfunction is calculated with the following assumptions:
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-29WATTS BARWBNP-107 (1)Reactor at zero load (a)A generic study performed by Westinghouse demonstrated that the consequences of a hot zero power feedwater malfunction with an increased feedwater flow rate of less that 150% of the nominal full power flow rate are non-limiting and are bounded by the hot full power feedwater malfunction. The hot zero power discussion herein is maintained for historical purposes. The reactor is assumed to be just critical in the hot shutdown condition.(b)Both automatic and manual rod control are considered for each of the zero-power cases.(c)For case 1a, an increase in feedwater flow to one steam generator from zero flow to 100% of the nominal single steam generator full-load flow is assumed.For case 1b, an increase in feedwater flow to each of the four steam generators from zero flow to 90%, 11%, 11%, and 12% of nominal flow
is assumed.(d)The feedwater temperature is assumed to be at a conservatively low value of 32 °F.(e)For case 1a, no credit is taken for the heat capacity of the steam and water in the unaffected steam generators.
(2)Reactor at full power (a)This accident is analyzed with the RTDP as described in Reference [18]; therefore initial reactor power, pressure, and RCS temperatures are assumed to be at their nominal values. Uncertainties in initial conditions are included in the limit DNBR as described in Reference [18].(b)Both automatic and manual rod control are considered for each of the full-power cases. The results from the most limiting scenario are presented.(c)For case 2a, a step increase in feedwater flow to one steam generator from nominal flow to 200% of nominal flow (for one steam generator) is assumed.
15.2-30CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107For case 2b, a step increase in feedwater flow to each of the four steam generators from nominal flow to 173%, 155%, 154%, and 157% of nominal flow is assumed.(d)For case 2a, no credit is taken for the heat capacity of the steam and water in the unaffected steam generators.(e)The feedwater flow from a fully open control valve is terminated by the steam generator high-high signal, which closes all feedwater control and isolation valves and trips the main feedwater pumps.
(3)For both cases 1 and 2 above: (a)The initial water level in all steam generators is at a conservatively low level for the initial conditions.(b)No credit is taken for the heat capacity of the reactor coolant system in attenuating the resulting plant cooldown.(c)A conservatively large moderator coefficient of reactivity that is characteristic of end-of-life core conditions is used. ResultsThe cases of an accidental full opening of one or more feedwater control valves with the reactor at hot zero power (HZP) are bounded by the hot full power cases as mentioned above. Therefore, the results of the analyses are not presented.The full-power cases (end-of-life, with automatic rod control) give the largest reactivity feedback and result in the greatest power increase. Figures 15.2-28a through 15.2-28j show the transient response for the accidental full opening of one or all four feedwater control valves with the reactor at full power. The DNBR does not drop below the limit value. Following reactor trip and feedwater isolation, the plant will approach a stabilized condition at hot standby. Normal plant operating procedures may then be followed. The operating procedures would call for operator action to control RCS boron concentration and pressurizer level using the CVCS, and to maintain steam generator level through control of the main or auxiliary feedwater system. Any action required of the operator to maintain the plant in a stabilized condition will be in a time frame in excess of ten minutes following reactor trip.
15.2.10.3 ConclusionsResults show that the DNBRs encountered for excessive feedwater addition at power are well above the limit value.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-31WATTS BARWBNP-10715.2.11 Excessive Load Increase Incident15.2.11.1 Identification of Causes and Accident DescriptionAn excessive load increase incident is defined as a rapid increase in the steam flow that causes a power mismatch between the reactor core power and the steam generator load demand. The RCS is designed to accommodate a 10% step load increase or a 5% per minute ramp load increase in the range of 15 to 100% of full power. Any loading rate in excess of these values may cause a reactor trip actuated by the reactor protection system .This accident could result from either an administrative violation such as excessive loading by the operator or an equipment malfunction in the steam dump control or turbine speed control.During power operation, steam dump to the condenser is controlled by reactor coolant condition signals; i.e., high reactor coolant temperature indicates a need for steam dump. A single controller malfunction does not cause steam dump; an interlock is provided which blocks the opening of the valves unless a large turbine load decrease or a turbine trip has occurred.Protection against an excessive load increase accident is provided by the following RPS signals:
(1)Overpower T (2)Overtemperature T (3)Power range high neutron flux (4)Low Pressurizer Pressure 15.2.11.2 Analysis of Effects and ConsequencesMethod of AnalysisFour cases are considered to demonstrate that the fuel cladding integrity will not be adversely impacted following a 10 percent step-load increase from rated load. This is shown by demonstrating that the minimum DNBR will not go below the safety analysis limit value.
(1)Reactor control in manual at beginning of life.
(2)Reactor control in manual at end of life.
(3)Reactor control in automatic at beginning of life.
(4)Reactor control in automatic at end of life.At beginning-of-life minimum moderator feedback conditions, the core has the least negative moderator temperature coefficient of reactivity and the least-negative Doppler 15.2-32CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107only power coefficient curve, and therefore, the least inherent transient response capability. A zero moderator temperature coefficient is evaluated for the minimum feedback conditions. For the end of life maximum moderator feedback conditions, the moderator temperature coefficient of reactivity has its most-negative value and the most-negative Doppler only power coefficient curve. This results in the largest amount of reactivity feedback due to changes in coolant temperature.The effect of this transient on the minimum DNBR is evaluated by applying conservatively large deviations to the initial conditions of core power, average coolant temperature, and pressurizer pressure at the normal full power operating conditions in order to generate a limiting set of statepoints. These deviations bound the variations which could occur as a result of an excessive load increase accident and are only applied in the direction that has the most adverse impact on the DNB ratio; namely increased power and coolant temperature and decreased pressure. No credit is taken for the decrease in coolant temperature expected for cases with manual rod control and no reactor trip is assumed.The reactor condition statepoints (temperature, pressure, and power) are compared to the conditions corresponding to operation at the safety analysis DNB limit. These limits are illustrated in the figure showing the Overpower and Overtemperature T Protection setpoints (Figure 15.1-1).Normal reactor control systems and engineered safety systems are not required to function. A conservative limit on the turbine valve opening is assumed. The analysis does not take credit for pressurizer heaters. The cases which assume automatic rod control are evaluated to ensure that the worst case in bounded. The automatic function is not required.The RPS is assumed to be operable. However, reactor trip is not encountered for most cases due to the error allowances assumed in the setpoints. No single active failure in any system or component required for mitigation will adversely affect the consequences of this accident.This accident is evaluated with the RTDP as described in Reference [18]. Initial reactor power, RCS pressure, and temperature are assumed to be nominal values. Uncertainties in initial conditions are included in the limit DNBR as described in Reference [18].Results An excessive load increase accident typically does not result in a reactor trip, and the plant soon reaches a new equilibrium condition at a higher power level based on the increased steam load.Transients assuming manual rod control yield decreased coolant temperatures and pressures resulting from the increased heat removal. If the automatic rod control system were available, coolant average temperature would be maintained at or near the programmed value while pressure would decrease. Figures 15.2-29 through 15.2-36 show a typical transient response for each case.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-33WATTS BARWBNP-107A comparison of the plant conditions assuming conservatively bounding deviations in core power, average coolant temperature, and pressure to the conditions corresponding to operation at the safety analysis DNB limit indicate that the minimum DNBR remains above the limit value for each of the cases.
15.2.11.3 ConclusionsIt has been demonstrated that for an excessive load increase the minimum DNBR during the transient will not be below the limiting value.
15.2.12 ACCIDENTAL DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM15.2.12.1 Identification of Causes and Accident DescriptionThe most severe core conditions resulting from an accidental depressurization of the reactor coolant system are associated with an inadvertent opening of a pressurizer safety valve. Note that the event is limiting for core analysis only and is not a design basis load condition for pipe stress analysis. Initially the event results in a rapidly decreasing reactor coolant system pressure which could reach the hot leg saturation pressure. At that time, the pressure decrease is slowed considerably. The pressure continues to decrease throughout the transient. The effect of the pressure decrease would be to decrease the neutron flux via the moderator density feedback but the reactor control system (if in the automatic mode) functions to maintain the power essentially constant throughout the initial stage of the transient. The average coolant temperature decreases slowly, but the pressurizer level increases until reactor trip.The reactor will be tripped by the following reactor protection system signals:
(1)Overtemperature T (2)Pressurizer low pressure 15.2.12.2 Analysis of Effects and ConsequencesMethod of AnalysisThe accidental depressurization transient is analyzed by employing the detailed digital computer code LOFTRAN
[5]. The code simulates the neutron kinetics, reactor coolant system, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generator, and steam generator safety valves. The code computes pertinent plant variables including temperatures, pressures, and power level.In calculating the DNBR, the following conservative assumptions are made:
(1)Nominal initial conditions of core power, reactor coolant temperatures. and reactor coolant pressure are assumed in accordance with the RTDP methology [18].
15.2-34CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107 (2)A least negative moderator coefficient of reactivity was assumed in this analysis. The spatial effect of void due to local or subcooled boiling is not considered in the analysis with respect to reactivity feedback or core power shape. The DNB evaluation is made assuming that core power peaking factors remain constant at their design values while, in fact, the effects of local or subcooled void would have the effect of flattening the power distribution (especially in hot channels) thus increasing the DNB margin.
(3)A high (absolute value) Doppler coefficient of reactivity such that the resultant amount of positive feedback is conservatively high in order to retard any power decrease due to moderator reactivity feedback.ResultsFigure 15.2-37 illustrates the nuclear power transient following the accident. Reactor trip on overtemperature T occurs as shown in Figure 15.2-37. The pressure and core average temperature versus time following the accident is given in Figure 15.2-38. The resulting DNBR never goes below its limiting value as shown in Figure 15.2-39. The calculated sequence of events for this accident is listed in Table 15.2-1.
Following reactor trip, RCS pressure will continue to fall until flow through the inadvertently opened valve is terminated. Automatic actuation of the safety injection system may occur if the pressure falls to the low pressurizer pressure SI setpoint.RCS pressure will stabilize following operator action to terminate flow to the inadvertently opened valve; normal operating procedures may then be followed. The operating procedures call for operator action to control RCS boron concentration and pressurizer level using the CVCS and to maintain steam generator level through control of the main or auxiliary feedwater system. Any action required of the operator to stabilize the plant is in a time frame in excess of ten minutes following reactor trip.
15.2.12.3 ConclusionsThe pressurizer low pressure and the overtemperature T reactor protection system signals provide adequate protection against this accident, and the minimum DNBR remains in excess of the limiting value.
15.2.13 ACCIDENTAL DE PRESSURIZATION OF THE MAIN STEAM SYSTEM15.2.13.1 Identification of Causes and Accident DescriptionThe most severe core conditions resulting from an accidental depressurization of the main steam system are associated with an inadvertent opening of a single steam dump, relief or safety valve. The analyses performed assuming a rupture of a main steam line are given in Section 15.4.2.1.The steam release as a consequence of this accident results in an initial increase in steam flow which decreases during the accident as the steam pressure falls. The energy removal from the reactor coolant system causes a reduction of coolant CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-35WATTS BARWBNP-107temperature and pressure. In the presence of a negative moderator temperature coefficient, the cooldown results in a reduction of core shutdown margin.The evaluation performed demonstrates that the following criterion is satisfied: assuming a stuck RCCA and a single failure in the engineered safety features (ESF), there will be no consequent damage to the fuel or RCS after reactor trip for a steam release equivalent to the spurious opening, with failure to close, of the largest of any single steam dump, relief or safety valve, with or without offsite power.The following systems provide the necessary protection against an accidental depressurization of the main steam system:
(1)Safety injection system actuation from any of the following: (a)Two out of three low pressurizer pressure signals.(b)Two out of three high containment pressure signals.(c)Two out of three low steamline pressure signals in any steamline.
(2)The overpower reactor trips (neutron flux and T and the reactor trip occurring in conjunction with receipt of the safety injection signal).
(3)Redundant isolation of the main feedwater lines. Sustained high feedwater flow would cause additional cooldown. Therefore, in addition to the normal control action which will close the main feedwater valves following reactor trip, a safety injection signal will rapidly close all feedwater control valves, trip the main feedwater pumps, and close the feedwater pump discharge valves (closure is accomplished by a main feedwater pump trip signal).
(4)Trip of the fast-acting steamline stop valves (main steam isolation valves) (designed to close in less than 6 seconds) on: (a)Two out of four high-high containment pressure signals.(b)Two out of three low steamline pressure signals in any steamline.(c)Two out of three high negative steamline pressure rate signals in any steamline (below Permissive P-11).
15.2.13.2 Analysis of Effects and ConsequencesMethod of AnalysisThe following conditions are assumed to exist at the time of an accidental depressurization of the main steam system:
15.2-36CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107 (1)End-of-life shutdown margin at no load, equilibrium xenon conditions, and with the most reactive rod cluster control assembly stuck in its fully withdrawn position.
(2)A negative moderator coefficient corresponding to the end-of-life rodded core with the most reactive rod cluster control assembly in the fully withdrawn position. The variation of the coefficient with temperature and pressure is included. The k eff versus temperature at 1100 psi corresponding to the negative moderator temperature coefficient used is shown in Figure 15.2-40.
(3)Minimum capability for injection of high concentration boric acid solution corresponding to the most restrictive single failure in the safety injection system. This corresponds to the flow delivered by one charging pump delivering its full contents to the cold leg header. Low concentration boric acid must be swept from the safety injection lines downstream of the RWST prior to the delivery of high concentration boric acid (2000 ppm) which is bounded for higher concentrations to the reactor coolant loops.
(4)The evaluation considers a maximum steam flow of 247 pounds per second at 1100 psia from one steam generator with offsite power available. This is the maximum capacity of any single steam dump, relief or safety valve.Initial hot shutdown conditions at time zero are assumed since this represents the most conservative initial condition. Should the reactor be just critical or operating at power at the time of a steam release, the reactor will be tripped by the normal overpower protection when power level reaches a trip point. Following a trip at power, the reactor coolant system contains more stored energy than at no load, the average coolant temperature is higher than at no load and there is appreciable energy stored in the fuel.Thus, the additional stored energy is removed via the cooldown caused by the steam release before the no load conditions of reactor coolant system temperature and shutdown margin assumed in the analyses are reached.
After the additional stored energy has been removed, the cooldown and reactivity insertions proceed in the same manner as in the analysis which assumes no load condition at time zero. However, since the initial steam generator water inventory is greatest at no load, the magnitude and duration of the reactor coolant system cooldown are greater for steam line release occurring from no load conditions.
(5)In computing the steam flow, the Moody Curve for fl/D = 0 is used.
(6)Perfect moisture separation in the steam generator and a tube plugging level of 10% is assumed.
(7)A thermal design flowrate of 372,400 gpm is used based on the assumption of a 10% steam generator tube plugging level and instrumentation uncertainty.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-37WATTS BARWBNP-107ResultsSince the conditions above for an accidental depressurization of the main steam system are significantly less limiting than those for the main steam line rupture (MSLB, 15.4.2) transient from HZP conditions and since these events are analyzed utilizing similar methodology, the analysis for the MSLB transient is used to bound the accidental depressurization of the main steam system event. This approach is supported by the fact that the maximum return to power for steam release transient is much lower than that for the HZP MSLB event. Hence, minimum DNBR is not a concern under these conditions.
15.2.13.3 ConclusionsThe analysis shows that the criteria stated earlier in this section are satisfied since a DNBR less than the limiting value does not exist.15.2.14 Inadvertent Operation of Emergency Core Cooling SystemThis analysis was performed after the boron injection tank (BIT) and associated 900 gallons of 20,000 ppm boron were deleted from the Watts Bar design basis. Therefore, the BIT is not referred to in this section. 15.2.14.1 Identification of Causes and Accident DescriptionSpurious Emergency Core Cooling System (ECCS) operation at power could be caused by operator error or a false electrical actuating signal. Spurious actuation may be assumed to be caused by any of the following:
(1)High containment pressure (2)Low pressurizer pressure (above Permissive P11)
(3)Low steamline pressure (above Permissive P11)
(4)Manual actuationFollowing the actuation signal, the suction of the centrifugal charging pumps is diverted from the volume control tank to the refueling water storage tank. The charging pumps then force concentrated (3300 ppm) boric acid solution from the RWST, through the common injection header and injection lines and into the cold leg of each reactor coolant loop. The safety injection pumps also start automatically, but provide no flow when the reactor coolant system is at normal pressure. The passive injection system and the low head system provide no flow at normal reactor coolant system pressure.A safety injection signal normally results in a reactor trip followed by a turbine trip. However, it cannot be assumed that any single fault that actuates a safety injection signal will also produce a reactor trip. Therefore, two different courses of events are considered.
15.2-38CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107 (1)Case A - Trip occurs at the same time spurious injection starts.The operator should determine if the spurious signal was transient or steady state in nature. The operator must also determine if the safety injection signal should be blocked. For a spurious occurrence, the operator would stop the safety injection and maintain the plant in the hot shutdown condition. If the ECCS actuation instrumentation must be repaired, future plant operation will be in accordance with the Technical Specifications.
(2)Case B -The reactor protection system produces a trip later in the transient.The reactor protection system does not produce an immediate trip, and the reactor experiences a negative reactivity excursion due to the injected boron causing a decrease in reactor power. The power mismatch causes a drop in primary coolant temperature and coolant shrinkage. Pressurizer pressure and level drop. Load will decrease due to the effect of reduced steam pressure on load when the turbine throttle valve is fully open. If automatic rod control is used, these effects will be lessened until the rods have moved out of the core. The transient is eventually terminated by the reactor protection system low pressure trip or by manual trip.The time to trip is affected by initial operating conditions including core burnup history which affects initial boron concentration, rate of change of boron concentration, Doppler and moderator coefficients.Recovery from this incident for Case B is made in the same manner described for Case A. The only difference is the lower Tavg and pressure associated with the power mismatch during the transient. The time at which reactor trip occurs is of no concern for this occurrence. At lower loads coolant contraction will be slower resulting in a longer time to trip.
15.2.14.2 Analysis of Effects and ConsequencesMethod of AnalysisThe spurious operation of the safety injection system is analyzed by employing the detailed digital computer program LOFTRAN[5]. The code simulates the neutron kinetics, reactor coolant system, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generator, steam generator safety valves, and the effect of the safety injection system. The program computes pertinent plant variables including temperatures, pressures, and power level.
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-39WATTS BARWBNP-107Inadvertent operation of the ECCS at power is classified as a Condition II event, a fault of moderate frequency. The criteria established for Condition II events include the following: (a)Pressure in the reactor coolant and main steam systems should be maintained below 110% of the design values, (b)Fuel cladding integrity shall be maintained by ensuring that the minimum DNBR remains above the 95/95 DNBR limit for PWRs, and (c)An incident of moderate frequency should not generate a more serious plant condition without other faults occurring independently.To address criterion (c), the more restrictive criterion that pressurizer power-operated relief valves (PORVs) do not open while a water-solid condition exists in the pressurizer is used. This addresses any concerns regarding subcooled water relief through the pressurizer PORVs or pressurizer safety relief valves (PSRVs) and the downstream piping which are not qualified for this condition. The inadvertent ECCS actuation at power event is analyzed to determine both the minimum DNBR value and maximum pressurizer water volume. The most limiting case with respect to DNB is a minimum reactivity feedback condition with the plant assumed to be in manual rod control. Because of the power and temperature reduction during the transient, operating conditions do not approach the core limits.For maximizing the potential for pressurizer filling, the most limiting case is a maximum reactivity feedback condition with an immediate reactor trip, and subsequent turbine trip, on the initiating SI signal. The transient results are presented for each case.Assumptions (1)Initial Operating ConditionsThe DNB case is analyzed with the Revised Thermal Design Procedure as described in WCAP-11397-P-A[18]. Initial reactor power, RCS pressure, and temperature are assumed to be at the nominal full power values. Uncertainties in initial conditions are included in the limit DNBR as described in Reference [18]. For the pressurizer filling case, initial conditions with uncertainties in their worst possible direction on power, vessel average temperature, pressurizer pressure, and pressurizer level are assumed in order to maximize the rate of coolant expansion and minimize the size of the steam bubble.
(2)Moderator and Doppler Coefficients of Reactivity The minimum DNBR case is evaluated at beginning of life (BOL) conditions, so a low BOL moderator temperature coefficient and a low absolute value Doppler power coefficient are assumed. For the pressurizer filling case, 15.2-40CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107conservative maximum feedback coefficients consistent with end of life operation are assumed.
(3)Reactor Control For the minimum DNBR case (without direct reactor trip on SI), the reactor is assumed to be in manual rod control. For the pressurizer filling case, a reactor trip is assumed to occur coincident with initiation of the transient.
(4)Pressurizer Pressure ControlPressurizer heaters are assumed to be inoperable for the minimum DNBR case, since this yields a higher rate of pressure decrease. The opposite is assumed for the pressurizer filling case, in which the operation of the pressurizer heaters has been found to result in an increase in the pressurizer filling rate.PORVs are operable for both the minimum DNBR and pressurizer filling cases. For the minimum DNBR case, maintaining a low pressurizer pressure is conservative. For the pressurizer filling case, availability of the PORVs may provide earlier steam relief and therefore maximizes the pressurizer insurge. However, the PORV opening setpoint is not reached in this analysis.Pressurizer spray is assumed available to minimize pressure for the minimum DNBR case and to increase the rate of the pressurizer level increase for the pressurizer filling case.
(5)Boron InjectionAt the initiation of the event, two centrifugal charging pumps inject borated water into the cold leg of each loop. In addition, flow is included to account for the potential operation of the positive displacement charging pump (PDP) for the DNBR case. However, this analysis remains valid although the PDP has been abandoned and is no longer used for normal operation. No PDP flow is assumed for the overfill case since the pump is not used for normal operation.
(6)Turbine LoadFor the minimum DNBR case (without direct reactor trip/turbine trip on SI), the turbine load remains constant until the governor drives the throttle valve wide open. After the throttle valve is fully open, turbine load decreases as steam pressure drops. In the case of pressurizer filling, the reactor and turbine both trip at the time of SI actuation with the turbine load dropping to zero simultaneously.
(7)Reactor Trip CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-41WATTS BARWBNP-107 Reactor trip is initiated by low pressure at 1925 psia for the minimum DNBR case. The pressurizer filling case assumes an immediate reactor trip on the initiating SI signal.
(8)Decay HeatThe decay heat has no impact on the DNB case (i.e., minimum DNBR occurs prior to reactor trip). For the pressurizer filling case, the availability of decay heat and its expansion effects on the RCS liquid volume is considered. Core residual heat generation is based on the 1979 version of ANSI 5.1[14] assuming long-term operation at the initial power level preceding the trip is
assumed. (9)Operator ActionsOperator action to terminate safety injection flow is assumed 10 minutes from event initiation, and thereby, mitigates the event.
(10)Auxiliary Feedwater SystemFor the pressurizer filling case only, the AFW System is assumed to actuate on the initiating SI signal. The AFW flow provides additional RCS cooling which slows the pressurizer insurge.ResultsThe transient responses for the pressurizer filling cases are shown in Figures 15.2-42a through 15.2-42c. Table 15.2-1 shows the calculated sequence of events for both minimum DNBR case and the pressurizer filling case.Minimum DNBR Case:Nuclear power starts decreasing immediately due to boron injection, but steam flow does not decrease until the turbine throttle valve goes wide open. The mismatch between load and nuclear power causes Tavg, pressurizer water level, and pressurizer pressure to drop. The reactor trips on low pressurizer pressure. After trip, pressures and temperatures slowly rise since the turbine is tripped and the reactor is producing some power due to delayed neutron fissions and decay heat. The DNBR remains above its initial value throughout the transient.Pressurizer Filling Case:Reactor trip occurs at event initiation followed by a rapid initial cooldown of the RCS. Coolant contraction results in a short-term reduction in pressurizer pressure and water level. The combination of the RCS heatup, due to residual RCS heat generation, and ECCS injected flow causes the pressure and level transients to rapidly turn around. Pressurizer water level then increases throughout the transient. Spray flow helps to condense the pressurizer steam bubble, causing a pressurizer insurge and minimizing pressurizer pressure.The ECCS injection flow is terminated via operator action in accordance with plant emergency procedures and the increase in pressurizer level 15.2-42CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107stops. SI flow termination at 10 minutes prevents the pressurizer from filling. As such, the integrity of the PORVs and PSRVs are not compromised.Following the analyzed portion of the transient, the plant will approach a stabilized condition at hot standby; normal plant operating procedures may then be followed. The operating procedures call for operator action to control RCS boron concentration and pressurizer level using the CVCS, and to maintain generator level through control of the main or auxiliary feedwater system. Any action required of the operator to maintain the plant in a stabilized condition is in a time frame in excess of ten minutes following reactor trip.
15.2.14.3 ConclusionsResults of the analysis show that spurious ECCS operation without immediate reactor trip does not present any hazard to the integrity of the RCS with respect to DNBR. The minimum DNBR is never less than the initial value. Thus, there will be no cladding damage and no release of fission products to the RCS. If the reactor does not trip immediately, the low pressurizer pressure reactor trip will provide protection. This trips the turbine and prevents excess cooldown, which expedites recovery from the incident.With respect to pressurizer filling, SI flow is terminated in sufficient time to prevent the pressurizer from going water solid. As such, the PORVs and PSRVs do not pass water and their integrity is not compromised. Termination of ECCS injection via operator action in accordance with plant emergency procedures, stops the further increase in pressure, thus preventing the safety valves from opening. This precludes possible damage to the valves which could potentially generate a more serious plant condition.15.2.15 Chemical and Volume Control System Malfunction During Power Operation15.2.15.1 Identification of Causes and Accident DescriptionIncreases in reactor coolant inventory caused by a malfunction of the chemical and volume control system may be postulated to result from operator error or a control signal malfunction. Transients examined in this section are characterized by increasing pressurizer level, increasing pressurizer pressure, and a constant boron concentration. The transients analyzed in this section are done to demonstrate that there is adequate time for the operator to take corrective action to ensure that the integrity of the pressurizer Power Operated Relief Valves (PORVs) and the Pressurizer Safety Relief Valves (PSRVs) is maintained (i.e., the valves do not actuate with the pressurizer in a water-solid condition). An increase in reactor coolant inventory, which results from the addition of cold, unborated water to the RCS, is analyzed in Section 15.2.4, Uncontrolled Boron Dilution.The most limiting CVCS Malfunction case would result if charging was in automatic control and the pressurizer level channel being used for charging control failed in a low direction. This would cause maximum charging flow to be delivered to the RCS and letdown flow to be isolated. The worst single failure for this event would be a second pressurizer level channel failing in an as-is condition or a low condition. This will defeat the reactor trip on two-out-of-three high pressurizer level channels. To ensure that the CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-43WATTS BARWBNP-107integrity of the PORVs and the PSRVs is maintained, the operator must be relied upon to terminate charging.During a CVCS Malfunction event, several main control board alarms could be generated to alert the operator, including the following:High charging flow alarmHigh pressurizer water level alarmPressurizer water level deviation alarmLow VCT level alarm 15.2.15.2 Analysis of Effects and ConsequencesMethod of AnalysisThe CVCS malfunction is analyzed using the LOFTRAN computer code (WCAP-7907-P-A). The code simulates the neutron kinetics, RCS, pressurizer, pressurizer relief and safety valves, pressurizer spray, feedwater system, steam generator, and steam generator safety valves. The code computes pertinent plant variables including temperatures, pressures, and power level. A Chemical and Volume Control System Malfunction at power event is classified as a Condition II event, a fault of moderate frequency. The criteria established for Condition II events include the following:Pressure in the reactor coolant and main steam systems should be maintained below 110% of the design values,Fuel cladding integrity shall be maintained by ensuring that the minimum DNBR remains above the 95/95 DNBR limit for PWRs, andAn incident of moderate frequency should not generate a more serious plant condition without other faults occurring independently.Of these, the limiting criterion is that the event will not propagate to a more serious event. To address this criterion, Westinghouse currently uses the more restrictive criterion that the pressurizer Power Operated Relief Valves (PORVs) do not open while a water-solid condition exists in the pressurizer. This addresses any concerns regarding subcooled water relief through the pressurizer PORVs or Pressurizer Safety Relief Valves (PSRVs) and the downstream piping which may not be qualified for this condition.The analysis assumptions are the same as those discussed in Section 15.2.14.2 for the pressurizer filling case with a few exceptions:No reactor trip is assumed.
15.2-44CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107The flow source is assumed to be at the RCS boron concentration.The same pumps are providing the flow as in the Section 15.2.14 event but the flow path has a higher resistance than the Safety Injection flow path. Thus, the CVCS Malfunction flow rates are lower than the Inadvertent ECCS flow ratesAlarm actuation alerts the operator 60 seconds after event initiationOperator terminates charging flow 10 minutes after an alarm notifies the operatorCases are examined with flow from both one and two centrifugal charging pumps to determine the time available for the operators to take the necessary corrective actions to maintain the integrity of the PORVs and PSRVs. The scenario analyzed with two charging pumps operating is slightly different than the one charging pump scenario. In the two pump scenario, it takes two failures to have two charging pumps operating at maximum capacity. Letdown isolation would require a third failure so letdown is not isolated in the two pump case. Minimum letdown flow is 75 gpm so the net inventory addition is decreased by 75 gpm for the two pump case.
Results The transient responses for the limiting CVCS system malfunction cases are shown in Figures 15.2-44 through Figure 15.2-47. Table 15.2-6 shows the calculated sequence of events. In all the cases analyzed, core power and RCS temperatures remain relatively constant. The pressurizer level increases as a result of the injected flow. In the case with one charging pump operating, the pressurizer reaches a peak water- volume of 1664 ft3 and the case with 2 charging pumps, the peak pressurizer water volume is 1635 ft3. Since the pressurizer does not fill in either case, there can be no water relief through either the PORVs or the PSRVs. Figures 15.2-44 through Figure 15.2-47 provide transient information for both the one-pump and two-pump cases and Table 15.2-6 shows a sequence of events.
15.2.15.3 ConclusionsWith respect to not creating a more serious plant condition, water relief out of the PORVs and PSRVs will not occur during a CVCS Malfunction event because operator action to terminate the charging flow occurs early enough to prevent a water-solid pressurizer. The sequence of events presented in Table 15.2-6 shows the operators have sufficient time to take corrective action.References (1)Gangloff, W. C., "An Evaluation of Anticipated Operational Transients in Westinghouse Pressurized Water Reactors," WCAP-7486-L (Proprietary), March 1971 and WCAP-7486 (Non-Proprietary), May 1971 .
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-45WATTS BARWBNP-107 (2)"Westinghouse Anticipated Transients Without Trip Analysis," WCAP-8330, August 1974.
(3)Risher, D. H. Jr. and Barry, R. F., "TWINKLE - A Multi-Dimensional Neutron Kinetics Computer Code," WCAP-7979-PA (Proprietary) and WCAP-8028-A (Non-Proprietary), January 1975.
(4)Hargrove, H. G., "FACTRAN, A FORTRAN IV Code for Thermal Transients in a U0 2 Fuel Rod," WCAP-7908-A, December 1989.
(5)Burnett, T. W. T., et. al., "LOFTRAN Code Description," WCAP-7907-P-A (Proprietary) and WCAP-7907-A (Non-Proprietary), April 1984.
(6)Deleted in Amendment 80.
(7)Deleted in Amendment 80.
(8)Deleted by UFSAR Amendment 2 (9)Smith, M., et al, "Overpressure Protection Report for Watts Bar Nuclear Power Plant Unit 2," March 2010.
(10)Deleted by Amendment 80.
(11)Letter from T.M. Anderson (Westinghous e) to S.H. Hanauer (NRC), "ATWS Submittal," Westinghouse Letter NS-TMA-2182, dated December 30, 1979.
(12)ATWS Final Rule - Code of Federal Regulations 10 CFR 50.62 and Supplementary Information Package, "Reduction of Risk from Anticipated Transients Without Scram (ATWS) Events for Light-Water-Cooled Nuclear Power Plants." (13)Haessler, R. L. et al., "Methodology for the Analysis of the Dropped Rod Event," WCAP-11394-P-A (Proprietary) and WCAP-11395-A (Non-Proprietary), January 1990.
(14)"American National Standard for Decay Heat Power in Light Water Reactors," ANSI/ANS-5.1-1979, August 1979.
(15)Deleted by Amendment 97.
(16)Deleted by Amendment 97.
(17)Deleted by Amendment 97.
(18)Friedland, A. J. and S. Ray, "Revised Thermal Design Procedure," WCAP-11397-P-A (Proprietary), WCAP-11398-A (Nonproprietary), April 1989.
15.2-46CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107Table 15.2-1 Time Sequence Of Events For Condition II Events (Page 1 of 5)AccidentEventTime (sec.)Uncontrolled RCCAWithdrawal from a Subcritical
ConditionInitiation of uncontro lled rod withdrawal 75 pcm/sec reactivity insertion rate from 10
-9 of normal power 0Power range high neutron flux low setpoint reached 10.43 Peak nuclear power occurs 10.57 Rods begin to fall into core 10.93 Peak heat flux occurs 12.40 Minimum DNBR occurs 12.40 Peak clad temperature occurs 12.931 Peak average fuel temperature occurs 13.141 Uncontrolled RCCAWithdrawal at Power1.Case AInitiation of uncontrolled RCCA withdrawal at maximum reactivity insertion rate (110 pcm/sec) 0Power range high neutron flux high trip point reached1.1Rods begin to fall into core1.6Minimum DNBR occurs2.72.Case BInitiation of uncontrolled RCCA withdrawal at a small reactivity insertion rate
(1 pcm/sec) 0Overtemperature T reactor trip signal initiated 61.1Rods begin to fall into core62.6Minimum DNBR occurs occurs 63.6 CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-47WATTS BARWBNP-107 Uncontrolled Boron Dilution1.Dilution During StartupDilution begins(Unspecified)*Reactor trip on source range high flux 0Shutdown margin lost 15842.Dilution During Full Power Operationa.Automatic Reactor Control Dilution beginsShutdown margin lost 02058b.Manual Reactor ControlDilution beginsReactor trip setpoint reached for overtemperature TRods begin to fall into core 0 78Shutdown margin lost (if dilution continues after trip)1980*The results of the analysis are not impacted by the time
of dilution initiationPartial Loss of Forced Reactor Coolant Flow (four loops operating, one pump coasting down)One pump begins coasting down 0Low flow trip setpoint reached1.32Rods begin to drop 2.52Minimum DNBR occurs3.7Loss of External Electrical Load1.With pressurizer control (BOL)Loss of electrical load 0High pressurizer pressurereactor trip point reached9.6Rods begin to drop11.1Table 15.2-1 Time Sequence Of Events For Condition II Events (Page 2 of 5)AccidentEventTime (sec.)
15.2-48CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107Minimum DNBR occurs12.62.Without pressurizer control Loss of electrical load 0High pressurizer pressure reactor trip point reached4.3Rods begin to drop6.3Peak Pressurizer pressure occurs7.2Loss of Normal Feedwater with Loss of Offsite Power (LOOP)Main Feedwater Flow Stops10.0Low-low steam generator water level reactor trip 62.1Rods begin to drop64.1Reactor coolant pumps begin to coastdown66.1Auxiliary Feedwater from Two Motor-Driven Auxiliary Feedwater Pumps Initiated122.1Four steam generators begin to receive auxiliary feed from two motor-driven auxiliary feedwater pumpsLongterm peak water level in pressurizer occurs175.0330Table 15.2-1 Time Sequence Of Events For Condition II Events (Page 3 of 5)AccidentEventTime (sec.)
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-49WATTS BARWBNP-107Single-Loop Feedwater Malfunction at Hot Full PowerOne Main Feedwater Control Valve Fails Fully Open0.0Minimum DNBR Occurs26.5S/G High-High Water Level ESF Setpoint Reached 49.7Feedwater Isolation Occurs57.7Overtemperature T Reactor Trip Setpoint Reached 61.0Reactor Trip Occurs62.5Multi-Loop Feedwater Malfunction at Hot Full PowerAll Four Main Feedwater Control Valves Fail Fully Open0.0Overtemperature T Reactor Trip Setpoint Reached 23.5Reactor Trip Occurs25.0Minimum DNBR Occurs25.5S/G High-High Water Level ESF Setpoint Reached 45.6Feedwater Isolation Occurs53.6Table 15.2-1 Time Sequence Of Events For Condition II Events (Page 4 of 5)AccidentEventTime (sec.)
15.2-50CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107Accidental Depressurization of the Reactor Coolant SystemInadvertent opening of one pressurizer safety valve0.0 OTT reactor trip setpoint reached32.3Rods begin to drop33.8Minimum DNBR occurs34.4Inadvertent Operation of ECCS During Power Operation DNBR Case:Charging pumps begin injecting borated water; neutron flux starts decreasing0.0Steam flow starts decreasing44Low pressurizer pressure reactor trip setpoint reached 56Rods begin to drop58Minimum DNBR occurs(1)Pressurizer Filling Case:Charging pumps begin injecting borated water; reactor trip on 'S' signal; rod motion begins0.0Operator terminates injection flow600Maximum pressurizer water level occurs667(1)DNBR does not decrease below its initial value.Table 15.2-1 Time Sequence Of Events For Condition II Events (Page 5 of 5)AccidentEventTime (sec.)
CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-51WATTS BARWBNP-107Table 15.2-2 Deleted by Amendment 63.
15.2-52CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107Table 15.2-3 Deleted by Amendment 80 CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-53WATTS BARWBNP-107Table 15.2-4 Deleted by Amendment 80 15.2-54CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107Table 15.2-5 Deleted by Amendment 80 CONDITION II - FAULTS OF MODERATE FREQUENCY 15.2-55WATTS BARWBNP-107Table 15.2-6 Time Sequence Of Events For CVCS MalfunctionAccidentEventTime (sec)CVCS malfunction, One pump operatingMaximum charging flow initiated / letdown isolated 0.0An annunciator on the control board alerts the operator that an event is
occuring60.0Operator terminates charging flow660.0Peak pressurizer water volume is reached1479.1CVCS malfunction, Two pumps operatingMaximum charging flow initiated from two charging pumps 0.0An annunciator on the control board alerts the operator thatn an event is
occuring60.0Operator terminates charging flow660.0Peak pressurizer water volume is reached688.2 15.2-56CONDITION II - FAULTS OF MODERATE FREQUENCY WATTS BARWBNP-107 THIS PAGE INTENT IONALLY LEFT BLANK Condition II - Faults of Moderate Frequency15.2-57WATTS BAR WBNP-107 Figure 15.2-1 Uncontrolled RCCA Bank Withdrawal From Subcritical
15.2-58Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-2 Uncontrolled RCCA Bank Withdrawal From Subcritical Condition II - Faults of Moderate Frequency15.2-59WATTS BAR WBNP-107Figure 15.2-3 Uncontrolled RCCS Bank Withdrawal from a Subcritical 15.2-60Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-3a Uncontrolled RCCS Bank Withdrawal from a Subcritical Condition II - Faults of Moderate Frequency15.2-61WATTS BAR WBNP-107Figure 15.2-4 Uncontrolled Rod Withdrawal From Full Power, Minimum Feedback 110 PCM/Sec Withdrawal Rate 15.2-62Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-5 Uncontrolled Rod Withdrawal From Full Power, Minimum Feedback 110 PCM/Sec Withdrawal Rate Condition II - Faults of Moderate Frequency15.2-63WATTS BAR WBNP-107Figure 15.2-6 Uncontrolled Rod Withdrawal From Full Power, Minimum Feedback 1 PCM/Sec Withdrawal Rate 15.2-64Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-7 Uncontrolled Rod Withdrawal From Full Power, Minimum Feedback 1 PCM/Sec Withdrawal Rate Condition II - Faults of Moderate Frequency15.2-65WATTS BARWBNP-107Figure 15.2-8 Uncontrolled Rod Withdrawal From 100% Power, Effect Of Reactivity Insertion Rate On Minimum DNBR 15.2-66Condition II - Faults of Moderate FrequencyWATTS BARWBNP-107Figure 15.2-9 Uncontrolled Rod Withdrawal From 60% Power, Effect Of Reactivity Insertion Rate On Minimum DNBR Condition II - Faults of Moderate Frequency15.2-67WATTS BARWBNP-107Figure 15.2-10 Uncontrolled Rod Withdrawal From 10% Power, Effect Of Reactivity Insertion Rate On Minimum DNBR 15.2-68Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-11 Pressurizer Pressure Transient, Nuclear Power, Core Average Temperature, and Core Heat Flux Transient for Dropped RCCA Assembly Condition II - Faults of Moderate Frequency15.2-69WATTS BAR WBNP-107Figure 15.2-12 Reactor Vessel Flow Transient Four Pumps in Operation, One Pump Coasting Down 15.2-70Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-13 Loop Flow Transient Four Pumps In Operation One Pump Coasting Down Condition II - Faults of Moderate Frequency15.2-71WATTS BAR WBNP-107Figure 15.2-14 Deleted by Amendment 89 15.2-72Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-15 Hot Channel Heat Flux Transient Four Pumps in Operation, One Pump Coasting Down Condition II - Faults of Moderate Frequency15.2-73WATTS BAR WBNP-107Figure 15.2-16 Nuclear Power Transient Four Pumps In Operation One Pump Coasting Down 15.2-74Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-17 DNBR Versus Time Four Pumps In Operation One Pump Coasting Down Condition II - Faults of Moderate Frequency15.2-75WATTS BAR WBNP-107Figure 15.2-18a Deleted by Amendment 97 15.2-76Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-18b Deleted by Amendment 97 Condition II - Faults of Moderate Frequency15.2-77WATTS BAR WBNP-107Figure 15.2-18c Deleted by Amendment 97 15.2-78Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-18d Deleted by Amendment 97 Condition II - Faults of Moderate Frequency15.2-79WATTS BAR WBNP-107Figure 15.2-18e Deleted by Amendment 97 15.2-80Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-19 Loss Of Load Accident With Pressurizer Spray and Power-Operated Relief Valves Condition II - Faults of Moderate Frequency15.2-81WATTS BAR WBNP-107Figure 15.2-20 Loss Of Load Accident With Pressurizer Spray and Power-Operated Relief Valves 15.2-82Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-21 Loss of Load Accident with Pressurizer Spray and Power-Operated Relief Valves Condition II - Faults of Moderate Frequency15.2-83WATTS BAR WBNP-107Figure 15.2-22 Loss of Load Accident with Pressurizer Spray and Power-Operated Relief Valves 15.2-84Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-23 Loss of Load Accident Without Pressurizer Spray and Power-Operated Relief Valves Condition II - Faults of Moderate Frequency15.2-85WATTS BAR WBNP-107Figure 15.2-24 Loss of Load Accident Without Pressurizer Spray and Power-Operated Relief Valves 15.2-86Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-25 Loss of Load Accident Without Pressurizer Spray and Power-Operated Relief Valves Condition II - Faults of Moderate Frequency15.2-87WATTS BAR WBNP-107Figure 15.2-26 Loss of Load Accident Without Pressurizer Spray and Power-Operated Relief Valves 15.2-88Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107 THIS PAGE INTENTIONALLY BLANK Condition II - Faults of Moderate Frequency15.2-89WATTS BAR WBNP-107Figure 15.2-27a Loss Of Normal Feedwater Nuclear Power Versus Time 15.2-90Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-27b Loss of Normal Feedwater Core Heat Flux Versus Time Condition II - Faults of Moderate Frequency15.2-91WATTS BAR WBNP-107Figure 15.2-27c Loss of Normal FeedwaterTotal RCS Flow Versus Time 15.2-92Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-27d Loss of Normal Feedwater Reactor Coolant System Temperature Transient Versus Time Condition II - Faults of Moderate Frequency15.2-93WATTS BAR WBNP-107Figure 15.2-27e Deleted by Amendment 72 15.2-94Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-27f Loss of Normal Feedwater Pressurizer Pressure Versus time Condition II - Faults of Moderate Frequency15.2-95WATTS BAR WBNP-107Figure 15.2-27g Loss of Normal Feedwater Pressurizer Water Volume Versus Time 15.2-96Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-27h Loss of Normal Feedwater Steam Generator Pressure Versus Time Condition II - Faults of Moderate Frequency15.2-97WATTS BAR WBNP-107Figure 15.2-27i Loss of Normal Feedwater Steam Generator Mass Versus Time 15.2-98Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-28a Single Feedwater Control Valve Malfunction, Excess Feedwater with Manual Rod Control - Nuclear Power Versus Time Condition II - Faults of Moderate Frequency15.2-99WATTS BAR WBNP-107Figure 15.2-28b Single Feedwater Control Valve Malfunction, Excess Feedwater with Manual Rod Control - Core Heat Flux Versus Time 15.2-100Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-28c Single Feedwater Control Valve Malfunction, Excess Feedwater with Manual Rod Control- Core Average Temp Versus Time Condition II - Faults of Moderate Frequency15.2-101WATTS BAR WBNP-107Figure 15.2-28d Single Feedwater Control Valve Malfunction, Excess Feedwater with Manual Rod Control - Pressurizer Pressure Versus Time 15.2-102Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-28e Single Feedwater Control Valve Malfunction, Ex cess Feedwater with Manual R od Control -DNBR Versus Time Condition II - Faults of Moderate Frequency15.2-103WATTS BAR WBNP-107Figure 15.2-28f Multiple Feedwater Control Valve Malfunction, Excess Feedwater withManual Rod Control -Nuclear Power Versus Time 15.2-104Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-28g Multiple Feedwater Control Valve Malfunction, Excess Feedwater with Manual Rod Control -Core Heat Flux Versus Time Condition II - Faults of Moderate Frequency15.2-105WATTS BAR WBNP-107Figure 15.2-28h Multiple Feedwater Control Valve Malfunction, Excess Feedwater with Manual Rod Control - Core Average Temp Versus Time 15.2-106Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-28i Multiple Feedwater Control Valve Malfunction, Excess Feedwater with Manual Rod Control - Pressurizer Pressure Versus Time Condition II - Faults of Moderate Frequency15.2-107WATTS BAR WBNP-107Figure 15.2-28j Multiple Feedwater Control Valve Malfunction, Excess Feedwater with Manual Rod Control -DNBR Versus Time 15.2-108Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-29 Typical Transient-10% Step Load Increase, Beginning of Life , Manual Reactor Control Condition II - Faults of Moderate Frequency15.2-109WATTS BAR WBNP-107Figure 15.2-30 Typical Transient-10% Step Load Increase, Beginning of Life, Manual Reactor Control 15.2-110Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-31 Typical Transient-10% Step Load Increase, End of Life, Manual Reactor Control Condition II - Faults of Moderate Frequency15.2-111WATTS BAR WBNP-107Figure 15.2-32 Typical Transient-10% Step Load Increase, End of Life, Manual Reactor Control 15.2-112Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-33 Typical Transient-10% Step Load Increase, Beginning of Life, Automatic Reactor Control Condition II - Faults of Moderate Frequency15.2-113WATTS BAR WBNP-107Figure 15.2-34 Typical Transient-10% Step Load Increase, Beginning of Life, Automatic Reactor Control 15.2-114Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-35 Typical Transient-10% Step Load Increase, End of Life, Automatic Reactor Control Condition II - Faults of Moderate Frequency15.2-115WATTS BAR WBNP-107Figure 15.2-36 Typical Transient-10%t Step Load Increase, End of Life, Automatic Reactor Control 15.2-116Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-37 Accidental Depressurization of the Reactor Coolant System Condition II - Faults of Moderate Frequency15.2-117WATTS BAR WBNP-107Figure 15.2-38 Accidental Depressurization of the Reactor Coolant System 15.2-118Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-39 Accidental Depressurization of the Reactor Coolant System Condition II - Faults of Moderate Frequency15.2-119WATTS BAR WBNP-107Figure 15.2-40 Variation of K eff with Core Average Temperature 15.2-120Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-41 Deleted by Amendment 97 Condition II - Faults of Moderate Frequency15.2-121WATTS BAR WBNP-107Figure 15.2-42a Inadvertent Operation of Emergency Core Cooling System - Nuclear Power and Core Average Temperature Response 15.2-122Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-42b Inadvertent Operation of Emergency Core Cooling System - Pressurizer Pressure and Pressurizer Water Volume Response Condition II - Faults of Moderate Frequency15.2-123WATTS BAR WBNP-107Figure 15.2-42c Inadvertent Operation of Emergency Core Cooling System - Maximum Emergency Core Cooling System Flow Rate 15.2-124Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-42d Deleted by Amendment 97 Condition II - Faults of Moderate Frequency15.2-125WATTS BAR WBNP-107Figure 15.2-42e Deleted by Amendment 97 15.2-126Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-42f Deleted by Amendment 97 Condition II - Faults of Moderate Frequency15.2-127WATTS BAR WBNP-107Figure 15.2-43a Deleted by Amendment 90 15.2-128Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-43b Deleted by Amendment 90 Condition II - Faults of Moderate Frequency15.2-129WATTS BAR WBNP-107Figure 15.2-44 CVCS MALFUNCTIONNUCLEAR POWER VS. TIME 15.2-130Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-45 CVCS MALFUNCTION RCS AVERAGE TEMPERATURE VERSUS TIME Condition II - Faults of Moderate Frequency15.2-131WATTS BAR WBNP-107Figure 15.2-46 CVCS MALFUNCTION PRESSURIZER PRESSURE VERSUS TIME 15.2-132Condition II - Faults of Moderate FrequencyWATTS BAR WBNP-107Figure 15.2-47 CVCS MALFUNCTION PRESSURIZER WATER VOLUME VERSUS TIME CONDITION III - INFREQUENT FAULTS 15.3-1WATTS BARWBNP-107 15.3 CONDITION III - INFREQUENT FAULTSBy definition Condition III occurrences are faults which may occur very infrequently during the life of the plant. They will be accommodated with the failure of only a small fraction of the fuel rods although sufficient fuel damage might occur to preclude resumption of the operation for a considerable outage time. The release of radioactivity will not be sufficient to interrupt or restrict public use of those areas beyond the exclusion radius. A Condition III fault will not, by itself, generate a Condition IV fault or result in a consequential loss of function of the RCS or containment barriers. For the purposes of this report the following faults have been grouped into this category:
(1)Loss of reactor coolant, from small ruptured pipes or from cracks in large pipes, which actuates the ECCS.
(2)Minor secondary system pipe breaks.
(3)Inadvertent loading of a fuel assembly into an improper position.
(4)Complete loss of forced reactor coolant flow.
(5)Waste gas decay tank rupture.
(6)Single rod cluster control assembly withdrawal at full power.15.3.1 Loss of Reactor Coolant From Small Ruptured Pipes or From Cracks in Large Pipes Which Actuate the Emergency Core Cooling System 15.3.1.1 Identification of Ca uses and Accident DescriptionA LOCA is defined as the loss of reactor coolant at a rate in excess of the reactor coolant normal makeup rate from breaks or openings in the RCPB inside primary containment up to, and including, a break equivalent in size to the largest justified pipe rupture (or in the absence of justification, a double-ended rupture of the largest pipe) in the reactor coolant pressure boundary (RCPB)(ANSI/ANS-51.1-1983). See Section 3.6 for a more detailed description of the loss of reactor coolant accident boundary limits. Ruptures of small cross section will cause expulsion of the coolant at a rate which can be accommodated by the charging pumps which would maintain an operational water level in the pressurizer, permitting the operator to execute an orderly shutdown. The coolant which would be released to the containment contains the existing fission products. The maximum break size for which the normal makeup system can maintain the pressurizer level is obtained by comparing the calculated flow from the RCS through the postulated break against the charging pump makeup flow at normal RCS pressure, i.e., 2250 psia. Should a larger break occur, depressurization of the RCS causes fluid to flow to the RCS from the pressurizer, resulting in a pressure and level decrease in the pressurizer.
15.3-2CONDITION III - INFREQUENT FAULTS WATTS BARWBNP-107A reactor trip occurs when the pressurizer low pressure trip setpoint is reached. The safety injection system is actuated when the appropriate pressure setpoint is reached. The consequences of the accident are limited in two ways:
(1)Reactor trip and borated water injection complement void formation in causing rapid reduction of nuclear power to a residual level corresponding to the delayed fission and fission product decay.
(2)Injection of borated water ensures sufficient flooding of the core to prevent excessive clad temperatures.Before the break occurs, the plant is in an equilibrium condition, i.e., the heat generated in the core is being removed via the secondary system. During blowdown, heat from decay, hot internals and the vessel continues to be transferred to the reactor coolant. The heat transfer between the RCS and the secondary system may be in either direction, depending on the relative temperatures. In the case of continued heat addition to the secondary system, pressure increases, and steam dump may occur.
Makeup to the secondary side is automatically provided by the auxiliary feedwater pumps. The reactor trip signal coincident with low Tavg signal (with assumed coincident loss of offsite power), stops normal feedwater flow by closing the main feedwater isolation valves and flow control valves. The secondary flow aids in the reduction of RCS pressure. When the RCS depressurizes to the cold leg accumulator tank pressure, the accumulators begin to inject water into the reactor coolant loops. The reactor coolant pumps are assumed to be tripped concurrent with the reactor trip, and effects of pump coastdown are included in the blowdown analyses.
15.3.1.2 Analysis of Effects and ConsequencesMethod of AnalysisFor breaks less than 1.0 ft 2, the NOTRUMP
[1,2,16] digital computer code is employed to calculate the transient depressurization of the RCS as well as to describe the mass and enthalpy of flow through the break.Small Break LOCA Analysis Using NOTRUMPThe NOTRUMP computer code is used in the analysis of loss-of-coolant accidents due to small breaks in the reactor coolant system. The NOTRUMP computer code is a one-dimensional general network code consisting of a number of advanced features. Among these features are the calculation of thermal non-equilibrium in all fluid volumes, flow regime-dependent drift flux calculations with counter-current flooding limitations, mixture level tracking logic in multiple-stacked fluid nodes, and regime-dependent heat transfer correlations. The NOTRUMP small break LOCA emergency core cooling system (ECCS) evaluation model was developed to determine the RCS response to design basis small break LOCAs and to address the NRC concerns expressed in NUREG-0611, "Generic Evaluation of Feedwater Transients and Small CONDITION III - INFREQUENT FAULTS 15.3-3WATTS BARWBNP-107Break Loss-of-Coolant Accidents in Westinghouse Designed Operating Plants." [Ref.15]In NOTRUMP, the RCS is nodalized into volumes interconnected by flowpaths. The broken loop is modeled explicitly with the intact loops lumped into a second loop. The transient behavior of the system is determined from the governing conservation equation of mass, energy, and momentum applied throughout the system. A detailed description of NOTRUMP is given in References [1], [2] and [16].The use of NOTRUMP in the analysis involves, among other things, the representation of the reactor core as heated control volumes with an associated bubble rise model to permit a transient mixture height calculation. The multinode capability of the program enables an explicit and detailed spatial representation of various system components. In particular, it enables a proper calculation of the behavior of the loop seal during a loss-of-coolant transient.Cladding thermal analyses are performed with the LOCTA-IV
[3] code which uses the RCS pressure, fuel rod power history, steam flow past the uncovered part of the core, and mixture height history from the NOTRUMP hydraulic calculations as input.A schematic representation of the computer code interfaces is given in Figure 15.3-1.Safety injection flow rate to the RCS as a function of system pressure is an input parameter. The SIS is assumed to begin delivering full flow to the RCS 27 seconds after the generation of a safety injection signal.Also, minimum safeguards ECCS capability and operability has been assumed in these analyses including use of the COSI/safety injection in the broken loop model.Hydraulic transient analyses are performed with the NOTRUMP code which determines the RCS pressure, fuel rod power history, steam flow past the uncovered part of the core and mixture height history. The core thermal transient is performed with the LOCTA-IV
[3] code. Both calculations assume the core is operating at 102% of licensed power.15.3.1.3 Reactor Coolant S ystem Pipe Break Results A spectrum of break sizes was analyzed to determine the limiting break size in terms of the highest peak cladding temperature. These break sizes were 2, 3, 4, 6, and 8.75 inches. For all cases reported, during the earlier part of the small break transient, the effect of the break flow is not strong enough to overcome the flow maintained by the reactor coolant pumps through the core as they are coasting down following reactor trip. Therefore, upward flow through the core is maintained.The resultant heat transfer cools the fuel rod cladding to very near the coolant temperatures as long as the core remains covered by a two-phase mixture. When the mixture level drops below the top of the core, the steam flow computed with NOTRUMP provides cooling to the upper portion of the core.
15.3-4CONDITION III - INFREQUENT FAULTS WATTS BARWBNP-107The typical core power (dimensionless) transient following the accident (relative) to reactor scram time is shown in Figure 15.3-9. Also shown is the typical hot rod axial power shape in Figure 15.3-10.The reactor scram delay time is equal to the reactor trip signal time plus control rod insertion time, or a total of 4.7 seconds (conservatively modeled as 5.0 seconds). During this delay period, the reactor is conservatively assumed to continue to operate at the initial rated power level.The safety injection flow vs. RCS pressure in Figure 15.3-2a is modeled for spill to RCS pressure cases (i.e., 2, 3, 4, and 6 inch break sizes). The safety injection flow vs. RCS pressure in Figure 15.3-2b is modeled for spill to containment pressure (0 psig) cases (i.e., 8.75 inch break size). Auxiliary feedwater flow is 660 gpm to four steam generators based on the operation of one motor-driven and one turbine driven auxiliary feedwater pump, each delivering to two steam generators. The flow rate is based on the conservative minimum flow of 165 gpm delivered by one motor-driven pump to one steam generator.The 27 second delay time includes the time for diesel generator startup, loading on the 6.9 kV shutdown board, and sequential loading of the centrifugal charging and safety injection pumps onto the emergency buses, with acceleration to full speed and capability for injection.The 4-inch break was determined to be the limiting break size, with a peak cladding temperature of 1183.9
°F. The transient results for the limiting 4-inch break are presented in Figures 15.3-3 to 15.3-8. The depressurization transient for the 4-inch break is shown in Figure 15.3-3. The extent to which the core is uncovered is shown in Figure 15.3-4. The peak cladding temperature transient is shown in Figure 15.3-5.
The steam flow rate for this break is shown in Figure 15.3-6. The heat transfer coefficients for the rod for this phase of the transient are given in Figure 15.3-7, and the hot spot fluid temperature is shown in Figure 15.3-8.The comparable transient results for the 2-inch break are presented in Figures 15.3-11 to 15.3-11e, for the 3-inch break in Figures 15.3-12 to 15.3-12e, for the 6-inch break in Figures 15.3-13 to 15.3-13e, and for the 8.75-inch break in Figures 15.3-14 to 15.3-14b. Note that since there is no core uncovery for the 8.75-inch break, cladding heatup is not calculated. An evaluation has been performed to determine the impact of change in the lower radial key stiffness value and concluded that the fuel assemblies on the core periphery are the only assemblies to experience grid deformation for Watts Bar Unit 2. An SBLOCA assessment has concluded that core coolable geometry is maintained if grid deformation remains in peripheral assembly locations. Therefore, it is further concluded that coolable core geometry is maintained for Watts Bar Unit 2 for cores of 17x17 RFA-2 fuel following a SBLOCA.Calculated peak cladding temperatures for large breaks are presented in section 15.4.1.
CONDITION III - INFREQUENT FAULTS 15.3-5WATTS BARWBNP-107 15.3.1.4 Conclusions - Thermal AnalysisFor cases considered, the emergency core cooling system meets the acceptance criteria as presented in 10 CFR 50.46. That is:
(1)The calculated peak fuel element cladding temperature provides margin to the limit of 2200F, based on an F q value of 2.50.
(2)The amount of fuel element cladding that reacts chemically with water or steam does not exceed 1% of the total amount of zircaloy in the reactor.
(3)The cladding temperature transient is terminated at a time when the core geometry is still amenable to cooling. The oxidation limit of 17% of the cladding thickness is not exceeded during or after quenching.
(4)The core temperature is reduced and decay heat is removed for an extended period of time, as required by the long-lived radioactivity remaining in the core.The time sequence of events is shown in Table 15.3-1. Table 15.3-2 summarizes the results of these analyses.
15.3.2 Minor Secondary System Pipe Breaks 15.3.2.1 Identification of Ca uses and Accident DescriptionIncluded in this grouping are ruptures of secondary system lines which would result in steam release rates equivalent to a 6 inch diameter break or smaller.
15.3.2.2 Analysis of Effects and ConsequencesMinor secondary system pipe breaks must be accommodated with the failure of only a small fraction of the fuel elements in the reactor. Since the results of analysis presented in Section 15.4.2 for a major secondary system pipe rupture also meet this criteria, separate analysis for minor secondary system pipe breaks is not required.The evaluation of the more probable accidental opening of a secondary system steam dump, relief or safety valve is presented in Section 15.2.13. These analyses are illustrative of a pipe break equivalent in size to a single valve opening. These smaller equivalent pipe break sizes are also bounded by the analysis presented in Section 15.4.2 for the MSLB event.
15.3.2.3 ConclusionsThe analyses presented in Section 15.4.2 demonstrate that the consequences of a minor secondary system pipe break are acceptable since a DNBR of less than the limiting value does not occur even for a more critical major secondary system pipe break.
15.3-6CONDITION III - INFREQUENT FAULTS WATTS BARWBNP-10715.3.3 Inadvertent Loading of a Fuel Assembly Into an Improper Position 15.3.3.1 Identification of Ca uses and Accident DescriptionFuel and core loading errors such as can arise from the inadvertent loading of one or more fuel assemblies into improper positions, loading a fuel rod during manufacture with one or more pellets of the wrong enrichment or the loading of a full fuel assembly during manufacture with pellets of the wrong enrichment will lead to increased heat fluxes if the error results in placing fuel in core positions calling for fuel of lesser enrichment. Also included among possible core loading errors is the inadvertent loading of one or more fuel assemblies requiring burnable poison rods into a new core without burnable poison rods.Any error in enrichment, beyond the normal manufacturing tolerances, can cause power shapes which are more peaked than those calculated with the correct enrichments. There is a 5% uncertainty margin included in the design value of power peaking factor assumed in the analysis of Condition I and Condition II transients. The Power Distribution Monitoring System is capable of revealing any assembly enrichment error or loading error which causes power shapes to be peaked in excess of the design value.To reduce the probability of core loading errors, each fuel assembly is marked with an identification number and loaded in accordance with a core loading diagram. During core loading the identification number is checked before each assembly is moved into the core. Serial numbers read during fuel movement are subsequently recorded on the loading diagram as a further check on proper placing after the loading is completed.In addition to the Power Distribution Monitoring System, thermocouples are located at the outlet of about one third of the fuel assemblies in the core. There is a high probability that these thermocouples would also indicate any abnormally high coolant enthalpy rise.
15.3.3.2 Analysis of Effects and ConsequencesMethod Of AnalysisSteady-state power distributions in the x-y plane of the core are calculated by the TURTLE[6] Code based on macroscopic cross section calculated by the LEOPARD
[7] Code. A discrete representation is used wherein each individual fuel rod is described by a mesh interval. The power distributions in the x-y plane for a correctly loaded core assembly are also given in Chapter 4 based on enrichments given in that section.For each core loading error case analyzed, the percent deviations from detector readings for a normally loaded core are shown at all incore detector locations (see Figures 15.3-15 to 15.3-19, inclusive).Results The following core loading error cases have been analyzed.
CONDITION III - INFREQUENT FAULTS 15.3-7WATTS BARWBNP-107 Case A:Case in which a Region 1 assembly is interchanged with a Region 3 assembly. The particular case considered was the interchange of two adjacent assemblies near the periphery of the core (see Figure 15.3-15).
Case B:
Case in which a Region 1 assembly is interchanged with a neighboring Region 2 fuel assembly. Two analyses have been performed for this case (see Figures 15.3-16 and 15.3-17).In Case B-1, the interchange is assumed to take place with the burnable poison rods transferred with the Region 2 assembly mistakenly loaded into Region 1.In Case B-2, the interchange is assumed to take place closer to core center and with burnable poison rods located in the correct Region 2 position but in a Region 1 assembly mistakenly loaded into the Region 2 position.
Case C:
Enrichment error: Case in which a Region 2 fuel assembly is loaded in the core central position (see Figure 15.3-18).
Case D:
Case in which a Region 2 fuel assembly instead of a Region 1 assembly is loaded near the core periphery (see Figure 15.3-19).
15.3.3.3 ConclusionsFuel assembly enrichment errors would be prevented by administrative procedures implemented in fabrication.In the event that a single pin or pellet has a higher enrichment than the nominal value, the consequences in terms of reduced DNBR and increased fuel and clad temperatures will be limited to the incorrectly loaded pin or pins.Fuel assembly loading errors are prevented by administrative procedures implemented during core loading. In the unlikely event that a loading error occurs, analyses in this section confirm that resulting power distribution effects will either be readily detected by the Power Distribution Monitoring System or will cause a sufficiently small perturbation to be acceptable within the uncertainties allowed between nominal and design power shapes.15.3.4 Complete Loss of Fo rced Reactor Coolant Flow 15.3.4.1 Identification of Ca uses and Accident DescriptionA complete loss of forced reactor coolant flow may result from a simultaneous loss of electrical supplies to all reactor coolant pumps (RCPs). If the reactor is at power at the 15.3-8CONDITION III - INFREQUENT FAULTS WATTS BARWBNP-107time of the accident, the immediate effect of loss of forced reactor coolant flow is a rapid increase in the reactor coolant temperature and subsequent increase in reactor coolant pressure. The flow reduction and increase in coolant temperature could eventually result in DNB and subsequent fuel damage before the peak pressures exceed the values at which the integrity of the pressure boundaries would be jeopardized unless the reactor was tripped promptly.Normal power for the reactor coolant pumps is supplied through individual buses from a transformer connected to the generator. When generator trip occurs, the buses are automatically transferred to a transformer supplied from external power lines, and the pumps will continue to provide forced coolant flow to the core. Following a turbine trip where there are no electrical faults or a thrust bearing failure which requires tripping the generator from the network, the generator remains connected to the network for approximately 30 seconds. The reactor coolant pumps remain connected to the generator thus ensuring full flow for 30 seconds after the reactor trip before any transfer is made.The following reactor trips provide the necessary protection against a loss of coolant flow accident:
(1)Reactor coolant pump power supply undervoltage or underfrequency.
(2)Low reactor coolant loop flow.The reactor trip on reactor coolant pump undervoltage is provided to protect against conditions which can cause a loss of voltage to all reactor coolant pumps, i.e., loss of power supply to all reactor coolant pumps. This function is blocked below the approximately 10% power (Permissive 7) interlock setpoint to permit startup.The reactor trip on reactor coolant pump underfrequency is provided to trip the reactor for an underfrequency condition, resulting from frequency disturbances on the power grid. This function is also blocked below the approximately 10% power (Permissive 7) interlock setpoint to permit startup.Reference [8] provides analyses of grid frequency disturbances and the resulting Nuclear Steam Supply System protection requirements which are applicable to current generation Westinghouse plants.These analyses have shown that the reactor is adequately protected by the underfrequency reactor trip such that DNB will be above the limiting value for grid frequency decay rates less than 6.8 Hz/sec based on a trip setpoint of approximately 57 Hz. In addition, for a maximum frequency decay rate of 5 Hz/sec, the selected trip setpoint would have to be at least 54.3 Hz. The sensing relay connected to the load side of each RCP breaker for WBN is set at approximately 57 Hz. A grid analysis has been provided which determined that for the worst case the maximum system frequency decay rate is less than 5 Hz/sec.The reactor trip on low primary coolant loop flow is provided to protect against loss of flow conditions which affect only one reactor coolant loop. This function is generated CONDITION III - INFREQUENT FAULTS 15.3-9WATTS BARWBNP-107by two out of three low flow signals per reactor coolant loop. Above approximately 48% power (Permissive 8), low flow in any loop will actuate a reactor trip. Between approximately 10% power and 48% power (Permissive 7 and Permissive 8), low flow in any two loops will actuate a reactor trip. The effect of low loop flow trip protection alone relative to frequency decay rate, although not the primary trip function taken credit for in WBN's design, is also addressed in Reference [8].
15.3.4.2 Analysis of Effects and ConsequencesMethod of Analysis This transient is analyzed by three digital computer codes. The LOFTRAN
[9] Code is used to calculate the loop flow, core flow, the time of reactor trip, the nuclear power transient, and the primary system pressure and coolant temperature transients. The
FACTRAN[10] Code is then used to calculate the heat flux transient based on the nuclear power and flow from LOFTRAN. Finally, the VIPRE-01
[13,14] Code (see Section 4.4.3.4) is used to calculate the DNBR during the transient based on the heat flux from FACTRAN and flow from LOFTRAN. The DNBR transients presented represent the minimum of the typical or thimble cell.The method of analysis and the assumptions made regarding initial operating conditions and reactivity coefficients are identical to those discussed in Section 15.2, except that following the loss of supply to all pumps at power, a reactor trip is actuated by either reactor coolant pump power supply undervoltage or underfrequency. Results The calculated sequence of events for the case analyzed is shown on Table 15.3-3. The reactor is assumed to trip on an undervoltage signal. Figures 15.3-20 and 15.3-23 through 15.3-25 show the transient response for the loss of power to all reactor coolant pumps. The DNBR never goes below the design basis limit.The most limiting statepoint occurred for the complete loss of flow under-frequency case for the DNB transient. The DNB evaluation showed that the minimum DNBR remained above the limiting value. An axial power shape that bounds the cycle specific conditions is used to perform the statepoint evaluation of the complete loss of flow analysis (also partial loss of flow analysis as presented in Section 15.2.5).Following reactor trip, the pumps will continue to coast down until natural circulation flow is established and will approach a stabilized hot standby condition as shown in Section 15.2.8. The operating procedures call for operator action to control RCS boron concentration and pressurizer level using the CVCS, and to maintain steam generator level through control of the main or auxiliary feedwater system. Any action required of the operator to maintain the plant in a stabilized condition is in a time frame in excess of ten minutes following reactor trip.
15.3-10CONDITION III - INFREQUENT FAULTS WATTS BARWBNP-107 15.3.4.3 ConclusionsThe analysis performed has demonstrated that for the complete loss of forced reactor coolant flow, the DNBR will not decrease below the design basis limit at any time during the transient.
15.3.5 Waste Gas Decay Tank Rupture 15.3.5.1 Identification of Ca uses and Accident DescriptionThe gaseous waste processing system, as discussed in Section 11.3, is designed to remove fission product gases from the reactor coolant. The system consists of a closed loop with waste gas compressors, waste gas decay tanks for service at power and other waste gas decay tanks for service at shutdown and startup. The maximum amount of waste gases stored occurs after a refueling shutdown at which time the gas decay tanks store the radioactive gases stripped from the reactor coolant.The accident is defined as an unexpected and uncontrolled release of radioactive xenon and krypton fission product gases stored in a waste decay tank as a consequence of a failure of a single gas decay tank or associated piping.
15.3.5.2 Analysis of Effects and ConsequencesFor the analyses and consequences of the postulated waste gas decay tank rupture, please refer to Section 15.5.2.15.3.6 Single Rod Cluster Control Assembly Withdrawal at Full Power 15.3.6.1 Identification of Ca uses and Accident DescriptionThe current WBN design basis for the single rod cluster control assembly (RCCA) withdrawal at full power event assumes no single electrical or mechanical failure in the rod control system could cause the accidental withdrawal of a single RCCA from the inserted bank at full power operation. The operator could deliberately withdraw a single RCCA in the control bank since this feature is necessary in order to retrieve an assembly should one be accidentally dropped. In the extremely unlikely event of simultaneous electrical failures which could result in single RCCA withdrawal, rod deviation and rod control urgent failure would both be displayed on the plant annunciator, and the rod position indicators would indicate the relative positions in the assemblies in the bank. The urgent failure alarm also inhibits automatic rod withdrawal. Withdrawal of a single RCCA by operator action would result in activation of the same alarm and the same visual indications.Each bank of RCCAs in the system is divided into two groups of 4 mechanisms each (except group 2 of bank D which consists of 5 mechanisms). The rods comprising a group operate in parallel through multiplexing thyristors. The two groups in a bank move sequentially such that the first group is always within one step of the second group in the bank. A definite sequence of actuation of the stationary gripper, movable gripper, and lift coils of a mechanism is required to withdraw the RCCA attached to the CONDITION III - INFREQUENT FAULTS 15.3-11WATTS BARWBNP-107mechanism. Since the stationary gripper, movable gripper, and lift coils associated with the RCCAs of a rod group are driven in parallel, any single failure which would cause rod withdrawal would affect a minimum of one group. Mechanical failures are in the direction of insertion, or immobility.In the unlikely event of multiple failures which result in continuous withdrawal of a single RCCA, it is not possible, in all cases, to provide assurance of automatic reactor trip such that DNB safety limits are not violated. Withdrawal of a single RCCA results in both positive reactivity insertion tending to increase core power, and an increase in local power density in the core area associated with the RCCA.
15.3.6.2 Analysis of Effects and ConsequencesMethod of Analysis Power distributions within the core are calculated by the TURTLE[6] Code based on macroscopic cross sections generated by LEOPARD
[7]. The peaking factors calculated by TURTLE are then used by THINC[11] to calculate the minimum DNBR for the event. The case of the worst rod withdrawn from bank D inserted at the insertion limit, with the reactor initially at full power, was analyzed. This incident is assumed to occur at beginning-of-life since this results in the minimum value of moderator temperature coefficient. This maximizes the power rise and minimizes the tendency of increased moderator temperature to flatten the power distribution.Results Two cases have been considered as follows:
(1)If the reactor is in the manual control mode, continuous withdrawal of a single RCCA results in both an increase in core power and coolant temperature, and an increase in the local hot channel factor in the area of the failed RCCA. In terms of the overall system response, this case is similar to those presented in Section 15.2.2; however, the increased local power peaking in the area of the withdrawn RCCA results in lower minimum DNBRs than for the withdrawn bank cases. Depending on initial bank insertion and location of the withdrawn RCCA, automatic reactor trip may not oc cur sufficiently fast to prevent the minimum core DNB ratio from falling below the limiting value. Evaluation of this case at the power and coolant conditions at which the overtemperature T trip would be expected to trip the plant shows that an upper limit for the number of rods with a DNBR less than the limiting value is 5%.
(2)If the reactor is in automatic control mode, the multiple failures that result in the withdrawal of a single RCCA will result in the immobility of the other RCCAs in the controlling bank. The transient will then proc eed in the same manner as Case 1 described above. For such cases as above, a trip will ultimately ensue, although not sufficiently fast in all cases to prevent the minimum DNBR in the core from decreasing below the limiting value.
15.3-12CONDITION III - INFREQUENT FAULTS WATTS BARWBNP-107Following reactor trip, the plant will approach a stabilized condition at hot standby; normal plant operating procedures may then be followed. The operating procedures would call for operator action to control RCS boron concentration and pressurizer level using the CVCS, and to maintain steam generator level through control of the main or auxiliary feedwater system. Any action required of the operator to maintain the plant in a stabilized condition will be in a time frame in excess of ten minutes following reactor trip.
15.3.6.3 ConclusionsFor the case of one RCCA fully withdrawn, with the reactor in the automatic or manual control mode and initially operating at full power with bank D at the insertion limit, an upper bound of the number of fuel rods experiencing DNBR at values less than the limiting value is 5% of the total fuel rods in the core.For both cases discussed, the indicators and alarms mentioned would function to alert the operator to the malfunction. For case 1, the insertion limit alarms (low and low-low alarms) would also serve to alert the operator.It is to be additionally noted that the current analysis methodology for the bank withdrawal at power uses point-kinetics and one-dimensional kinetics transient models, respectively. These models use conservative constant reactivity feedback assumptions which result in an overly conservative prediction of the core response for these events.The accidental withdrawal of a bank or banks of RCCAs in the normal overlap mode is a transient which has been specifically considered in the safety analysis. The consequences of a bank withdrawal accident meet Condition II criteria (no DNB). If, however, it is assumed that less than a full group or bank of control rods is withdrawn, and these rods are not symmetrically located around the core, this then can cause a "tilt" in the core radial power distribution. The "tilt" could result in a radial power distribution peaking factor which is more severe than is normally considered in the safety analysis, and therefore cause a loss of DNB margin.A more detailed DNBR analysis addressing the limiting transient setpoints has been conducted (References 11 and 12) and the Revised Thermal Design Procedure (RTDP) maximizes DNBR margins and determines setpoints that are conservatively low when compared to previous results.Using these approaches, generic analyses and their plant-specific application demonstrate that for WBN DNB does not occur for the worst-case asymmetric rod withdrawal, and the licensing basis for the facility with regard to the requirements for system response to a single failure in the rod control system (GDC-25 or equivalent) is still satisfied.
CONDITION III - INFREQUENT FAULTS 15.3-13WATTS BARWBNP-107REFERENCES (1)Lee, N., et al., "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," WCAP-10054-P-A and WCAP-10081-A (Non-Proprietary), August 1985.
(2)Meyer, P. E., et al., "NOTRUMP: A Nodal Transient Small Break and General Network Code," WCAP-10079-P-A and WCAP-10080-A (Non-Proprietary),
August 1985.
(3)F. M. Bordelon, et. al., "LOCTA-IV Program: Loss-of-Coolant Transient Analysis," WCAP-8305 (Non-Proprietary) and WCAP-8301 (Proprietary), June 1974.
(4)Deleted by Amendment 63.
(5)Deleted by Amendment 63.
(6)Barry, R. F. and Altomare, S. "The TURTLE 24.0 Diffussion Depletion Code," WCAP-7213-P-A (Proprietary) and WCAP-7758-A (Non-Proprietary),
January 1975.
(7)Barry, F. R., "LEOPARD, A Spectrum Dependent Non-Spatial Depletion Code for the IBM-7094," WCAP-3269-26, September 1963.
(8)Balwin, M. S., Merrian, M. M., Schenkel, H. S., and Vandewalle, D. J., "An Evaluation of Loss of Flow Accidents Caused by Power System Frequency Transients in Westinghouse PWRs," WCAP-8424, Revision 1, June 1975.
(9)Burnett, T. W. T, et.al., "LOFTRAN Code Description", WCAP-7907-P-A (Proprietary) and WCAP-7907-A (Non-Proprietary), April 1984.
(10)Hargrove, H. G., "FACTRAN, A FORTRAN IV Code for Thermal Transients in a UO2 Fuel Rod," WCAP-7908-A, December 1989.
(11)Friedland, A. J., and Ray, S., "Improved THINC IV Modeling for PWR Core Design," WCAP-12330-P, August 1989.
(12)Huegel, D., et al., "Generic Assessment of Asymmetric Rod Cluster Control Assembly Withdrawal," WCAP-13803, August 1993.
(13)C. W. Stewart, et al., "VIPRE-01; A Thermal-Hydraulic Code for Reactor Cores," Volume 1-3 (Revision 3, August 1989), Volume 4 (April 1987), NP-2511-CCM-A, EPRI.
(14)WCAP-14565-P-A, "VIPRE-01 Modeling and Qualification for Pressurized Water Reactor Non-LOCA Thermal-Hydraulic Safety Analysis," October 1999.
15.3-14CONDITION III - INFREQUENT FAULTS WATTS BARWBNP-107 (15)"Generic Evaluation of Feedwater Transients and Small Break Loss-of-Coolant Accidents in Westinghouse-Designed Operating Plants," NUREG-0611, January 1980.
(16)Thompson, C. M., et al., "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model, "WCAP-10054-P-A, Addendum 2, Revision 1 (Proprietary), July 1997.
CONDITION III - INFREQUENT FAULTS 15.3-15WATTS BARWBNP-107Table 15.3-1 Small Break Loca Analysis Time Sequence Of Events Break Size:2 inch 3 inch 4 inch 6 inch8.75 inchBreak initiation [sec]0.00.00.00.00.0Reactor trip signal [sec]143.352.126.813.47.7 Safety injection signal [sec]143.352.126.813.47.7 Top of core uncovered3688901629401N/A Accumulator Injection Begins [sec]N/A2698858366169 Peak cladding temperature occurs
[sec]4910.41409.2976.6468.4N/ATop of core recovered [sec]557225401918483N/A*Note: There is no core uncovery for the 8.75 inch break.
15.3-16CONDITION III - INFREQUENT FAULTS WATTS BARWBNP-107Table 15.3-2 Small Break LOCA Fuel Cladding Results Break Size:2-inch3-inch4-inch6-inch*8.75 inchPeak cladding temperature (PCT)
(°F)1009.51043.21183.9747.8N/ALocation of PCT [ft.]11.2511.2511.2510.75N/APCT Time [sec]4910.41409.2976.6468.4N/AMaximum Local Zr-H 2O Reaction
(%)0.020.030.060.00N/AMaximum Local Zr-H 2O Reaction Location (ft)11.2511.2511.2511.00N/ATotal Zr-H 2O Reaction (%)<1<1<1<1N/AHot rod burst time (sec)N/AN/AN/AN/AN/A Hot rod burst location [ft.]N/AN/AN/AN/AN/A
- Note: Three is no core uncovery for the 8.75-inch break.
Boundary Condition AssumptionsNSSS powerEquivalent to 102% of 3427 MWt Core power (rod heatup analysis)Equivalent to 102% of 3411 MWt Peak linear power13.89 kW/ft Cold leg accumulators:Water volume (each)1050 ft3Pressure600 psia CONDITION III - INFREQUENT FAULTS 15.3-17WATTS BARWBNP-107Table 15.3-3 Time Sequence Of Events For Condition III EventsAccidentEventTime (seconds)Complete Loss of Forced Reactor Coolant Flow Undervoltage1. All pumps in operation, all pumps coasting down All operating pumps lose power (due to undervoltage event) and begin coasting down 0 Rods begin to dropMinimum DNBR occurs1.53.7Underfrequency2. All pumps in operation, all pumps deceleratingAll operating pumps lose power (due to underfrequency event) and begin coasting down 0 Rods begin to dropMinimum DNBR occurs 1.243.6 15.3-18CONDITION III - INFREQUENT FAULTS WATTS BARWBNP-107THIS PAGE INTENTIONALLY BLANK Condition III - Infrequent Faults15.3-19WATTS BAR WBNP-107Figure 15.3-1 Code Interface Description for Small Break Model
15.3-20Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-2a Pumped Safety Injection Flowrate VS. RCS Pressure (Spilling To RCS Pressure)
Condition III - Infrequent Faults15.3-21WATTS BAR WBNP-107Figure 15.3-2b Pumped Safety Injection Flow Rate VS. RCS Pressure (Spilling To Containment Pressure) 15.3-22Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-3 Reactor Coolant System Pressure for Limiting 4-Inch Break Condition III - Infrequent Faults15.3-23WATTS BAR WBNP-107Figure 15.3-4 Core Mixture Level for Limiting 4-Inch Break 15.3-24Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-5 Cladding Temperature Transient at Peak CladdingTemperature Elevation for Limiting4-Inch Break Condition III - Infrequent Faults15.3-25WATTS BAR WBNP-107Figure 15.3-6 Core Outlet Steam Flow for Limiting 4-Inch Break 15.3-26Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-7 Cladding Surface Heat Transfer Coefficient at Peak CladdingTemperature Elevation for Limiting 4-Inch Break Condition III - Infrequent Faults15.3-27WATTS BAR WBNP-107Figure 15.3-8 Fluid Temperature at Peak Cladding Temperature Elevation for Limiting 4-Inch Break 15.3-28Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-8b Deleted by Amendment 89 Condition III - Infrequent Faults15.3-29WATTS BAR WBNP-107Figure 15.3-8c Deleted by Amendment 89 15.3-30Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-8d Deleted by Amendment 89 Condition III - Infrequent Faults15.3-31WATTS BAR WBNP-107Figure 15.3-8e Deleted by Amendment 89 15.3-32Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-8f Deleted by Amendment 89 Condition III - Infrequent Faults15.3-33WATTS BAR WBNP-107Figure 15.3-8g Deleted by Amendment 89 15.3-34Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-8h Deleted by Amendment 89 Condition III - Infrequent Faults15.3-35WATTS BAR WBNP-107Figure 15.3-8i Deleted by Amendment 89 15.3-36Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-8j Deleted by Amendment 89 Condition III - Infrequent Faults15.3-37WATTS BAR WBNP-107Figure 15.3-8k Deleted by Amendment 89 15.3-38Condition III - Infrequent FaultsWATTS BAR WBNP-107\Figure 15.3-8l Deleted by Amendment 89 Condition III - Infrequent Faults15.3-39WATTS BAR WBNP-107Figure 15.3-8m Deleted by Amendment 89 15.3-40Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-8n Deleted by Amendment 89 Condition III - Infrequent Faults15.3-41WATTS BAR WBNP-107Figure 15.3-9 Core Power Transient 15.3-42Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-10 Hot Rod Axial Power Shape Condition III - Infrequent Faults15.3-43WATTS BAR WBNP-107Figure 15.3-11 Reactor Coolant System Pressure for 2-Inch Break
15.3-44Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-11a Core Mixture Level Transient for 2-inch Break Condition III - Infrequent Faults15.3-45WATTS BAR WBNP-107Figure 15.3-11b Cladding Temperature Transient at Peak Cladding Temperature Elevation for 2-Inch Break 15.3-46Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-11c Core Outlet Steam Flow Rate for 2-Inch Break Condition III - Infrequent Faults15.3-47WATTS BAR WBNP-107Figure 15.3-11d Cladding Surface Heat Transfer Coefficient at Peak Cladding Temperature Elevation for 2-Inch Break 15.3-48Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-11e Fluid Temperature at Peak Cladding Temperature Elevation for 2-Inch Break Condition III - Infrequent Faults15.3-49WATTS BAR WBNP-107Figure 15.3-12 Reactor Coolant System Pressure for 3-Inch Break 15.3-50Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-12a Core Mixture Level Transient for 3-Inch Break Condition III - Infrequent Faults15.3-51WATTS BAR WBNP-107Figure 15.3-12b Clad Temperature Transient at Peak Temperature Elevation for 3-Inch Break 15.3-52Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-12c Core Outlet Steam Flow Rate for 3-Inch Break Condition III - Infrequent Faults15.3-53WATTS BAR WBNP-107Figure 15.3-12d Clad Surface Heat Transfer Coefficient at Peak Clad Temperature Elevation for 3-Inch Break 15.3-54Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-12e Fluid Temperature at Peak Clad Temperature Elevation for 3-Inch Break Condition III - Infrequent Faults15.3-55WATTS BAR WBNP-107Figure 15.3-13 Reactor CoolantSystem Pressure For 6-Inch Break 15.3-56Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-13a Core Mixture Level Transient For 6-Inch Break Condition III - Infrequent Faults15.3-57WATTS BAR WBNP-107Figure 15.3-13b Cladding Temperature Transient At Peak Cladding Temperature Elevation For 6-Inch Break 15.3-58Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-13c Core Outlet Steam Flow Rate For 6-Inch Break Condition III - Infrequent Faults15.3-59WATTS BAR WBNP-107Figure 15.3-13d Cladding Surface Heat Transfer Coefficient At Peak Cladding Temperature Elevation For 6-Inch Break 15.3-60Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-13e Fluid Temperature At Peak Cladding Temperature Elevation For 6-Inch Break Condition III - Infrequent Faults15.3-61WATTS BAR WBNP-107Figure 15.3-14 Reactor Coolant System Pressure For 8.75-Inch Break 15.3-62Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-14a Core Mixture Level Transient For 8.75-Inch Break Condition III - Infrequent Faults15.3-63WATTS BAR WBNP-107Figure 15.3-14b Core Outlet Steam Flow Rate For 8.75-Inch Break 15.3-64Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-15 Interchange Between Region 1 and Region 3 Assembly Condition III - Infrequent Faults15.3-65WATTS BAR WBNP-107Figure 15.3-16 Interchange Between Region 1 and Region 2 Assembly, Burnable Poison Rods Being Retained by the Region 2 Assembly 15.3-66Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-17 Interchange Between Region 1 and Region 2 Assembly,Burnable Poison Rods Being Transferred to the Region 1 Assembly Condition III - Infrequent Faults15.3-67WATTS BAR WBNP-107Figure 15.3-18 Enrichment Error: A Region 2 Assembly Loaded into the Core Central Position 15.3-68Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-19 Loading a Region 2 Assembly into a Region 1 Position Near Core Periphery Condition III - Infrequent Faults15.3-69WATTS BAR WBNP-107Figure 15.3-20 Reactor Vessel Flow Transient Complete Loss of Flow - Undervoltage Four Pumps in Operation, Four Pumps Coasting Down 15.3-70Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-21 Deleted by Amendment 80 Condition III - Infrequent Faults15.3-71WATTS BAR WBNP-107Figure 15.3-22 Deleted by Amendment 97 15.3-72Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-23 Hot Channel Heat Flux Transient Complete Loss Of Flow-Undervoltage; Four Pumps in Operation, Four Pumps Coastin g Down Condition III - Infrequent Faults15.3-73WATTS BAR WBNP-107Figure 15.3-24 Nuclear Power Transient Complete Loss Of Flow-Undervoltage; Four Pumps in Operation, Four Pumps Coasting Down 15.3-74Condition III - Infrequent FaultsWATTS BAR WBNP-107Figure 15.3-25 DNBR Versus TimeComplete L oss of Flow-Undervoltage Four Pumps in Operation, Four Pumps Coasting Down Condition III - Infrequent Faults15.3-75WATTS BAR WBNP-107Figure 15.3-26 Deleted by Amendment 97 15.3-76Condition III - Infrequent FaultsWATTS BAR WBNP-107 THIS PAGE INTENTIONALLY BLANK CONDITION IV - LIMITING FAULTS 15.4-1WATTS BARWBNP-107 15.4 CONDITION IV - LIMITING FAULTSCondition IV occurrences are faults which are not expected to take place, but are postulated because their consequences would include the potential for the release of significant amounts of radioactive material. They are the most drastic which must be designed against and represent limiting design cases. Condition IV faults are not to cause a fission product release to the environment resulting in an undue risk to public health and safety in excess of guideline values of 10 CFR Part 100. A single Condition IV fault is not to cause a consequential loss of required functions of systems needed to cope with the fault including those of the emergency core cooling system (ECCS) and the containment. For the purposes of this report the following faults have been classified in this category:
(1)Major rupture of pipes containing reactor coolant up to and including double ended rupture of the largest pipe in the reactor coolant system (loss of coolant accident).
(2)Major secondary system pipe ruptures.
(3)Steam generator tube rupture.
(4)Single reactor coolant pump locked rotor.
(5)Fuel handling accident.
(6)Rupture of a control rod drive mechanism housing (rod cluster control assembly ejection).The analysis of thyroid and whole body doses, resulting from events leading to fission product release, appears in Section 15.5. The fission product inventories which form a basis for these calculations are presented in Chapter 11 and Section 15.1. Section 15.5 also includes the discussion of systems interdependency contributing to limiting fission product leakages from the containment following a Condition IV occurrence.15.4.1 Major Reactor Coolant System Pipe Ruptures (Loss of Coolant Accident)Loss-of-coolant accidents (LOCAs) are accidents that would result from the loss of reactor coolant at a rate in excess of the capability of the reactor coolant makeup system. LOCAs could occur from breaks in pipes in the reactor coolant pressure boundary up to and including a break equivalent in size to the double-ended rupture of the largest pipe in the reactor coolant system (RCS). Large breaks are defined as breaks in the reactor coolant pressure boundary having a cross-sectional area greater than or equal to 1.0 ft
- 2. Reference [34] documents this criterion. The large break LOCA analysis is performed to demonstrate compliance with the 10 CFR 50.46 acceptance criteria[35] for emergency core cooling systems for light water nuclear power reactors.A large break LOCA is the postulated double-ended guillotine or split rupture of one of the RCS primary coolant pipes.
15.4-2CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107The boundary considered for loss of coolant accidents is the RCS or any line connected to the system up to the first closed valve.The sequence of events following a limiting large break LOCA transient is presented in Table 15.4-17. Before the break occurs, the RCS is assumed to be operating normally at full power in an equilibrium condition, i.e., the heat generated in the core is being removed via the secondary system. A large beak is assumed to open almost instantaneously in one of the main RCS pipes. Calculations have demonstrated that the most severe transient results occur for a break in the cold leg between the pump and the reactor vessel.Immediately following the cold leg break, a rapid system depressurization occurs along with a core flow reversal due to a high discharge of subcooled fluid into the broken cold leg and out the break. The fuel rods go through departure from nucleate boiling (DNB) and the cladding rapidly heats up, while the core power shuts down due to voiding in the core. The hot water in the core, upper plenum, and upper head flashes to steam, and subsequently the cooler water in the lower plenum and downcomer begins to flash.
Once the system has depressurized to the accumulator pressure, the accumulators begin to inject cold borated water into the intact cold legs. During the blowdown period a portion of the injected ECCS water is calculated to be bypassed around the downcomer and out the break. The bypass period ends as the system pressure continues to decrease and approaches the containment pressure, resulting in reduced break flow and consequently reduced core flow.As the refill period begins, the core begins a period of heatup and the vessel begins to fill with ECCS water. This phase continues until the lower plenum is filled and the bottom of the core begins to reflood and entrainment begins.During the reflood period, the core flow is oscillatory as ECCS water periodically rewets and quenches the hot fuel cladding which generates steam and causes system repressurization. The steam and entrained water must pass through the vessel upper plenum, the hot legs, the steam generators, and the reactor coolant pumps before it is vented out the break. This flow path resistance is overcome by the downcomer water elevation head which provides the gravity driven reflood force. The pumped ECCS water aids in the filling of the downcomer and subsequently supplies water to maintain a full downcomer and complete the reflood period.15.4.1.1 Thermal Analysis15.4.1.1.1 Westinghouse Pe rformance Criteria for Emergency Core Cooling SystemThe reactor is designed to withstand thermal effects caused by a loss of coolant accident including the double ended severance of the largest reactor coolant system pipe. The reactor core and internals together are designed so that the reactor can be safely shutdown and the essential heat transfer geometry of the core preserved following the accident. The current internals is of the upflow barrel/baffle design. The CONDITION IV - LIMITING FAULTS 15.4-3WATTS BARWBNP-107ECCS, even when operating during the injection mode with the most limiting single active failure, is designed to meet the acceptance criteria.15.4.1.1.2 Method of Thermal AnalysisWhen the Final Acceptance Criteria (FAC) governing the loss-of-coolant accident (LOCA) for Light Water Reactors was issued in Appendix K of 10 CFR 50.46, both the Nuclear Regulatory Commission (NRC) and the industry recognized that the stipulations of Appendix K were highly conservative. That is, using the then accepted analysis methods, the performance of the Emergency Core Cooling System (ECCS) would be conservatively underestimated, resulting in predicted Peak Clad Temperatures (PCTs) much higher than expected. At that time, however, the degree of conservatism in the analysis could not be quantified. As a result, the NRC began a large-scale confirmatory research program with the following objectives:1) Identify, through separate effects and integral effects experiments, the degree of conservatism in those models permitted in the Appendix K rule. In this fashion, those areas in which a purposely prescriptive approach was used in the Appendix K rule could be quantified with additional data so that a less prescriptive future approach might be allowed.2) Develop improved thermal-hydraulic computer codes and models so that more accurate and realistic accident analysis calculations could be performed. The purpose of this research was to develop an accurate predictive capability so that the uncertainties in the ECCS performance and the degree of conservatism with respect to the Appendix K limits could be quantified.Since that time, the NRC and the nuclear industry have sponsored reactor safety research programs directed at meeting the above two objectives. The overall results have quantified the conservatism in the Appendix K rule for LOCA analyses and confirmed that some relaxation of the rule can be made without loss in safety to the public. It was confirmed that some plants were being restricted in operating flexibility by the overly conservative Appendix K requirements. In recognition of the Appendix K conservatism that was being quantified by the research programs, the NRC adopted an interim approach for evaluation methods. This interim approach is described in SECY-83-472 [50]. The SECY-83-472 [50] represented an important step in basing licensing decisions on realistic calculations, as opposed to those calculations prescribed by Appendix K.In 1998, the NRC Staff amended the requirements of 10 CFR 50.46 and Appendix K, "ECCS Evaluation Models", to permit the use of a realistic evaluation model to analyze the performance of the ECCS during a hypothetical LOCA. This decision was based on an improved understanding of LOCA thermal-hydraulic phenomena gained by extensive research programs. Under the amended rules, best-estimate thermal-hydraulic models may be used in place of models with Appendix K features. The rule change also requires, as part of the LOCA analysis, an assessment of the uncertainty of the best estimate calculations. It further requires that this analysis uncertainty be 15.4-4CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107included when comparing the results of the calculations to the prescribed acceptance criteria of 10 CFR 50.46. Further guidance for the use of best-estimate codes is provided in Regulatory Guide 1.157[44]. To demonstrate use of the revised ECCS rule, the NRC and its consultants developed a method called the Code Scaling, Applicability, and Uncertainty (CSAU) evaluation methodology (NUREG/CR-5249[45]). This method outlined an approach for defining and qualifying a best-estimate thermal-hydraulic code and quantifying the uncertainties in a LOCA analysis. A LOCA evaluation methodology for three- and four-loop Pressurized Water Reactor (PWR) plants based on the revised10 CFR 50.46 rules was developed by Westinghouse with support of EPRI and Consolidated Edison and has been approved by the NRC (WCAP-12945-P-A [46]).More recently, Westinghouse developed an alternative methodology called ASTRUM, which stands for Automated Statistical TReament of Uncertainty Method (WCAP-16009-P-A [49]). This method is still based on the CQD methodology and follows the steps in the CSAU methodology (NUREG/CR-5249 [45]). However, the uncertainty analysis (Element 3 in the CSAU) is replaced by a technique based on order statistics. The ASTRUM methodology replaces the response surface technique with a statistical sampling method where the uncertainty parameters are simultaneously sampled for each case. The ASTRUM methodology has received NRC approval for referencing in licensing calculations in WCAP-16009-P-A [49].The three 10 CFR 50.46 criteria (peak clad temperature, maximum local oxidation, and core-wide oxidation) are satisfied by running a sufficient number of WCOBRA/TRAC calculations (sample size). In particular, the statistical theory predicts that 124 calculations are required to simultaneously bound the 95th percentile values of three parameters with a 95-percent confidence level.This analysis is in accordance with the applicability limits and usage conditions defined in Section 13-3 of WCAP-16009-P-A [49], as applicable to the ASTRUM methodology.
Section 13-3 of WCAP-16009-P-A [49] was found to acceptably disposition each of the identified conditions and limitations related to WCOBRA/TRAC and CQD uncertainty approach per section 4.0 of the ASTRUM Final Safety Evaluation Report appended to this topical report.The methods used in the application of WCOBRA /TRAC to the large break LOCA with ASTRUM are described in WCAP-12945-P-A [46] and WCAP-16009-P-A [49]. A detailed assessment of the computer code WCOBRA/TRAC was made through comparisons to experimental data. These assessments were used to develop quantitative estimates of the code's ability to predict key physical phenomena in a PWR large break LOCA. Modeling of a PWR introduces additional uncertainties which are identified and quantified in the plant-specific analysis. WCOBRA/TRAC MOD7A was used for the execution of ASTRUM for Watts Bar Unit 2 (WCAP-16009-P-A [49]).
WCOBRA/TRAC combines two-fluid, three-field, multi-dimensional fluid equations used in the vessel with one-dimensional drift-flux equations used in the loops to allow CONDITION IV - LIMITING FAULTS 15.4-5WATTS BARWBNP-107a complete and detailed simulation of a PWR. This best-estimate computer code contains the following features:1) Ability to model transient three-dimensional flows in different geometries inside the vessel2) Ability to model thermal and mechanical non-equilibrium between phases
- 3) Ability to mechanistically represent interfacial heat, mass, and momentum transfer in different flow regimes4) Ability to represent important reactor components such as fuel rods, steam generators, reactor coolant pumps, etc.The two-fluid formulation uses a separate set of conservation equations and constitutive relations for each phase. The effects of one phase on another are accounted for by interfacial friction and heat and mass transfer interaction terms in the equations. The conservation equations have the same form for each phase; only the constitutive relations and physical properties differ. Dividing the liquid phase into two fields is a convenient and physically accurate way of handling flows where the liquid can appear in both film and droplet form. The droplet field permits more accurate modeling of thermal-hydraulic phenomena such as entrainment, de-entrainment, fallback, liquid pooling, and flooding.
WCOBRA/TRAC also features a two-phase, one-dimensional hydrodynamic formulation. In this model, the effect of a phase slip is modeled indirectly via a constitutive relationship which provides the phase relative velocity as a function of fluid conditions. Separate mass and energy conservation equations exist for the two-phase mixture and for the vapor.The reactor vessel is modeled with the three-dimensional, three-field model, while the loop, major loop components, and safety injection points are modeled with the one-dimensional model.All geometries modeled using the three-dimensional model are represented as a matrix of cells. The number of mesh cells used depends on the degree of detail required to resolve the flow field, the phenomena being modeled, and practical restrictions such as computing costs and core storage limitations.The equations for the flow field in the three-dimensional model are solved using a staggered difference scheme on the Eulerian mesh. The velocities are obtained at mesh cell faces, and the state variables (e.g., pressure, density, enthalpy, and phasic volume fractions) are obtained at the cell center. This cell is the control volume for the scalar continuity and energy equations. The momentum equations are solved on a staggered mesh with the momentum cell centered on the scalar cell face.The basic building block for the mesh is the channel, a vertical stack of single mesh cells. Several channels can be connected together by gaps to model a region of the reactor vessel. Regions that occupy the same level form a section of the vessel.
15.4-6CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Vessel sections are connected axially to complete the vessel mesh by specifying channel connections between sections. Heat transfer surfaces and solid structures that interact significantly with the fluid can be modeled with rods and unheated conductors.One-dimensional components are connected to the vessel. The basic scheme used also employs the staggered mesh cell. Special purpose components exist to model specific components such as the steam generator and pump.A typical calculation using WCOBRA/TRAC begins with the establishment of a steady-state initial condition with all loops intact. The input parameters and initial conditions for this steady-state calculation are discussed in the next section.Following the establishment of an acceptable steady-state condition, the transient calculation is initiated by introducing a break into one of the loops. The evolution of the transient through blowdown, refill, and reflood proceeds continuously, using the same computer code (WCOBRA/TRAC) and the same modeling assumptions. Containment pressure is modeled with the BREAK comp onent using a time dependent pressure table. Containment pressure is calculated using the LOTIC-2 [5] code and mass and energy releases from the WCOBRA/TRAC calculation .The final step of the best-estimate methodology, in which all uncertainties of the LOCA parameters are accounted for to estimate a Peak Cladding Temperature (PCT), Maximum Local Oxidation (MLO), and Core-Wide Oxidation (CWO) at 95-percent probability, is described in the following sections.1) Plant Model Development:
In this step, a WCOBRA/TRAC model of the plant is developed. A high level of noding detail is used in order to provide an accurate simulation of the transient. However, specific guidelines are followed to ensure that the model is consistent with models used in the code validation. This results in a high level of consistency among plant models, except for specific areas dictated by hardware differences, such as in the upper plenum of the reactor vessel or the ECCS injection configuration.2) Determination of Plant Operating Conditions:In this step, the expected or desired operating range of the plant to which the analysis applies is established. The parameters considered are based on a "key LOCA parameters" list that was developed as part of the methodology. A set of these parameters, at mostly nominal values, is chosen for input as initial conditions to the plant model.A transient is run utilizing these parameters and and is known as the "initial transient". Next, several confirmatory runs are made, which vary a subset of the key LOCA parameters over their expected operating range in one-at-a-time sensitivities. Because certain parameters are not included in the uncertainty analysis, these parameters are set at their bounding condition. This analysis is CONDITION IV - LIMITING FAULTS 15.4-7WATTS BARWBNP-107commonly referred to as the confirmatory analysis. The most limiting input conditions, based on these confirmatory runs, are then combined into the model that will represent the limiting state for the plant, which is the starting point for the assessment of uncertainties.3) Assessment of Uncertainty:The ASTRUM methodology is based on order statistics. The technical basis of the order statistics is described in Section 11 of WCAP-16009-P-A [49]. The determination of the PCT uncertainty, MLO uncertainty, and CWO uncertainty relies on a statistical sampling technique. According to the statistical theory, 124
WCOBRA /TRAC calculations are necessary to assess against the three 10 CFR 50.46 criteria (PCT,MLO,CWO).The uncertainty contributors are sampled randomly from their respective distributions for each of the WCOBRA/TRAC calculations. The list of uncertainty parameters, which are randomly sampled for each time in the cycle, break type (split or double-ended guillotine), and break size for the split break are also sampled as uncertainty contributors within the ASTRUM methodology.Results from the 124 calculations are tallied by ranking the PCT from highest to lowest. A similar procedure is repeated for MLO and CWO. The highest rank of PCT, MLO, and CWO will bound 95 percent of their respective populations with 95-percent confidence level.4) Plant Operating Range:The plant operating range over which the uncertainty evaluation applies is defined. Depending on the results obtained in the above uncertainty evaluation, this range may be the desired range or may be narrower for some parameters to gain additional margin.15.4.1.1.3 Containment AnalysisThe containment pressure analysis is performed with the LOTIC-2 [5] code. Transient mass and energy releases for input to the LOTIC-2 model are obtained from the WCOBRA/TRAC code. The transient pressure computed by the LOTIC-2 code is then used in WCOBRA/TRAC for the purpose of supplying a backpressure at the break plane while computing the reflood transient. The containment pressure transients and associated parameters were computed by LOTIC-2 and are presented in Figures 15.4-40b through 15.4-40g. The data used to model the containment for the analysis is presented in Tables15.4-14 and 15.4-15. Mass and energy release rates to containment can be found in Table 15.4-16.The impact of purging on the calculated containment pressure was addressed by performing a calculation to obtain the amount of mass which exits through two available purge lines during the initial portion of a postulated LOCA transient. The 15.4-8CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107maximum air loss was calculated using the transient mass distribution (TMD) computer code model, which is described in Section 6.2.1.3.4, to be 1160 lbm. The containment pressure calculations account for a loss of 1160 lbm of air after initiation of the accident through modifying the compression ratio input to the LOTIC-2 code.
15.4.1.1.4 Results of La rge Break Limiting TransientThe Watts Bar Unit 2 PCT/MLO/CWO - limiting transient is a cold leg split break (effective break area = 1.8138) which analyzes conditions that fall within those listed in Table 15.4-19. Traditionally, cold leg breaks have been limiting for large break LOCA. Analysis experience indicates that this break location most likely causes conditions that result in flow stagnation to occur in the core. Scoping studies with WCOBRA/TRAC have confirmed that the cold leg remains the limiting break location (WCAP-12945-P-A[46]).The large break LOCA transient can be divided into convenient time periods in which specific phenomena occur, such as various hot assembly heatup and cool down transients. For a typical large break, the blowdown period can be divided into the Critical Heat Flux (CHF) phase, the upward core flow phase, and the downward core flow phase. These are followed by the refill, reflood, and long-term cooling periods. Specific important transient phenomena and heat transfer regimes are discussed below, with the transient results shown in Figure 15.4-41 through 15.4-55. (The limiting case was chosen to show a conservative representation of the response to a large break LOCA.)1) Critical Heat Flux (CHF) Phase:
Immediately following the cold leg rupture, the break discharge rate is subcooled and high (Figure 15.4-42). The region of the RCS with the highest initial temperatures (core, upper plenum, upper head, and hot legs) begin to flash to steam, the core flow reverses and the fuel rods begin to go through departure from nucleate boiling (DNB). The fuel cladding rapidly heats up (Figures 15.4-41a and 15.4-41b) while the core power shuts down due to voiding in the core. This phase is terminated when the water in the lower plenum and downcomer begins to flash (Figures 15.4-47 and 15.4-51). The mixture swells and intact loop pumps, still rotating in single phase liquid, push this two-phase mixture into the core.2) Upward Core Flow Phase:
Heat transfer is improved as the two-phase mixture is pushed into the core. This phase may be enhanced if the pumps are not degraded, or if the break discharge rate is low due to saturated fluid conditions at the break. If pump degradation is high or the break flow is large, the cooling effect due to upward flow may not be significant. Figure 15.4-44 shows the void fraction for one intact loop pump and the broken loop pump. This figure shows that the intact loop remains in single-phase liquid flow for several seconds, resulting in enhanced upward core flow cooling. This phase ends as the lower plenum mass is depleted, the loop flow becomes two-phase, and the pump head degrades.
CONDITION IV - LIMITING FAULTS 15.4-9WATTS BARWBNP-1073) Downward Core Flow Phase:The loop flow is pushed into the vessel by the intact loop pumps and decreases as the pump flow becomes two-phase. The break flow begins to dominate and pulls flow down through the core, up the downcomer to the broken loop cold leg, and out the break. While liquid and entrained liquid flow provide core cooling, the top of the core vapor flow (Figures 15.4-45 and 15.4-46) best illustrates this phase of core cooling. Once the system has depressurized to the accumulator pressure (Figure 15.4-43), the accumulators begin to inject cold borated water into the intact cold legs (Figure 15.4-48). During this period, due to steam upflow in the downcomer, a portion of the injected ECCS water is calculated to be bypassed around the downcomer and out the break. As the system pressure continues to fall, the break flow, and consequently the downward core flow, is reduced. The core begins to heat up as the system pressure approaches the containment pressure and the vessel begins to fill with ECCS water (Figure 15.4-52). 4) Refill Phase:
As the refill period begins, the core begins a period of heatup and the vessel begins to fill with ECCS water (Figures 15.4-48 and 15.4-49). This period is characterized by a rapid increase in cladding temperatures at all elevations due to the lack of liquid and steam flow in the core region. This period continues until the lower plenum is filled and the bottom of the core begins to reflood and entrainment begins.5) Early Reflood Phase:
During the early reflood phase, the accumulators begin to empty and nitrogen enters the system. This forces water into the core, which then boils, causing system re-pressurization, and the lower core region begins to quench (Figure 15.4-50). During this time, core cooling may increase due to vapor generation and liquid entrainment.
During the reflood period, the core flow is oscillatory as cold water periodically rewets and quenches the hot fuel cladding, which generates steam and causes system re-pressurization. The steam and entrained water must pass through the vessel upper plenum, the hot legs, the steam generators, and the reactor coolant pumps before it is vented out the break. This flow path resistance is overcome by the downcomer water elevation head, which provides the gravity driven reflood force. From the later stage of blowdown to the beginning of reflood, the accumulators rapidly discharge borated cooling water into the RCS, filling the lower plenum and contributing to the filling of the downcomer. The pumped ECCS water aids in the filling of the downcomer and subsequently supplies water to maintain a full downcomer and complete the reflood period. As the quench front progresses up the core, the PCT location moves higher into the top core region. As the vessel continues to fill, the PCT location is cooled and the early reflood period is terminated.6) Late Reflood Phase:
The late reflood phase is characterized by boiling in the downcomer. The mixing of ECCS water with hot water and and steam from the core, in addition to the continued heat transfer from the hot vessel metal, reduces the subcooling of water in the lower 15.4-10CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107plenum and downcomer. Figure 15.4-54 illustrates the reduction in lower plenum subcooling.The saturation temperature is dictated by the containment backpressure. For WBN, which has a low containment pressure after the LOCA, boiling does occur and has a significant effect on the gravity reflood. Vapor generated in the downcomer reduces the driving head which results in a reduced core reflood rate. The top core elevations experience a second reflood heatup, which exceeds the first.
15.4.1.1.5 POST ANALYSIS OF RECORD EVALUATIONSIn addition to the analyses presented in this section, evaluations and reanalyses may be performed as needed to address computer code errors and emergent issues, or to support plant changes. The issues or changes are evaluated, and the impact on the Peak Cladding Temperature (PCT) is determined. The resultant increase or decrease in PCT is applied to the analysis of record PCT. The PCT, including all penalties and benefits is presented in Tables 15.4-18a for the large break LOCA. The current PCT is demonstrated to be less than the 10 CFR 50.46(b) requirement of 2200 °F.In addition, 10 CFR 50.46 requires that licensees assess and report the effect of changes to or errors in the evaluation model used in the large break LOCA analysis. These reports constitute addenda to the analysis of record provided in the FSAR until overall changes become significant as defined by 10 CFR 50.46. If the assessed changes or errors in the evaluation model results in significant changes in calculated PCT, a schedule for formal reanalysis or other action as needed to show compliance will be addressed in the report to the NRC. Finally, the criteria of 10 CFR 50.46 requires that holders and users of the evaluation models establish a number of definitions and processes for assessing changes in the models or their use. Westinghouse, in consultation with the PWR Owner's Group (PWROG), has developed an approach for compliance with the reporting requirements. This approach is documented in WCAP-13451 [36], Westinghouse Methodology for Implementation of 10 CFR 50.46 Reporting. TVA provides the NRC with annual and 30-day reports, as applicable, for Watts Bar Unit 2. TVA intends to provide future reports required by 10 CFR 50,46 consistent with the approach described in WCAP-13451.
15.4.1.
1.6 CONCLUSION
S - THERMAL ANALYSISIt must be demonstrated that there is a high level of probability that the limits set forth in 10 CFR 50.46 are met. The demonstration that these limits are met is as follows:(b)(1) The limiting PCT corresponds to a bounding estimate of the 95th percentile at the 95-percent confidence level. Figure 15.4-41a shows the predicted HOTSPOT cladding temperature transient at the PCT location for the limiting PCT case. The HOTSPOT PCT plot includes local uncertainties applied to the Hot Rod. Figure 15.4-41b presents the W COBRA/TRAC PCT transient predicted for the limiting PCT case. This figure does not account for any local CONDITION IV - LIMITING FAULTS 15.4-11WATTS BARWBNP-107uncertainties. Since the resulting HOTSPOT PCT for the limiting case is 1552°F, the analysis confirms that 10 CFR 50.46 acceptance criterion (b)(1), i.e., "Peak Clad Temperature less than 2200°F, is demonstrated. The results are shown in Table 15.4-18b.(b)(2) The maximum cladding oxidation corresponds to a bounding estimate of the 95th percentile MLO at the 95-percent confidence level. Since the resulting MLO for the limiting case is 1.04 percent, the analysis confirms that 10 CFR 50.46 acceptance criterion (b)(2), i.e., "Maximum Local Oxidation of the cladding less than 17 percent", is demonstrated. The results are shown in Table 15.4-18b.(b)(3) The limiting core-wide oxidation corresponds to a bounding estimate of the 95th percentile CWO at the 95-percent confidence level. The limiting Hot Assembly Rod (HAR) total maximum oxidation is 0.0 percent. A detailed CWO calculation takes advantage of the core power census that includes many lower power assemblies. Because there is significant margin to the regulatory limit, the CWO value can be conservatively chosen as that calculated for the limiting HAR. A detailed CWO calculation is therefore not needed because the outcome will always be less than the HAR value. Since the resulting CWO is 0.0 percent, the analysis confirms that 10 CFR 50.46 acceptance criterion (b)(3), i.e., "Core Wide Oxidation less than 1 percent", is demonstrated.(b)(4) 10 CFR 50.46 acceptance criterion (b)(4) requires that the calculated changes in core geometry are such that the core remains amenable to cooling. This criterion has historically been satisfied by adherence to criteria (b)(1) and (b)(2), and by assuring that the fuel deformation due to combined LOCA and seismic loads is specifically addressed. It has been demonstrated that the PCT and maximum cladding oxidation limits remain in effect for Best-Estimate LOCA applications. The approved methodology (WCAP-12945-P-A
[46]) specifies that effects of LOCA and seismic loads on core geometry do not need to be considered unless grid crushing extends beyond the 44 assemblies in the low-power channel. This situation has not been calculated to occur for Watts Bar Unit 2. Therefore, acceptance criterion (b)(4) is satisfied.(b)(5) 10 CFR 50.46 acceptance criterion (b)(5) requires that the long-term core cooling be provided following the successful initial operation of the ECCS. Long-term cooling is dependent on the demonstration of continued delivery of cooling water to the core. While WCOBRA/TRAC is typically not run past full core quench, all base calculations are run well past PCT turnaround and past the point where increasing vessel inventories are calculated. The 15.4-12CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107conditions at the end of the WCOBRA/TRAC calculations indicate that the transition to long term cooling is underway even before the entire core is quenched.Based on the ASTRUM Analysis results (Table 15.4-18b), it is concluded that Watts Bar Unit 2 maintains a margin of safety to the limits prescribed by 10 CFR 50.46.15.4.1.1.7 PLANT OPERATING RANGEThe expected PCT and its uncertainty developed are valid for a range of plant operating conditions. The range of variation of the operating parameters has been accounted for in the uncertainty evaluation. Tables 15.4-19 summarizes the operating ranges as defined for the proposed operating conditions which are supported by the Best-Estimate LBLOCA analysis for Watts Bar Unit 2. Tables 15.4-14 and 15.4-15 summarize the LBLOCA containment data used for calculating containment pressure. If operation is maintained within these ranges, the LBLOCA results developed in this report using WCOBRA/TRAC are considered to be valid. Note that some of these parameters vary over their range during normal operation (accumulator temperature) and other ranges are fixed for a given operational condition (Tavg).
15.4.1.2 Hydrogen Produc tion and AccumulationPursuant to NRC final rule as defined in 10 CFR 50.44 and Regulatory Guide 1.7, the new definition of design-basis LOCA hydrogen release eliminates requirements for hydrogen control systems for mitigation of releases. "All PWRs with ice condenser type containments must have the capability to control combustible gas generated from metal-water reaction involving 75% of the fuel cladding surrounding the active fuel region (excluding the cladding surrounding the plenum volume) so that there is no loss of containment structural integrity. The deliberate ignition systems provided to meet this existing combustible gas source term are capable of safely accommodating even greater amounts of combustible gas associated with even more severe core melt sequences that fail the reactor vessel and involve molten core-concrete interaction.
Deliberate ignition systems, if available, generally consume the combustible gas before it reaches concentrations that can be detrimental to containment integrity." On the basis of this definition, no further analysis is required to support events considered to be outside the design basis. Deliberate ignition systems are described in FSAR Section 6.2.5 15.4.2 Major Secondary System Pipe Rupture15.4.2.1 Major Rupture of a Main Steam Line 15.4.2.1.1 Identification of Causes and Accident DescriptionThe steam release arising from a rupture of a main steam line would result in an initial increase in steam flow which decreases during the accident as the steam pressure falls. The energy removal from the reactor coolant system causes a reduction of coolant temperature and pressure. In the presence of a negative moderator temperature coefficient, the cooldown results in a reduction of core shutdown margin.
CONDITION IV - LIMITING FAULTS 15.4-13WATTS BARWBNP-107If the most reactive rod cluster control assembly (RCCA) is assumed stuck in its fully withdrawn position after reactor trip, there is an increased possibility that the core will become critical and return to power. A return to power following a steam line rupture is a potential problem mainly because of the high power peaking factors which exist, assuming the most reactive RCCA to be stuck in its fully withdrawn position. The core is ultimately shut down by the boric acid injection delivered by the safety injection system. The analysis of a main steam line rupture is performed to demonstrate that the following criterion is satisfied:Assuming a stuck RCCA with or without offsite power and assuming a single failure in the engineered safeguards, the core remains in place and intact. Radiation doses are not expected to exceed the guidelines of 10 CFR 100.Although DNB and possible clad perforation following a steam pipe rupture are not necessarily unacceptable, the following analysis, in fact, shows that no violation of the DNB design basis occurs for any rupture assuming the most reactive assembly stuck in its fully withdrawn position.The following functions provide the necessary protection for a steam line rupture:
(1)Safety injection system actuation from any of the following: (a)Two out of three low pressurizer pressure signals. (b)Two out of three high containment pressure signals.(c)Two out of three low steamline pressure signals in any steamline.
(2) The overpower reactor trips (neutron flux and T) and the reactor trip occurring in conjunction with receipt of the safety injection signal.
(3)Redundant isolation of the main feedwater lines: Sustained high feedwater flow would cause additional cooldown. A safety inje ction signal will rapidly close all feedwater control valves and main feedwater isolation valves, and trip the main feedwater pumps, condensate booster pumps, condensate demineralizer pump, and motor-operated standby feedwater pump if operating.
(4)Trip of the fast acting steam line stop valves (main steam isolation valves) (designed to close in less than 6 seconds) on: (a)Two out of four high-high containment pressure signals.(b)Two out of three low steamline pressure signals in any steamline.(c)Two out of three high negative steamline pressure rate signals in any steamline.
15.4-14CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Fast-acting isolation valves are provided in each steam line that will fully close within 6 seconds after a steamline isolation signal setpoint is reached. The time delay for actuation of the low steamline pressure safety injection actuation signal, high negative steamline pressure rate signal, high-high containment pressure signal, and manual block of the low steamline pressure safety injection actuation signal must be within 2 seconds after initiation. This, along with the main steam isolation time of approximately 6 seconds,shall not exceed a 8 second total response time for this action in the safety analysis for this event. For breaks downstream of the isolation valves, closure of all valves would completely terminate the blowdown. For any break, in any location, no more than one steam generator would blowdown even if one of the isolation valves fails to close. A description of steam line isolation is included in Chapter 10.Steam flow is measured by monitoring dynamic head in nozzles located in the throat of the steam generator. The effective throat area of the nozzles is 1.4 square feet, which is considerably less than the main steam pipe and thus the nozzles also serve to limit the maximum steam flow for a break at any location.Table 15.4-6 lists the equipment required in the recovery from a high energy line rupture. Not all equipment is required for any one particular break, since it will vary depending upon postulated break location and details of initial conditions. Design criteria and methods of protection of safety related equipment from the dynamic effects of postulated piping ruptures are provided in Section 3.6.15.4.2.1.2 Analysis of Effects and ConsequencesMethod of AnalysisThe analysis of the steam pipe rupture has been performed to determine:
(1)The core heat flux and reactor coolant system temperature and pressure resulting from the cooldown following the steam line break. The
LOFTRAN[11] Code has been used.
(2)The thermal and hydraulic behavior of the core following a steam line break. A detailed thermal and hydraulic digital computer code, VIPRE-01[30], has been used to determine if the calculated DNBR occurs for the core conditions computed in Item 1 above.The following conditions were assumed to exist at the time of a main steam line break accident.(1)End-of-life shut down margin at no load, equilibrium xenon conditions, and the most reactive RCCA stuck in its fully withdrawn position. Operation of the control rod banks during core burnup is restricted in such a way that addition of positive reactivity in a steam line break accident will not lead to a more adverse condition than the case analyzed.
CONDITION IV - LIMITING FAULTS 15.4-15WATTS BARWBNP-107 (2)The negative moderator coefficient corresponding to the end-of-life rodded core with the most reactive RCCA in the fully withdrawn position: The variation of the coefficient with temperature and pressure has been included. The k eff versus temperature at 1110 psi corresponding to the negative moderator temperature coefficient used is shown in Figure 15.2-40. The effect of power generation in the core on overall reactivity is shown in Figure 15.4-9. The parameters used to determine the radioactivity releases for the steamline break are given in Table 15.5-16.The core properties associated with the sector nearest the affected steam generator and those associated with the remaining sector were conservatively combined to obtain average core properties for reactivity feedback calculations. Further, it was conservatively assumed that the core power distribution was uniform. These two conditions cause underprediction of the reactivity feedback in the high power region near the stuck rod. To verify the conservatism of this method, the reactivity as well as the power distribution was checked for the statepoints shown on Table 15.4-7. These core analyses considered the Doppler reactivity from the high fuel temperature near the stuck RCCA, moderator feedback from the high water enthalpy near the stuck RCCA, power redistribution and non-uniform core inlet temperature effects. For cases in which steam generation occurs in the high flux regions of the core, the effect of void formation was also included. It was determined that the reactivity employed in the kinetics analysis was always larger than the reactivity calculated including the above local effects for all statepoints. The limiting statepoint is presented in Table 15.4-7. These results verified conservatism, i.e., underproduction of negative reactivity feedback from power generation.
(3)Minimum capability for injection of concentrated boric acid which is bounding for higher boric acid solution corresponding to the most restrictive single failure in the safety injection system. The emergency core cooling system consists of three systems: 1) the passive accumulators (at 1900 ppm), 2) the residual heat removal system, and 3) the safety injection system (at 2000 ppm).The actual modeling of the safety injection system in LOFTRAN is described in Reference [11] and reflects injection as a function of RCS pressure versus flow including RCP seal injection, excluding centrifugal charging pump miniflow, and with no spilling lines. This injection analysis result is bounded when using the minimum composite pump curve (degraded by 5% of design head) as shown in Figure 6.3-4. This corresponds to the flow delivered by one charging pump and one safety injection pump delivering its full flow to the cold leg header. No credit has been taken for the low concentration borated water, which must be swept from the lines downstream of the RWST prior to the delivery of concentrated boric acid to the reactor coolant loops.For the cases where offsite power is assumed, the sequence of events in the safety injection system is the following. After the generation of the safety 15.4-16CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107injection signal (appropriate delays for instrumentation, logic, and signal transport included), the appropriate valves begin to operate and the high head safety injection pump starts. In 27 seconds, the valves are assumed to be in their final position and the pump is assumed to be at full speed. The volume containing the low concentration borated water is swept, of course, before the 2000 ppm (which is bounding for higher boric acid concentrations) reaches the core. This delay, described above is inherently included in the
modeling.In cases where offsite power is not available, a 10-second delay is assumed to start the diesels and then begin loading the necessary safety injection equipment sequentially onto them.This assumption results in additional conservatism in the analysis, which adds the 10 seconds to the 27 seconds assumed for valve alignment in the offsite power available case for a total of 37 seconds.
(4)Design value of the steam generator heat transfer coefficient including allowance for fouling factor.
(5)Since the steam generators are provided with integral flow restrictors with a 1.4 square foot throat area, any rupture with a break area greater than 1.4 square feet, regardless of location would have the same effect on the Nuclear Steam Supply System (NSSS) as the 1.4 square foot break. The following cases have been considered in determining the core power and reactor coolant system transients: (a)Complete severance of a pipe, with the plant initially at no load conditions, full reactor coolant flow with offsite power available.(b)Case a above with loss of offsite power. Loss of offsite power results in coolant pump coastdown.
(6)Power peaking factors corresponding to one stuck RCCA and nonuniform core inlet coolant temperatures are determined at end of core life. The coldest core inlet temperatures are assumed to occur in the sector with the stuck rod. The power peaking factors account for the effect of the local void in the region of the stuck control assembly-during the return to power phase following the steam line break.The limiting statepoints for the two cases are presented in Table 15.4-7.
Both the cases above assume initial hot shutdown conditions at time zero since this represents the most limiting initial condition. Should the reactor be just critical or operating at power at the time of a steam line break, the reactor will be tripped by the normal overpower protection system when power level reaches a trip point. Following a trip at power the reactor coolant system contains more stored energy than at no load, the average coolant temperature is higher than at no load and there is appreciable energy stored CONDITION IV - LIMITING FAULTS 15.4-17WATTS BARWBNP-107in the fuel. Thus, the additional stored energy is removed via the cooldown caused by the steam line break before the no load conditions of RCS temperature and shutdown margin assumed in the analyses are reached. After the additional stored energy has been removed, the cooldown and reactivity insertions proceed in the same manner as in the analysis which assumes no load condition at time zero.However, since the initial steam generator water inventory is greatest at no load, the magnitude and duration of the RCS cooldown are greater for steam line breaks occurring from no load conditions.
(7)In computing the steam flow during a steam line break, the Moody Curve
[9] for fl/D = 0 is used.
(8)A steam generator tube plugging level of 10% is assumed.
(9)A thermal design flowrate of 372,400 gpm is used which accounts for the 10% steam generator tube plugging level and instrumentation uncertainty.ResultsThe results presented are a conservative indication of the events which would occur assuming a steam line rupture since it is postulated that all of the conditions described above occur simultaneously.Core Power and RCS TransientFigures 15.4-11a through 15.4-11c show the RCS transient and core response following a main steam line rupture (complete severance of a pipe) at initial no load condition (Case a). Offsite power is assumed available so that full reactor coolant flow exists. The transient shown assumes an uncontrolled steam release from only one steam generator. Should the core be critical at near zero power when the rupture occurs the initiation of safety injection by low steamline pressure will trip the reactor. Steam release from more than one steam generator will be prevented by automatic trip of the fast acting isolation valves in the steam lines by high-high containment pressure or low steam line pressure signals. Even with the failure of one valve, release is limited by isolation valve closure for the other steam generators while the one generator blows down. The main steamline isolation valves are designed to be fully closed in less than 6 seconds from receipt of a closure signal.As shown in Figure 15.4-11a the core attains criticality with the RCCAs inserted (with the design shutdown assuming one stuck RCCA) shortly after boron solution at 2000 ppm (which is bounding for higher boric acid concentrations) enters the reactor coolant system. A peak core power less than the nominal full power value is attained.The calculation assumes the boric acid is mixed with, and diluted by the water flowing in the reactor coolant system prior to entering the reactor core. The concentration after mixing depends upon the relative flow rates in the reactor coolant system and in the safety injection system. The variation of mass flow rate in the reactor coolant system due to water density changes is included in the calculation as is the variation of flow 15.4-18CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107rate in the safety injection system due to changes in the reactor coolant system pressure. The safety injection system flow calculation includes the line losses in the system as well as the pump head curve.It should be noted that the safety injection accumulators are actuated in Case (a) due to low RCS pressure (Figure 15.4-11b). Once the accumulators actuate, 2400 ppm boron is delivered to the core and the transient is terminated before a significant return to power is achieved. Once the transient is terminated and the plant is stabilized, emergency operating procedures may be followed to recover from the MSLB event. Figures 15.4-12a through 15.4-12c show the responses of the salient parameters for Case b which corresponds to the case discussed above with additional loss of offsite power at the time the safety injection signal is generated. The injection of borated water is conservatively delayed to 37 seconds based on the assumed 10 second diesel generator delay time plus the 27 seconds associated with the valve lineup for the offsite power available case (Case a). In this case criticality is achieved later and the core power increase is slower than in the similar case with offsite power available. The ability of the emptying steam generator to extract heat from the reactor coolant system is reduced by the decreased flow in the reactor coolant system. For both these cases the peak power remains well below the nominal full power value.Unlike Case a, Case b does not result in the actuation of the safety injection accumulators. Therefore, due to the fact that less boric acid solution is delivered to the core, Case b results in a more limiting return to power than Case a.It should be noted that following a steam line break only one steam generator blows down completely. Thus, the remaining steam generators are still available for dissipation of decay heat after the initial transient is over. In the case of loss of offsite power this heat is removed to the atmosphere via the steam line safety valves.Following blowdown of the faulted steam generator, the plant can be brought to a stabilized hot standby condition through control of auxiliary feedwater flow and safety injection flow as described by plant operating procedures. The operating procedures call for operator action to limit RCS pressure and pressurizer level by terminating safety injection flow, and to control steam generator level and RCS coolant temperature using the auxiliary feedwater system. Any action required of the operator to maintain the plant in a stabilized condition is in a time frame in excess of ten minutes following safety injection actuation.Margin to Critical Heat Flux A DNB analysis was performed for the limiting case. The limiting statepoints are presented in Table 15.4-7. It was found that all cases had a minimum DNBR greater than the limit value. 15.4.2.1.3 ConclusionsThe analysis shows that the criteria stated earlier in this section are satisfied. In addition, the pressure differential across the steam generator tubes that has been CONDITION IV - LIMITING FAULTS 15.4-19WATTS BARWBNP-107calculated for a postulated main feedwater line break is more limiting (i.e., dictates a minimum tube wall thickness) than the pressure differential for a postulated main steam line break. Therefore, steam generator tube rupture is not expected to occur (see Section 4.19.7.6 of Reference [34]).Although DNB and possible clad perforation following a steam pipe rupture are not necessarily unacceptable and not precluded in the criterion, the above analysis, in fact, shows that no violation of the DNB design basis occurs for any rupture assuming the most reactive RCCA stuck in its fully withdrawn position.If it is assumed that there is leakage from the reactor coolant system to the secondary system in the steam generators and that offsite power is lost following the steam line break, radioactivity will be released to the atmosphere through the relief or safety valves. Environmental consequences of a postulated steam line break are addressed in Section 15.5.4.15.4.2.2 Major Rupture of a Main Feedwater Pipe 15.4.2.2.1 Identification of Causes and Accident DescriptionA major feedwater line rupture is defined as a break in a feedwater pipe large enough to prevent the addition of sufficient feedwater to the steam generators to maintain shell-side fluid inventory in the steam generators. If the break is postulated in a feedline between the check valve and the steam generator, fluid from the steam generator may also be discharged through the break. Further, a break in this location could preclude the subsequent addition of auxiliary feedwater to the affected steam generator. (A break upstream of the feedline check valve would affect the nuclear steam supply system only as a loss of normal feedwater.)Depending upon the size of the break and the plant operating conditions at the time of the break, the break could cause either a reactor coolant system cooldown (by excessive energy discharge through the break), or a reactor coolant system heatup.
Potential reactor coolant system cooldown resulting from a secondary pipe rupture is evaluated in Section 15.4.2.1. Therefore, only the reactor coolant system heatup effects are evaluated for a feedline rupture.A feedline rupture reduces the ability to remove heat generated by the core from the reactor coolant system because of the following reasons:
(1)Feedwater to the steam generators is reduced. Since feedwater is subcooled, its loss may cause reactor coolant temperatures to increase prior to reactor trip.
(2)Liquid in the steam generator may be discharged through the break, and would then not be available for decay heat removal after trip.
(3)The break may be large enough to prevent the addition of any main feedwater after trip.
15.4-20CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107An auxiliary feedwater system is provided to assure that adequate feedwater is available such that:
(1)No substantial overpressurization of the reactor coolant system occurs; and (2)Liquid in the reactor coolant system is sufficient to cover the reactor core at all times.The following provides the necessary protection for a main feedwater rupture:
(1)A reactor trip on any of the following conditions: (a)High pressurizer pressure (b)Overtemperature T (c)Low-low steam generator water level in one or more steam generators (d)Safety injection signals from any of the following:(i)Low steamline pressure (ii)Low pressurizer pressure (iii)High containment pressure (2) An auxiliary feedwater system to provide an assured source of feedwater to the steam generators for decay heat removal.15.4.2.2.2 Analysis of Effects and ConsequencesThe discussion of the analysis for a main feedwater break inside primary containment presented below is based on a reactor trip generated by steam generator low-low water level. Evaluations that were performed using the MONSTER
[37] Code show a high containment pressure signal is generated in less than 1.0 second. In the analysis presented below, steam generator level decreases to its trip setpoint in 37.1 seconds.
Thus, the following analysis is conservative and is being retained although containment pressure is the signal that will actually be used to generate a reactor trip for this event.Method of AnalysisA detailed analysis using the LOFTRAN
[11] Code is performed in order to determine the plant transient following a feedline rupture. The code describes the plant thermal kinetics, reactor coolant system including natural circulation, pressurizer, steam generators and feedwater system, and computes pertinent variables including the pressurizer pressure, pressurizer water level, and reactor coolant average temperature.Two cases are analyzed. One case assumes that offsite electrical power is maintained throughout the transient. Another case assumes the loss of offsite electrical power at CONDITION IV - LIMITING FAULTS 15.4-21WATTS BARWBNP-107the time of reactor trip, and RCS flow decreases to natural circulation. Both cases assume a double-ended rupture of the largest feedwater pipe at full power. Major assumptions used in the analysis are as follows:
(1)The plant is initially operating at full power including applicable uncertainty.
(2)Initial reactor coolant average temperature is 6.0°F above the nominal value (bounds an instrument uncertainty of +/-5°F and instrument bias of -1°F), and the initial pressurizer pressure is 50 psi below its nominal value (bounds an instrument uncertainty of +/- 50 psi and instrument bias of -20 psi).
(3)The pressurizer power-operated relief valves and the safety relief valves are assumed to function. No credit is taken for pressurizer spray. Initial pressurizer level is at the nominal programmed value plus 8% uncertainty.
(4)No credit is taken for the following potential protection logic signals to mitigate the consequences of the accident: High pressurizer pressure Overtemperature T High pressurizer level High containment pressure (For breaks outside containment)
(5)Main feedwater to all steam generators is assumed to stop at the time the break occurs (all main feedwater spills out through the break).
(6)The initial blowdown quality from the affected steam generator is assumed to be 15% due to effects as the inventory passes back through the preheater.
At the time of reactor trip, the frothing and oscillations within the steam generator are reduced and saturated liquid (0% quality) is blown out the break until all the liquid is gone. Subsequent blowdown, prior to the time of steamline isolation, is assumed to be saturated liquid (100% quality).
(7)No credit is taken for the low-low water level trip on the affected steam generator until the steam generator level reaches 0% of the narrow range span. This assumption minimizes the steam generator fluid inventory at the time of trip, and thereby maximizes the resultant heatup of the reactor coolant.(8)A double-ended break area of 0.223 ft 2 is assumed.
(9)No credit is taken for heat energy deposited in reactor coolant system metal during the RCS heatup.
(10)No credit is taken for charging or letdown.
15.4-22CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107 (11)Steam generator heat transfer area is assumed to decrease as the shellside liquid inventory decreases.
(12)The core residual heat generation is based on the 1979 version of ANS 5.1 [Ref. 33] based upon long term operation at the initial power level. The decay of U-238 capture products is included as an integral part of this expression.
(13)The auxiliary feedwater is actuated by the low-low steam generator water level signal.The analysis addresses either TDAFWP failure with and without offsite power or MDAFWP failure with and without offsite power. The assumptions for the limiting case (MDAFWP) failure) are as follows:a. The motor driven pump which feeds two intact steam generators is assumed to fail.b. After steamline isolation, all flow from all pumps is initially assumed "lost" to the faulted steam generator. After the faulted steam generator pressure drops below 360 psig, a valve automatically restricts MD pump flow to the faulted steam generator, thus allowing some delivery (assumed to be 60 gpm) to an intact loop.c. Operator action to isolate the affected steam generator is assumed to occur no later than 12 minutes from the time of the first low steam generator level signal. d. After isolation of the faulted steam generator, the TDAFWP supplies flow to the 3 remaining steam generators while the operating MD pump supplies flow to 1 steam generator.A 60 second delay was assumed following the low-low steam generator water level signal to allow time for startup of the emergency diesel generators and the auxiliary feedwater pumps.
Results Figures 15.4-13a, 15.4-13b, and 15.4-13c show the calculated plant parameters following a feedline rupture for the case with offsite power. Figures 15.4-14a, 15.4-14b, and 15.4-14c show the calculated plant parameters following a feedline rupture with loss of offsite power. The calculated sequence of events for both cases analyzed is presented in Table 15.4-9.The system response following the feedwater line rupture is similar for both cases analyzed. Results presented in the figures show that pressures in the RCS and main steam system remain below 110% of the respective design pressures. Pressurizer pressure increases until reactor trip occurs on low-low steam generator water level. Pressure then decreases, due to the loss of heat input, until steamline isolation occurs.
Coolant expansion occurs due to reduced heat transfer capability in the steam CONDITION IV - LIMITING FAULTS 15.4-23WATTS BARWBNP-107generators. The pressurizer relief valves open to maintain primary pressure at an acceptable value. The calculated relief rates are within the relief capacity of the pressurizer relief valves. Addition of the safety injection flow aids in cooling down the primary side and helps to ensure that sufficient fluid exists to keep the core covered with water.The reactor core remains covered with water throughout the transient and the auxiliary feedwater system flow capacity is sufficient to preclude bulk boiling in the RCS throughout the transient.15.4.2.2.3 ConclusionsResults of the analysis show that for the postulated feedline rupture, the assumed auxiliary feedwater system capacity is adequate to remove decay heat, to prevent overpressurizing the reactor coolant system, and to prevent the water level in the RCS from dropping to the top of the core.
15.4.3 Steam Gene rator Tube Rupture 15.4.3.1 Identification of Ca uses and Accident DescriptionThe accident examined is the complete severance of a single steam generator tube. The accident is assumed to take place at power with the reactor coolant contaminated with fission products corresponding to continuous operation with a limited amount of defective fuel rods. The accident leads to an increase in contamination of the secondary system due to transfer of radioactive coolant from the reactor coolant system. In the event of a coincident loss of offsite power, or failure of the condenser dump system, discharge of radioactivity to the atmosphere takes place via the steam generator power-operated relief valves (and safety valves if their setpoint is reached).The steam generator tube material is Inconel-600 and is a highly ductile material; thus, it is considered that the assumption of a complete severance of a tube is somewhat conservative. The more probable mode of tube failure would be one or more minor leaks of undetermined origin. Activity in the steam and power conversion system is subject to continual surveillance and an accumulation of minor leaks which exceed the limits established in the Technical Specifications is not permitted during the unit operation.The operator is expected to readily determine that a steam generator tube rupture (SGTR) has occurred, identify and isolate the faulty steam generator on a restricted time scale in order to complete the required recovery actions to stabilize the plant, minimize contamination of the secondary system, and ensure termination of radioactive release to the atmosphere from the faulty unit. The recovery procedure can be carried out on a time scale which ensures that break flow to the secondary system is terminated before water level in the affected steam generator rises into the main steam pipe. Sufficient indications and controls are provided to enable the operator to carry out these functions satisfactorily.
15.4-24CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Assuming normal operation of the various plant control systems, the following sequence of events is initiated by a tube rupture:
(1)Pressurizer low pressure and low level alarms are actuated and charging pump flow increases in an attempt to maintain pressurizer level. On the secondary side there is a steam flow/feedwater flow mismatch alarm as feedwater flow to the affected steam generator is reduced due to the additional break flow which is now being supplied to that steam generator from the primary side.
(2)Continued loss of reactor coolant inventory leads to a reactor trip signal generated by low pressurizer pressure or by overtemperature T. Resultant plant cooldown following reactor trip leads to a rapid change of pressurizer level, and the safety injection signal, initiated by low-low pressurizer pressure, follows soon after the reactor trip. The safety injection signal automatically terminates normal feedwater supply and initiates auxiliary feedwater addition.
(3)The steam generator blowdown liquid monitor, the condenser vacuum exhaust radiation monitor and/or main steamline radiation monitor will alarm, indicating a sharp increase in radioactivity in the secondary system. The steam generator blowdown liquid monitor will automatically terminate steam generator blowdown to the cooling tower and divert flow to the condensate
demineralizer.
(4)The reactor trip automatically trips the turbine and if offsite power is available the steam dump valves open permitting steam dump to the condenser. In the event of a coincident station blackout, the steam dump valves would automatically close to protect the condenser. The steam generator pressure would rapidly increase resulting in steam discharge to the atmosphere through the steam generator power operated relief valves (and safety valves if their setpoint is reached).
(5)Following reactor trip, the continued action of auxiliary feedwater supply and borated safety injection flow (supplied from the refueling water storage tank) provide a heat sink which absorbs some of the decay heat. This reduces the amount of steam bypass to the condenser, or in the case of loss of offsite power, steam relief to atmosphere.
(6)Safety injection flow results in increasing RCS pressure and pressurizer water level, and the RCS pressure trends toward an equilibrium value where the safety injection flow rate equals the break flow rate.In the event of an SGTR, the plant operators must diagnose the event and perform the required recovery actions to stabilize the plant and terminate the primary to secondary break flow. The operator actions for SGTR recovery are provided in the plant Emergency Operating Procedures.Operator actions are described below.
CONDITION IV - LIMITING FAULTS 15.4-25WATTS BARWBNP-107 (1)Identify the ruptured steam generator.High secondary side activity, as indicated by the condenser vacuum exhaust radiation monitor, steam generator blowdown liquid monitor, or main steam line radiation monitor, typically will provide the first indication of an SGTR event. The ruptured steam generator can be identified by an unexpected increase in steam generator narrow range level, a RADCONradiation protection survey, or a chemistry laboratory sample. For an SGTR that results in a reactor trip at high power, the steam generator water level as indicated on the narrow range scale will decrease significantly for all of the steam generators. The auxiliary feedwater flow will begin to refill the steam generators, distributing flow to each of the steam generators. Since primary to secondary break flow adds additional liquid inventory to the ruptured steam generator, the water level will increase more rapidly than normally expected in that steam generator. This response, as displayed by the steam generator water level instrumentation, provides confirmation of an SGTR event and also identifies the ruptured steam generator.
(2)Isolate the ruptured steam generator from the intact steam generators and isolate feedwater to the ruptured steam generator.Once the steam generator with a tube rupture has been identified, recovery actions begin by isolating steam flow from and stopping feedwater flow to the ruptured steam generator. In addition to minimizing radiological releases, this also reduces the possibility of overfilling the ruptured steam generator with water by l) minimizing the accumulation of feedwater flow and 2) enabling the operator to establish a pressure differential between the ruptured and intact steam generators as a necessary step toward terminating primary to secondary break flow.
(3)Cool down the RCS using the intact steam generators.After isolation of the ruptured steam generator, the RCS is cooled as rapidly as possible to less than the saturation temperature corresponding to the ruptured steam generator pressure by dumping steam from only the intact steam generators. This ensures adequate subcooling will exist in the RCS after depressurization of the RCS to the ruptured steam generator pressure in subsequent actions. If offsite power is available, the normal steam dump system to the condenser can be used to perform this cooldown. However, if offsite power is lost, the RCS is cooled using the steam generator power operated relief valves to release steam from the intact steam generators.
(4)Depressurize the RCS to restore reactor coolant inventory.When the cooldown is completed, safety injection flow will increase RCS pressure until break flow matches safety injection flow. Consequently, safety injection flow must be terminated to stop primary to secondary break flow. However, adequate reactor coolant inventory must first be assured. This includes both sufficient reactor coolant subcooling and pressurizer inventory 15.4-26CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107to maintain a reliable pressurizer level indication after safety injection flow is stopped. Since break flow from the primary side will continue after safety injection flow is stopped until RCS and ruptured steam generator pressures equalize, an "excess" amount of inventory is needed to ensure pressurizer level remains on span. The "excess" amount required depends on RCS pressure and reduces to zero when RCS pressure equals the pressure in the ruptured steam generator.The RCS depressurization is performed using normal pressurizer spray if the RCPs are running. However, if offsite power is lost or the RCPs are not running for some other reason, normal pressurizer spray is not available. In this event, RCS depressurization can be performed using the pressurizer power operated relief valve or auxiliary pressurizer spray.
(5)Terminate safety injection to stop primary to secondary break flow.The previous actions will have established adequate RCS subcooling, a secondary side heat sink, and sufficient reactor coolant inventory to ensure that safety injection flow is no longer needed. When these actions have been completed, safety injection flow must be stopped to terminate primary to secondary break flow. Primary to secondary break flow will continue after safety injection flow is stopped until RCS and ruptured steam generator pressures equalize. Charging flow, letdown, and pressurizer heaters will then be controlled to prevent repressurization of the RCS and reinitiation of break flow into the ruptured steam generator.Following safety injection termination, t he plant conditions will be stabilized, the primary to secondary break flow will be terminated, and all immediate safety concerns will have been addressed. At this time a series of operator actions are performed to prepare the plant for cooldown to cold shutdown conditions. Subsequently, actions are performed to cooldown and depressurize the RCS to cold shutdown conditions and to depressurize the ruptured steam generator.
15.4.3.2 Analysis of Effects and ConsequencesAn SGTR results in the transfer of contaminated reactor coolant into the secondary system and subsequent release of a portion of the activity to the atmosphere. Therefore, an analysis must be performed to assure that the offsite radiological consequences resulting from an SGTR are within the allowable guidelines. One of the major concerns for an SGTR is the possibility of steam generator overfill since this could potentially result in a significant increase in the offsite radiological consequences. Therefore, an analysis was performed to demonstrate margin to steam generator overfill, assuming the limiting single failure relative to overfill. The results of this analysis demonstrated that there is margin to steam generator overfill for a design basis SGTR for Watts Bar Units 1 and 2. A thermal and hydraulic analysis was also performed to determine the input for the offsite radiological consequences analysis, assuming the limiting single failure relative to offsite doses without steam generator overfill. Since steam generator overfill does not occur, the results of this analysis represent the limiting case for the analysis of the radiological consequences for an CONDITION IV - LIMITING FAULTS 15.4-27WATTS BARWBNP-107SGTR for Watts Bar. The results of the thermal and hydraulic analysis for the offsite radiological consequences analysis are discussed as follows.Thermal and Hydraulic AnalysisA thermal and hydraulic analysis has been performed to determine the plant response for a design basis SGTR, and to determine the integrated primary to secondary break flow and the mass releases from the ruptured and intact steam generators to the condenser and to the atmosphere. This information has been used to calculate the quantity of radioactivity released to the environment and the resulting radiological consequences.The plant response following an SGTR was analyzed with the LOFTTR2 program until the primary to secondary break flow is terminated. The reactor protection system and the automatic actuation of the engineered safeguards systems were modeled in the analysis. The major operator actions which are required to terminate the break flow for an SGTR were also simulated in the analysis.Analysis AssumptionsThe accident modeled is a double-ended break of one steam generator tube located at the top of the tube sheet on the outlet (cold leg) side of the steam generator. The time of reactor trip was calculated by modeling the Watts Bar Unit 2 reactor protection system. It was assumed that the reactor is operating at full power at the time of the accident and the initial secondary mass was assumed to correspond to operation at nominal steam generator mass, minus an allowance for uncertainties. It was also assumed that a loss of offsite power occurs at the time of reactor trip and the highest worth control assembly was assumed to be stuck in its fully withdrawn position at reactor trip.The limiting single failure was assumed to be the failure of the power operated relief valve on the ruptured steam generator. Failure of this valve in the open position will cause an uncontrolled depressurization of the ruptured steam generator which will increase primary to secondary break flow and the mass release to the atmosphere. It was assumed that the ruptured steam generator power operated relief valve fails open when the ruptured steam generator is isolated, and that the valve was subsequently isolated by locally closing the associated block valve.The major operator actions required for the recovery from an SGTR are discussed in Section 15.4.3.1 and these operator actions were simulated in the analysis. The operator action times which were used for the analysis are presented in Table 15.4-20. It is noted that the power operated relief valve on the ruptured steam generator was assumed to fail open at the time the ruptured steam generator was isolated. Before proceeding with the recovery operations, the failed open power operated relief valve was assumed to be isolated by locally closing the associated block valve. It was assumed that the ruptured steam generator power operated relief valve is isolated at 11.0 minutes after the valve was assumed to fail open. After the ruptured steam generator power operated relief valve was isolated, the additional delay time of 7.15 15.4-28CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107minutes (Table 15.4-20) was assumed for the operator action time to initiate the RCS cooldown.Transient DescriptionThe LOFTTR2 analysis results are described below. The sequence of events for this transient is presented in Table 15.4-21.Following the tube rupture, reactor coolant flows from the primary into the secondary side of the ruptured steam generator since the primary pressure is greater than the steam generator pressure. In response to this loss of reactor coolant, pressurizer level decreases as shown in Figure 15.4-97a. The RCS pressure also decreases as shown in Figure 15.4-97b as the steam bubble in the pressurizer expands. As the RCS pressure decreases due to the continued primary to secondary break flow, automatic reactor trip occurs at approximately 109 seconds on an overtemperature T trip signal.After reactor trip, core power rapidly decreases to decay heat levels. The turbine stop valves close and steam flow to the turbine is terminated. The steam dump system is designed to actuate following reactor trip to limit the increase in secondary pressure, but the steam dump valves remain closed due to the loss of condenser vacuum resulting from the assumed loss of offsite power at the time of reactor trip. Thus, the energy transfer from the primary system causes the secondary side pressure to increase rapidly after reactor trip until the steam generator power operated relief valves and (safety valves if their setpoints are reached) lift to dissipate the energy, as shown in Figure 15.4-97c. The loss of offsite power at reactor trip results in the termination of main feedwater and actuation of the auxiliary feedwater system. It was assumed that auxiliary feedwater flow is initiated to all steam generators at 60 seconds after reactor trip.The RCS pressure and pressurizer level decrease more rapidly after reactor trip as energy transfer to the secondary shrinks the reactor coolant and the leak flow continues to deplete primary inventory. The decrease in RCS inventory results in a low pressurizer pressure SI signal at approximately 155 seconds. After SI actuation, the RCS pressure and pressurizer level begin to increase and approach the equilibrium values where the safety injection flow rate equals the break flow rate.Since offsite power is assumed lost at reactor trip, the RCPs trip and a gradual transition to natural circulation flow occurs. Immediately following reactor trip the temperature differential across the core decreases as core power decays (see Figures 15.4-97d and 15.4-97e); however, the temperature differential subsequently increases as the reactor coolant pumps coast down and natural circulation flow develops. The cold leg temperatures trend toward the steam generator temperature as the fluid residence time in the tube region increases. The hot leg temperatures reach a peak and then slowly decrease as steady state conditions are reached until the ruptured steam generator is isolated and the power operated relief valve is assumed to fail open.
CONDITION IV - LIMITING FAULTS 15.4-29WATTS BARWBNP-107Major Operator Actions (1)Identify and Isolate the Ruptured Steam Generator The ruptured steam generator is assumed to be isolated at either 15 minutes after initiation of the SGTR or when the narrow range level reaches 30%, whichever time is greater. Since the time to reach 30% narrow range is less than 15 minutes, it was assumed that the ruptured steam generator is isolated at 15 minutes. The failure causes the ruptured steam generator to rapidly depressurize as shown in Figure 15.4-97c which results in an increase in primary to secondary break flow. The depressurization of the ruptured steam generator increases the break flow and energy transfer from primary to secondary which results in a decrease in the ruptured loop temperatures as shown in Figure 15.4-97e. The intact steam generator loop temperatures also slowly decrease, as shown in Figure 15.4-97d until the RCS cooldown is initiated. The shrinkage of the reactor coolant due to the decrease in the RCS temperatures results in a decrease in the pressurizer level and RCS pressure as shown in Figures 15.4-97a and 15.4-97b. When the depressurization of the ruptured steam generator is terminated, the pressure begins to increase as shown in Figure 15.4-97c.
(2)Cool Down the RCS to es tablish Subcooling MarginAfter the block valve for the ruptured steam generator power operated relief valve is closed, there is a 7.15 minute operator action time assumed prior to initiation of cooldown. The depressurization of the ruptured steam generator due to the failed-open power operated relief valve affects the RCS cooldown target temperature since it is determined based on the pressure at that time.
Since offsite power is lost, the RCS is cooled by dumping steam to the atmosphere using the intact steam generator power operated relief valves. The cooldown is continued until RCS subcooling at the ruptured steam generator pressure is 65 °F plus an allowance for instrument uncertainty. Because of the lower pressure in the ruptured steam generator when the cooldown is initiated, the associated temperature the RCS must be cooled to is also lower which has the net effect of extending the time required for cooldown.The reduction in the intact steam generator pressures required to accomplish the cooldown is shown in Figure 15.4-97c, and the effect of the cooldown on the RCS temperature is shown in Figure 15.4-97d. The pressurizer level and RCS pressure also decrease during this cooldown process due to shrinkage of the reactor coolant, as shown in Figures 15-4-97a and 15.4-97b.
(3)Depressurize RCS to Restore InventoryAfter the RCS cooldown, a 2.45 minute operator action time is assumed prior to the RCS depressurization. The RCS is depressurized to assure adequate coolant inventory prior to terminating safety injection flow. With the RCPs stopped, normal pressurizer spray is not available and the RCS is 15.4-30CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107depressurized by opening a pressurizer power operated relief valve. The depressurization is initiated and continued until the criteria in the emergency operating procedures are satisfied. The RCS depressurization reduces the break flow as shown in Figure 15.4-97g and increases safety injection flow to refill the pressurizer as shown in Figure 15.4-97a.
(4)Terminate SI to Stop Primary to Secondary Break FlowThe previous actions establish adequate RCS subcooling, a secondary side heat sink, and sufficient reactor coolant inventory to ensure that safety injection flow is no longer needed. When these actions have been completed, the safety injection flow must be stopped to prevent repressurization of the RCS and to terminate primary to secondary break flow. The safety injection flow is terminated at this time if the safety injection termination criteria in the emergency operating procedures are satisfied.After depressurization is completed, an operator action time of 4.07 minutes is assumed prior to initiation of safety injection termination. When termination requirements are satisfied, actions proceed to close off the safety injection flow path. After safety injection termination, the RCS pressure begins to decrease as shown in Figure 15.4-97b. The intact steam generator power operated relief valves are opened to dump steam to maintain the prescribed RCS temperature to ensure that subcooling is maintained. When the power operated relief valves are opened, the increased energy transfer from primary to secondary also aids in the depressurization of the RCS to the ruptured steam generator pressure. The differential pressure between the RCS and the ruptured steam generator is shown in Figure 15.4-97f. Figure 15.4-97g shows that the primary to secondary break flow continues after the safety injection flow is stopped until the RCS and ruptured steam generator pressures equalize.The ruptured steam generator water volume for the transient is shown in Figure 15.4-97h. The mass of water in the ruptured steam generator is also shown as a function of time in Figure 15.4-97i.Mass ReleasesThe mass releases are determined for use in evaluating the site boundary and low population zone radiation exposure. The steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and primary to secondary break flow into the ruptured steam generator are determined for the period from accident initiation until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after the accident and from 2 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after the accident. The releases for 0-2 hours are used to calculate the radiation doses at the site boundary for a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> exposure, and the releases for 0-8 hours are used to calculate the radiation doses at the low population zone for the duration of the
accident.The operator actions for the SGTR recovery up to the termination of primary to secondary break flow are simulated in the LOFTTR2 analysis. Thus, the steam CONDITION IV - LIMITING FAULTS 15.4-31WATTS BARWBNP-107releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and the primary to secondary break flow into the ruptured steam generator are determined from the LOFTTR2 results for the period from the initiation of the accident until the break flow is terminated.Following the termination of break flow, actions are taken to cooldown the plant to cold shutdown conditions. The power operated relief valves for the intact steam generators can be used to cool down the RCS to the RHR system operating temperature of 375°F, at the maximum allowable cooldown rate of 100°F/hr. The steam releases and the feedwater flows for the intact steam generators for the period from break flow termination until two hours are then determined from a mass and energy balance using the calculated RCS and intact steam generator conditions at the time of break flow termination and at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The RCS cooldown is continued after 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> until the RHR system in-service temperature of 375 °F is reached. Depressurization of the ruptured steam generator can be performed to the RHR in-service pressure of 414.7 psia via steam release from the ruptured steam generator power operated relief valve. The RCS pressure is also reduced concurrently as the ruptured steam generator is depressurized. Therefore, the analysis assumes that the continuation of the RCS cooldown and depressurization to RHR operating conditions are completed within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after the accident since there is ample time to complete the operations during this time period. The steam releases and feedwater flows from 2 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> are then determined for the intact and ruptured steam generators from a mass and energy
balance using the conditions at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at the RHR system in-service conditions.After 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, plant cooldown to cold shutdown as well as long-term cooling can be provided by the RHR system. Therefore, the steam releases to the atmosphere are terminated after RHR cut-in, assumed to be reached at 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.For the time period from initiation of the accident until break flow termination, the releases are determined from the LOFTTR2 results for the time prior to reactor trip and following reactor trip. Since the condenser is in service until reactor trip, any radioactivity released to the atmosphere prior to reactor trip would be through the condenser vacuum exhaust. After reactor trip, the releases to the atmosphere are assumed to be via the steam generator power operated relief valves. The mass release rates to the atmosphere from the LOFTTR2 analysis are presented in Figure 15.4-97j and 15.4-97k for the ruptured and intact steam generators, respectively, for the time period until break flow termination. The mass releases calculated from the time of break flow termination until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and from 2-8 hours were also assumed to be released to the atmosphere via the steam generator power operated relief valves. The mass releases for the SGTR event for the 0-2 hour and 2-8 hour time intervals considered are presented in Table 15.4-22.In addition to the mass releases, information is developed for use in performing the offsite radiation dose analysis. The time dependent fraction of rupture flow that flashes to steam and is assumed to be immediately released to the environment is presented in Figure 15.4-97e. The break flow flashing fraction is conservatively calculated assuming that 100% of the break flow comes from the hot leg side of the steam generator, whereas the break flow actually comes from both the hot leg and cold leg 15.4-32CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107sides of the steam generator. The water above the steam generator tubes reduces the iodine content of the atmospheric release by scrubbing the steam bubbles as they rise from the rupture to the water surface. However, if partial tube uncovery were to occur, the increase in iodine release would be negligible. This result for tube uncovery is described in References [39] and [40]. Reference [41] provides NRC approval of References [39] and [40] and states that no further evaluation of steam generator tube uncovery is required.
15.4.3.3 ConclusionsA steam generator tube rupture will cause no subsequent damage to the reactor coolant system or the reactor core. An orderly recovery from the accident can be completed even assuming simultaneous loss of offsite power. The results of the thermal and hydraulic analysis are used to evaluate the environmental consequences of the postulated SGTR. The results of the environmental consequences analysis are presented in Section 15.5.5.15.4.4 Single Reactor Coolant Pump Locked Rotor 15.4.4.1 Identification of Ca uses and Accident DescriptionThe accident postulated is an instantaneous seizure of a reactor coolant pump rotor such as is discussed in Section 5.5.1.3.5.Flow through the affected reactor coolant loop is rapidly reduced, leading to initiation of a reactor trip on a low flow signal.Following initiation of the reactor trip heat stored in the fuel rods continues to be transferred to the coolant causing the coolant to expand. At the same time, heat transfer to the shell side of the steam generators is reduced, first because the reduced flow results in a decreased tube side film coefficient and then because the reactor coolant in the tubes cools down while the shell side temperature increases (turbine steam flow is reduced to zero upon plant trip). The rapid expansion of the coolant in the reactor core, combined with reduced heat transfer in the steam generators causes an insurge into the pressurizer and a pressure increase throughout the reactor coolant system. The insurge into the pressurizer compresses the steam volume, actuates the automatic spray system, opens the power-operated relief valves, and opens the pressurizer safety valves, in that sequence. The two power-operated relief valves are designed for reliable operation and would be expected to function properly during the accident. However, for conservatism, their pressure reducing effect as well as the pressure reducing effect of the spray is not included in the analysis.The consequences of a locked rotor are very similar to those of a pump shaft break. The initial rate of reduction of coolant flow is greater for the locked rotor event. However, with a failed shaft, the impeller could conceivably be free to spin in the reverse direction as opposed to being fixed in position as assumed for a locked rotor.
The effect of such reverse spinning is a slight decrease in the endpoint (steady-state) core flow when compared to the locked rotor. Only one analysis is performed, CONDITION IV - LIMITING FAULTS 15.4-33WATTS BARWBNP-107representing the most limiting condition for the locked rotor and pump shaft break accidents.
15.4.4.2 Analysis of Effects and ConsequencesMethod of AnalysisTwo digital-computer codes are used to analyze this transient. The LOFTRAN
[11] Code is used to calculate the resulting loop and core flow transient following the pump seizure, the time of reactor trip, based on the loop flow transients, the nuclear power following reactor trip, and the reactor coolant system peak pressure. The thermal behavior of the fuel located at the core hot spot is investigated using the FACTRAN[12] Code, using the core flow and the nuclear power calculated by LOFTRAN. The FACTRAN Code includes a film boiling heat transfer coefficient.One reactor coolant pump seizure has been analyzed for a locked rotor/shaft break with four loops in operation.The accident is evaluated without offsite power available. For the evaluation, power is assumed to be lost to the unaffected pumps instantaneously after reactor trip. At the beginning of the postulated locked rotor accident, i.e. at the time the shaft in one of the reactor coolant pumps in assumed to seize, the plant is assumed to be in operation under the most adverse steady state operating conditions, i.e., maximum steady state power level, maximum steady state pressure, and maximum steady state coolant average temperature. When the peak pressure is evaluated, the initial pressure is conservatively estimated as 70 psi above nominal pressure (2250 psia) to allow for errors in the pressurizer pressure measurement and control channels. This is done to obtain the highest possible rise in the coolant pressure during the transient. To obtain the maximum pressure in the primary side, conservatively high loop pressure drops are added to the calculated pressurizer pressure. The pressure response shown in Figure 15.4-15 is at the point in the reactor coolant system having the maximum pressure. Evaluation of the Pressure TransientAfter pump seizure, the neutron flux is rapidly reduced by control rod insertion effect. Rod motion is assumed to begin 1.2 seconds after the flow in the affected loop reaches 87% to nominal flow. No credit is taken for the pressure reducing effect of the pressurizer relief valves, pressurizer spray, steam dump or controlled feedwater flow after plant trip.Although these systems are expected to function and would result in a lower peak pressure, an additional degree of conservatism is provided by ignoring their effect.The pressurizer safety valves are full open at 2580 psia and their capacity for steam relief is as described in Section 5.2.2.
15.4-34CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Evaluation of DNB in the Core During the AccidentFor this accident, DNB is assumed to occur in the core and, therefore, an evaluation of the consequences with respect to fuel rod thermal transients is performed. Results obtained from analysis of the 'hot spot' condition represent the upper limit with respect to clad temperature and zirconium water reaction.Film Boiling CoefficientThe film boiling coefficient is calculated in the FACTRAN Code using the Bishop-Sandberg-Tong film boiling correlation
[19]. The fluid properties are evaluated at film temperature (average between wall and bulk temperatures). The program calculates the film coefficient at every time step based upon the actual heat transfer conditions at the time. The neutron flux, system pressure, bulk density and mass flow rate as a function of time are used as program input.For this analysis, the initial values of the pressure and the bulk density are used throughout the transient since they are the most conservative wi th respect to clad temperature response. For conservatism, DNB was assumed to start at the beginning of the accident.Fuel Clad Gap CoefficientThe magnitude and time dependence of the heat transfer coefficient between fuel and clad (gap coefficient) has a presounded influence on the thermal results. The larger the value of the gap coefficient, the more heat is transferred between pellet and clad. Based on investigations on the effect of the gap coefficient upon the maximum clad temperature during the transient, the gap coefficient was assumed to increase from a steady state value consistent with initial fuel temperature to 10,000 BTU/hr-ft 2-°F at the initiation of the transient. Thus the large amount of energy stored in the fuel because of the small initial value is released to the clad at the initiation of the transient.Zirconium Steam ReactionThe zirconium-steam reaction can become significant above 1800°F (clad temperature). The Baker-Just parabolic rate equation shown below is used to define the rate of the zirconium steam reaction.where: dw 2dt---------------33.310 6455001.986 T-----------------
--exp=
CONDITION IV - LIMITING FAULTS 15.4-35WATTS BARWBNP-107w = amount reacted, mg/cm 2 t = time, sec T = temperature, °K The reaction heat is 1510 cal/gmResultsThe calculated sequence of events is shown on Table 15.4-1. The transient results without offsite power available are shown in Figures 15.4-15 through 15.4-20. The peak reactor coolant system pressure reached during the transient is less than that which would cause stresses to exceed the faulted condition stress limits. Also, the peak clad surface temperature is considerable less than 2700 °F. It should be noted that the clad temperature was conservatively calculated assuming that DNB occurs at the initiation of the transient. The results of these calculations (peak pressure, peak clad temperature, and zirconium-steam reaction) are also summarized in Table 15.4-10.15.4.4.3 Conclusions (1)Since the peak reactor coolant system pressure reached during any of the transients is less than that which cause stresses to exceed the faulted condition stress limits, the integrity of the primary coolant system is not endangered.
(2)Since the peak clad surface temperature calculated for the hot spot during the worst transient remains considerably less than 2700°F, and the amount of zirconium-water reaction is small, the core will remain in place and intact with no consequential loss of core cooling capability.
15.4.5 Fuel Ha ndling Accident 15.4.5.1 Identification of Ca uses and Accident DescriptionThe accident is defined as dropping of a spent fuel assembly onto the fuel storage area floor resulting in the rupture of the cladding of all the fuel rods in the assembly despite many administrative controls and physical limitations imposed on fuel handling operations. Dropping a fuel assembly in the spent fuel pool has been analyzed and will not result in criticality.
[43] 15.4.5.2 Analysis of Effects and ConsequencesFor the analyses and consequences of the postulated fuel handling accident, refer to Section 15.5.6.
15.4-36CONDITION IV - LIMITING FAULTS WATTS BARWBNP-10715.4.6 Rupture of a Control Rod Drive Mechanism H ousing (Rod Cluster Control Assembly Ejection) 15.4.6.1 Identification of Ca uses and Accident DescriptionThis accident is defined as the mechanical failure of a control rod mechanism pressure housing resulting in the ejection of a rod cluster control assembly (RCCA) and drive shaft. The consequence of this mechanical failure is a rapid positive reactivity insertion together with an adverse core power distribution, possibly leading to localized fuel rod damage.15.4.6.1.1 Design Prec autions and ProtectionCertain features in Westinghouse pressurized water reactors are intended to preclude the possibility of a rod ejection accident, or to limit the consequences if the accident were to occur. These include a sound, conservative mechanical design of the rod housings, together with a thorough quality control (testing) program during assembly, and a nuclear design which lessens the potential ejection worth of RCCAs and minimizes the number of assemblies inserted at high power levels.Mechanical DesignThe mechanical design is discussed in Section 4.2. Mechanical design and quality control procedures intended to preclude the possibility of a RCCA drive mechanism housing failure are listed below:
(1)Each full length control rod drive mechanism housing was completely assembled and shop tested at 4100 psi.
(2)The mechanism housings were individually hydrotested after being attached to the head adapters in the reactor vessel head, and checked during the hydrotest of the completed reactor coolant system.
(3)Stress levels in the mechanism are not be affected by anticipated system transients at power, or by the thermal movement of the coolant loops. Moments by the design earthquake are acceptable within the allowable primary working stress range specified by the ASME Code,Section III, for Class 1 components.
(4)The latch mechanism housing and rod travel housing are each a single length of forged Type-304 stainless steel. This material exhibits excellent notch toughness at all temperatures which will be encountered.A significant margin of strength in the elastic range together with the large energy absorption capability in the plastic range gives additional assurance that gross failure of the housing will not occur. The joints between the latch mechanism housing and head adapter, and between the latch mechanism housing and rod travel housing, are threaded joints reinforced by canopy type rod welds. Administrative regulations require periodic inspections of these (and other) welds.
CONDITION IV - LIMITING FAULTS 15.4-37WATTS BARWBNP-107Nuclear DesignEven if a rupture of a RCCA drive mechanis m housing is postulated, the operation of a plant utilizing chemical shim is such that the severity of an ejected RCCA is inherently limited. In general, the reactor is operated by compensating for fuel depletion and xenon oscillations with changes to the boron concentration. Typically the control rods are not deeply inserted. Further, the location and grouping of control RCCA banks are selected during the nuclear design to lessen the severity of a RCCA ejection accident. Therefore, should a RCCA be ejected from its normal po sition during full power operation, a less severe reactivity excursion could be expected to occur.However, it may be occasionally desirable to operate with larger than normal insertions. For this reason, a rod insertion limit is defined as a function of power level.
Operation with the RCCAs above this limit guarantee s adequate shutdown capability and acceptable power distribution. The position of all RCCAs is continuously indicated in the control room. An alarm will occur if a bank of RCCAs approaches its insertion limit or if one RCCA deviates from its bank. Operating instruction requirements are as specified in Technical Specifications 3.1.5, 3.1.6 and 3.1.7. Reactor ProtectionThe reactor protection in the event of a rod ejection accident has been described in Reference [14]. The protection for this accident is provided by high neutron flux trip (high and low setting) and high rate of neutron flux increase trip. These protection functions are described in detail in Section 7.2.Effects on Adjacent HousingsDisregarding the remote possibility of the occurrence of a RCCA mechanism housing failure, investigations have shown that failure of a housing due to either longitudinal or circumferential cracking would not cause damage to adjacent housings leading to an increase in severity of the initial accident.Effects of Rod Travel Housing Longitudinal FailuresIf a longitudinal failure of the rod travel housing should occur, the region of the position indicator assembly opposite the break would be stressed by the reactor coolant pressure of 2250 psia. The most probable leakage path would be provided by the radial deformation of the position indicator coil assembly, resulting in the growth of axial flow passages between the rod travel housing and the steel tube.If failure of the position indicator coil assembly should occur, the resulting free radial jet from the failed housing could cause it to bend and contact adjacent rod housings.
If the adjacent housings were on the periphery, they might bend outward from their bases. The housing material is quite ductile; plastic hinging without cracking would be expected. Housings adjacent to a failed housing, in locations other than the periphery, would not be bent because of the rigidity of multiple adjacent housings.
15.4-38CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Effect of Rod Travel Housing Circumferential FailuresIf circumferential failure of a rod travel housing should occur, the broken-off section of the housing would be ejected vertically because the driving force is vertical and the position indicator coil stack assembly and the drive shaft would tend to guide the broken-off piece upwards during its travel. Travel is limited by the missile shield, thereby limiting the projectile acceleration. When the projectile reached the missile shield it would partially penetrate the shield and dissipate its kinetic energy. The water jet from the break would continue to push the broken-off piece against the missile shield.If the broken-off piece of the rod travel housing were short enough to clear the break when fully ejected, it would rebound after impact with the missile shield. The top end plates of the position indicator coil stack assemblies would prevent the broken piece from directly hitting the rod travel housing of a second drive mechanism. Even if a direct hit by the rebounding piece were to occur, the low kinetic energy of the rebounding projectile would not be expected to cause significant damage.Possible ConsequencesFrom the above discussion, the probability of damage to an adjacent housing must be considered remote. However, even if damage is postulated, it would not be expected to lead to a more severe transient since RCCAs are inserted in the core in symmetric patterns, and control rods immediately adjacent to worst ejected rods are not in the core when the reactor is critical. Damage to an adjacent housing could, at worst, cause that RCCA not to fall on receiving a trip signal; however, this is already taken into account in the analysis by assuming a stuck rod adjacent to the ejected rod.
SummaryThe considerations given above lead to the conclusion that failure of a control rod housing, due either to longitudinal or circumferential cracking, would not cause damage to adjacent housings that would increase severity of the initial accident.
15.4.6.1.2 Limiting CriteriaDue to the extremely low probability of a RCCA ejection accident, some fuel damage could be considered an acceptable consequence.Comprehensive studies of the threshold of fuel failure and of the threshold of significant conversion of the fuel thermal energy to mechanical energy, have been carried out as part of the SPERT project by the Idaho Nuclear Corporation[15]. Extensive tests of UO 2 zirconium clad fuel rods representative of those in Pressurized Water Reactor type cores have demonstrated failure thresholds in the range of 240 to 257 cal/gm. However, other rods of a slightly different design have exhibited failures as low as 225 cal/gm. These results differ significantly from the TREAT[13] results, which indicated that this threshold decreases by about 10% with fuel burnup. The clad failure mechanism appears to be melting for zero burnup rods and brittle fracture for irradiated rods. Also important is the conversion ratio of thermal to mechanical energy. This ratio becomes marginally detectable above 300 cal/gm or unirradiated rods and 200 cal/gm CONDITION IV - LIMITING FAULTS 15.4-39WATTS BARWBNP-107for irradiated rods; catastrophic failure, (large fuel dispersal, large pressure rise) even for irradiated rods, did not occur below 300 cal/gm.In view of the above experimental results, criteria are applied to ensure that there is little or no possibility of fuel dispersal in the coolant, gross lattice distortion, or severe shock waves. These criteria are:
(1)Average fuel pellet enthalpy at the hot spot to be below 225 cal/gm for unirradiated fuel and 200 cal/gm for irradiated fuel.
(2)Peak reactor coolant pressure less than that which would cause stresses to exceed the faulted condition stress limits. This criteria is generically addressed in Reference [16].
(3)Fuel melting will be limited to less than the innermost 10% of the fuel pellet at the hot spot even if the average fuel pellet enthalpy at the hot spot is below the limits of criterion 1 above.It should be noted that the FSAR included an additional criterion that the average clad temperature at the hot spot must remain below 3000°F. The elimination of this criterion as a basis for evaluating the RCCA Ejection accident results is consistent with the revised Westinghouse acceptance criteria for this event.
15.4.6.2 Analysis of Effects and ConsequencesMethod of AnalysisThe calculation of the RCCA ejection transient is performed in two stages: first an average core channel calculation and then a hot region calculation. The average core calculation is performed using spatial neutron kinetics methods to determine the average power generation with time including the various total core feedback effects, i.e., Doppler reactivity and moderator reactivity. Enthalpy and temperature transients in the hot spot are then determined by multiplying the average core energy generation by the hot channel factor and performing a fuel rod transient heat transfer calculation.
The power distribution calculated without feedback is pessimistically assumed to persist throughout the transient.A detailed discussion of the method of analysis can be found in Reference [16].Average Core AnalysisThe spatial kinetics computer code, TWINKLE[17], is used for the average core transient analysis. The computer code includes a detailed multiregion, transient fuel-clad-coolant heat transfer model for calculation of pointwise Doppler and moderator feedback affects. In this analysis, the code is used as a one dimensional axial kinetics code since it allows a more realistic representation of the spatial effects of axial moderator feedback and RCCA move ment and the elimination of axial feedback weighting factors. However, since the radial dimension is missing, it is still 15.4-40CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107necessary to employ very conservative methods (described below) of calculating the ejected rod worth and hot channel factor. Further description of TWINKLE appears in Section 15.1.9.Hot Spot AnalysisIn the hot spot analysis, the initial heat flux is equal to the nominal times the design hot channel factor. During the transient, the heat flux hot channel factor is linearly increased to the transient value in 0.1 second, the time for full ejection of the rod.
Therefore, the assumption is made that the hot spot before and after ejection are coincident. This is very conservative since the peak after ejection will occur in or adjacent to the assembly with the ejected rod, and prior to ejection the power in this region will necessarily be depressed.The hot spot analysis is performed using the detailed fuel and clad transient heat transfer computer code, FACTRAN
[12]. This computer code calculates the transient temperature distribution in a cross section of a metal clad UO 2 fuel rod, and the heat flux at the surface of the rod, using as input the nuclear power versus time and the local coolant conditions. The zirconium-water reaction is explicitly represented, and all material properties are represented as functions of temperature. A parabolic radial power distribution is used within the fuel rod.FACTRAN uses the Dittus-Boelter or Jens-Lottes correlation to determine the film heat transfer before DNB, and the Bishop-Sandburg-Tong correlation
[19] to determine the film boiling coefficient after DNB. The DNB heat flux is not calculated, instead the code is forced into DNB by specifying a conservative DNB heat flux. The gap heat transfer coefficient can be calculated by the code; however, it is adjusted in order to force the full power steady state temperature distribution to agree with the fuel heat transfer design codes presently in use by Westinghouse. Further description of FACTRAN appears in Section 15.1.9.System Overpressure AnalysisBecause safety limits for fuel damage specified earlier are not exceeded, there is little likelihood of fuel dispersal into the coolant. The pressure surge may therefore be calculated on the basis of conventional heat transfer from the fuel and prompt heat generation in the coolant.The pressure surge is calculated by first performing the fuel heat transfer calculation to determine the average and hot spot heat flux versus time. Using this heat flux data, a thermal hydraulic calculation is conducted to determine the volume surge. Finally, the volume surge is simulated in a plant transient computer code. This code calculates the pressure transient taking into account fluid transport in the reactor coolant system and heat transfer to the steam generators. No credit is taken for the possible pressure reduction caused by the assumed failure of the control rod pressure housing.The system overpressure is generically addressed in Reference [16].
CONDITION IV - LIMITING FAULTS 15.4-41WATTS BARWBNP-107Calculation of Basic ParametersInput parameters for the analysis are conservatively selected on the basis of values calculated for this type of core. The more important parameters are discussed below. Table 15.4-12 presents the parameters used in this analysis.Ejected Rod Worths and Hot Channel FactorsThe values for ejected rod worths and hot channel factors are calculated using either three dimensional static methods or by synthesis method employing one dimensional and two dimensional calculations. Standard nuclear design codes are used in the analysis. No credit is taken for the flux flattening effects of reactivity feedback. The calculation is performed for the maximum allowed bank insertion at a given power level, as determined by the rod insertion limits. Adverse xenon distributions and part length rod positions are considered in the calculation.Appropriate margins are added to the ejected rod worth and hot channel factors to account for any calculational uncertainties.Reactivity Feedback Weighting FactorsThe largest temperature rises, and hence the largest reactivity feedbacks occur in channels where the power is higher than average. Since the weight of a region is dependent on flux, these regions have high weights. This means that the reactivity feedback is larger than that indicated by a simple channel analysis. Physics calculations have been carried out for temperature changes with a flat temperature distribution, and with a large number of axial and radial temperature distributions. Reactivity changes were compared and effective weighting factors determined. These weighting factors take the form of multipliers which when applied to single channel feedbacks correct them to effective whole core feedbacks for the appropriate flux shape. In this analysis, since a one dimensional (axial) spatial kinetics method is employed, the axial weighting is not necessary. In addition, no weighting factor is applied to the transient fuel temperature to obtain an effective fuel temperature as a function of time accounting for the missing spatial dimension. These weighting factors have also been shown to be conservative compared to three dimensional analysis
[16].Moderator and Doppler CoefficientThe critical boron concentrations at the beginning-of-life and end-of-life are adjusted in the nuclear code in order to obtain moderator temperature coefficients which are conservative compared to actual design conditions for the plant. For example, a Positive Moderator Temperature Coefficient (PMTC) of +5 pcm / °F was applied to both beginning-of-life rod ejection cases, although a PMTC is precluded by the plant Technical Specifications at hot full power conditions. As discussed above, no weighting factor is applied to these results.The Doppler reactivity defect is determined as a function of power level using a one dimensional steady state computer code with a Doppler weighting factor of 1.0. The resulting curve is conservative compared to design predictions for this plant. The Doppler weighting factor should be larger than 1.0 (approximately 1.2), just to make 15.4-42CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107the present calculation agree with design predictions before ejection. This weighting factor will increase under accident conditions, as discussed above.Delayed Neutron Fraction, Calculations of the effective delayed neutron fraction eff typically yield values no less than 0.70% at beginning-of-life and 0.50% at end-of-life for the first cycle. The accident is sensitive to if the ejected rod worth is equal to or greater than as in zero power transients. In order to allow for future cycles, conservative estimates of of 0.48% at beginning-of-cycle and 0.44% at end-of-cycle were used in the analysis.Trip Reactivity InsertionThe trip reactivity insertion assumed is given in Table 15.4-12 and includes the effect of one stuck RCCA. These values are reduced by the ejected rod reactivity. The shutdown reactivity was simulated by dropping a rod of the required worth into the core. The start of rod motion occurred 0.5 seconds after the high neutron flux trip point was reached. This delay is assumed to consist of 0.2 seconds for the instrument channel to produce a signal, 0.15 seconds for the trip breaker to open and 0.15 seconds for the coil to release the rods. A curve of trip rod insertion versus time was used which assumed that insertion to the dashpot does not occur until 2.7 seconds after the start of fall. The choice of such a conservative insertion rate means that there is over 1 second after the trip point is reached before significant shutdown reactivity is inserted into the core. This is a particularly important conservatism for a full-power accident. The rod ejection transient was evaluated using the thermal design flowrate. The minimum design shutdown margin available for this plant at HZP may be reached only at end-of-life in the equilibrium cycle. This value includes an allowance for the worst stuck rod, adverse xenon distribution, conservative Doppler and moderator defects, and an allowance for calculational uncertainties. Physics calculations for this plant have shown that the effect of two stuck RCCAs (one of which is the worst ejected rod) is to reduce the shutdown by about an additional 1% k. Therefore, following a reactor trip resulting from an RCCA ejection accident, the reactor will be subcritical when the core returns to HZP.Depressurization calculations have been performed for a typical four-loop plant assuming the maximum possible size break (2.75 inch diameter) located in the reactor pressure vessel head. The results show a rapid pressure drop and a decrease in system water mass due to the break. The safety injection system is actuated on low pressurizer pressure within one minute after the break. The reactor coolant system pressure continues to drop and reaches saturation (1100 to 1300 psi depending on the system temperature) in about two to three minutes. Due to the large thermal inertia of primary and secondary system, there has been no significant decrease in the reactor coolant system temperature below no-load by this time, and the depressurization itself has caused an increase in shutdown margin by about 0.2% k due to the pressure coefficient. The cooldown transient could not absorb the available shutdown margin until more than 10 minutes after the break. The addition of borated safety injection flow starting one minute after the break is much more than sufficient to ensure that the core remains sub-critical during the cooldown.
CONDITION IV - LIMITING FAULTS 15.4-43WATTS BARWBNP-107ResultsCases are presented for both beginning and end-of-life at zero and full power.In the full power cases, control bank D was assumed to be inserted to its insertion limit. In the zero power cases, control bank D was assumed to be fully inserted, and control banks B and C were assumed to be at their insertion limits.The results for these cases are summarized in Table 15.4-12. In all cases the maximum fuel pellet average enthalpy is well below that which could cause sudden cladding failure, the maximum clad average temperature is below the point of clad embrittlement, and fuel melting, if any, is limited to less than 10% of the fuel cross-section at the hot spot.The nuclear power and hot spot fuel and clad temperature transients for the worst cases (beginning-of-life full power and end-of-life zero power) are presented in Figures 15.4-24 through 15.4-27. Fission Product ReleaseIt is assumed that fission products are released from the gaps of all rods entering DNB. In all cases considered, less than 10% of the rods entered DNB based on a detailed three-dimensional THINC analysis
[16]. Although limited fuel melting at the hot spot was predicted for the full power cases, in practice melting is not expected since the analysis conservatively assumed that the hot spots before and after ejection were coincident.Pressure SurgeA detailed calculation of the pressure surge for an ejection worth 1 dollar at beginning-of-life, hot full power, indicates that the peak pressure does not exceed that which would cause the faulted condition stress limits to be exceeded
[16]. Since the severity of the present analysis does not exceed this "worst case" analysis, the accident for this plant will not result in an excessive pressure rise or further damage to the reactor coolant system.Lattice DeformationsA large temperature gradient will exist in the region of the hot spot. Since the fuel rods are free to move in the vertical direction, differential expansion between separate rods cannot produce distortion. However, the temperature gradients across individual rods may produce a differential expansion tending to bow the midpoint of the rods toward the hotter side of the rod. Calculations have indicated that this bowing would result in a negative reactivity effect at the hot spot since Westinghouse cores are under-moderated, and bowing will tend to increase the under-moderation at the hot spot. Since the 17 x 17 fuel design is also under-moderated, the same effect would be observed. In practice, no significant bowing is anticipated, since the structural rigidity of the core is more than sufficient to withstand the forces produced. Boiling in the hot spot region would produce a net flow away from that region. However, the heat from the fuel is 15.4-44CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107released to the water relatively slowly, and it is considered inconceivable that cross flow will be sufficient to produce significant lattice forces. Even if massive and rapid boiling, sufficient to distort the lattice, is hypothetically postulated, the large void fraction in the hot spot region would produce a reduction in this ratio at the hot spot.
The net effect would therefore be a negative feedback. It can be concluded that no conceivable mechanism exists for a net positive feedback resulting from lattice deformation. In fact, a small negative feedback may result. The effect is conservatively ignored in the analysis.
15.4.6.3 ConclusionsEven on a worst-case basis, the analyses indicate that the described fuel and clad limits are not exceeded. It is concluded that there is no danger of sudden fuel dispersal into the coolant. Since the peak pressure does not exceed that which would cause stresses to exceed the faulted condition stress limits, it is concluded that there is no danger of further, consequential damage to the reactor coolant system. The reference
[16] analyses have demonstrated that the number of fuel rods entering DNB amounts to less than 10%, thus satisfactorily limiting fission product release.The environmental consequences of this accident is bounded by the loss of coolant accident. See Section 15.5.3, "Environmental Consequences of a Loss of Coolant Accident." The reactor coolant system integrated break flow to containment following a rod ejection accident is shown in Figure 15.4-28.Following reactor trip, requirements for operator action and protection system operation are similar to those presented in the analysis of a small loss of coolant event, section 15.3.1. REFERENCES (1)Deleted by Amendment 97 (2)Deleted by Amendment 97 (3)Deleted by Amendment 97 (4)Deleted by Amendment 97 (5)Hsieh, T., and Raymund, M., "Long Term Ice Condenser Transient Analysis (LOTIC II)," WCAP-8355 Supplement 1, May 1975 and WCAP-8354 (Proprietary), July 1974.
(6)Deleted by Amendment 97 (7)Deleted by Amendment 63.
(8)Deleted by Amendment 80.
(9)Moody, F. S., "Transactions of the ASME, Journal of Heat Transfer," Figure 3, Page 134, February 1965.
CONDITION IV - LIMITING FAULTS 15.4-45WATTS BARWBNP-107 (10)Deleted Amendment 80.
(11)Burnett, T. W. T., et. al., "LOFTRAN Code Description," WCAP-7907-P-A (proprietary) and WCAP-7907-A (non-proprietary), April 1984.
(12)Hunin, C., "FACTRAN, A FORTRAN IV Code for Thermal Transients in a UO 2 Fuel Rod," WCAP-7908, July 1972.
(13)Liimataninen, R. C. and Testa, F. J., "Studies in TREAT of Zircaloy-2-Clad, UO 2-Core Simulated Fuel Elements," ANL-7225, January - June 1966, p. 177, November 1966.
(14)Burnett, T. W. T, "Reactor Protection System Diversity in Westinghouse Pressurized Water Reactors," WCAP-7306, April 1969.
(15)Taxelius, T. G., "Annual Report - Spert Project, October 1968, September 1968," Idaho Nuclear Corporation IN-1370, June 1970.
(16)Risher, D. H., Jr., "An Evaluation of the Rod Ejection Accident in Westinghouse Pressurized Water Reactors Using Spatial Kinetics Methods,"
WCAP-7588, Revision 1-A, January 1975.
(17)Barry, R. F., and Risher, D. H., Jr., "TWINKLE - A Multi-Dimensional Neutron Kinetics Computer Code," WCAP-7979-P-A, January 1975 (Proprietary) and WCAP-8208-A, January 1975 (Non-Proprietary).
(18)Deleted by Amendment 80.
(19)Bishop, A. A., et al., "Forced Convection Heat Transfer at High Pressure After the Critical Heat Flux," ASME 65-HT-31, August 1965.
(20)Deleted by Amendment 97.
(21)Deleted by Amendment 97.
(22)Deleted by Amendment 97.
(23)Deleted by Amendment 97.
(24)Deleted by Amendment 97.
(25)Deleted by Amendment 97.
(26)Deleted by Amendment 97.
(27)Deleted by Amendment 97.
(28)Deleted by Amendment 80.
(29)Deleted by Amendment 80.
15.4-46CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107 (30)C. W. Stewart, et al., "VIPRE-01: A Thermal-Hydraulic Code for Reactor Cores, "Volumes 1-3 (Revision 3, August 1989), Volume 4 (April 1987), NP-2511-CCM-A, EPRI.
(31)Deleted by Amendment 80.
(32)Deleted by Amendment 97.
(33)"American National Standard for Decay Heat Power in Light Water Reactors," ANSI/ANS-5.1-1979, August 1979.
(34)Rupprecht, S. D, et. al., "Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study with the NOTRUMP Code," WCAP-11145-P-A (Proprietary), WCAP-11372 (Non-Proprietary), October 1986.
(35)U.S. Nuclear Regulatory Commission, Code Federal Regulations - Energy 10, Chapter 1, Part 50, Section 50.46(c), "Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors." (36)"Westinghouse Methodology for Implementation of 10 CFR 50.46 Reporting", WCAP-13451 October 1992.
(37)Devault, R. M., Smith, J. D., and Studer, P. G., "MONSTER - A Multi-Compartment Containment System Analysis Program User Manual," System I.D. 262303, March 1993.
(38)Deleted by Amendment 97 (39)Letter from Walsh, L. A., Westinghouse Owners Group, to Jones, R. C., U.S. Nuclear Regulatory Commission, "Steam Generator Tube Uncovery Issue," OG-92-25, March 1992.
(40)"Report on the Methodology for the Resolution of the Steam Generator Tube Uncovery Issue," WCAP-13247 (Proprietary), March 1992.
(41)Letter from Jones, R. C., U.S. Nuclear Regulatory Commission, to Walsh, L. A., Westinghouse Owners Group, "Steam Generator Tube Uncovery Issue," March 10, 1993.
(42)Watts Bar "Design Basis Events Design Criteria", Document WB-DC-40-64.
(43)Criticality Analysis Summary Report for Watts Bar Nuclear Plant," Document Number PFE-R07, Tennessee Valley Authority Nuclear Fuels Department (L38 961015 802).
(44)USNRC Regulatory Guide 1.157, "Best-Estimate Calculations of Emergency Core Cooling System Performances", May 1989.
CONDITION IV - LIMITING FAULTS 15.4-47WATTS BARWBNP-107 (45)Boyack, B., et al, 1989, "Qualifying Reactor Safety Margins: Application of Code Scaling Applicability and Uncertainty (CSAU) Evaluation Methodology to a Large Break Loss-of- Coolant-Accident", NUREG/CR-5249 (46)"Code Qualification Document for Best Estimate Loss of Coolant Accident Analysis," WCAP- 12945-P-A, Volume 1 (Revision 2) and Volumes 2 through 5 (Revision 1), March 1998 (Westinghouse Proprietary).
(47)"Best Estimate Analysis of the Large Break Loss of Coolant Accident for the Watts Bar Nuclear Plant," WCAP-14839-P Revision 1, June 1998.
(48)Letter from W. J. Johnson of Westinghouse to R. C. Jones of the NRC, "Use of 2700 °F PCT Acceptance Limit in Non-LOCA Accidents, "NS-NRC 3466, October 1989.
(49)"Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)", WCAP-16009-P-A, January 2005 (Westinghouse Proprietary)
(50)"Emergency Core Cooling System Analysis Methods", SECY-83-472, Information Report from W. J. Dircks to the Commissioners, November 17.1983.
15.4-48CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-1 Time Sequence Of Events For Condition IV Events (Page 1 of 2)AccidentEventTime (Seconds)Major Reactor CoolantSystem Pipe Ruptures, Double-Ended Cold Leg
Guillotine See Table 15.4-17Major Secondary System Pipe Rupture1.Case BComplete severence of a pipe, loss of offsite power simultaneous with the break and initiation of safety injection signalSteam Line RupturesLow Steam Pressure Setpoint Reached
Pressurizer Empties Criticality Attained Boron Reaches Core Accumulators Actuated 0.0 0.6712.0 58.0 46.0N/A2.Case AComplete severence of a pipe, offsite power availableSteam Line Ruptures Low Steam Pressure Setpoint Reached
Pressurizer Empties Boron Reaches Core Criticality Attained Accumulators Actuated 0.0 0.6711.034.0 44.0 54Reactor Coolant PumpShaft Seizure (Locked Rotor/Broken Shaft)All pumps in operation,one shaft seizure without offsite power availableRotor on one pump seizes0Low flow trip point reached0.02Rods begin to drop1.22 Undamaged pumps lose power and begin coasting down 1.22Maximum RCS pressureoccurs 3.50Maximum clad temperatureoccurs 3.99 CONDITION IV - LIMITING FAULTS 15.4-49WATTS BARWBNP-107Rod Ejection BOL HFP EOL HZPRCCA Ejected0.00.0 Reactor Trip Setpoint Reached0.050.163Peak Nuclear Power0.1350.193Rods Drop0.550.663Peak Fuel Average Temperature is Reached2.2051.821Peak Clad Temperature is Reached2.251.490Peak Heat Flux2.2561.519Table 15.4-1 Time Sequence Of Events For Condition IV Events (Page 2 of 2)AccidentEventTime (Seconds) 15.4-50CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-2 Deleted by Amendment 97 CONDITION IV - LIMITING FAULTS 15.4-51WATTS BARWBNP-107 Table 15.4-3 Deleted by Amendment 97 15.4-52CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-4 Deleted by Amendment 97 CONDITION IV - LIMITING FAULTS 15.4-53WATTS BARWBNP-107Table 15.4-5 Deleted by Amendment 97 15.4-54CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-6 Equipment Required Following A High Energy Line Break (Page 1 of 3)SHORT TERM(REQUIRED FOR MITIGATIONOF ACCIDENT)HOT STANDBYREQUIRED FOR COOLDOWNReactor trip and safeguards actuation channels including sensors, circuitry, and processing equipment (the protection circuits used to trip the reactor on under- voltage, underfrequency, and turbine trip may be excluded).
Auxiliary feedwater system including pumps, water supply, and system valves and piping (this system must be placed in service to supply water to operable steam generators no later than 10 minutes after the incident).Steam generator power-operated relief valves (can be manually operated locally) Controls for defeating automatic safety injection actation during a cooldown and depressurization.Safety injection system including the pumps, the refueling water storage tank, and the systems valves and piping.Capability for obtaining a reactor coolant systemsample.Residual heat removal system including pumps, heat exchanger, and system valves and piping necessary to cool and maintain the reactor coolant system in a cold shutdown conditionDiesel generators and emergency power distribution equipment.Essential raw cooling watersystemContainment safeguards cooling equipment.Main feedwater control valves* (trip closed feature).Lower compartment cooling fans must be started (a minimum of 2 of 4) 1-1/2 hours to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the initiation of HELB.Ice condenser.Air return fan to recirculate air thru ice condenser.Containment spray to maintain hot standby lower compartment temperature.
CONDITION IV - LIMITING FAULTS 15.4-55WATTS BARWBNP-107Bypass feedwater control valves* (trip closed feature).Circuits and/or equipment required to trip the main feedwater pumps.*Main steam line stop valves* (Main Steam Isolation Valves trip closed feature).Main steam line stop valve bypass valves* (trip closed feature).Steam generator blowdown isolation valves (automatic closure feature).Batteries (Class 1E).
Control room ventilation.
Control room equipment must not be damaged to an extent where any equipment will be spuriously actuated or any of the equipment contained elsewhere in this list cannot be operated.Table 15.4-6 Equipment Required Following A High Energy Line Break (Page 2 of 3)SHORT TERM(REQUIRED FOR MITIGATIONOF ACCIDENT)HOT STANDBYREQUIRED FOR COOLDOWN 15.4-56CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107* Required for steam line, feed line, and steam generator blowdown line break only.** See Section 7.5 for a discussion of the post accident monitoring system.Emergency lighting.Post accident monitoringsystem**Wide range Thot or Tcoldfor each reactor coolant loop.Pressurizer water level.
Wide range reactor coolantsystem pressureSteam line pressure for each steam generator.
Wide range and narrow range steam generator level for each steam generator.Containment pressureTable 15.4-6 Equipment Required Following A High Energy Line Break (Page 3 of 3)SHORT TERM(REQUIRED FOR MITIGATIONOF ACCIDENT)HOT STANDBYREQUIRED FOR COOLDOWN CONDITION IV - LIMITING FAULTS 15.4-57WATTS BARWBNP-107Table 15.4-7 Limiting Core Parameters Used In Steam Break DNB AnalysisReactor vessel inlet temperature (°F)Faulted SG Loop Intact SG Loops398.7 479.5 RCS pressure (psia)603.22 RCS flow fraction of nominal (%)100 Heat flux fraction of nominal (%)Reactivity (%)
Density (gm/cc)
Boron (ppm) 1.6 0.015 0.829 16.45Time (seconds) 57.4 15.4-58CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-8 Deleted by Amendment 80 CONDITION IV - LIMITING FAULTS 15.4-59WATTS BARWBNP-107Table 15.4-9 Time Sequence Of Events For Feedline BreakEventTime (seconds)With Offsite PowerWithout Offsite PowerFeedline rupture occurs1010 Pressurizer relief valve setpoint reached26.526.5 Low-low steam generator level reactor trip and auxiliary feedwater pump start setpoint reached in affected steam generator3737Rods begin to drop3939Auxiliary feedwater starts to intact steam generators9797 Cold auxiliary feedwater reaches intact steam generators144144Low steamline pressure setpoint reached328392All main steam stop (main steam isolation) valves closed336400Pressurizer water relief begins6803196Core power decreases to auxiliary feedwater removal capacity7643600 15.4-60CONDITION IV - LIMITING FAULTS WATTS BARWBNP-1071. A generic study was performed that addressed an initial pressurizer level including the pressurizer water level uncertainty which determined that at most a 41 psi increase would result from modeling this condition. The evaluation demonstrated that sufficient margin exists and the pressure limit will continue to be met. Hence, the conclusions presented in the section remain valid.Table 15.4-10 Summary Of Results For Locked Rotor Transients4 Loops Operating Initially Maximum reactorcoolant system pressure (psia)2672 (1)Maximum cladtemperature at core hot spot (°F)1852Zr-H2O reaction at core hot spot (% by weight)0.36%
CONDITION IV - LIMITING FAULTS 15.4-61WATTS BARWBNP-107Table 15.4-11 Deleted by Amendment 80 15.4-62CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-12 Parameters Used In The Analysis Of The Rod Cluster Control Assembly Ejection AccidentTime in LifeBeginningBeginningEndEndPower Level, %Ejected rod worth, %KDelayed neutron fraction, %
Trip Reactivity, % KFq before rod ejection Fq after rod ejection Number of operational pumps1020.2000.48 4.02.50 6.70 4 0 0.7250.48 2.0--10.60 21020.210 0.444.0 2.50 7.25 4 00.970 0.44 2.0--23.0 2Results:
Max. fuel pellet average temperature, °FMax. fuel center temperature, °F Max. clad average temperature, °F Max. fuel stored energy, cal/gm Percent of fuel melted39324948 2207171<1029293400 2175121 038044851 2130164<1037524190 2957162 0 CONDITION IV - LIMITING FAULTS 15.4-63WATTS BARWBNP-107Table 15.4-13 Parameters Recommended For Determining Radioactivity Releases For Rod Ejection AccidentFailed fuel10% of fuel rods in coreActivity released to reactor coolant from failed fuel and available for releaseNoble gasesIodines10% of gap inventory10% of gap inventoryMelted fuel0.25% of core Activity released to reactor coolant from melted fuel and available for releaseNoble gasesIodines0.25% of core inventory0.125% of core inventorySteam dump from relief valves59,000 lbs Duration of dump from relief valves140 secTime between accident and equilization of primary and secondary system pressures300 sec 15.4-64CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-14 Large-Break LOCA Containment Data (Ice Condenser Containment) Used for Calculation of Containment Pressure for Watts Bar Unit 2Parameter ValueNet Free Volume Distribution Between Upper (UC), Lower (LC), Ice Condenser (IC) and Dead-Ended (DE) CompartmentsUC: 710,000 ft 3LC: 253,114 ft 3IC: 122,350 ft 3DE: 129,900 ft 3Initial Condition Containment Pressure14.7 psiaMaximum Temperature for the Upper (UC), Lower (LC and Dead-Ended (DE) CompartmentsUC: 110°FLC: 120°F DE: 120°FMinimum RWST Temperature (Containment Spray Temperature)60°F Minimum Temperature Outside Containment5°F Maximum Containment Spray Flow Rate4000 gpm/pump Number of Spray Pumps Operating2 Post-Accident Initiation of Spray System25 secPost-Accident Delay Time for Deck Fan Actuation490 secDeck Fan Flow Rate41,690 cfm/fan Initial Ice Mass2,450,000 lb m
CONDITION IV - LIMITING FAULTS 15.4-65WATTS BARWBNP-107Notes:1. UC and LC are Upper and Lower Compartment, respectively.Table 15.4-15 Large-Break Containment Data - Heat Sinks Data (Ice Condenser Containment) WallCompartment (1)Area [ft 2]Thickness [ft]Material1UC5124.1.6concrete 2UC19992.0.000525/1.6coating/concrete 3UC4032.0.02167/1.6stainless steel/concrete4UC11192.0.00065/0.03908coating/carbon steel 5UC47800.0.00065/0.09252/1.0coating/carbon steel/concrete6UC273.0.00065/0.1308coating/carbon steel 7LC59000.2.1concrete 8LC17178.0.000133/2.1coating/concrete 9LC12988.2.1concrete10LC2384.0.02167/2.1stainless steel/concrete11LC25444.0.00065/0.1089/1.0coating/carbon steel/concrete12LC12810.0.00065/0.07593coating/carbon steel 13LC2625.0.00055/0.12083coating/carbon steel 14LC1575.0.00065/0.14167coating/carbon steel 15LC12915.0.00065/0.044167coating/carbon steel16LC12988.2.1concrete17LC34390.1561carbon steel 15.4-66CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-16 Mass And Energy Release Rates Used for Calculation of Containment Pressure for Watts Bar Unit 2 (Page 1 of 2)Time After Break (sec)Mass Flow Rate(lbm/sec) Energy Flow Rate (BTU/sec) 0.9646.75369419.
1.71201.539577048.
2.50782.128747484.
3.40475.123410743.
4.34105.420560588.
5.30009.118713303.
6.27906.017640053.
7.26130.916632257.
8.24651.115663961.
9.22805.614511306.10.20004.813053678.11.17472.911605252.12.14601.010093803.12.413464.49420184.14.12172.57614137.
15.12554.46455205.
16.11369.75308157.
17.10902.44491501.
18.10124.73756484.
19.9258.13127399.
20.8178.72411114.
21.7321.02120146.227603.91977749.23.5474.91402837.
24.4641.5999621.
25.6992.01356562.
26.5955.41051498.
28.4062.4618361.
29.3020.7405978.
30.1824.1201868.
32.1873.8190499.
CONDITION IV - LIMITING FAULTS 15.4-67WATTS BARWBNP-10733.1882.1180047.34.51890.2204412.35.1921.9200973.
39.2275.7246561.
41.1959.7214441.
43.2031.8267974.
45.2650.2384113.
46.7824.11100908.47.52842.5400880.50.1811.6373546.
51.1764.3397686.
55.2254.1544982.57.51383.9503576.60.1621.8592463.
65.790.9338984.
80.686.2251517.110.646.9232801.150.643.9307300.
190.654.1229705.
226.374.2116811.
300.404.3144644.
349.503.8176903.Table 15.4-16 Mass And Energy Release Rates Used for Calculation of Containment Pressure for Watts Bar Unit 2 (Page 2 of 2)Time After Break (sec)Mass Flow Rate(lbm/sec) Energy Flow Rate (BTU/sec) 15.4-68CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107 Note:1. Accumulator injection switches from liquid to nitrogen.Table 15.4-17 Watts Bar Unit 2 Best-Estimate Large-Break LOCA Sequence Of Events for Limiting PCT TransientEventTime after break (sec)Start of Transient0.0 Safety Injection Signal5.5 Accumulator Injection Begins12.0 End of Blowdown24.5 Bottom of Core Recovery40.0 Accumulator Empty (1)50.8Safety Injection Begins60.5 PCT Occurs209.5 End of analysis time400.0 CONDITION IV - LIMITING FAULTS 15.4-69WATTS BARWBNP-107Table 15.4-18b Watts Bar Unit 2 Best-Estimate Large-Break LOCA ResultsTable 15.4-18a Peak Clad Temperature Including All Penalties and Benefits, Best-Estmate Large-Break LOCA (BE LBLOCA) for Watts Bar Unit 2PCT for Analysis-of-Record (AOR)1552°FPCT Assessments Allocated to AORNoneN/A BE LBLOCA PCT for Comparison to 10 CFR 50.46 Requirements1552°FASTRUM ResultsValueAcceptance Criteria95/95 PCT1552°F<2200°F 95/95 MLO1.04%<17%
95/95 CWO0.0%<1%
15.4-70CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-19 Plant Operating Range Analyzed by the Best-Estimate Large-Break LOCA Analysis for Watts Bar Unit 2 (Page 1 of 2)ParameterAs-Analyzed Value or Range1.0Plant Physical Descriptiona) DimensionsNominal b) Pressurizer locationModeled on an intact loop c) Hot assembly locationAnywhere in core interior (1)d) Hot assembly type17x17 RFA-2, ZIRLO Clad with IFMse) Steam generator tube plugging level 10% Any or All SGs2.0Plant Initial Operating Conditions2.1 Reactor Powera) Core Power3479.8 MWt +/-0% Uncertainty (2)b) Peak heat flux hot channel factor (F Q)2.50c) Peak hot rod enthalpy rise hot channel factor (FH)1.65d) Hot assembly radial peaking factor (P HA)1.65/1.04e) Hot assembly heat flux hot channel factor (FQHA)2.50/1.04f) Axial power distribution (PBOT ,P MID)Figure 15.4-56g) Low power region relative power (P LOW)0.2 P LOW < 0.8h) Hot assembly burnup 75,000 MWD/MTU, lead rod(3)i) MTC 0 at hot full power (HFP)j) Typical cycle length20,000 MWD/MTU k) Minimum beginning of cycle core average burnup 10,000 MWD/MTUl) Maximum steady state depletion, F Q2.02.2 Fluid Conditions a) TAVG582.2°F < TAVG < 594.2°Fb) Pressurizer pressure2180 psia P RCS 2300 psiac) Loop flowTDF > 93,100 gpm/loopd) Upper head temperature= T COLDe) Pressurizer level (at full power)1067 ft 3f) Accumulator temperature100°F T ACC 120°Fg) Accumulator pressure585 psig P AC 690 psigh) Accumulator liquid volume1005 ft 3 V ACC 1095 ft 3 CONDITION IV - LIMITING FAULTS 15.4-71WATTS BARWBNP-107i) Accumulator fL/D5.6186 +/- 20%j) Minimum accumulator boron1900 ppm (4)3.0Accident Boundary Conditionsa) Minimum safety injection flowTable 15.4-23 b) Safety injection temperature60°F SI Temp 105°Fc) Safety injection delay (5)40 seconds (with offsite power)55 seconds (with LOOP)d) Containment modelingTables 15.4-14, 15.4-15, and 15.4-16 and Figure 15.4-40be) Single failure1 RHR, 1 IHSI, and 1 CH/SI Pump Operable; Containment pressure: all trains operationalNotes:
- 1. 44 peripheral locations will not physically be lead power assembly.2. The core average linear heat rate is set equal to a value corresponding to 3479.8 MWt (100.6 percent of 3459 MWt), and is not ranged in the uncertainty analysis. This power level approach bounds any future plant operation whose product of nominal full power and calorimetric uncertainty of 3479.8 MWt (for example, a nominal full power of 3479.8/1.005) MWt and 0.5% calorimetric uncertainty is bounded).3. Please note that the fuel temperature and rod internal pressure data is only provided up to 62,000 MWD/MTU. In addition, the hot assembly/hot rod will not have a burnup this high in ASTRUM analyses.4. The accumulator boron concentration used for the uncertainty analysis was 1900 ppm rather than 3000 ppm, which was the value transmitted to Westinghouse by TVA. This bounds the value transmitted by TVA and will have no impact on the results presented herein.5. Conservatively high SI delay times were used to bound the values transmitted by TVA to Westinghouse.Table 15.4-19 Plant Operating Range Analyzed by the Best-Estimate Large-Break LOCA Analysis for Watts Bar Unit 2 (Page 2 of 2)ParameterAs-Analyzed Value or Range 15.4-72CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-20 Operator Action Times For Design-Basis Steam Generator Tube Rupture AnalysisIdentify and isolate ruptured SG 15.00 min or LOFTTR2 calculated time from event initiation to reach 30% narrow range level in the ruptured SG, whichever is longerOperator action time to initiate cooldown7.15 min CooldownCalculated by LOFTTR2 Operator action time to initiate depressurization2.45 minDepressurizationCalculated by LOFTTR2Operator action time to initiate SI termination4.07 minSI termination and pressure equalizationCalculated by LOFTTR2 CONDITION IV - LIMITING FAULTS 15.4-73WATTS BARWBNP-107*Additional two seconds results from program limitations for simulating operator actions.Table 15.4-21 Steam Generator Tube Rupture Analysis Sequence Of Events EVENTTIME (sec)SG Tube Rupture0 Reactor Trip109 Safety Injection155 Ruptured SG Isolated900*
Ruptured SG Atmospheric Steam Dump Valve Fails Open906Ruptured SG Atmospheric Steam Dump Valve Closed1566RCS Cooldown Initiated1995 Flashing Stops2253 RCS Cooldown Terminated3152 RCS Depressurization Initiated3303RCS Depressurization Terminated3392 SI Terminated3638 Break Flow Terminated5032 15.4-74CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107Table 15.4-22 Steam Generator Tube Rupture Analysis Mass Release Results Total Mass Flow (Pounds)0 - 2 HRS2 - 8 HRSRuptured SG
- Condenser118,6000
- Atmosphere103,30032,800
- Feedwater149,6000Intact SGs- Condenser532,4000
- Atmosphere492,100900,200
- Feedwater1,018,600900,500Break Flow191,4000Flashing Break Point Pre-Trip = 934.4 lbm Flashing Break Flow Post-Trip = 9142.8 lbm CONDITION IV - LIMITING FAULTS 15.4-75WATTS BARWBNP-107Table 15.4-23 Minimum Injected Safety Injection Flow Used in Best-Estimate Large-Break LOCA Analysis for Watts Bar Unit 2 Pressure[psia] Charging Flow[gpm] SI Flow[gpm]RHR Flow[gpm]Total Flow[gpm]14.7262.2416.92715.23394.334.7260.5413.72284.62958.8 54.7258.8410.41811.32480.5 74.7257.0407.21367.72031.9 94.7255.3403.91156.91816.1 114.7253.6400.7916.91571.2 134.7251.9396.8633.2 1281.9 154.7250.1393.0232.2875.3 214.7244.9381.40.0626.3 314.7236.1360.80.0596.9 414.7227.1339.50.0566.6 514.7218.0317.60.0535.6 614.7208.4294.60.0503.0 714.7198.6269.80.0468.4 814.7188.5242.70.0431.2 914.7178.2214.50.0392.7 1014.7167.6185.00.0352.6 1114.7156.7150.20.0306.9 1214.7145.4150.90.0251.3 1314.7131.050.80.0181.8 1414.7115.90.00.0115.9 1514.7100.10.00.0100.1 1614.783.00.00.083.0 1714.763.70.00.063.7 1814.744.30.00.044.3 1914.727.00.00.027.0 2014.75.80.00.05.8 2114.70.00.00.00.0 15.4-76CONDITION IV - LIMITING FAULTS WATTS BARWBNP-107THIS PAGE IS INTENTIONALLY BLANK Condition IV - Limiting Faults15.4-77WATTS BAR WBNP-107Figure 15.4-1 Deleted by Amendment 97
15.4-78Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-1a Deleted by Amendment 97 Condition IV - Limiting Faults15.4-79WATTS BARWBNP-107Figure 15.4-1b Deleted by Amendment 97 15.4-80Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-2 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-81WATTS BARWBNP-107Figure 15.4-3 Deleted by Amendment 97 15.4-82Condition IV - Limiting FaultsWATTS BARWBNP-107Figure 15.4-4 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-83WATTS BARWBNP-107Figure 15.4-5 Deleted by Amendment 97 15.4-84Condition IV - Limiting FaultsWATTS BARWBNP-107Figure 15.4-6 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-85WATTS BARWBNP-107Figure 15.4-7 Deleted by Amendment 97 15.4-86Condition IV - Limiting FaultsWATTS BARWBNP-107Figure 15.4-8 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-87WATTS BAR WBNP-107Figure 15.4-9 Variation of Reactivity with Power at Constant Core Average Temperature 15.4-88Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-10 Deleted by Amendment 89 Condition IV - Limiting Faults15.4-89WATTS BAR WBNP-107Figure 15.4-11a Transient Response to Steam Line Break with Safety Injection and Offsite Power (CASE A) 15.4-90Condition IV - Limiting FaultsWATTS BAR WBNP-107 Figure 15.4-11b Transient Response to Steam Line Break with Safety Injection and Offsite Power (CASE A)
Condition IV - Limiting Faults15.4-91WATTS BAR WBNP-107 Figure 15.4-11c Transient Response to Steam Line Break with Safety Injection and Offsite Power (CASE A) 15.4-92Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-12a Transient Response to Steam Line Break without Offsite PowerNuclear Power and Reactivity Versus Time Condition IV - Limiting Faults15.4-93WATTS BAR WBNP-107Figure 15.4-12b Transient Response to Steam Line Break without Offsite PowerCore Average Temperature and RCS Pressure Versus Time 15.4-94Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-12c Transient Response to Steam Line Break without Offsite PowerFaulted Loop Steam Flow Versus Time Condition IV - Limiting Faults15.4-95WATTS BAR WBNP-107Figure 15.4-13a Pressurizer Pressure and Water Volume Transients for Main Feedline Rupture With Offsite Power 15.4-96Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-13b Reactor Coolant Temperature Transients Main Feedline Rupture With Offsite Power Condition IV - Limiting Faults15.4-97WATTS BAR WBNP-107Figure 15.4-13c Steam Generator Pressure and Water Mass Transients for Main Feedline Rupture With Offsite Power 15.4-98Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-14A Pressurizer Pressure and Water Volume Transients for Main Feedline Rupture Without Offsite Power Condition IV - Limiting Faults15.4-99WATTS BAR WBNP-107Figure 15.4-14B Reactor Coolant Temperature Transients for Main Feedline Rupture Without Offsite Power 15.4-100Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-14C Steam Generator Pressure and Water Mass Transients for Main Feedline Rupture Without Offsite Power Condition IV - Limiting Faults15.4-101WATTS BAR WBNP-107Figure 15.4-15 RCS Pressure Transient; Four Pumps in Operation, One Locked Rotor 15.4-102Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-16 Deleted by Amendment 80 Condition IV - Limiting Faults15.4-103WATTS BAR WBNP-107Figure 15.4-17 Reactor Vessel Flow Transient; Four Pumps in Operation, One Locked Rotor 15.4-104Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-18 Loop Flow Transient; Four Pumps in Operation, One Locked Rotor Condition IV - Limiting Faults15.4-105WATTS BAR WBNP-107Figure 15.4-19 Core Heat Flux Transient; Four Pumps in Operation, One Locked Rotor 15.4-106Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-20 Nuclear Power Transient; Four Pumps in Operation, One Locked Rotor Condition IV - Limiting Faults15.4-107WATTS BAR WBNP-107Figure 15.4-21 Clad Inner Temperature Transient; Four Pumps in Operation, One Locked Rotor
15.4-108Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-22 Deleted by Amendment 80 Condition IV - Limiting Faults15.4-109WATTS BAR WBNP-107Figure 15.4-23 Deleted by Amendment 80 15.4-110Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-24 Nuclear Power Transient; BOL HFP Rod Ejection Accident Condition IV - Limiting Faults15.4-111WATTS BAR WBNP-107Figure 15.4-25 Hot Spot Fuel and Clad Temperature Versus Time; BOL HFP Rod Ejection Accident 15.4-112Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-26 Nuclear Power Transient; EOL HZP Rod Ejection Accident Condition IV - Limiting Faults15.4-113WATTS BAR WBNP-107Figure 15.4-27 Hot Spot Fuel and Clad Temperature Versus Time; EOL HZP Rod Ejection Accident 15.4-114Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-28 Reactor Coolant System Integrated Break Flow Following a Rod Ejection Accident Condition IV - Limiting Faults15.4-115WATTS BARWBNP-107Figure 15.4-29 Deleted by Amendment 97 15.4-116Condition IV - Limiting FaultsWATTS BARWBNP-107Figure 15.4-30 Deleted by Amendment97 Condition IV - Limiting Faults15.4-117WATTS BAR WBNP-107Figure 15.4-31 Deleted by Amendment9 15.4-118Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-32 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-119WATTS BAR WBNP-107Figure 15.4-33 Deleted by Amendment 97 15.4-120Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-34 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-121WATTS BARWBNP-107Figure 15.4-35 Deleted by Amendment 97 15.4-122Condition IV - Limiting FaultsWATTS BARWBNP-107Figure 15.4-36 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-123WATTS BAR WBNP-107Figure 15.4-37 Deleted by Amendment 97 15.4-124Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-38 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-125WATTS BAR WBNP-107Figure 15.4-39 Deleted by Amendment 97 15.4-126Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-40a Deleted by Amendment 97 Condition IV - Limiting Faults15.4-127WATTS BAR WBNP-107Figure 15.4-40b Watts Bar Unit 2 Lower Bound Containment Pressure 15.4-128Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-40c Watts Bar Unit 2 Containment Temperatures Condition IV - Limiting Faults15.4-129WATTS BAR WBNP-107Figure 15.4-40d Watts Bar Unit 2 Lower Compartment Structural Heat Removal Rate 15.4-130Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-40e Watts Bar Unit 2 Ice Bed Heat Removal Rate Condition IV - Limiting Faults15.4-131WATTS BAR WBNP-107Figure 15.4-40f Watts Bar Unit2 Sump Heat Removal Rate 15.4-132Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-40g Watts Bar Unit2 Sump Heat Removal Rate Condition IV - Limiting Faults15.4-133WATTS BAR WBNP-107Figure 15.4-40h Containment Lower Compartment Pressure, Maximum Safeguards, Upflow Barrel/Baffle Region 15.4-134Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-40i Compartment Temperatures, Maximum Safeguards, Upflow Barrel/Baffle Region Condition IV - Limiting Faults15.4-135WATTS BAR WBNP-107Figure 15.4-40j Lower Compartment Structural Heat Removal Rate, Maximum Safeguards, Upflow Barrel/Baffle Region 15.4-136Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-40k Ice Bed Heat Removal Rate, Maximum Safeguards, Upflow Barrel/Baffle Region Condition IV - Limiting Faults15.4-137WATTS BAR WBNP-107Figure 15.4-40l Heat Removal by Sump, Maximum Safeguards, Upflow Barrel/Baffle Region 15.4-138Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-40m Heat Removal by Spray, Maximum Safeguards, Upflow Barrel/Baffle Region Condition IV - Limiting Faults15.4-139WATTS BAR WBNP-107Figure 15.4-41a Watts Bar Unit 2 Limiting PCT Case Hotspot PCT At The Limiting Elevation 15.4-140Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-41b Watts Bar Uni 2 Limiting PCT Case WC/T PCT Condition IV - Limiting Faults15.4-141WATTS BAR WBNP-107Figure 15.4-42 Watts Bar Unit 2 Limiting PCT Case Break Flow 15.4-142Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-43 Watts Bar Unit 2 Limitig PCT Case Pressuizer Pressue Condition IV - Limiting Faults15.4-143WATTS BAR WBNP-107Figure 15.4-44 Watts Bar Unit 2 Limiting PCT Case Broken And Intact Loop Void Fraction 15.4-144Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-45 Watts Bar Unit 2 Limiting PCT Case Vapor Flow At Top Of Core Average Channel Condition IV - Limiting Faults15.4-145WATTS BAR WBNP-107Figure 15.4-46 Watts Bar Unit 2 Limiting PCT Case Vapor Flow At Top Of Hot Assembly Channel 15.4-146Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-47 Watts Bar Unit 2 Limiting PCT Case Lower Plenum Collapsed Liquid Level Condition IV - Limiting Faults15.4-147WATTS BAR WBNP-107Figure 15.4-48 Watts Bar Unit 2 Limiting PCT Case Loop 2 Accumulator Flow
15.4-148Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-49 Watts Bar Unit 2 Limiting PCT Case Loop 2 Safety Injection Flow Condition IV - Limiting Faults15.4-149WATTS BAR WBNP-107Figure 15.4-50 Watts Bar Unit 2 Limiting PCT Case Core Average Channel Collapsed Liquid Level 15.4-150Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-51 Watts Bar Unit 2 Limiting PCT Case Loop 2 Downcomer Collapsed Liquid Level Condition IV - Limiting Faults15.4-151WATTS BAR WBNP-107Figure 15.4-52 Watts Bar Unit 2 Limiting PCT Vessel Fluid Mass 15.4-152Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-53 Watts Bar Unit 2 Limiting PCT Case PCT Location Condition IV - Limiting Faults15.4-153WATTS BAR WBNP-107Figure 15.4-54 Watts Bar Unit 2 Limiting PCT Case Liquid And Saturation Temperature At Bottom Of Downcomer 15.4-154Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-55 Watts Bar Unit 2 Limiting PCT Case PCT For All Rods Condition IV - Limiting Faults15.4-155WATTS BAR WBNP-107Figure 15.4-56 Watts Bar Unit 2 BELOCA Analysis Axial Power Shape Operating Space Envelope 15.4-156Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-57 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-157WATTS BAR WBNP-107Figure 15.4-58 Deleted by Amendment 97 15.4-158Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-59 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-159WATTS BAR WBNP-107Figure 15.4-60 Deleted by Amendment 97 15.4-160Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-61 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-161WATTS BAR WBNP-107Figure 15.4-62 Deleted by Amendment 97 15.4-162Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-63 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-163WATTS BAR WBNP-107Figure 15.4-64 Deleted by Amendment 97 15.4-164Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-65 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-165WATTS BAR WBNP-107Figure 15.4-66 Deleted by Amendment 97 15.4-166Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-67 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-167WATTS BAR WBNP-107Figure 15.4-68a Deleted by Amendment 97 15.4-168Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-68b Deleted by Amendment 97 Condition IV - Limiting Faults15.4-169WATTS BAR WBNP-107Figure 15.4-68c Deleted by Amendment 97 15.4-170Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-68d Deleted by Amendment 97 Condition IV - Limiting Faults15.4-171WATTS BAR WBNP-107Figure 15.4-68e Deleted by Amendment 97 15.4-172Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-68f Deleted by Amendment 97 Condition IV - Limiting Faults15.4-173WATTS BAR WBNP-107Figure 15.4-68g Deleted by Amendment 97 15.4-174Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-68h Deleted by Amendment 97 Condition IV - Limiting Faults15.4-175WATTS BAR WBNP-107Figure 15.4-68i Deleted by Amendment 97 15.4-176Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-68j Deleted by Amendment 97 Condition IV - Limiting Faults15.4-177WATTS BAR WBNP-107Figure 15.4-68k Deleted by Amendment 97 15.4-178Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-68l Deleted by Amendment 97 Condition IV - Limiting Faults15.4-179WATTS BAR WBNP-107Figure 15.4-68m Deleted by Amendment 97 15.4-180Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-68n Deleted by Amendment 97 Condition IV - Limiting Faults15.4-181WATTS BAR WBNP-107Figure 15.4-69 Deleted by Amendment 97 15.4-182Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-70 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-183WATTS BAR WBNP-107Figure 15.4-71 Deleted by Amendment 97 15.4-184Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-72 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-185WATTS BAR WBNP-107Figure 15.4-73 Deleted by Amendment 97 15.4-186Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-74 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-187WATTS BAR WBNP-107Figure 15.4-75 Deleted by Amendment 97 15.4-188Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-76 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-189WATTS BAR WBNP-107Figure 15.4-77 Deleted by Amendment 97 15.4-190Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-78 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-191WATTS BAR WBNP-107Figure 15.4-79 Deleted by Amendment 97 15.4-192Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-80 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-193WATTS BAR WBNP-107Figure 15.4-81 Deleted by Amendment 97 15.4-194Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-82 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-195WATTS BAR WBNP-107Figure 15.4-83 Deleted by Amendment 97 15.4-196Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-84 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-197WATTS BAR WBNP-107Figure 15.4-85 Deleted by Amendment 97 15.4-198Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-86 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-199WATTS BAR WBNP-107Figure 15.4-87 Deleted by Amendment 97 15.4-200Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-88 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-201WATTS BAR WBNP-107Figure 15.4-89 Deleted by Amendment 97 15.4-202Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-90 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-203WATTS BAR WBNP-107Figure 15.4-91 Deleted by Amendment 97 15.4-204Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-92 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-205WATTS BAR WBNP-107Figure 15.4-93 Deleted by Amendment 97 15.4-206Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-94 Deleted by Amendment 97 Condition IV - Limiting Faults15.4-207WATTS BAR WBNP-107Figure 15.4-95 Deleted by Amendment 97 15.4-208Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-96a Deleted by Amendment 97 Condition IV - Limiting Faults15.4-209WATTS BAR WBNP-107Figure 15.4-96b Deleted by Amendment 97 15.4-210Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-96c Deleted by Amendment 97 Condition IV - Limiting Faults15.4-211WATTS BAR WBNP-107Figure 15.4-96d Deleted by Amendment 97 15.4-212Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-96e Deleted by Amendment 97 Condition IV - Limiting Faults15.4-213WATTS BAR WBNP-107Figure 15.4-96f Deleted by Amendment 97 15.4-214Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-96g Deleted by Amendment 97 Condition IV - Limiting Faults15.4-215WATTS BAR WBNP-107Figure 15.4-97a Steam Generator Tube Rupture Analysis Pressurizer Level 15.4-216Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-97b Steam Generator Tube Ruptue Analysis RCS Pressure Condition IV - Limiting Faults15.4-217WATTS BAR WBNP-107Figure 15.4-97c Steam Generator Tube Ruptue Analysis -Secondary Pressure 15.4-218Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-97d Steam Generator Tube Ruptue Analysis -Intact Loop Hot and Cold Leg Temperatures Condition IV - Limiting Faults15.4-219WATTS BAR WBNP-107Figure 15.4-97e Steam Generator Tube Ruptue Analysis -Ruptured Loop Hot and Cold Leg Temperatures 15.4-220Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-97f Steam Generator Tube Ruptue Analysis - Differential Pressure Between RCS and Ruptured SG Condition IV - Limiting Faults15.4-221WATTS BAR WBNP-107Figure 15.4-97g Steam Generator Tube Ruptue Analysis - Primary to Secondary Break Flow Rate 15.4-222Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-97h Steam Generator Tube Ruptue Analysis - Ruptured SG Water Volume*
Condition IV - Limiting Faults15.4-223WATTS BAR WBNP-107Figure 15.4-97i Steam Generator Tube Ruptue Analysis - Ruptured SG Water Mass 15.4-224Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-97j Steam Generator Tube Ruptue Analysis - Ruptured SG Mass Release Rate to the Atmosphere Condition IV - Limiting Faults15.4-225WATTS BAR WBNP-107Figure 15.4-97k Steam Generator Tube Ruptue Analysis - Intact SGs Mass Release Rate to the Atmosphere 15.4-226Condition IV - Limiting FaultsWATTS BAR WBNP-107Figure 15.4-97l Steam Generator Tube Ruptue Analysis - Break Flow Flashing Fraction Condition IV - Limiting Faults15.4-227WATTS BAR WBNP-107Figure 15.4-97m Deleted by Amendment 97 15.4-228Condition IV - Limiting FaultsWATTS BAR WBNP-107 THIS PAGE INTENTIONALLY BLANK ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-1WATTS BARWBNP-10715.5 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS15.5.1 Environmental Consequences of a Postulated Loss of AC Power to the Plant AuxiliariesThe postulated accidents involving release of steam from the secondary system will not result in a release of radioactivity unless there is leakage from the reactor coolant system (RCS) to the secondary system in the steam generator. A conservative analysis of the potential offsite doses resulting from this accident is presented with steam generator leakage as a parameter. This analysis incorporates assumptions of a Technical Specification limit of 0.1
µCi/gm I-131 dose equivalent, and a realistic source term. Parameters used in both the realistic and conservative analyses are listed in Table 15.5-1.The realistic assumptions that determine the equilibrium concentrations of isotopes in the secondary system are as follows:
(1)Primary coolant activity is associated with 0.125% defective fuel and is given in Table 11.1-7.
(2)The iodine partition factor in the steam generators is:
(3)No noble gas is dissolved or contained in the steam generator water, i.e., all noble gas leaked to the secondary system is continuously released with steam from the steam generators through the condenser off gas system.
(4)The 0-2 and 2-8 hour atmospheric dilution factors given in Appendix 15A and Table 15.5-14; the 0-8 hour breathing rate of 3.47 x 10
-4 m 3/sec are applicable. Doses are based on the dose models in Appendix 15A .
(5)Primary and Secondary side source terms are based on ANSI/ANS-18.1-1984.Assumptions used for the conservative analysis are the same as the realistic assumptions except the Secondary side source terms at the Technical Specification limit of 0.1
µCi/gm I-131 dose equivalent are assumed.The steam releases to the atmosphere for the loss of AC power are in Table 15.5-1.The gamma, beta, and thyroid doses for the loss of AC power to the plant auxiliaries at the exclusion area boundary and low population zone are in Table 15.5-2 for the realistic and conservative analyses. These doses are calculated by the FENCDOSE amount of iodine/unit mass steamamount of iodine/unit mass liquid
= 0.01 15.5-2ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107computer code[16]. The doses for this accident are less than 25 rem whole body, 300 rem beta and 300 rem thyroid. This is well within the limits as defined in 10 CFR 100. The whole body, beta, and thyroid doses to control room personnel from the radiation sources discussed above are presented in Table 15.5-2. The doses are calculated by the COROD computer code
[17]. Parameters for the control room analysis are found in Table 15.5-14. The dose to whole body is below the GDC 19 limit of 5 rem for control room personnel, and thyroid dose is below the limit of 30 rem.Dose equations in TID-14844
[23] were used to determine the dose. Dose conversion factors in ICRP-30 [25] were used to determine thyroid doses in place of those found in TID-14844.
15.5.2 Environmental Consequences of a Postulat ed Waste Gas Decay Tank RuptureTwo analyses of the postulated waste gas decay tank rupture are performed:(1) a realistic analysis, and (2) an analysis based on Regulatory Guide 1.24 (Reference 2). The parameters used for each of these analyses are listed in Table 15.5-3. The assumptions for the Regulatory Guide analysis are:
(1)The reactor has been operating at full power with 1% defective fuel for the RG 1.24 analysis.
(2)The maximum content of the decay tank assumed to fail is used for the purpose of computing the noble gas inventory in the tank. Radiological decay is taken into account in the computation only for the minimum time period required to transfer the gases from the reactor coolant system to the decay tank. For the Regulatory Guide 1.24 analysis, noble gas and iodine inventories of the tank are given in Table 15.5-4. For the realistic analysis, source terms are based on ANSI/ANS-18.1-1984 methodology
[14].(3)The tank rupture is assumed to occur immediately upon completion of the waste gas transfer, releasing the entire contents of the tank through the Auxiliary Building vent to the outside atmosphere. The assumption of the release of the noble gas inventory from only a single tank is based on the fact that all gas decay tanks will be isolated from each other whenever they are in use.(4)The short-term (i.e., 0-2 hour) dilution factor at the exclusion area boundary given in Appendix 15A is used to evaluate the doses from the released activity. Doses are based on the dose models presented in Appendix 15A. The gamma, beta, and thyroid doses for the gas decay tank rupture at the exclusion area boundary and low population zone are given in Table 15.5-5 for both the realistic and Regulatory Guide 1.24 analyses.
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-3WATTS BARWBNP-107 (5)The whole body, beta, and thyroid doses to control room personnel from the radiation sources discussed above are presented in Table 15.5-5. The doses are calculated by the COROD computer code
[17]. Parameters for the control room analysis are found in Table 15.5-14. The dose to whole body is below the GDC 19 limit of 5 rem for control room personnel, and thyroid dose is below the limit of 30 rem.Dose equations in TID-14844
[23] were used to determine the dose. Dose conversion factors in ICRP-30 [25] were used to determine thyroid doses in place of those found in TID-14844.
15.5.3 Environmental Consequences of a Postulated Loss of Coolant AccidentThe results of the analysis presented in this section demonstrate that the amounts of radioactivity released to the environment in the event of a loss-of-coolant accident do not result in doses which exceed the reference values specified in a 10 CFR 100.The analysis is based on Regulatory Guide 1.4
[3]. The parameters used for this analysis are listed in Table 15.5-6. In addition, an evaluation of the dose to control room operators and an evaluation of the offsite doses resulting from recirculation loop leakage are presented.Fission Product Release to the ContainmentFollowing a postulated double-ended rupture of a reactor coolant pipe with subsequent blowdown, the emergency core cooling system keeps cladding temperatures well below melting, and limits zirconium-water reactions to an insignificant level, assuring that the core remains intact and in place. As a result of the increase in cladding temperature and rapid depressurization of the core, however, some cladding failure may occur in the hottest regions of the core. Thus, a fraction of the fission products accumulated in the pellet-cladding gap may be released to the reactor coolant system and thereby to the primary containment.In this analysis, based on Regulatory Guide 1.4
[3], a total of 100% of the noble gas core inventory and 25% of the core iodine inventory is assumed to be immediately available for leakage from the primary containment. Of the halogen activity available for release, it is further assumed that 91% is in elemental form, 4% in methyl form, and 5% in particulate form. The core inventory of iodines and noble gases is listed in Table15.1-5. Primary Containment ModelThe quantity of activity released from the containment was calculated with a single volume model of the containment.If it is assumed that there are no sources of activity following the initial instantaneous release of fission products to the containment, the equation which describes the time dependent activity or quantity of material in a component is:
15.5-4ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107where A ij is the activity or quantity of material i in component j. Pij is the rate at which activity or material i is added to component j, and ij is the rate at which activity or material i is removed or lost from component j. If both and P are independent of time, then for one material and one component one obtains the solution:where A o is the initial activity. However, in general, P is time dependent and in some cases is also time dependent. The addition of material to the component, P ij(t), may come from two sources: (1) flow from another component in the system may add material to the component, (2) material may be produced within the component by radioactive decay. Thus, the addition rate for material i to component j can be expressed as:where:is the transfer coefficient of i from component jj to j, and is the rate of pr oduction of i from ii in component j. Note that ii-i is not normally a function of time or component.Similarly, the loss from a component can be due to: (1) loss within the component (such as radioactive decay), (2) flow out of the component to other components, and (3) removal from the system. Thus, the loss rate from component j for material i can be expressed as:where i is the removal rate inside the component due to radioactive decay (neither time nor component dependent), (1)dA ij tdt----------------
--ij A ij tP ij t+=(2)AA 0 et-P----1 et--+=(3)P ij tP ij 1tP ij 2t+=P ij 1tcijjj-tA ijj tcijjj-t;jjj n=P i 2tiii-A iij tiii-;ii n=ij tiij 2tij 3t++=(4)
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-5WATTS BARWBNP-107 is the transfer coefficient of material i from component j to jj,and is the removal from the system.A computer program Source Transport Program (STP) has been developed to solve equation (1) for each isotope and for two halogen forms (i.e., elemental and or organic). From this, the isotopic concentration airborne in the containment as a function of time and the integrated isotopic leakage from the containment for a given time period can be obtained. Parameters used in the loss-of-coolant accident analysis are listed in Table 15.5-6.Modeling of Removal ProcessFor fission products other than iodine, the only removal processes considered are radioactive decay and leakage.The fission product iodine is assumed to be present in the containment atmosphere in elemental, organic, and particulate form. It is assumed that 91% of the iodine available for leakage from the containment is in elemental (i.e., I 2 vapor) form, 4% is assumed to be in the form of organic iodine compounds (e.g., methyl iodine), and 5% is assumed to be absorbed on airborne particulate matter. In this analysis it was conservatively assumed that the organic form of iodine is not subject to any removal processes other than radioactive decay and leakage from the containment. The elemental and particulate forms of iodine are assumed to behave identically.The effectiveness of the ice condenser for elemental iodine removal is described in Section 6.5.4. For the calculation of doses, the ice condenser was treated as a time dependent removal process. The time dependent ice condenser iodine removal efficiencies for the Regulatory Guide 1.4 analysis are given in Table 15.5-7.Ice CondenserThe ice condenser is designed to limit the leakage of airborne activity from the containment in the event of a loss-of-coolant accident. This is accomplished by the removal of heat released to the containment during the accident to the extent necessary to initially maintain that structure below design pressure and then reduce the pressure to near atmospheric. The addition of an alkaline solution such as sodium tetraborate enhances the iodine removal qualities of the melting ice to a point where credit can be assumed in the radiological analyses.The operation of the containment deck fans (air return fans) is delayed for approximately 10 minutes following a Phase B isolation signal resulting from the loss-of-coolant accident.This delay in fan operation yields an initial inlet steam-air mixture into the ice condenser of greater than 90% steam by volume which results in more efficient iodine removal by the ice condenser.ij 2tfijjj-tfijjj-t;jjj n=ij 3t 15.5-6ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107As a result of experimental and analytical efforts, the ice condenser system has been proven to be an effective passive system for removing iodine from the containment atmosphere following a loss-of-coolant accident. (Reference 4)With respect to iodine removal by the ice condenser, the following assumptions were made: (1)The ice condenser is only effective in removing airborne elemental and particulate iodine from the containment atmosphere.
(2)The ice condenser is modeled as a time dependent removal process.
(3)The ice condenser is no longer effective in removing iodine after all of the ice has been melted using the most conservative assumptions.Primary Containment Leak RateThe primary containment leak rate used in the Regulatory Guide 1.4 analysis for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is the design basis leak rate guaranteed in the technical specifications regarding containment leakage and it is 50% of this value for the remainder of the 30 day period. Thus, for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following the accident, the leak rate was assumed to be 0.25% per day and the leak rate was assumed to be 0.125% per day for the remainder of the 30 day period.The leakage from the primary containment can be grouped into two categories: (1) leakage into the annulus volume and (2) through line leakage to rooms in the Auxiliary Building (see Figure 15.5-1). The environmental effects of the core release source events have been analyzed on the basis that 25% of the total primary containment leakage goes to the Auxiliary Building.The leakage paths to the Auxiliary Building are tested as part of the normal Appendix J testing of all containment penetrations. An upper bound to leakage to the Auxiliary Building was estimated to be 25% of the total containment leakage. Selecting an upper bound is conservative because an increasing leakage fraction to the Auxiliary Building results in an increasing calculated offsite dose. This upper bound was also selected on the basis that it is large enough to be verified by testing. The periodic Appendix J testing will assure that leakage to the Auxiliary Building remains below 25%. The remaining 75% of the leakage goes to the annulus.Bypass Leakage PathsThere are no bypass paths for primary containment leakage to go directly to the atmosphere without being filtered. For further details see the discussion on Type E leakage paths in Section 6.2.4.3.1.Auxiliary Building Release PathThe Auxiliary Building allows holdup and is normally ventilated by the auxiliary building ventilation system. However, upon an ABI signal following a loss-of-coolant accident, the normal ventilation systems to all areas of the Auxiliary Building are shutdown and ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-7WATTS BARWBNP-107isolated. Upon Auxiliary Building isolation, the Auxiliary Building gas treatment system (ABGTS) is activated to provide ventilation of the area and filtration of the exhaust to the atmosphere. This system is described in Section 6.2.3.2.3.Fission products which leak from the primary containment to areas of the Auxiliary Building are diluted in the room atmosphere and travel via ducts and other rooms to the fuel handling area or the waste packaging area where the suctions for the Auxiliary Building gas treatment system are located. The mean holdup time for airborne activity in the Auxiliary Building areas other than the fuel handling area is greater than one hour with the Auxiliary Building isolated and both trains of the ABGTS operating. It has been conservatively assumed in the estimation of activity release that activity leaking to the Auxiliary Building is directly released to the environment for the first four minutes and then through the ABGTS filter system, with a conservatively assumed mean hold-up time of 0.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> in the Auxiliary Building before being exhausted. In the Regulatory Guide 1.4 analysis the ABGTS filter system is assumed to have a removal efficiency of 99% for elemental, organic, and particulate iodines. Minor leakage into the ABGTS and EGTS ductwork allows some unfiltered Auxiliary Building air to be released to the environment. This leakage, quantified by testing, is modeled in the LOCA analysis as indicated in Table 15.5-6 and does not significantly impact doses. The Auxiliary Building internal pressure is maintained at less than atmospheric during normal operation (see Section 9.4.2 and 9.4.3), thereby preventing release to the environment without filtration following a LOCA. The annulus pressure is maintained more negative than the Auxiliary Building internal pressure during normal operation and after a DBA. Therefore, any leakage between the two volumes following a LOCA is into the annulus. Shield Building ReleasesThe presence of the annulus between the primary containment and the Shield Building reduces the probability of direct leakage from the vessel to the atmosphere and allows holdup, dilution, sizing, and plate-out of fission products in the Shield Building. The major factor in the effectiveness of the secondary containment is its inherent capability to collect the containment leakage for filtration of the radioactive iodine prior to release to the environment. This effect is greatly enhanced by the recirculation feature of the air handling systems, which forces repeated filtration passes for the major fraction of the primary containment leakage before release to the environment. Seventy-five percent of the primary containment leakage is assumed to go to the annulus volume.The initial pressure in the annulus is less than atmospheric. However, the dose analysis conservatively assumes the Annulus is at atmospheric pressure at event initiation. After blowdown, the annulus pressure will increase rapidly due to expansion of the containment vessel as a result of primary containment atmosphere temperature and pressure increases. The annulus pressure will continue to rise due to heating of the annulus atmosphere by conduction through the containment vessel. After a delay, the EGTS operates to maintain the annulus pressure below atmospheric pressure.The EGTS is essentially an annulus recirculation system with pressure activated valves which allow part of the system flow to be exhausted to atmosphere to maintain 15.5-8ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107a "negative" annulus pressure. The system includes absolute and impregnated charcoal filters for removal of halogens. The EGTS combined with ABGTS ensures that all primary containment leakage is filtered before release to the atmosphere.The EGTS suction in the annulus is located at the top of the containment dome, while nearly all penetrations are located near the bottom of the containment (see Section 6.2), thereby minimizing the probability of leakage directly from the primary containment into the EGTS.Transfer of activity from the annulus volume to the EGTS suction is assumed to be a statistical process similar mathematically to the decay process, (i.e., the rate of removal from the annulus is proportional to the activity in the annulus). This corresponds an assumption that the activity is homogeneously distributed throughout the mixing volume. Because of the low EGTS flow rate (compared to the annulus volume), the thermal convection due to heating of the containment vessel, and the relative locations of the EGTS suctions (at the top of the dome) and the EGTS recirculation exhausts (at the base of the annulus), a high degree of mixing can be expected. It is conservatively assumed that only 50% of the annulus free volume is available for mixing of activity in the Regulatory Guide 1.4 analysis.Tables 15.5-8 and 15.5-8A list the EGTS and recirculation flow rates as a function of time after the LOCA, which were used for calculation of activity releases for the Regulatory Guide 1.4 analysis. Table 15.5-8 flow rates are as a result of a postulated single failure loss of one train of EGTS concurrent with LOCA. Table 15.5-8A flow rates are as a result of an alternate single failure scenario resulting in one pressure control train in full exhaust to the shield building exhaust stack while the other train remains functional. Both EGTS fans are in service until operator action is taken to place one fan in standby between one and two hours post accident. The flow path of fission products which are drawn into the air handling systems is shown schematically in Figure 15.5-1 where: L 0Represents the flow of activity from primary containment to the annulus L 1Represents the flow of activity from primary containment to the Auxiliary BuildingLRepresents the flow of activity from the annulus into the EGTS KRepresents the ratio of EGTS recirculation flow to total EGTS flow rate
n fRepresents the appropriate filter efficiencyEffectiveness of Double Containment DesignThe analysis has demonstrated clearly the benefits of the double containment concept. As would be expected for a double barrier arrangement, the second barrier acts as an effective holdup tank, resulting in substantial reduction in the two-hour inhalation and whole body immersion doses. The expected offsite doses for the 30-day period at the ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-9WATTS BARWBNP-107low population zone are also substantially reduced, since the holdup process is effective for the duration of the accident.The EGTS exhaust flow rate is dependent on the rate of air inleakage to the annulus. In fact, after about 30 minutes following blowdown of the reactor vessel the EGTS exhaust flow is approximately equal to the air inleakage rate. Studies
[5] made of leak rates from typical concrete buildings of this type have resulted in leak rates from 4% to 8% per day at a pressure differential of 14 inches of water. Although the pressure differential in this case will be much lower than this value, it has been assumed that a shield building inleakage flow of 250 cfm exists throughout the 30-day period for the single failure scenario which results in loss of one EGTS train concurrent with a LOCA. The inleakage flow for the single failure scenario which results in one pressure control train in full exhaust to the shield building exhaust stack (while the other train remains functional) was conservatively assumed to be greater since the resulting annulus pressure is more negative than the original single failure scenario loss of one EGTS train. The long term inleakage flow rates of 832 cfm (until operator action to place one fan in standby) and 604 cfm thereafter are used in the dose analysis. This inleakage flow includes leakage past ventilation system primary containment isolation valves assuming that a single isolation valve fails in the open position.In order to evaluate the effectiveness of the Shield Building, the following case was analyzed:50% Mixing CaseAt the beginning of the accident, the EGTS starts exhausting filtered fission products to the environs (see Tables 15.5-8 and 15.5-8A). At approximately 114 seconds for the loss of one EGTS train the Annulus pressure becomes less than -0.25 inches w.g. and the effluents are filtered for the duration of the accident. At approximately 60 seconds (for the single failure scenario which results in one pressure control train in full exhaust to the shield building exhaust stack while the other train remains functonal) the annulus pressure becomes less than minus 0.25 inches w.g., and the effluents are filtered for the duration of the accident. All of the primary containment leakage going to the shield building is assumed to be uniformly mixed in 50% of the annulus free volume.Emergency Gas Treatment System Filter EfficienciesThe EGTS takes suction from the annulus, and the exhaust gases are drawn through two banks of impregnated charcoal filters in series. Sufficient filter capacity is provided to contain all iodines, inorganic, organic, and particulate available for leakage. Since the air in the annulus is dry, filter efficiencies of greater than 99% are attainable as reported in ORNL-NSIC-4
[6]. Heaters and demisters have been incorporated upstream of the filters resulting in a relative humidity of less than 70% in the air entering the filters which further ensures high filter efficiency.In the Regulatory Guide 1.4 analysis however, an overall removal efficiency of 99% for elemental, organic, and particulate iodine is assumed for the two filter banks in series.
15.5-10ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Discussion of ResultsThe gamma, beta, and thyroid doses for the LOCA at the exclusion area boundary and the low population zone are given in Table 15.5-9. These doses are calculated by the FENCDOSE computer code
[16]. The doses are based on the atmospheric dilution factors and dose models given in Appendix 15A. The doses for this accident are less than 25 rem whole body, 300 rem beta, and 300 rem thyroid. The doses are well within the 10 CFR 100 guidelines and reflect the worst case values in consideration of both single failure scenarios.Loss of Coolant Accident - Environmental Consequences of Recirculation Loop LeakageComponent leakage in the portion of the emergency core cooling system outside containment during the recirculation phase following a loss of coolant accident could result in offsite exposure. The maximum potential leakage for this equipment is specified is Table 6.3-6. This leakage refers to specified design limits for components and normal leakage is expected to be well below those upper limits. Recirculation is assumed in the analysis to start at 10 minutes after the loss of coolant accident. At this time the sump temperature is approximately 160F (Figure 6.2.1-3). The enthalpy of the sump is approximately 130 BTU/lb. The enthalpy of saturated liquid at 1.0 atmosphere pressure and 212F is greater than 130 BTU/lb. Therefore, there will be no flashing of the leakage from recirculation loop components, and an iodine partition factor of 0.1 is assumed for the total leakage. The analysis of the environmental consequences is performed as follows:Core iodine inventory given in Table 15.1-5 is used. The water volume is comprised of water volumes from the reactor coolant system, accumulators, refueling water storage tank, and ice melt. All the noble gases are assumed to escape to the primary containment. Ninety-seven percent of trituim was assumed to remain liquid and accumulate in the sump, while 3% was assumed to go airborne to the containment. An alternate analysis was also performed assuming 100% of the tritium goes airborne into the containment. Radioactive decay was taken into account in the dose calculation. The major assumptions used in the analysis are listed in Table 15.5-12. The offsite doses at the exclusion area boundary and low population zone for the analysis are given in Table 15.5-13 and reflect the worst case values in consideration of 3% airborne tritium or 100% airborne tritium. The atmospheric dilution factors and dose models discussed in Appendix 15A are used in the dose analysis. The whole body, beta, and thyroid doses to control room personnel from the radiation sources discussed above are presented in Table 15.5-13. The doses are calculated by the COROD computer code
[17]. Parameters for the control room analysis are found in Table 15.5-14. The dose to whole body is below the GDC 19 limit of 5 rem for control room personnel, and thyroid dose is below the limit of 30 rem.Dose equations in TID-14844
[23] were used to determine the dose. Dose conversion factors in ICRP-30 [25] were used to determine thyroid doses in place of those found in TID-14844.
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-11WATTS BARWBNP-107Loss of Coolant Accident - Control Room Operator DosesIn accordance with General Design Criterion 19, the control room ventilation system and shielding have been designed to limit the whole body gamma dose during an accident period to 5 rem, the thyroid dose to 30 rem and the beta skin dose to 30 rem.The doses to personnel during a post-accident period originate from several different sources. Exposure within the control room may result from airborne radioactive nuclides entering the control room via the ventilation system. In addition, personnel are exposed to direct gamma radiation penetrating the control room walls, floor, and roof from:
(1)Radioactivity within the primary containment atmosphere (2)Radioactivity released from containment which may have entered adjacent structures (3)Radioactivity released from containment which passes above the control room roofFurther exposure of control room personnel to radiation may occur during ingress to the control room from the exclusion area boundary and during egress from the control room to the exclusion area boundary.In the event of a radioactive release incident, the control room is isolated automatically by a safety injection system signal and/or by radiation signal from beta detectors located in the air intake stream common to the air intake ports at either end of the Control Building. These redundant signals are routed to redundant controls which actuate air-operated isolation dampers downstream of the beta detectors. Operation of the emergency pressurizing fans with inline HEPA filters and charcoal adsorbers is also initiated by these signals. Simultaneously, recirculation air is rerouted automatically through the HEPA filters and charcoal adsorbers. Approximately 711 cfm of outside air, the emergency pressurization air, flows through a duct routed to the emergency recirculation system upstream of the HEPA filters and charcoal adsorbers. This flow of outside air provides the control room with a slight positive pressure relative to the atmosphere outside and to surrounding structures. In addition, the equivalent of 51 cfm of unfiltered outside air enters through the main control room doors and other sources. Isolation dampers located in each intake line may be selectively closed by control room personnel. The selection between the two would be based on the objective of admitting a minimum of airborne activity to the control room via the makeup airflow.The control room ventilation flow system is shown in Figure 9.4-1.To evaluate the ability of the control room to meet the requirements of General Design Criterion 19, a time-dependent model of the control room was developed. In this model, the outside air concentration enters the control room via the isolation damper bypass line and the HEPA filters and charcoal absorbers. The concentration in the room is reduced by decay, leakage out, and by recirculation through the HEPA filters 15.5-12ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107and charcoal absorbers. Credit for filtration is taken during two passes through the charcoal absorbers. Using these assumptions, the following equations for the rate of change of the control room concentrations are obtained:Where:M(t)=Once-filtered time-dependent concentration N(t)=Twice-filtered (or more) time-dependent concentration C(t)=Total time-dependent concentration in control room
C o=Concentration of isotope entering air intake K 1=Filter efficiency for a particular isotope during first pass K 2=Filter efficiency for a particular isotope during second passL=Flow rate of outside air into control room and leakage out of control room
R c=Recirculated air flow rate through filters=Decay constantV= Control room free volumeThese equations are readily solvable if C o is constant or a simple function of time during a time interval. Since C o consists of a number of terms involving exponentials, it was assumed to be constant during particular time intervals corresponding to the average concentration during each interval as described below. Solving equations (1), (2), and (3) yields:
(1)dM dt--------C o 1 K 1-LV LVM-R c V-------M- M-=dN dt--------R c V-------1 K 2-MLVN N--=(2)CtMtNt+=(3)Ct1 K 1-1 K 2-C o W m V--------------------------------------
- L 1 K 2---------------------
1 e Wmt--R c L W n V------------
1 e W n t--Le W n t-e W m t---+=(4)
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-13WATTS BARWBNP-107Where:The value of C o used in equation (4) is determined as follows:
C oi= Average concentration of activity outside control room during ith time period (Ci/m 3).(x/Q)i= Atmospheric dilution factor (sec/m
- 3) during the ith time period.R= Time dependent release rate of activity from containment (Ci/sec).The atmospheric dilution factors were determined using the accumulated meteorological data on wind speed, direction, and duration of occurrence obtained from the Watts Bar plant site applied to a building wake dilution model. The dilution factors are calculated by the ARCON96 methodology[8] and are the maximum values for each time period. The worst case is Unit 1 exhaust to intake 2. These factors are applied for the first 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, at which time it is assumed that the operator selects intake 1 which has more favorable dilution factors. The values used in the analysis are given in Table 15.5-14. Equation (4) is used to determine the concentration at any time within a time period and upon integrating and dividing by the time interval gives the average concentration during the time interval due to inflow of radioactivity with outside air as shown:Where: W m LR c V++V-----------------------------------
=W n L V+V---------------------
-=C oi XQi Rt d t i t i 1+t i 1+t i--------------------
=(5)C i C i tdt T 0------------------
-0 T=(6) 15.5-14ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107T = t - ti-1t = Time after accident ti-1 = Time at end of previous time periodFurther contributions to the concentration during the time period are due to the concentrations remaining from prior time periods. These contributions are obtained from the following equations:With initial conditions: (Once-filtered concentration at end of the ith time period.) (Twice-filtered, or more, concentration at end of the ith time period.)Solving equations (8) and (9) and substituting certain initial condition relations, equation (7) becomes:Integrating equation (10) for each of the prior time periods gives the contribution from these time periods to the present time period. The average concentration is determined for these contributions using the method of equation (6).Filter efficiencies of 95% for elemental and particulate iodine and 95% for organic iodine were deemed appropriate for the first filter pass. Since the concentrations of iodine in the main control room are such reduced as a result of this filtration, the efficiencies were reduced for the second pass to 70% for elemental and particulate iodine, and 70% for organic iodine.To account for the unfiltered inleakage, a bypass leak rate (BPR) of 51 cfm was added to the makeup flow (L in equation (1)) of 711 cfm, and the filter factor for the first pass was decreased by the ratio L/(L+BPR). The filter efficiencies for the second pass are not affected by the unfiltered inleakage.The filter efficiency for noble gases was taken as zero for all cases.
(7)CRij+MRij+NRij++=(8)dMRij+dt-----------------------
-LV-R c V+M R ij++=(9)dNRij+dt----------------------
-R c V1 K 2-MRij+LV+-NRij+== M = (0)M 0(i)R j)R(i+=N = (0)N 0(i)R j)R(i+(10)CRij+C R 0 ie W-Ntti-M R 0 iK 2 e W Ntti---e W Mtti---=
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-15WATTS BARWBNP-107The above equations were incorporated into computer program COROD[17] together with appropriate equations for computing gamma dose, beta dose, and inhalation dose using these average nuclide concentrations and time periods. The whole body gamma dose calculation consists of an incremental volume summation of a point kernel over the control room volume. The principal gammas of each isotope are used to compute the dose from each isotope. The dose computations for beta activity were based on a semi infinite cloud model. Doses to thyroid were based on activity to dose conversion factors. (The equations and various data are given below.) The doses from these calculations are presented in Table 15.5-9. Gamma dose contributions from shine through the control room roof due to the external cloud and from shine through the control room walls from adjacent structures and from containment are computed using an incremental volume summation of a point kernel which includes buildup factors for the concrete shielding. For the calculation of shine through the control room roof, an atmospheric, rectangular volume several thousand feet in height and several control room widths was used. The control room roof is a 2 foot 3-inch-thick concrete slab and is the only shielding considered in this calculation. The average isotope concentrations at the control bay for each time period were used as the source concentrations. For the shine from adjacent structures, the shielding consists of the 3-foot-thick (5 feet in certain areas) control room walls. The doses are calculated similarly to the shine dose through the roof. The average isotope concentrations at the control bay intake for each time period are also used for these calculations.The shine from the spreading room below the control room is also computed in the same manner as adjacent structures.Shielding for this computation consists of the 8-inch-thick concrete floor. The summation of the incremental elements is performed over the volume of each room or structure of interest.In addition to the dose due to shine from surrounding structures and from the passing cloud, the shine from the reactor containment building also contributes to the gamma whole body dose to personnel. This contribution is computed in the same manner as the methods used above. Due to the location of the Auxiliary Building between the Reactor Buildings and the control room and the thicker control room auxiliary building wall near the roof, the minimum ray path through concrete from the containment into the control room below 10 feet above the control floor, is 8 feet. All nuclides released to containment are assumed uniformly distributed and their time-dependent concentrations were used to compute the dose. The dose computed from this source is small.Several doors penetrate the control room walls, and the dose at these areas would be larger than the doses calculated as described above. The potential shine at these doors and at other penetrations has been evaluated. As a result, hollow steel doors filled with no. 12 lead shot have been incorporated into the design of the shield wall between the control room and the Turbine Building. These doors provide shielding comparable to the concrete walls. Shine through other penetrations was found to be negligible.
15.5-16ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Another contribution to the total exposure of control room personnel is the exposure incurred during ingress from and egress to the exclusion area boundary. The doses due to ingress and egress were computed based on the following assumptions:
(1)Five minutes are required to leave the control room and arrive at car or vice versa.(2)The distance traveled on the access road to the site exclusion boundary is estimated to be 1500 meters. The average car speed is assumed to be 25 mph.(3)One one-way trip first day, one round-trip/day 2nd through 30th days.The control room occupancy factors used in this calculation were taken from Murphy and Campe[9]. They are: 100% occupancy 0-24 hours 60%occupancy 1-4 days 40%occupancy 4-30 days.
All atmospheric dilution factors were conservatively based on 5th percentile wind velocity averages.It was also assumed that initially the makeup air intake would be through the vent admitting the highest radioisotope concentration, but that the main control room personnel would switch intake vents 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after the accident in order to admit a lower amount of airborne activity to the MCR via the makeup air flow.The whole body, beta, and thyroid doses from the radiation sources discussed above are presented in Table 15.5-9. The dose to whole body is below the GDC 19 limit of 5 rem for control room personnel, and the thyroid dose is below the limit of 30 rem. Dose Equations, Data, and AssumptionsThe dose from gamma radiation originating within the control room is given by:Where: D = Absorbed dose in flesh in mrads D1.6910 4TCOT ik E kl f kl e------l al x m 2 y n 2 z q 2++-exp x m 2 y n 2 z q 2++--------------------------------------------------------------
-xyzq 1=n 1=m 1=
l 1=
k 1=i 1==(11)
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-17WATTS BARWBNP-107 TCOT ik=Total concentration integrated over time period i of isotope k in curies/m 3 E k= Energy of gamma from isotope k in MeV f k= Number of gammas of isotope k given off per disintegration
= Mass attenuation coefficient for flesh determined at the energy of gamma in cm 2/gram=Linear attenuation coefficient for air determined at the energy of gamma in inverse meters x m ,y n ,z q=Coordinate distances from the dose point to the source volume element (m,n,q) in metersx,y,z=Dimensions of source element (m,n,q)=Number of time periods=Number of isotopes=Number of gammas from an isotope=Number of intervals in the x direction=Number of intervals in the y direction=Number of intervals in the z directionThe control room radiation dose from gamma radiation originating outside of the control room and penetrating concrete walls is given as:Where: e------l D1.6910 4 C o ik E kl f kl e------l al x m 2 y n 2 z q 2++-exp x m 2 y n 2 z q 2++---------------------------------------------------------------
- cl t csec-B c cl t c secxyzexpq 1=n 1=m 1=l 1=k 1=i 1= t i t i 1--=
15.5-18ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107cl= Linear attenuation coefficient of concrete determined at the energy of gamma in inverse meters t c= Concrete shield thickness in meters = Angle between a vector normal to the shield and a vector from the dose point to the source point B c (cl t c sec) = Buildup factor for concrete C oik = Average concentration of isotope k outside the control room during time period i in curies/m 3 ti-1 ,t i = Times at the beginning and end of time period i in hoursOther parameters are defined as previously noted.
The dose from beta radiation is given by the semi-infinite cloud immersion dose:Where: D B=Dose due to beta in remX/Q=Atmospheric dispersion factor during time period in sec/m 3 Q i=Accumulated activity release of isotope i during time period E ik=Average energy of beta k of isotope i f ik=Number of k betas of isotope i per disintegrationFor beta dose in the control room, equation (12) becomes:
(12)D B0.230XQQE ik f ik k 1=i 1==D B0.230C ij E ik f iktjt j 1--1i 1=i 1==
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-19WATTS BARWBNP-107Where: =Average concentration of isotope i during time period jInhalation Dose (Thyroid)The inhalation dose for a given period of time has the general form:Where: D I=Thyroid inhalation dose, remX/Q=Site dispersion factor during time period, sec/m 3B=Breathing rate during time period, m 3/hr Q ij=Average activity release rate during time period j of iodine isotope i DCF i=ICRP-30 Dose conversion factor for iodine isotope i, rem/microcurie inhaled t j=Total time at end of period j, hoursFor inhalation dose within the control room, equation (13) becomes:In this expression C ij, the average concentration of isotope i during time period j, has replaced the following factor:(X/Q) Q ijThe C ij's are those determined by equations (4) and (6). The breathing rate factor B, was taken to be 3.47 x 10
-4 m 3/sec, 1.75 x 10
-4 m 3/sec, and 2.32 x 10
-4 m 3/sec for the time intervals of 0-8 hours, 8-24 hours, and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> - 30 days, respectively.
C ij (13)D I XQBQ i jDCF ii 1=n t J t j 1--=D I BC ij i 1=nDCF it j t j 1--=
15.5-20ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107 15.5.4 Environmental Consequences of a Postulated Main Steam Line BreakThe postulated accidents involving release of steam from the secondary system will not result in a release of radioactivity unless there is a leakage from the reactor coolant system to the secondary system in the steam generator. An acceptable primary-to-secondary leakage rate for the main steam line break (MSLB) accident is 1 gallon per minute (gpm) for the faulted steam generator loop and 150 gallons per day (gpd) for each unfaulted steam generator.A calculation determines the offsite and main control room doses resulting from a MSLB incorporating the above primary-to-secondary criteria. The calculation determined that 1 gpm (at standard temperature and pressure) primary-to-secondary leakage in the faulted steam generator results in site boundary doses within 10CFR100 guidelines and control room doses within the 10CFR50, Appendix A, General Design Criteria (GDC)-19 limit. The calculation uses TVA computer codes STP, FENCDOSE and COROD. The STP output is input to COROD, which determines control room operator dose and FENCDOSE, which determines the 30-day low population zone (LPZ) and the 2-hour exclusion area boundary (EAB) dose.Two methods for determining the resultant dose for a MSLB in accordance with the Standard Review Plan 15.1.5, Appendix A methodology are:1. A pre-accident iodine spike where the iodine level in the reactor coolant spiked upward to the maximum allowable limit of 14 µCi/gm I-131 dose equivalent just prior to the initiation of the accident.2. The reactor coolant at the maximum steady state dose of equivalent I-131 of 0.265µCi/gm with an accident initiated iodine spike consisting of a 500 times increase on the rate of iodine release from the fuel.In both cases, the primary-to-secondary side leak is assumed to be 1 gpm in the faulted steam generator loop and 150 gpd in each faulted loop. The primary side activity release uses the Technical Specification (TS) limit design reactor coolant activities, and the secondary side activity uses the Technical Specification limit of
<0.1µCi/gm I-131 dose equivalent. The steam releases to the atmosphere for the MSLB are in Table 15.5-16.
The gamma, beta and thyroid doses for the MSLB accident at the EAB and LPZ are in Table 15.5-17. The doses from this accident are less than the reference values as listed in 10CFR100 (25 rem whole body and 300 rem thyroid).The whole body, beta and thyroid doses to control room personnel from the radiation sources discussed above are in Table 15.5-17. The doses are calculated by the COROD computer code.
[17] Parameters for the control room analysis are found in Table 15.5-14. The dose to whole body is below the GDC limit of 5 rem for control room personnel, and the thyroid dose is below the limit of 30 rem.
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-21WATTS BARWBNP-107Dose equations in TID-14844 [23] determine the dose. Dose conversion factor in ICRP-30 [25] determine thyroid doses in place of those found in TID-14844.Assumptions for the MSLB accident:
- 1. RCS letdown flow of 124.39 gpm.
- 3. ANSI/ASN-18.1-1984 spectrum scaled up to 0.265 or 14 µCi/gm equivalent iodine.
- 4. Two cases were used. In the first, pre-accident iodine spike of 14 µCi/gm I-131 dose equivalent in the RCS. In the second case, an accident initiated spike which increases the iodine concentration at the equilibrium into the reactor coolant from the fuel rods.5. Primary side to secondary side leakage of 150 gpd (standard temperature and pressure) per steam generator in the intact loops.6. The primary-to-secondary leakage mass release to the Environment is 1 gpm (standard temperature and pressure) from the faulted loops.7. Steam generator secondary inventory released as steam to the atmosphere:
a) total from the non-defective steam generators (0-2 hrs), 433,079 lbm b) total from the non-defective steam generators (2-8 hrs), 870,754 lbm c) total from the faulted steam generator (0-30 mins), 96,100 lbm
- 8. Iodine partition coefficients from steaming of steam generator water:
- i. non-defective steam generators initial inventory and primary-to-secondary leakage, 100. ii. faulted steam generator initial inventory and primary-to-secondary leakage, 1.0
- 9. Atmospheric dilution factors, x/Q, are in Table 15A-2 for offsite and Table15.5-14 for control room personnel.10. Main control room related assumptions are in Table 15.5-14.
15.5.5 Environmental Cons equences of a Postulat ed Steam Generator Tube RuptureThermal and hydraulic analyses determine the plant response for a design basis steam generator tube rupture (SGTR), and the integrated primary to secondary break flow and mass releases from the ruptured and intact steam generators (SGs) to the condenser and the atmosphere (Section 15.4.3). An analysis of the environmental consequences of the postulated SGTR has also been performed, utilizing the reactor coolant mass and secondary steam mass releases determined in the base thermal and 15.5-22ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107 hydraulic analysis (See Reference [38] in Section 15.4). Table 15.5-18 summarizes the parameters used in the SGTR analysis.The SGTR thermal and hydraulic analysis documents use WBN specific parameters and actual operator performance data, as determined from simulator exercises utilizing the appropriate emergency operating procedures (EOPs). Two cases were analyzed.
Case 1: The primary side activity release use the maximum Technical Specification (TS) limit design reactor coolant activities and an iodine spike immediately after the accident that increases the iodine activity in the reactor coolant by a factor of 500 times the iodine production rate necessary to maintain a steady state concentration of 0.265µCi/gm of I-131 dose equivalent. Case 2: The initial reactor coolant activity is at 14µCi/gm of I-131 dose equivalent due to a pre-accident iodine spike caused by an RCS transient. For both cases, the secondary side releases uses expected secondary side activities, based on ANSI/ANS-18.1-l984
[14] as modified for WBN, and on a 150 gpd/steam generator primary-to-secondary-side leakage. Credit was taken for flashing of the primary coolant (References [34] and [35] of Section 15.4), but "scrubbing" of the iodine in the rising steam bubbles by the water in the steam generator was conservatively neglected. A partition factor of 100 applies to iodine in the remaining unflashed coolant which will boil.The atmospheric diffusion coefficients (X/Q) for the exclusion area boundary (EAB) and offsite dose determination are the same as those used for the LOCA analysis (Appendix 15A). The X/Q values for the control room operator were determined in the analysis. The LOCA X/Q values are for a release from the shield building vent, whereas the SGTR release is from the top of the main steam valve vault. The methodology for determination of the WBN control room X/Q values is based on computer code ARCON96.The whole body, beta, and thyroid doses to control room personnel from the radiation sources discussed above are in Table 15.5-19. The doses are calculated by the COROD computer code
[17]. Parameters for the control room analysis are in Table 15.5-14. The dose to whole body is below the GDC 19 limit of 5 rem for control room personnel, and thyroid dose is below the limit of 30 rem.Dose equations in TID-14844 [23] were used to determine the dose. Dose conversion factors in ICRP-30 [25] were used to determine thyroid doses in place of those found in TID-14844.The gamma, beta, and thyroid dose for the SGTR event are in Table 15.5-19. The doses at the EAB and the low population zone are less than 10% of the 10 CFR 100 limits. 15.5.6 Environmental Cons equences of a Postulat ed Fuel Handling AccidentThe analysis of the fuel handling accident considers three cases. The first case is for a Fuel Handling Accident inside containment with the containment closed and the Reactor Building Purge System operating. This analysis is discussed in Section 15.5.6.1 and is based on Regulatory Guide 1.25[11] and NUREG 5009[24]. The second case is for an accident in the spent fuel pool area located in the Auxiliary ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-23WATTS BARWBNP-107Building. This case is discussed in Section 15.5.6.2 and is evaluated using the Alternate Source Term based on Regulatory Guide 1.183[18], "Alternate Source Terms." The third case considered is an open containment case for an accident inside containment where there is open communication between the containment and the Auxiliary Building. This evaluation is discussed in Section 15.5.6.2 and is based on Regulatory Guide 1.183.15.5.6.1 Fuel Handling Accident Based on Regulatory Guide 1.25The parameters used for this analysis are listed in Table 15.5-20.The bases for the Regulatory Guide 1.25 evaluation are:
(1)In the Regulatory Guide 1.25 analysis, the accident occurs 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> after plant shutdown. Radioactive decay of the fission product inventory during the interval between shutdown and placement of the first spent fuel assembly into the spent fuel pit is taken into account.
(2)In the Regulatory Guide 1.25 analysis damage is assumed for all rods in one assembly.(3)The assembly damaged is the highest powered assembly in the core region to be discharged. The values for individual fission product inventories in the damaged assembly are calculated assuming full-power operation at the end of core life immediately preceding shutdown. Nuclear core characteristics used in the analysis are given in Table 15.5-21. A radial peaking factor of 1.65 is used.
(4)For the Regulatory Guide 1.25 analysis all of the gap activity in the damaged rods is released to the spent fuel pool and consists of 10% of the total noble gases and radioactive iodine inventory in the rods at the time of the accident with the following gap percentage exceptions which are based on NUREG/CR 5009 [24] as appropriate: 14% of the Kr-85, 5% of the Xe-133, 2% of the Xe-135, and 12% of the I-131.
(5)Noble gases released in the containment are released through the Shield Building vent to the environment.
(6)In the Regulatory Guide 1.25 analysis the iodine gap inventory is composed of inorganic species (99.75%) and organic species (0.25%).
(7)A filter efficiency of 90% for inorganic iodine and 30% for organic iodine for the purge air exhaust filters is used since no relative humidity control is provided.(8)No credit is taken for natural decay after the activity has been released to the atmosphere.
15.5-24ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107 (9)The short-term (i.e., 0-2 hour) atmospheric dilution factors at the exclusion area boundary and low population zone given in Table 15A-2 are used. The thyroid dose utilizes ICRP-30 [25] iodine dose conversion factors. Doses are based on the dose models presented in Appendix 15A.15.5.6.2 Fuel Handling Accident Based on Regulatory Guide 1.183The analysis of a postulated fuel handling accident in the Auxiliary Building refueling Area is based on Regulatory Guide 1.183. i.e., Alternate Source Terms (AST). The parameters used for this analysis are listed in Table 15.5-20.a.The bases for evaluation are:
(1)In the Regulatory Guide 1.183 analysis, the accident occurs 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> after plant shutdown. Radioactive decay of the fission product inventory during the interval between shutdown and placement of the first spent fuel assembly into the spent fuel pit is taken into account.
(2)In the Regulatory Guide 1.183 analysis, damage was assumed for all rods in one assembly.
(3)The assembly damaged is the highest powered assembly in the core region to be discharged. The values for individual fission product inventories in the damaged assembly are calculated assuming full-power operation at the end of core life immediately preceding shutdown. Nuclear core characteristics used in the analysis are given in Table 15.5-21. A radial peaking factor of 1.65 is used.(4)The Regulatory Guide 1.183 analysis assumes all of the gap activity in the damaged rods is released to the spent fuel pool and consists of 8% I-131, 10% Kr-85, and 5% of other noble gases and other halogens.
(5)Noble gases released to the Auxiliary Building spent fuel pool are released through the Auxiliary Building vent to the environment.
(6)In the Regulatory Guide 1.183 analysis, the iodine gap inventory is composed of inorganic species (99.85%) and organic species (0.15%).
(7)In the Regulatory Guide 1.183 analysis, the overall inorganic and organic iodine spent fuel pool decontamination factor is 200.
(8)In the Regulatory Guide 1.183 analysis, all iodine escaping from the Auxiliary Building spent fuel pool is exhausted unfiltered through the Auxiliary Building vent.(9)No credit is taken for the ABGTS or Containment Purge System Filters in the analysis.(10)No credit is taken for natural decay either due to holdup in the Auxiliary Building or after the activity has been released to the atmosphere.
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-25WATTS BARWBNP-107 (11)The short-term (i.e., 0-2 hour) atmospheric dilution factors at the exclusion area boundary and low population zone given in Table 15A-2 are used.
(12)The TEDE values for the Exclusion Area Boundary and Low Population Zone are calculated using dose conversion factors taken from EPA-400-R-92-001, "Manual of Protective Action Guides and Protective Actions of Nuclear Incidents," May 1992. A breathing rate of 3.33E-4 m 3/sec was used for calculating the TEDE.
(13)The TEDE values for the Main Control Room are calculated using the 100% of the gamma dose calculated using a point kernel integration, 1% of Beta
dose, and conversion factors taken from EPA-400-R-92-001, "Manual of Protective Action Guides and Protective Actions of Nuclear Incidents," May 1992. A breathing rate of 3.33E-4 m 3/sec was used for calculating the TEDE. FSAR Section 15.5.3 provides a discussion of the COROD calculation methods for gamma and beta dose.15.5.6.3 Fuel Handli ng Accident ResultsThe radiation dose results of the Regulatory Guide 1.25 with the containment closed fuel handling accident (FHA) are given in Table 15.5-23. For a FHA inside containment, no allowance has been made for possible holdup in the primary containment or isolation of the primary containment as a result of a high radiation signal from the monitors in the ventilation systems for the case where containment penetrations are closed to the Auxiliary Building. However, the containment purge filters are credited. Dose equations in TID-14844 [23] were used to determine the dose. Dose conversion factors in ICRP-30 [25] were used to determine thyroid doses in place of those found in TID-14844.The ventilation function of the reactor building purge ventilating system (RBPVS) is not a safety-related function. However, the filtration units and associated exhaust ductwork do provide a safety-related filtration path following a fuel-handling accident prior to automatic closure of the associated isolation valves. The RBPVS contains air cleanup units with prefilters, HEPA filters, and 2-inch-thick charcoal adsorbers. This system is similar to the auxiliary building gas treatment system except that the latter is equipped with 4-inch-thick charcoal adsorbers. Anytime fuel handling operations are being carried on inside the primary containment, either the containment is isolated or the reactor building purge filtration system is operational. The assumptions listed above are, therefore, applicable to a fuel handling accident inside primary containment. The radiation dose results of the Regulatory Guide 1.183 fuel handling accident (FHA) are given in Table 15.5-23. Alternate source term (AST) described in RG 1.183 was selectively used to evaluate the FHA due to an event in the spent fuel pool located in the Auxiliary Building or in the containment when the equipment hatch or both doors in a personnel air lock are open. As part of this selective implementation of AST, the following assumptions are used in the analysis:
15.5-26ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107The total effective dose equivalent (TEDE) acceptance criterion of 10 CFR 50.67(b)(2) replaces the previous whole body and thyroid dose guidelines of 10 CFR 100.11.The gap activity is revised to be consistent with that required by RG 1.183.The decontamination factors were changed to be consistent with those required by RG. 1.183.No Auxiliary Building isolation is assumed.No filtration of the release from the spent fuel pool to the environment by the ABGTS is assumed.The evaluation for the FHA at the spent fuel pool is a bounding analysis for a dropped assembly in containment when the containment is open. The release point for the containment purge system is the Unit 2 shield building stack. The X/Qs are lower for this release point than for the normal au xiliary building exhaust. In addition, any release from the shield building stack would go through the purge system HEPA and Charcoal filter assemblies prior to release. Currently, when the purge lines isolate on high radiation, the auxiliary building also isolates and ABGTS is actuated. The release point for ABGTS is the shield building stacks and the releases are filtered through HEPA and Charcoal assemblies.
Thus AST analysis for the FHA in the Auxiliary Building that considers no filtration is conservative and an acceptable as the basis for the containment open evaluation.
The offsite doses were calculated utilizing FENCDOSE [16], while the control room doses were calculated utilizing the COROD computer code [17].For the RG 1.25 case, the thyroid, gamma, and beta dose are given in Table 15.5-23 for the control room, exclusion area boundary, and low population zone. The whole body dose and thyroid dose to the control room occupants are below the whole body limit established in 10 CFR 50 Appendix A, GDC 19 of 5 rem, and the thyroid dose limit of 30 rem. The dose at the exclusion area boundary and the low population zone are less than 25% of the 10 CFR 100.11 limits of 300 rem to the thyroid, and 25 rem gamma to the whole body.For the RG 1.183 cases, the TEDE dose is given in Table 15.5-23 for the control room, exclusion area boundary, and low population zone. The dose to control room personnel is less than the limit of 10 CFR 50.67(b)(2)(iii) of 5 rem TEDE, and the dose to the exclusion area boundary and low population zone are less than the limit of 10 CFR 50.67(b)(2)(i) and (ii), as modified by Regulatory Position C.4.4 of Regulatory Guide 1.183 of 6.3 rem TEDE.
15.5.7 Environmental Cons equences of a Postulat ed Rod Ejection AccidentThis accident is bounded by the loss-of-coolant accident. See Section 15.5.3 for the loss-of-coolant accident.
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-27WATTS BARWBNP-107REFERENCES (1)Styrikovich, M. A., Martynova, 0. I., Katkovska, K. YA., Dubrovski, I. YA., Smrinova, I. N., "Transfer of Iodine from Aqueous Solutions to Saturated Vapor," translated from Atomnaya Energiya, Vol. 17, No. 1, pp. 45-49, July 1964.(2)Regulatory Guides for Water Cooled Nuclear Power Plants, Regulatory Guide 1.24, "Assumptions Used for Evaluating the Potential Radiological Consequences of a Pressurized Water Reactor Gas Storage Tank Failure," Division of Reactor Standards, U.S. Atomic Energy Commission, March 23, 1972.(3)Regulatory Guide 1.4, "Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Pressurized Water Reactors," Directorate of Regulatory Standards, U.S. Atomic Energy Commission, June 1974.
(4)D. D. Malinowski, "Iodine Removal in the Ice Condenser System," WCAP-7426, April 1970.
(5)NAA-SR 10100, Conventional Buildings for Reactor Containment.
(6)ORNL-NSIC-4, Behavior of Iodine in Reactor Containment Systems, February 1965.
(7)Branch Technical Position CSB 6-2, "Control of Combustible Gas Concentrations in Containment Following a Loss-of-Coolant Accident." (8)Ramsdell, J. V. Jr. and C. A. Simonen, "Atmospheric Relative Concentrations in Building Wakes." Prepared by Pacific Northwest laboratory fo the U. S. Nuclear Regulatory Commission, PNL-10521, NUREG/CR-6331, Revision1, May1997.(9)K. G. Murphy and Dr. K. M. Campe "Nuclear Power Plant Control Room Ventilation System Design for Meeting General Criterion 19," 13th AEC Air Cleaning Conference, August 1974.
(10)Deleted by Amendment 80.
(11)Regulatory Guides for Water Cooled Nuclear Power Plants, Regulatory Guide 1.25, "Assumptions Used for Evaluating the Potential Radiological Consequences of a Fuel Handling Accident in the Fuel Handling and Storage Facility for Boiling and Pressurized Water Reactors," Division of Reactor Standards, U.S. Atomic Energy Commission, March 23, 1972.
15.5-28ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107 (12)Regulatory Guides for Water Cooled Nuclear Power Plants, Regulatory Guide 1.77, "Assumptions Used for Evaluating a Control Rod Ejection Accident for Pressurized Water Reactors," Directorate of Regulatory Standards, U.S. Atomic Energy Commission, May 1974.
(13)D. B. Risher, Jr., "An Evaluation of the Rod Ejection Accident in Westinghouse Pressurized Water Reactors Using Spatial Kinetics Methods," WCAP-7588, Revision 1, December 1971.
(14)ANSI/ANS-18.1-1984, "Radioactive Source Terms for Normal Operations of Light Water Reactors," December 31, 1984.
(15)WCAP-7664, Revision 1, "Radiation Analysis Design Manual-4 Loop Plant," RIMS Number NEB 810126 316, October 1972.
(16)Computer Code FENCDOSE, Code I.D. 262358.
(17)Computer Code COROD, Code I.D. 262347.
(18)Regulatory Guide 1.183 R0, Alternate Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors, US Nuclear Regulatory Commission, July 2000.
(19)Not used (20)NRC Safety Evaluation for Watts Bar Nuclear Plant Unit 1, Amendment 38, for Steam Generator Tubing Voltage Based Alternate Repair Criteria for Outside Diameter Stress Corrosion Cracking (ODSCC) dated February26,2002.
(21)NRC Generic Letter 95-05, "Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking", dated August 3, 1995.
(22)TVA Letters to NRC "Technical Specification Change No. WBN-TS-99-014 - Steam Generator Alternate Repair Criteria for Axial Outside Diameter Stress Corrosion Cracking (ODSCC)," dated April 10, 2000, September 18, 2000, August 22, 2001, November 8, 2001 and January 15, 2002.
(23)J.J. Dinunno, et, al "Calculation of Distance Factors for Power and Test Reactor Sites", TIC-14844, March 1962.
(24)NUREG/CR-5009, "Assessment of the Use of Extended Burnup Fuel in Light Water Power Reactors," February 1988.
(25)International Commission on Radiation Protection (ICRP) Publication 30, Limits for Intakes of Radionuclides by Workers," 1979.
ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-29WATTS BARWBNP-107Table 15.5-1 Parameters Used In Loss Of A. C. Power AnalysesRealistic AnalysisConservative AnalysisCore thermal power3565 MWt3565 MWt Steam generator tube leak rateprior to and during accident1 gpm1.0 gpmFuel defectsANSI/ANS 18.1 - 1984Technical Specification limit of 0.1 µCi/gm I-131 dose equivalentIodine partition factor in steam generator prior to and during accident0.010.01Blowdown rate per steamgenerator prior to accident25 gpm25 gpmDuration of plant cooldown by secondary system after accident8 hrs8 hrsSteam release from 4 steam generators444,875 lbm (0-2 hrs)903,530 lbm (2-8 hrs)444,875 lbs (0-2 hrs)903,530 lbs (2-8 hrs)MeteorologySee Tables 15A-2 & 15.5-14See Tables 15A-2 & 15.5-14 15.5-30ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-2 Doses From Loss Of A/C PowerConservative Analysis (rem)2HR EAB30 DAY LPZCONTROL ROOMGamma7.45E-044.18E-042.10E-04Beta4.48E-042.52E-042.52E-03 Thyroid - ICRP-304.57E-022.57E-022.09E-02Realistic Analysis (rem) 2HR EAB30 DAY LPZCONTROL ROOMGamma1.80E-081.01E-085.05E-09Beta1.66E-059.29E-061.79E-04 Thyroid - ICRP-301.10E-066.18E-075.03E-07 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-31WATTS BARWBNP-107(1)Activity based on maximum concentrations of each isotope and actual plant flow rates of the GWPS.Table 15.5-3 Parameters Used In Waste Gas Decay Tank Rupture AnalysesRealistic AnalysisRegulatory Guide1.24 AnalysisCore thermal power3565 MWt3565 MWt Plant load factor1.01.0 Fuel defectsANSI/ANS-18.1, 19841%
Activity released from GWPS(1)See Table 15.5-4 Time of accidentAfter Tank FillAt end of equilibrium core cycleMeteorologySee Table 15.5-14 and Table 15A-2See Table 15.5-14 and Table 15A-2 15.5-32ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-4 Waste Gas Decay Tank Inventory (One Unit) (Regulatory Guide 1.24 Analysis) Isotope Activity (Curies) Xe-131m 8.9 x 10 2 Xe-133 6.8 x 10 4 Xe-133m 1.0 x 10 3 Xe-135 9.4 x 10 2 Xe-135m 4.8 x 10 1 Xe-137 2.7 x 10
-1 Xe-138 3.2 Kr-83m 1.7 x 10 1 Kr-85 4.2 x 10 3 Kr-85m 1.3 x 10 2 Kr-87 2.9 x 10 1 Kr-88 1.6 x 10 2 Kr-89 1.0 x 10
-1 I-131 4.8 x 10
-2 I-132 --------- I-133 3.3 x 10
-2 I-134 --------- I-135 1.2 x 10
-2 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-33WATTS BARWBNP-107Table 15.5-5 Doses From Gas Decay Tank RuptureRegulatory Guide 1.24 Analysis (rem)2HR EAB30 DAY LPZCONTROL ROOMGamma5.96E-011.67E-018.43E-01Beta1.61E+004.51E-017.28E+00 Thyroid - ICRP-301.29E-023.60E-036.99E-03Realistic Analysis (rem) 2HR EAB30 DAY LPZCONTROL ROOMGamma2.88E-028.05E-033.81E-02Beta1.10E-013.08E-025.01E-01 Thyroid - ICRP-301.21E-023.37E-036.50E-03 15.5-34ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-6 Parameters Used In LOCA Analysis (Page 1 of 2)Regulatory Guide 1.4Analysis Core thermal power 3565 MWt Primary containment free volume1.27 x 10 6 ft 3Annulus free volume3.75 x 10 5 ft 3Primary containment deck (air return) fan flow rate40,000 cfmNumber of deck (containment air return fans) fans assumed operating 1 of 2Activity released to primary containment and available for releasenoble gases100% of coreinventoryiodines25% of coreinventoryForm of iodine activity in primary containment available for releaseelemental iodine91%
methyl iodine 4%
particulate iodine 5%
Ice condenser removal efficiency for elemental and particulate iodineSee Table 15.5-7Primary containment leak rate (volume percent)0.25% per day(0-24 hours)0.125% per day(1-30 days)Percent of primary containment leakage to auxiliary building 25%ABGTS filter efficiencies elemental iodine99%
methyl iodine99%
particulate iodine99%
Delay time of activity in auxiliary building before ABGTS operation NoneDelay time before filtration credit is taken for the ABGTS4 minMean holdup time in auxiliary building after initial 4 minutes 0.3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />sABGTS flow rate 9000 cfm ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-35WATTS BARWBNP-107Leakage from Auxiliary Building to ABGTS downstream HVAC (bypass of filters)27.88 cfmLeakage from ABGTS HVAC into Auxiliary Building 8.87 cfmLeakage from Auxiliary Build ing into EGTS downstream HVAC (bypass of filters)10.7 cfmLeakage from Auxiliary Building to environment due to single failure of ABGTS (from 30 minutes to 34 minutes post-LOCA)9900 cfm (for 4 minutes)Percent of primary containment leakage to annulus75%Emergency gas treatment system flow ratesSee Table 15.5-8 and Table 15.5-8A Percent of annulus free volume available for mixing of recirculated activity50%Number of emergency gas treatment system air handling units operating 1 of 2Emergency gas treatment system filter efficiencies elemental iodine99%
methyl iodine99%
particulate iodine 99%
Shield building mixing model (see Section 15.5.3)50% mixing MeteorologySee Table 15.5-14 and Table 15A-2Table 15.5-6 Parameters Used In LOCA Analysis (Page 2 of 2) 15.5-36ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107(1)The ice condenser removal efficiencies given in the above table are used for the Regulatory Guide 1.4 analysis. The inlet steam/air mixture coming into the ice condenser is greater than 90% steam by volume initially due to the delaying of the operation of the containment deck fans. Without the delay of operation of the deck fans, the amount of steam by volume in the inlet mixture initially would be much lower and the ice condenser iodine removal efficiencies would be reduced.(2)The ice bed iodine removal efficiency, O I, has been computed on a time dependent basis and is shown in Table 15.5-7. Note that the information presented in Table 15.5-7 has been revised by Westinghouse letter WAT-D-10954. The revised efficiency information is associated with the WCAP-15699, Revision 1 analysis for reduced ice weight. A comparison of the information presented in Table 15.5-7 and the revised information contained in WAT-D-10954 shows that the information in Table 15.5-7 is conservative. Analyses supporting the plant design basis acknowledge the revised efficiency information but shall utilize the information presented in Table.15.5-7.Table 15.5-7 Ice Condenser Elemental And Particulate Iodine Removal Efficiency (1,2) Time IntervalPost LOCA (Hours)Iodine Removal Efficiency 0.0 to 0.156 0.960.156 to 0.267 0.760.267 to 0.323 0.730.323 to 0.489 0.710.489 to 0.615 0.600.615 to 0.768 0.580.768 to 0.824 0.400.824 to 720 0.0 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-37WATTS BARWBNP-107 Table 15.5-8 EMERGENCY GAS TREATMENT SYSTEM FLOW RATES (Sheet 1 of 1)Time IntervalTime IntervalRecirculation RateExhaust Rate(sec)(hours)(cfm)(cfh)(cfm)(cfh)0-3030-39 39-40 40-41 41-42 42-43 43-190 190-191 191-192 192-193 193-194 194-199 199-207 207-215 215-225 225-245 245-265 265-285 285-305 305-446 446-601 601-602 602-1700 1700-1701 1701-1702 1702-1703 1703-1704 1704-1705 1705-1706 1706-1855 1855-2100 2100-30 days*0-0.00830.0083-0.0108 0.0108-0.0111 0.0111-0.0114 0.0114-0.0117 0.0117-0.0119 0.0119-0.0528 0.0528-0.0531 0.0531-0.0533 0.0533-0.0536 0.0536-0.0539 0.0539-0.0553 0.0553-0.0575 0.0575-0.0597 0.0597-0.0625 0.0625-0.0681 0.0681-0.0736 0.0736-0.0792 0.0792-0.0847 0.0847-0.1239 0.1239-0.1669 0.1669-0.1672 0.1672-0.4722 0.4722-0.4725 0.4725-0.4728 0.4728-0.4731 0.4731-0.4733 0.4733-0.4736 0.4736-0.4739 0.4739-0.5153 0.5153-0.5833 0.5833-7200.003600.00 3286.62 2352.31 1304.79362.600.00537.28 733.23 735.14 737.51 745.23 764.12 790.80 825.45 892.72 992.801102.401217.05 1664.05 2356.72 2661.35 3600.00 3508.13 3423.44 3410.73 3408.66 3408.17 3407.91 3395.23 3372.37 3350.000.00E+002.16E+05 1.97E+05 1.41E+05 7.83E+04 2.18E+04 0.00E+00 3.22E+04 4.40E+04 4.41E+04 4.43E+04 4.47E+04 4.58E+04 4.74E+04 4.95E+04 5.36E+04 5.96E+04 6.61E+04 7.30E+04 9.98E+04 1.41E+05 1.60E+05 2.16E+05 2.10E+05 2.05E+05 2.05E+05 2.05E+05 2.04E+05 2.04E+05 2.04E+05 2.02E+05 2.01E+05 0.00 0.00313.381247.69 2295.21 3237.40 3600.00 3062.72 2866.77 2864.86 2862.49 2854.77 2835.89 2809.20 2774.56 2707.29 2607.20 2497.61 2382.95 1935.96 1243.29938.65 0.00 91.87176.56 189.27 191.34 191.83 192.09 204.77 227.64 250.000.00E+000.00E+00 1.88E+04 7.49E+04 1.38E+05 1.94E+05 2.16E+05 1.84E+05 1.72E+05 1.72E+05 1.72E+05 1.71E+05 1.70E+05 1.69E+05 1.66E+05 1.62E+05 1.56E+05 1.50E+05 1.43E+05 1.16E+05 7.46E+04 5.63E+04 0.00E+00 5.51E+03 1.06E+04 1.14E+04 1.15E+04 1.15E+04 1.15E+04 1.23E+04 1.37E+04 1.50E+04 *Required to maintain annulus pressure when assuming 250 cfm annulus inleakage 15.5-38ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107*Reflects operator action to place one EGTS fan in standby mode at 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.Table 15.5-8A Emergency Gas Treatment System Flow Rates (Unit 2)Time IntervalTime IntervalRecirculation RateExhaust Rate(sec)(sec)(hours)(hours)(cfm)(cfh)(cfm) (cfh) 0 30 39 40 41 42 43 71 78 79 30 39 40 41 42 43 71 78 79 80 00.00830.01080.01110.01140.01170.01190.01970.02170.02190.00830.01080.01110.0114 0.01170.01190.0197 0.02170.02190.0222 0 72006573.244704.62 2609.58 725.2 0 010624775 0.00E+00 4.32E+05 3.94E+05 2.82E+05 1.57E+05 4.35E+04 0.00E+00 0.00E+00 6.37E+04 2.87E+05 0 0626.762495.38 4590.426474.87200 7200613824250.00E+000.00E+003.76E+041.50E+05 2.75E+053.88E+054.32E+05 4.32E+053.68E+051.46E+05 80102132165 170210307 498602102132165170 210307498 6026030.02220.02830.03670.0458 0.04720.05830.0853 0.13830.16720.02830.03670.04580.0472 0.05830.08530.1383 0.16720.16754337 4188 3922 3762 3719 3760 4050 4797 5232 2.60E+05 2.51E+05 2.35E+05 2.26E+05 2.23E+05 2.26E+05 2.43E+05 2.88E+05 3.14E+052863301232783438 348134403150 240319681.72E+051.81E+051.97E+052.06E+05 2.09E+052.06E+051.89E+05 1.44E+051.18E+05603850110013501600185085011001350 1600185021000.16750.2361 0.3056 0.37500.44440.51390.23610.3056 0.3750 0.44440.51390.583351375237 5337 543755375637 3.08E+05 3.14E+05 3.20E+05 3.26E+05 3.32E+05 3.38E+0514321332 1232113210329328.59E+047.99E+04 7.39E+04 6.79E+046.19E+045.59E+0421003600*3600*30 days0.58331.00001.000030 days57373455 3.44E+05 2.07E+058326044.99E+043.62E+04 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-39WATTS BARWBNP-107Table 15.5-9 DOSES FROM LOSS-OF-COOLANT ACCIDENT(rem)2Hr EAB30 Day LPZControl RoomGamma2.122.181.05Beta1.252.619.10Thyroid - ICRP - 3040.414.333.75Breakdown of Control Room Personnel Dose(rem)AirborneShineIngress/EgressTotalGamma1.020.0050.0271.05Beta9.040.0000.0609.10Thyroid - ICRP - 303.660.0000.0903.75 15.5-40ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-10 Deleted by Amendment 80 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-41WATTS BARWBNP-107Table 15.5-11 Deleted by Amendment 80 15.5-42ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-12 PARAMETERS USED IN ANALYSIS OF RECIRCULATION LOOP LEAKAGE FOLLOWING A LOCARegulatory Guide 1.4 AnalysisCore thermal power3565 MWtRecirculation sump water volume 9.63 x 10 4 ft 3Activity mixed with recirculation loop water Noble gases Iodines Tritium 0.050% of core inventory 97% to sump (water)Leakage of ECCS equipment outside containment See Table 6.3-6Iodine partition factor for leakage 0.1 ABGTS filter efficiencies elemental iodine 99%methyl iodine 99%particulate iodine 99%Meteorology See Table 15.5-14 and Table 15A-2 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-43WATTS BARWBNP-107Table 15.5-13 Doses From Recirculation Loop Leakage Following A LOCA (rem)2HR EAB30 Day LPZControl RoomGamma4.14E-032.28E-021.51E-03Beta1.36E-038.54E-021.62E-02Thyroid - ICRP - 301.40E-031.53E-013.69E-02 15.5-44ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-14 Atmospheric Dilution Factors At The Control BuildingDILUTION FACTOR (sec/m
- 3) Time Period (hr) LOCA/FHASGTR/MSLB/Loss of AC Power WGDT 0-21.09E-032.59E-032.56E-03 2-89.44E-042.12E-03N/A 8-241.56E-04*N/AN/A 24-961.16E-04**N/AN/A 96-7209.59E-05***N/AN/AGENERAL CONTROL ROOM PARAMETERSVolume257,198 cu ft Makeup/pressurization flow711 cfm Recirculation flow2889 cfm Unfiltered intake51 cfm Filter efficiency95% first pass70% second pass 0% for noble gases, TritiumIsolation time, T40 seconds Occupancy factors:
0-24 hr100%
1-4 days60%
4-30 days40%1. All FHA releases are within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Thus, only the 0-2 hr X/Q is applicable for the FHA.* Calculated value for U1 Shield Bldg Vent to East MCR Intake1.26E-04** Calculated value for U1 Shield Bldg Vent to East MCR Intake9.53E-05*** Calculated valu e for U1 Shield Bldg Vent to East MCR Intake8.07E-05 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-45WATTS BARWBNP-107Table 15.5-15 Deleted by Amendment 97 15.5-46ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-16 Parameters Used In Steam Line Break AnalysisAnalysis ValueSteam Generator tube leak rate Faulted Steam Generator 1.0 gpm Per Intact Steam Generator 150 gpd Iodine Partition Factor Faulted Steam Generator 1 Intact Steam Generator 100 RCS Letdown flow rate 124.39 gpm Steam Releases Faulted Steam Generator (0-30 minutes) 96,100 Ibm Three Intact Steam Generators (0-2 hrs) 433,079 Ibm Three Intact Steam Generators (2-8 hrs) 870,754 Ibm ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-47WATTS BARWBNP-107Table 15.5-17 Doses From Main Steam Line Break1 gpm Primary-to-Secondary Leakage(ARCON-96 x/Q)2 HR EAB30-Day LPZ SRP Guidance for 10CFR100 Limits (rem)Control Room SRP Guidance for 10CFR100 Limits (rem)Pre-Accident Initiated Spike Case (14 µCi/gm maximum peak)
Gamma Beta Thyroid -
ICRP-302.74E-028.80E-032.41E+001.11E-024.20E-03 1.21E+00 25 300 3004.32E-033.96E-027.38E+00 5 30 30Accident Initiated Spike Case (0.265 µCi/gm steady state)
Gamma Beta Thyroid -
ICRP-301.04E-012.54E-023.09E+001.25E-013.02E-02 4.78E+00 2.5 30 308.00E-036.44E-021.03E+01 5300 300 15.5-48ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-18 Parameters Used In Steam Generator Tube Rupture AnalysisPrimary Side ActivityTechnical Specification Limit Secondary Side ActivityANSI/ANS-18.1-1984(Expected levels, 150 gpd/SG)Iodine Spiking FactorCase 1: Accident initiated spike of 500 times equilibrium iodine concentrationCase 2: Pre-accident spike of 14 µCi/gm I-131 dose equivalentIodine Partition Factor100 Secondary Side Mass Release (Ruptured Steam Generator)0 -2 hours2 - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />s103,300 lbm32,800 lbmSecondary Side Mass Release(Intact Steam Generator)0 - 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s2 - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />s492,100 lbm900,200 lbmPrimary Coolant Mass Release (Total)0 - 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s191,400 lbmPrimary Coolant Mass Release (Flashed)0 - 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s10,077.2 lbmMeteorologySee Table 15A-2 and 15.5-14 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-49WATTS BARWBNP-107Table 15.5-19 Doses From Steam Generator Tube RupturePre-Accident Initiated Spike Case (14 µCi/gm maximum peak)(rem)2 HR EAB30 DAY LPZCONTROL ROOM Gamma3.78E-011.11E-016.22E-02Beta2.26E-016.92E-027.01E-01Thyroid - ICRP-301.39E+013.79E+001.23E+01Accident Initiated Iodine Spike Case (0.265 µCi/gm steady state)(rem)2 HR EAB30 DAY LPZCONTROL ROOM Gamma5.46E-011.60E-015.71E-02Beta2.51E-017.73E-026.64E-01Thyroid - ICRP-307.19E+002.12E+002.01E+00 15.5-50ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-20 Parameters Used In Fuel Handling Accident AnalysisRegulatory Guide 1.25 Analysis Time between plant shutdown and accident 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> Damage to fuel assemblyAll rods ruptured Fuel assembly activityHighest powered fuel assembly in core region dischargedActivity release to spent fuel poolGap activity in ruptured rods (1)Radial peaking factor1.65Form of iodine activity releasedelemental iodine methyl iodine 99.75%0.25% Filter efficiencies in auxiliary building elemental iodinemethyl iodine RBPVS (2) 90%
30%Amount of mixing of activity in Auxiliary BuildingNoneMeteorologySee Table 15.5-14 and Table 15A-2 (1) 10% of the total radioactive iodine except for 12% of I-131 and 10% of total noble gases, except for 14% for Kr-85, 5% for Xe-133 and 2% for Xe-135 in the damaged rods at the time of the accident. (2) Reactor Building Purge Ventilation System ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-51WATTS BARWBNP-107Table 15.5-20a Parameters Used In Fuel Handling Accident AnalysisRegulatory Guide 1.183 AnalysisTime between plant shutdown and accident100 hoursDamage to fuel assemblyAll rods ruptured Fuel assembly activityHighest powered fuel assembly in core region dischargedActivity release to spent fuel poolGap activity in ruptured rods (1)Radial peaking factor1.65Form of iodine activity released to spent fuel poolelemental iodinemethyl iodine99.85%(AST)0.15%(AST)Decontamination factor in spent fuel poolAST Overall=200Filter efficienciesNo credit taken Amount of mixing of activity in Auxiliary BuildingNoneMeteorology See Table 15.5-14 and Table15A-2(1) 8% I-131, 10% Kr-85, and 5% other gasses and other halogens.
15.5-52ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-21 Nuclear Characteristics Of Highest Rated Discharged Assembly Used In The Analysis Core thermal powerNumber of assemblies Fuel rods per assembly Core average assembly power 3565 MWt193 264 18.47 MWtDischarged Assembly Radial peak to average ratio 1.65 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-53WATTS BARWBNP-107Table 15.5-22 Deleted by Amendment 80 15.5-54ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107 Table 15.5-23 Doses From A Fuel Handling Accident (FHA) (rem) Doses from Fuel Handling Accident Regulatory Guide 1.183 AnalysesFHA in Auxiliary Building (rem)*2 HR EAB30 DAY LPZCONTROL ROOMTEDE2.38E+006.66E-011.02E-00* The FHA in the Auxiliary Building results conservatively bound the FHA in containment with the containment open. See text in Section 15.5.6.3.Doses from Fuel Handling Accident Regulatory Guide 1.25 AnalysesFHA in Reactor Building, Containment Closed (rem)2 HR EAB30 DAY LPZCONTROL ROOMGamma4.31E-011.21E-012.72E-01 Beta1.24E+003.48E-012.25E+00 Thyroid - ICRP-304.15E+011.16E+016.81E+00 ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15.5-55WATTS BARWBNP-107Table 15.5-24 Deleted by Amendment 80 15.5-56ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS WATTS BARWBNP-107Table 15.5-25 Deleted by Amendment 80 Environmental Consequences of Accidents15.5-57WATTS BAR WBNP-107Figure 15.5-1 Schematic of Leakage Path
15.5-58Environmental Consequences of AccidentsWATTS BAR WBNP-107Figure 15.5-2 Deleted by Amendment 80 Environmental Consequences of Accidents15.5-59WATTS BAR WBNP-107Figure 15.5-3 Deleted by Amendment 97 15.5-60Environmental Consequences of AccidentsWATTS BARWBNP-107Figure 15.5-4 Deleted by Amendment 97Watts Bar FSAR Section15.0 Accident Analyses INTRODUCTION 15A-1WATTS BARWBNP-10715A DOSE MODELS USED TO EVALUATE THE ENVIRONMENTAL CONSEQUENCES OF ACCIDENTS 15A.1 INTRODUCTIONThis Appendix identifies the models used to calculate the offsite radiological doses that would result from releases of radioactivity due to various postulated accidents. The postulated accidents are:
(1)Fuel Handling Accident (2)Waste Gas Decay Tank Rupture (3)Steam Generator Tube Rupture (4)Steam Line Break (5)Loss of A. C. Power (6)Loss of Coolant Accident15A.2 ASSUMPTIONSThe following assumptions are basic to both the model for the gamma and beta doses due to immersion in a cloud of radioactivity and the model for the thyroid dose due to inhalation of radioactivity.
(1)Direct radiation from the source point is negligible compared to gamma and beta radiation due to submersion in the radioactivity leakage cloud.
(2)All radioactivity releases are from the appropriate point of discharge.
(3)The dose receptor is a standard man as defined by the International Commission on Radiological Protection (ICRP).
[1](4)Radioactive decay from the point of release to the dose receptor is neglected.
(5)Isotopic data such as decay rates and decay energy emissions are taken from Table of Isotopes.[2]15A.3 GAMMA DOSE AND BETA DOSEThe gamma and beta dose delivered to a dose receptor is obtained by considering the dose receptor to be immersed in a radioactive cloud which is infinite in all directions above the ground plane, i.e., an "infinite semispherical cloud." The concentration of radioactive material within this cloud is taken to be uniform and equal to the maximum centerline ground level concentration that would exist in the cloud at the appropriate distance from the point of release.
15A-2THYROID INHALATION DOSE WATTS BARWBNP-107The beta dose is a result of external beta radiation and the gamma dose is a result of external gamma radiation. Equations describing an infinite semispherical cloud were used to calculate the doses for a given time period as follows:
[5]andwhere: A R i=activity of isotope i released during a given time period, curies (X/Q)t=atmospheric dilution factor for a given time interval t, sec/m 3 Ei=average beta radiation energy emitted by isotope i per disintegration, mev/dis Ei=average gamma radiation energy omitted by isotope i per disintegration, mev/dis 15A.4 THYROID INHALATION DOSEThe thyroid dose for a given time period t, is obtained from the following expression
[6]:where:D = thyroid inhalation dose, rem (X/Q)t = site dispersion factor for time interval t, sec/m 3B = Breathing rate for time interval t, m 3/sec Q i = total activity of iodine isotope i released in time period t, curies (DCF)i = dose conversion factor for iodine isotope i, rem/curies inhaledBeta Dose0.23 XQt A R i E ii=Gamma Dose0.25 XQt A R i iE i=DXQt BQ i iDCF i=
THYROID INHALATION DOSE 15A-3WATTS BARWBNP-107The isotopic data and "standard man" data are given in Table 15A-1. The atmospheric dilution factors used in the analysis of the environmental consequences of accidents are given in Chapter 2 of this report and are reiterated in Table 15A-2 of this appendix.The gamma energies, E, on Table 15A-1 include the X-rays and annihilation gamma rays if they are prominent in the electromagnetic spectrum. Also the beta energies E, include conversion electrons if they are prominent in the electromagnetic spectrum. The beta energies are averaged quantities in the sense that the continuous beta spectra energies are computed as one-third the maximum beta energies.REFERENCES (1)"Report of ICRP Committee II on Permissible Dose for Internal Radiation (1959)," Health Physics, Vol. 3, pp. 30, 146-153, 1970.
(2)Leaderer, C. M., et. al., Table of Isotopes, 6th edition, 1968.
(3)Nuclear Data Sheets, Oak Ridge National Laboratory (ORNL) Nuclear Data Group, Vol. 7, Number 1, Academic Press, New York, January 1972.
(4)Radioactive Atoms - Supplement 1, ORNL-4923, Martin, M. J., NTIS, November 1973.
(5)Regulatory Guide 1.4 "Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Pressurized Water Reactors," USAEC, June 1974.
(6)J. J. Dinunno, et. al, "Calculation of Distance Factors for Power and Test Reactor Sites", TID 14844, March 1962.
15A-4THYROID INHALATION DOSE WATTS BARWBNP-107* Refer to Reference [6]**** Refer to Reference [2], [3], [4]Table 15A-1 Physical Data For IsotopesIsotopeDecay Constant**(Hr-1) Gamma Energy**(Mev/Disint.)Beta Energy**(Mev/Disint.)Dose Conversion Factor*(Rem/Curie)I-131I-132I-133 I-134I-1353.5833 x 10
-33.0401 x 10
-13.332 x 10
-27.9067 x 10
-11.0486 x 10
-10.38102.33320.6100 2.59281.58020.19430.51430.4090 0.61020.36801.48 x 10 65.35 x 10 44.00 x 10 52.50 x 10 41.24 x 10 5Xe-131m2.4269 x 10
-30.02010.1428 Xe-133Xe-133m Xe-135Xe-135m Xe-1385.4594 x 10
-31.2836 x 10
-27.5755 x 10
-22.6574 x 10 02.9350 x 10 00.04540.0416 0.34700.43181.1830 0.1540.1898 0.31680.09500.6058--
---Kr-83m3.7267 x 10
-10.00250.0371Kr-85 Kr-85mKr-87Kr-88 7.3692 x 10
-61.5472 x 10
-15.4508 x 10
-12.4755 x 10
-10.00220.15860.79281.96290.25060.25291.32370.3750--Kr-891.3078 x 10
-12.08371.2310BREATHING RATESTime Period(Hours)Breathing Rates (M 3/Sec) 0 - 8 8 - 2424 - 720 3.47 x 10
-4 1.75 x 10
-4 2.32 x 10
-4 THYROID INHALATION DOSE 15A-5WATTS BARWBNP-107 *The dilution factors were calculated for a travel distance of 1100 meters, the distance from the 100 meter radius release zone to the 1200 meter radius exclusion boundary (See Section 2.3.4).Table 15A-2 Accident Atmospheric Dilution Factors (sec/m 3)Conservative And Regulatory Guide AnalysesTime Period (hours)Exclusion Area Boundary*Low Population Zone (4828 meters)0-22-88-2424-9696-7206.382E-041.784E-048.835E-05 6.217E-052.900E-059.811E-06 15A-6THYROID INHALATION DOSE WATTS BARWBNP-107 THIS PAGE IS INTENTIONALLY LEFT BLANK