Application for Amend to License NPF-63 to Permit Manager of Operations to Hold Senior Reactor Operator (SRO) License,To Have at One Time Held SRO License & to Meet Qualifications Per Sept 1979 Draft of ANS 3.1
ML18005A743
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/29/1988
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18005A744 List:
References
NLS-88-290, NUDOCS 8901040249
Download: ML18005A743 (6)


Text

AC CEXZRATH)ST33BUTf ON DEMON'RrkTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8901040249 DOC.DATE: 88/12/29 NOTARIZED:

YES FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION MCDUFFIE,M.A.

Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to License NPF-63,revising senior reactor operator requirements for manager-operations.

DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR J ENCL I SIZE: TITLE: OR Submittal:

'General Distribution NOTES:Application for permit renewal filed.DOCKET 05000400 05000400~j RECIPIENT ID CODE/NAME, PD2-1 LA BUCKL'EY,B INTERNAL ACRS NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/DOEA/TSB 11 NUDOCS-ABSTRACT RE~'X~01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 0 1 1 6 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DEST/S I CB NRR/PMAS/I LRB 1 2 OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 2 2 1 0 1 1 1 1 1 1 1 1 1 0 1 1 1 1 D\D)JJ'P~gg(p oL.~0+pp HFS i I h NVZE TO ALL"RIDS>>RECIPIENTS

~PIZASE HELP US TO REDUCE HASTE.'ONTACT

'IHE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT.20079)TO ZZZHZNATE YOUR NAME FRCH DISTIGBUTION LISTS POR DOCE&NIS YOU DGNiT NEEDf sS TOTAL NUMBER OF COPIES REQUIRED: LTTR Z6'NCL 2Q l l CHILL Carolina Power 8 Ught Company P.O.Box 1551~Raleigh, N.C.27502 M.A.McDUFFIE Senior Vlcc Prestdent Nuclear Generation OECQ s$88 SERIAL: NLS-88-290 10CFR50.90 h United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT SRO REQUIREMENTS FOR MANAGER-OPERATIONS Gentlemen:

Carolina Power&Light Company hereby submits a supplement to the January 4, 1988 license amendment request for the Shearon Harris Nuclear Power Plant (SHNPP)regarding Technical Specification 6.2.2.e.This submittal is a result of conversations held between members of the Staff and CP&L personnel.

Currently, Technical Specification 6.2.2.e requires that the Manager-Operations hold a Senior Reactor Operator (SRO)license.The proposed change would allow the Manager-Operations to: (1)hold an SRO license;(2)have at one time held an SRO license;or (3)meet the qualifications for plant managers specified in Section 4.2.1 of the September 1979 draft of ANS 3.1.Based on discussions with the Staff, CP&L has removed Option 3 from the request.Enclosure 1 provides a revised Technical Specification page reflecting this change.The Company's January 4, 1988 request was prenoticed on March 9, 1988 (46 FR 7587).Removal of Option 3 from the original request does not affect the conclusions reached in the 10 CFR 50.92 analysis provided in the January 4, 1988 submittal or the March 9, 1988 prenotice.

As such, the 10 CFR 50.92 analysis remains valid and an additional prenotice of this request should not be necessary.

890i040249 881229 PDR ADOCK 05000400 P.PDC wag P4/on/-g~~g 44'(age (l'~E<gl/6/I/FP v 0 0 t 4 E.>1 ,"I Document Control Desk NLS-88-290

/Page 2 Please refer any questions regarding this submittal to Mr.Mark A.Turkal at (919)362-2985.Yours very truly, Qg 7'~M.A.McDuffie MAM/MAT

Enclosures:

1.Technical Specification Page CC: Mr.R.A.Becker Mr.W.H.Bradford Mr.Dayne H.Brown Mr.M.L.Ernst M.A.McDuffie, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and the sources of his information are-officers, employees, contractors, and agents of Carolina Power&Light Company.My commission expires: 9 7 H a Notary (Seal~gyqill II l y yp gOKAR>~044-, PuSuc~