ML18005A745

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Senior Reactor Operator Requirements for Manager - Operations
ML18005A745
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/29/1988
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18005A744 List:
References
NUDOCS 8901040251
Download: ML18005A745 (4)


Text

ENCLOSURE I SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENT TO REQUEST FOR LICENSE AMENDMENT SRO REQUIREMENTS FOR MANAGER - OPERATIONS TECHNICAL SPECIFICATION PAGE 89010<ADOC< SBi229 0gppOp00 pgR ,

, pic p

~ ~

VV

\

- ADMINISTRATIVE CONTROLS UNIT STAFF 6.2.2 The unit organization shall be subject to the following:

Each on-duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1;

b. At least one licensed Operator shall be in the control room when fuel is in the reactor. In addition, while the unit is in MODE 1, 2, 3, or 4, at least one licensed Senior Operator shall be in the control room;
c. An individual qualified as a Radiation Control Technician* shall be on site when fuel is in the reactor;
d. All CORE ALTERATIONS shall be observed and directly supervised by either a licensed Senior Operator or licensed Senior Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation;
e. The Manager-Operations shall The Operations Supervisor shall hold a Senior Reactor Operator License.

0

/tuber hold a Senior ~ea&or Qpg anal l teenage. or gave. cd. Cne, +me, held ~ geniOr R'easer OpQrA~Or 1 teeMe, "The Radiation Control Technician composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommo-date unexpected absence, provided immediate action is taken to fill the re-quired positions.

SHEARON HARRIS - UNIT 1 6-la Amendment No. 3