ML18064A661

From kanterella
Revision as of 18:46, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Withdraws Deferral of Listed Srs,Per 950210 TS Change Request Proposing One Time Deferral of Several 18 Month Srs. Updated Proposed TS Pages Encl
ML18064A661
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/30/1995
From: Haas K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18064A662 List:
References
NUDOCS 9503310312
Download: ML18064A661 (3)


Text

consumers Power POWERING MIC.HlliAN'S PROliRE55 Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 March 30, 1995 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT KurtM. Haas Plant Safety and Licensing Director TECHNICAL SPECIFICATIONS CHANGE REQUEST -ONE TIME DEFERRAL OF REFUELING INTERVAL SURVEILLANCE

-REVISED PAGES On February 10, 1995, Consumers Power Company submitted a Technical Specifications (TS) change request proposing deferral of several 18 month surveillance requirements.

In our letter of March 27, 1995 on this subject, we noted that several of the requested deferrals are not necessary:

1) The containment pressure detector testing (TS 4.17.1 #12 & 4.17.3 #1 b&c) will not become due until after the start of the upcoming refueling outage. 2) Calibration of the containment atmospheric radioactive gas monitor (TS 4.17.6 #7.b) can be accomplished with the plant operating.

That calibration has been completed.

3) The Channel Functional Testing of the boric acid tank low level alarm switches (TS 4.17.6 #14) will be completed as scheduled.

Therefore, deferral of those surveillance requirements is no longer needed and the request for their deferral is hereby withdrawn.

In addition, one of the proposed pages submitted on February 10, 1995 was subsequently revised by the issuance of Amendment 163 to the Palisades Facility Operating License. The changes proposed in this change request have been added to the amended pag.e. Attachment 1 to this letter contains a complete set of updated proposed pages with the one amended page and the unnecessary deferrals omitted from the remaining pages. This revision of the proposed pages does not affect the No Significant Hazards analysis submitted in our February 10, 1995 letter because no changes beyond those proposed in that letter are proposed, and the conclusions of that analysis did not depend on the of the changes being deleted. ---*-----*---*. --9503310312 950330 PDR ADOCK 05000255 P PDR ------*-,**--*--

....... _ .... A G<<S' ENER6YCOMPANY Summary of Commitments:

This letter does not make or alter any commitments to the NRC. I Kurt M. Haas Director, Plant Safety & Licensing CC Administrator, Region III, USNRC Resident Inspector, Palisades State of Michigan Attachments 2

I --CONSUMERS POWER COMPANY To the best of my knowledge, the contents of this Technical Specifications change request, deferring several 18 month interval surveillance requirements until the upcoming refueling outage, are truthful and complete.

By _£Lt'----'"*

Robert A. Fenech, Vice President Nuclear Operations Sworn and subscribed to before me this Norma Jean o ler, Notary Public Van Buren County, Michigan My commission expires May 14, 1998 1995. [SEAL]