GNRO-2014/00086, Revision 72 to Emergency Plan
ML14344A326 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 12/10/2014 |
From: | Nadeau J J Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
GNRO-2014/00086, FOIA/PA-2015-0025 | |
Download: ML14344A326 (300) | |
Text
{{#Wiki_filter:Entergy Operations, Inc.P.o.Box 756 Port Gibson, MS 39150 James Nadeau Manager, Regulatory Assurance Grand Gulf Nuclear Station Tel.(601)437-2103 GNRO-2014/00086 December 10,2014 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Dear Sir or Madam:
Emergency Plan, Revision 72 Grand Gulf Nuclear Station, Unit 1 Docket No.50-416 License No.NPF-29 In accordance with 10CFR50.54(q)(5), 1 OCFR50 Appendix E(V), 10CFR50.4(b)(5)(ii), 10CFR72.44(f) and 10CFR 72.4, Entergy Operations Inc.(Entergy)hereby submits Revision 72 to the Grand Gulf Nuclear Station (GGNS)Emergency Plan, including a summary and analysis of the changes, which became effective November 19,2014.The changes to the GGNS Emergency Plan were evaluated by Entergy and determined to not reduce the effectiveness of the plan.Attachment 1 contains the Summary and Analysis of the Emergency Plan Changes.Attachment 2 contains the GGNS Emergency Plan Revision 72.This letter contains no new commitments. If you have any questions concerning this submittal, please contact Mr.Chris Lewis at (601)437-2166. IN/tmc Attachments: 1.Summary and Analysis of the GGNS Emergency Plan Changes 2.Grand Gulf Nuclear Station Emergency Plan, Revision 72 cc: (see next page) GNRO-2014/00086 Page 2 of 2 cc: U.S.Nuclear Regulatory Commission ATTN: Mr.A.Wang, NRR/DORL (w/2)Mail Stop OWFN8B1 Washington, DC 20555-0001 U.S.Nuclear Regulatory Commission ATTN: Mr.Marc Dapas (w/2)Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S.Nuclear Regulatory Commission ATTN: Mr.Mark Lombard Director, Division of Spent Fuel Storage And Transportation, Office of Nuclear Material Safety and Safeguards 11555 Rockville Pike Rockville, Maryland 20852-0001 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Attachment 1 to GNRO-2014/00086 Summary and Analysis of the GGNS Emergency Plan Changes ATTACHMENT 9.1 Sheet 1 of 4 10CFR50.54(q) SCREENING Procedure/Document Number: GGNS Emergency Plan I Revision: 72 (LBDCR 2014-032)Equipment/Facility/Other: Grand Gulf Nuclear Station Title: GGNS Emergency Plan Part I.Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the emergency plan or affect the implementation of the emergency plan): E-Plan Changes: 1.1-5 thru 1-8 Add definitions of Monitor and Prepare and Rapidly Progressing Severe Accident 2.6-8*Changethe minimum standard PAR to replace'shelter the remainder of the 10 mile EPZ'to'monitor and prepare the remainder of the 10 mile EPZ'.*Remove the word'prophylactic' from the KI statement.
- Remove reference to NUREG/BR-0150 and replace it with a reference to NUREG 0654 FEMA-REP-1, Rev I Supplement 3.3.7-5&6 Added details to the description of the Back-Up EOF (location, communications and computer equipment available, capabilities.)
4.7-32 Update BEOF diagram with new BWSES Admin.Building floor plan.5.0-2 Insert new letter of agreement with Department of Energy.6.7-32 Remove reference to 10-S-01-33 (deleted)7.A-2-9,11,15, 16*Remove references to 01-S-10-4 EP Drills and Exercises (cancelled) and replace with reference toEP-306 Drills and Exercises.
- Remove Reference to 10-S-01-29 OSC Operations (cancelled) and replace with EN-EP-611 OSC Operations.
- Remove Reference to 10-S-01-30 TSC Operations (cancelled) and replace with EN-EP-610 TSC Operations.
- Remove Reference to 10-S-01-33 EOF Operations (cancelled) and replace with EN-EP-609 EOF Operations.
8.A-7 Add line for section 6.2.2 that was inadvertently omitted in Revision 65.Editorial Changes List of Effective Page 1-3 Update revision dates.(reference or annotation change)Part II.Activity Previously Reviewed?Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or Alert and Notification System Design Report?If YES, identify bounding source document number/approval reference and ensure the basis for concluding the source document fully bounds the proposed change is documented below: Justification: D Bounding document attached (optional) DYES 50.54(q)(3) Evaluation is NOT required.Enter justification below and complete Part VI.IZI NO Continue to next part------------------------------_._ .EN-EP-305 REV 3 AnACHMENT 9.1 Sheet 2 of 4 10CFR50.54(q) SCREENING Procedure/Document Number: GGNS Emergency Plan I Revision: 72 (LBDCR 2014-032)Equipment/Facility/Other: Grand Gulf Nuclear Station Title: GGNS Emergency Plan Part IU.Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity.(Refer to EN-L1-100) NOTE: For example, when a design change is the proposed activity, consequential actions may include changes to other documents which have a different change control process and are NOT to be included in this 50.54(q)(3) Screening. APPLICABILITY CONCLUSION 181 If there are no controlling change processes, continue the 50.54(q)(3) Screening. D One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects the implementation of the emergency plan;continue the 50.54(q)(3) Screening for that portion of the activity.Identify the applicable controlling change processes below.D One or more controlling change processes are selected and fully bounds all aspects of the activity.50.54(q)(3) Evaluation Is NOT required.Identify controlllnQ chanQe processes below and complete Part VI.CONTROLLING CHANGE PROCESSES 1 OCFR50.54(q)Part IV.Editorial Change Is this activity an editorial or typographical change such as formatting, paragraph numbering, spelling, or punctuation that does not change intent?Justification: The following are considered editorial changes in accordance with EN-EP-305: List of Effective Page 1-3 Update revision dates.(reference or annotation change)NO is selected because other changes are not editorial. DYES 50.54{q)(3) Evaluation is NOT required.Enter justification and complete Part VI.181 NO Continue to next part EN-EP-305 REV 3 ATTACHMENT 9.1 Sheet 3 of 4 10CFR50.54(q) SCREENING Procedure/Document Number: GGNS Emergency Plan I Revision: 72 (LBDCR 2014-032)Equipment/Facility/Other: Grand Gulf Nuclear Station Title: GGNS Emergency Plan Part V.Emergency Planning Element/Function Screen (Associated 10 CFR 50.47(b)planning standard function identified in brackets)Does this activity affect any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II?1.Responsibility for emergency response is assigned.[1]D 2.The response organization has the staff to respond and to augment staff on a continuing basis (24n D staffing)in accordance with the emergency plan.[1]3.The process ensures that on shift emergency response responsibilities are staffed and assigned.[2]D 4.The process for timely augmentation of onshift staff is established and maintained. [2]D 5.Arrangements for requesting and using off site assistance have been made.[3]6.State and local staff can be accommodated at the EOF in accordance with the emergency plan.[3]D 7.A standard scheme of emergency classification and action levels is in use.[4]D 8.Procedures for notification of State and local governmental agencies are capable of alerting them of D the declared emergency within 15 minutes after declaration of an emergency and providing follow-up notifications. [5]9.Administrative and physical means have been established for alerting and providing prompt D instructions to the public within the plume exposure pathway.[5]10.The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and D Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter.[5]11.Systems are established for prompt communication among principal emergency response D organizations. [6]12.Systems are for prompt communication to emergency response personnel. [6]D 13.Emergency preparedness information is made available to the pUblic on a periodic basis within the D plume exposure pathway emergency planning zone (EPZ).[7]14.Coordinated dissemination of public information during emergencies is established. [7]D 15.Adequate facilities are maintained to support emergency response.[8]18I 16.Adequate equipment is maintained to support emergency response.[8]IZI 17.Methods, systems, and equipment for assessment of radioactive releases are in use.[9]D 18.A range of public PARs is available for implementation during emergencies. [10]18I 19.Evacuation time estimates for the population located in the plume exposure pathway EPZ are D available to support the formulation of PARs and have been provided to State and local governmental authorities. [10]20.A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.[10] 21.The resources for controlling radiological exposures for emergency workers are established. [11]D 22.Arrangements are made for medical services for contaminated, injured individuals. [12]D 23.Plans for recovery and reentry are developed.D 24.A drill and exercise program (including radiological, medical, health physics and other program D areas)is established. [14]EN-EP-305 REV 3........................ _----------------------------------_ ..._..._-_*...*._-_.._._..__ ..._-_. ATTACHMENT 9.1 Sheet 4 of 4 10CFR50.54(q) SCREENING Procedure/Document Number: GGNS Emergency Plan I Revision: 72 (LBDCR 2014-032)Equipment/Facility/Other: Grand Gulf Nuclear Station Title: GGNS Emergency Plan 25.Drills, exercises, and training evolutions that provide performance opportunities to develop, 0 maintain, and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]26.Identified weaknesses are corrected. [14]0 27.Training is provided to emergency responders. [15]0 28.Responsibility for emergency plan development and review is established. [16]D 29.Planners responsible for emergency plan development and maintenance are properly trained.[16]0 APPLICABILITY CONCLUSION o If no Part V criteria are checked, a 50.54(q)(3) Evaluation is NOT required;document the basis for conclusion below and complete Part VI.o If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation. BASIS FOR CONCLUSION The changes listed in items 6 and 7 correct the Emergency Plan to the proper references. These are reference changes only that do not change intent and may be screened out.Item 8 makes a change to add information back into the document that was previously inadvertently deleted.The correction to include inadvertently deleted information does not change a process and is therefore screened out.The changes being made to the GGNS Emergency Plan in items 1 through 5 have the potential to affect the following 10CFR50.47(b) planning standards:
- 10CFR50.47 (b)[3]Arrangements for requesting and using off site assistance have been made.o 10CFR50.47 (b)[8J Emergency Facilities
- 10CFR50.47 (b)[10]A range of public PARs is available for implementation during emergencies These changes will be evaluated under 10 CFR 50.54 (q)Part VI.Signatures:
Date: Date: Date: 10/27/14EP p{oject Manager Preparer Name (Print)Richard Van Den Akker EN-EP-305 REV 3 Procedure/Document Number: GGNS E-Plan I Revision: 72 Equipment/Facility/Other: Grand Gulf Nuclear Station Title: GGNS Emergency Plan Rev 72 ATTACHMENT 9.2 Sheet 1 of 5 10CFR50.54(q) EVALUATION ,Part I.Description of Proposed Change: 1.1-8 Add definitions of Monitor and Prepare and Rapidly Progressing Severe Accident 2.6-8*Change the minimum standard PAR to replace'shelter the remainder of the 10 mile EPZ'to'monitor and prepare the remainder of the 10 mile EPZ'.*Remove the word'prophylactic' from the KI statement.
- Remove reference to NUREG/BR-0150 and replace it with a reference to NUREG 0654 FEMA-REP-1, Rev I Supplement 3.3.7-5&6 Added details to the description of the Back-Up EOF (location, communications and computer equipment available, capabilities.)
\4.7-32 Update BEOF diagram with new BWSES Admin.Building floor plan.5.0-2 Insert new letter of agreement with Department of Energy.Part II.Description and Review of Licensing Basis Affected by the Proposed Change: Performed electronic search of the Emergency Plan.Technical Requirements Manual, TS Bases, Operating License, COLR, ODCM, NRC Orders.Keywords used;"Protective Action Recommendations","shelter Jl*"monitor and prepare Jl*"PARslI and, JlBack-up EOF JI*Only relevant sections identified were GGNS Emergency Plan sections 5.7.6 Department of Energy 6.5.Protective Actions and 7.3.4 Back-up EOF Protective action recommendations are not discussed in any of the LBDs with the exception of the Emergency Plan.Offsite agreements with federal agencies is not discussed in any LBDs with the exception of the GGNS Emergency Plan.The changes to the Emergency Plan will not affect the GGNS Licensing Basis.EN-EP-305 REV 3 Procedure/Document Number: GGNS E-Plan I Revision: 72 Equipment/Facility/Other: Grand Gulf Nuclear Station Title: GGNS Emergency Plan Rev 72 ATTACHMENT 9.2 Sheet 2 of 5 10CFR50.54(q) EVALUATION Part III.Describe How the Proposed Change Complies with Relevant Emergency Preparedness .1 Regulatlon(s) and Previous Commitment(s) Made to the NRC: Emergency Protective Actions Items 1 and 2: The changes to the GGNS Protective Action Recommendation comply with the regulatory requirement in 1 OCFR50 Appendix E.IV.3 to use NRC approved evacuation time estimates in the formulation of protective action recommendations. The changes also incorporate guidance contained in NUREG 0654 FEMA-REP-1, Rev 1, Supplement 3 (Guidance for Protective Action Strategies) and NEI 12-10.Rev 1 (Guideline for Developing a Licensee Protective Action Recommendation Procedure Using NUREG-0654 Supplement 3).The changes to the GGNS protective action recommendations were developed with the concurrence of the state and local ORO's using Appendix A of NEI12-10.The new PAR strategy is consistent with both NUREG 0654 Supp 3 and NEI12-10.Emergency Facilities and Equipment Item 3: The additional information describing the Back-Up EOF (BEOF)is being added to address NRC Order EA-02-026,NRC Bulletin 05-02 and NEIISG Alternate Facilities. These references apply to Alternate ERF's.Since the GGNS BEOF is 17 miles from the site it fulfills many of the requirements for Alternate ERFs.The information being added clarifies the capabilities and equipment at the BEOF.Emergency Response Support and Resources Changes to various letters of agreement with offsite support agencies complies with the requirements of NUREG 0654 section II p.4 Each organization shall update its plan and agreements as needed, review and certify it to be current on an annual basis.The changes being made to the Letters of Agreement are the result of the annual review.There are no Grand Gulf specific NRC commitments related to Protective Action Recommendations, Facilities or Emergency Response Support and Resources.
- EN-EP-305 REV 3 Procedure/Document Number: GGNS E-Plan I Revision: 72 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: GGNS Emergency Plan Rev 72 AnACHMENT 9.2 Sheet 3 of 5 10CFR50.54(q) EVALUATION Part IV.Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change: 10 CFR 50.47(b)(3) -Emergency Response Support and Resources o Arrangements for requesting and using offsite assistance have been made.Sections IV.A.6 and IV.A.7 of Appendix E to 10 CFR 50 provide supporting requirements. Informing criteria appear in Section II.C of NUREG-0654 and the licensee's emergency plan.10 CFR 50.47(b)(8) -Emergency Facilities and Equipment o Adequate facilities are maintained to support emergency response.D Adequate equipment is maintained to support emergency response.Sections IV.E.1-4, IV.E.8, and IV.G of Appendix E to 10 CFR 50 provide supporting requirements. Informing criteria appear in Section II.H of NUREG-0654; NUREG-0696."Functional Criteria for Emergency Response Faciliti'es," and the licensee's emergency plan.10 CFR 50.47(b)(10) -Emergency Protective Actions o A range of public PARs is available for implementation during emergencies. Appendix E to 10 CFR 50 does not contain any support requirements. Informing criteria appear in NUREG-0654 in Sections II.J.1-8, Section II.J.10, and Supplement 3 and in the licensee's emergency*plan.EN-EP-305 REV 3 __ --.-..--...------..--.--- Procedure/Document Number: GGNS E-Plan I Revision: 72\Equipment/Facility/Other: Grand Gulf Nuclear Station Title: GGNS Emergency Plan Rev 72 ATTACHMENT 9.2 Sheet 4 of 5 10CFR50.54(q) EVALUATION Part V.Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan Functions: .Items 1 and 2: Implementation of the new GGNS PAR Strategy.The changes to section 6 of the GGNS Emergency Plan are part of'implementing the new GGNS PAR strategy that was developed in accordance with NUREG 0654 Supplement 3 and NEI12-10.The new strategy was developed with the participation and approval of the appropriate OROS's and implements the updated federal guidance contained in NUREG 0654 Supplement 3.The addition of a recommendation for populations not impacted by a potential or actual radioactive plume to go indoors, monitor emergency broadcasts and prepare for further action as necessary (monitor and prepare)can be more protective for these populations at certain times of the year than recommending that they shelter in place by turning off ventilation systems, given the relative risk to them from a radioactive plume.Therefore this change does not reduce the effectiveness of the GGNS Emergency Plan, but improves it by adding the flexibility of recommendation for populations at lower risk that can be more protective and still prepares them for further action should it become necessary. The removal of the word"prophylactic" from a statement does not change the process for using KI and therefore does not reduce the effectiveness of the GGNS Emergency Plan.These'changes will not affect GGNS'ability to implement 10 CFR 47 (b)(10)and will not reduce the effectiveness of the GGNS Emergency Plan.Item 5: Insert updated Letter Of Agreement for Department of Energy.The updated letter of agreement being added to this revision is the result of the annual review of the letters of agreement. This updated letter includes no changes to the agreement itself and will not affect the availability or nature of the support provided.This change will not affect GGNS'ability to implement 10 CFR 47(b)(3)and will not reduce the effectiveness of the GGNS Emergency Plan.Item 4: Added details to the description of the Back-Up EOF (location. communications and computer equipment available. capabilities and updated floor plan.)The GGNS Back-up EOF (BEOF)is located seventeen miles north of the plant so it also fills the role of an Alternate EOF (AEOF).The information being added to this revision clarifies the equipment and capabilities of the BEOF to show that it is consistent with recent guidance on Alternate Emergency Response Facilities (AERFs)(NRC Order EA-02-026, NRC BUlletinBL-05-02, and NEI ISG Alternate Facilities, Onsite Protective Actions, ORO Coordination, ORO Event.)This change will not affect GGNS'ability to implement 10 CFR 47(b)(8)and will not reduce the effectiveness of the GGNS Emergency Plan because it does not make changes to any existing facilities or equipment, but refers to them in the Emergency Plan as meeting a regulatory requirement. These changes will not reduce the effectiveness of the GGNS Emergency Plan functions. EN-EP-305 REV 3 Procedure/Document Number: GGNS E-Plan I Revision: 72 Equipment/Facility/Other: Grand Gulf Nuclear Station Title: GGNS Emergency Plan Rev 72 ATTACHMENT 9.2 Sheet 5 of 5 Part VI.Evaluation Conclusion Answer the following questions about the proposed change.10CFR50.54(q) EVALUATION I.Does the proposed change comply with 10 CFR 50.47(b)and 10 CFR 50 Appendix E?2.Does the proposed change maintain the effectiveness of the emergency plan (Le., no reduction in effectiveness)? r8]YES D NO r8]YES D NO 3.Does the proposed change constitute an emergency action level scheme change?DYES I2l NO If questions 1 or 2 are answered NO, or question 3 answered YES, reject the proposed change, modify the proposed change and perform a new evaluation or obtain prior NRC approval under provisions of 10 CFR 50.90.If questions 1 and 2 are answered YES, and question 3 answered NO, implement applicable change process(es). Refer to step 5.6[8].Part VII.Signatures Preparer Name (Print)Richard Van Den Akker (0 tional)Reviewer Name (Print)61" Nuclear EP Manager'/? Name (Print)I_. lIW,S EP Manager or designee Date: 10/27/14 Date: Date:-it EN-EP-305 REV 3
- .*........
__**........ -. Attachment 2 to GNRO-2014/00086 Grand Gulf Nuclear Station Emergency Plan, Revision 72
GRAND GULF NUCLEAR STATION EMERGENCY PLAN RECORD OF REVISION Revision/Change Number Date Entered Entered by Keep this sheet in the front of your copy of the GGNS Emergency Plan as a record of incorporation of periodic revisions and changes. Revision GG FSAR LIST OF EFFECTIVE PAGES Revision List of Effective Pages 1 72 2 72 3 72 4 72 i 44 11 70 iii 71 111 a 71 iv 61 v 61 vi 44 vii 44 viii 44 IX 70 X 61 1-1 56 1-2 44 1-3 61 1-4 61 1-5 72 1-6 72 1-7 72 1-8 72'2-1 23 2-2 64 2-2a 58 2-3 25 2-4 56 2-4a 52 2-5 25 2-6 25 2-7 39 2-8 58 2-9 61 2-10 70 2-10a 70 2-11 26 2-12 68 2-13 70 2-14 70 2-15 64 3-1 68 3-1a 68 3-2 64 4-1 59 4-2 61 4-3 65 4-4 61 4-5 69 4-6 69 4-7 69 4-8 69 4-9 69 4-10 69 4-11 69 4-12 69 4-12a 69 4-13 69 4-13a 69 4-14 69 4-15 71 4-16 69 4-17 69 4-17a 69 4-18 69 4-19 69 4-20 69 4-21 69 4-22 69 4-23 57 5-1 70 5-2 70 5-3 70 5-4 70 Revision 72 11/14 Revision GG FSAR LIST OF EFFECTIVE PAGES Revision 5-5 61 5-6 61 5-7 61 5-8 62 5-9 61 5-9a 71 5-10 71 5-11 71 5-12 71 5-13 71 5-14 71 5-15 71 5-16 71 5-17 71 5-18 71 5-19 61 5-20 71 5-21 64 5-22 71 5-23 61 5-24 61 5-25 61 5-26 61 5-27 68 5-28 70 5-29 71 5-30 69 5-31 61 5-32 70 5-33 70 5-34 71 5-35 61 5-36 61 6-1 61 6-2 43 6-3 64 6-4 61 6-5 43 6-6 70 6-7 61 2 6-8 72 6-9 61 6-10 61 6-11 65 6-12 61 6-13 61 6-14 61 6-15 26 6-16 71 7-1 61 7-2 61 7-3 70 7-4 61 7-5 72 7-6 72 7-7 58 7-8 61 7-9 71 7-10 64 7-11 66 7-12 51 7-13 46 7-14 61 7-15 59 7-16 25 7-17 45 7-18 45 7-19 28 7-20 65 7-21 61 7-22 51 7-23 43 7-24 61 7-25 71 7-26 61 7-27 41 7-28 46 7-29 61 7-30 29 7-31 24 Revision 72 11/14 Revision GG FSAR LIST OF EFFECTIVE PAGES Revision 7-32 72 7-33 68 7-34 71 7-35 53 7-36 53 7-37 71 7-38 61 8-1 70 8-2 23 8-3 70 8-4 26 8-5 70 8-6 64 8-7 51 8-8 70 8-9 70 8-10 70 8-10a 70 8-11 70 8-12 31 9-1 46 9-2 61 9-3 61 9-4 43 A-I 28 A-2 72 A-3 72 A-4 72 A-5 72 A-5a 72 A-6 72 A-7 72 A-8 72 A-9 72 A-I0 70 A-II 72 A-12 70 A-13 31 3 A-14 39 A-15 72 A-16 72 B-1 47 C-l 23 D-l 70 D-2 72 D-3 70 D-4 51 D-5 70 D-5a 60 D-5b 60 D-5c 60 D-5d 70 D-5e 70 D-5f 71 D-6 70 D-7 49 D-7a 49 D-7b 71 D-8 52 D-8a 52 D-8b 71 D-9 60 D-9a 60 D-9b 39 D-9c 39 D-9d 71 D-lO 49 D-ll 25 D-lla 25 D-12 71 D-12a 71 D-13 70 Revision 72 11/14 Revision GG FSAR LIST OF EFFECTIVE PAGES Revision D-14 70 D-15 47 D-16 47 D-17 47 D-18 47 D-19 70 D-20 37 D-21 26 D-22 26 D-23 70 D-24 70 D-25 70 D-26 70 D-27 70 D-28 57 D-29 68 D-30 68 D-31 71 D-32 27 D-33 27 D-34 70 D-35 70 D-36 53 D-37 60 D-38 60 D-39 60 D-40 71 Appendix E Cover Page 70 E-l 70 E-2 70 E-3 70 E-4 70 E-5 70 E-6 70 E-7 70 E-8 70 E-9 70 E-IO 70 E-ll 70 4 E-12 70 E-13 70 E-14 70 E-15 70 E-16 70 E-17 70 E-18 70 E-19 70 F-l 33 G-l 29 Hq 61 H-2 64 H-3 61 H-4 61 H-5 61 H-6 61 Revision 72 11/14 GRAND GULF NUCLEAR STATION FINAL SAFETY ANALYSIS REPORT SECTION 13.3-EMERGENCY PLANNING TABLE OF CONTENTS SECTION 1.0 DEFINITIONS1-1 2.0 SCOPE AND APPLICABILITY2-1 2.1 Criterion for Grand Gulf Nuclear Station Emergency Plan Development2-1 2.2 Applicability of the Emergency Plan2-1 2.2.1 General Information and Site Description2-1 2.2.2 Population and Population Distribution2-3 2.2.3 Emergency Planning Zones2-3 2.3 Scope of the Emergency Plan2-4 2.3.1 Regulatory Requirements2-4 2.3.2 Objectives of the Emergency Plan2-5 2.4 Emergency Plan Interrelationships2-5 2.4.1 Emergency Plan Procedures2-6 2.4.2 Related Plans, Programs and Procedures2-6 2.4.3 Participating Governmental Agencies2-7 3.0
SUMMARY
OF EMERGENCY PLAN3-1 3.1 Emergency Planning3-1 3.2 Emergency Plan Steps3-1 3.3 Emergency Direction and Assignments3-2 4.0 EMERGENCY CONDITIONS4-1 4.1 Emergency Classification Systems4-1 4.1.1 Unusual Event4-2 4.1.2 Alert4-2 4.1.3 Site Area Emergency4-3 4.1.4 General Emergency4-3 4.2 Classification of Postulated Accidents4-4 Revision 44 01/01 GG FSAR SECTION PAGE 5.0 ORGANIZATIONAL CONTROL OF EMERGENCIES5-1 5.1 GGNS Organ.ization5-1 5.2 Normal Station Organ.ization5-1 5.2.1 General Man.ager, Plant Operations5-1 5.2.2 Manager, Operations5-2 5.2.3 Man.ager, Maintenan.ce5-2 5.2.4 Man.ager, Radiation Protection5-2 5.2.5 Man.ager, Production5-2 5.2.6 Man.ager, Training5-3 5.2.7 Shift Technical Advisor5-3 5.2.8 Manager, Materials, Purchasing an.d Contracts5-3 5.2.9 Director, Regulatory &Performan.ce Improvement5-3 5.3 Normal Station Shift Staffmg5-4 5.4 Emergency Organ.ization5-4 5.4.1 Normal Station Shift5-4 5.4.2 Emergency Director (ED)5-5 5.4.3 EOF Manager5-5 5.4.4 Radiological Assessment Coordinator (RAC)5-6 5.4.5 Technical Advisor (TA)5-6 5.4.6 Admin.&Logistics Coordinator5-7 5.4.7 Public Information Liaison5-7 5.4.8 Offisite Communicator 5-7 5.4.9 EOF Communicator5-8 5.4.10 Lead Offsite Liaison5-8 5.4.11 Offsite Liaison5-8 5.4.12 Dose Assessor5-8 5.4.13 Offsite Team Coordinator (OTC)5-9 5.4.14 Offsite Monitoring Team (OMT)5-9 11 Revision 70 11/13 SECTION 5.4.15 5.4.16 5.4.17 5.4.18 5.4.19 5.4.20 5.4.21 5.4.22 5.4.23 5.4.24 5.4.25 5.4.26 5.4.27 5.4.28 5.4.29 5.4.30 5.4.31 5.4.32 5.4.33 5.4.34 5.4.35 5.4.36 5.4.37 5.4.38 5.4.39 GG FSAR PAGE Information Technology (IT)Specialist -EOF 5-9 EOF Log Keeper 5-9a EmergencyPlantManager (EPM)5-10 TSC Manager5-10 TSC Communicator5-11 Security Coordinator5-11 ENS Communicator5-11 Maintenance Coordinator5-12 Engineering Coordinator5-12 Radiological Coordinator5-12 Operations Coordinator5-13 Engineers (Mechanical/I&C/Electrical)5-13 Reactor Engineer5-13 OSC Manager5-14 Log Keeper-OSC5-14 Operations Support5-14 Work Control Coordinator5-15 Mechanical/I&C/Electrical Coordinator5-15 Rad Chern Coordinator5-15 Company Spokesperson5-16 Technical Advisor-JIC5-16 JIC Manager5-16 Log Keeper-JIC5-16 Inquiry Response Coordinator5-17 Press Release Writer5-17 111 Revision 71 06/14 SECTION 5.5 5.6 GG FSAR PAGE Recovery Orga.tlization5-19 Local Services Support5-20 5.6.1 Medical Support5-20 5.6.2 Fire Support5-21 5.6.3 Law Enforcement Agencies5-22 5.7 Coordination with Governmental Agencies5-22 5.7.1 Mississippi Emergency Management Agency (MEMA)and Mississippi State Department of Health!Division of Radjological Healtll.(ORR)5-23 iiia Revision 71 06/14 GG FSAR SECTION 5.7.2 5.7.3 5.7.4 5.7.5 5.7.6 5.7.7 5.7.8 Louisiana Department of Environmental Quality (LD EQ)and Louisiana Office of Homeland Security and Emergency Preparedness (LHLS/EP)5-24 Port Gibson/Claiborne County Civil Defense5-25 Tensas Parish Office of Homeland Security and Emergency Preparedness5-25 Nuclear Regulatory Commission (NRC)5-26 Department of Energy (DOE)5-27 Institute of Nuclear Power Operations (INPO):5-27 U.S.Coast Guard5-27 5.8 Contractor Assistance5-28 5.9 Support for Federal Response5-28 6.0 EMERGENCY MEASURES6-1 6.1 Initiating Emergency Measures6-1 6.1.1 Emergency Suspension of N annal Quality Assurance Procedures and Administrative Controls, License Conditions, and Technical Specifications,6-1 6.1.2 Suspension of Normal Emergency Actions for Security Emergencies " 6-1 6.2 Activation of Emergency Organization6-2 6.2.1 Control Room Operators6-2 6.2.2 Shift Manager6-2 6.2.3 Shift Technical Advisor6-3 6.2.4 Emergency Director6-3 6.3 Assessment Actions6-4 6.3.1 Assessment Actions During Unusual Events6-4 6.3.2 Assessment Actions During Alerts6-5 6.3.3 Assessment Actions During Site Area Emergencies6-5 6.3.4 Assessment Actions During General Emergencies6-5 6.4 Corrective Actions6-6 iv Revision 61 03/09 SECTION 6.5 6.6 6.7 GG FSAR PAGE Protective Actions6-6 6.5.1 Protective Cover, Evacuation, Personnel Accountability6-6 6.5.1.a Grand Gulf Nuclear Station_6-6 6.5.1.b Offsite Areas6-8 Contamination Control Measures6-9 Aid to Affected Personnel6-9 6.7.1 Emergency Personnel Exposure6-9 6.7.2 Decontamination and First Aid 6-11 6;7.3 Medical Transportation6-12 6.704 Medical Treatment6-12 7.0 EMERGENCY FACILITIES AND EQUIPMENT7-1 7.1 Facilities and Equipment7-1 7.2 Control Room7-1 7.3 Emergency Response Facilities7-1 7.3.1 Technical Support Center (TSC)7-1 7.3.2 Operations Support Center (OS C)7-3 7.3.3 Emergency Operations Facility (EOF)7-4 7.304 Backup Emergency Operations Facility (BEOF)7-4 7.3.5 Media Centers7-5 7 A County and State Emergency Centers7-6 704.1 Claiborne County Emergency Operations Center7-6 7.4.2 Mississippi State Emergency Operations Center7-6 704.3 Tensas Parish Emergency Operations Center7-7 7.4.4 Louisiana State Emergency Operations Center7-7 7.5 Communications Systems7-7 7.5.1 Telephone System7-8 v Revision 61 03/09 I SECTION 7.5.2 7.5.3 7.5.4 GG FSAR PAGE Plant Paging System&Sound Powered Phones7-8 Emergency Communications Equipment7-9 Alert Notification System7-12 7.6 Assessment Facilities7-12 7.6.1 Onsite Systems and Equipment7-12 7.6.2 Offsite Monitoring Equipment and Facilities ,7-19 7.6.3 Radiological Assessment Laboratories7-20 7.6.4 Post-Accident Sampling Capability7-21 7.7 Protective Facilities7-22 7.8 First Aid and Medical Facilities
- 7-22 7.9 Rescue and Damage Control Equipment7-23 7.10 Personal Protective Equipment'7-23 8.0, MAINTAINING EMERGENCY PREPAREDNESS8-1 8.1 Organizational Preparedness8-1 8.2 Training8-1 8.2.1 General Emergency Plan Training8-2 8.2.2 Emergency Preparedness Training Specialized and Emergency Plan Procedure Training8-2 8.2.3 Orientation and Training Program for Offsite Support Agencies8-3 8.3 Drills and Exercises8-4 8.3.1 Drill and Exercise Scenarios8-5 8.3.2 Drill and Exercise Schedule8-6 8.4 Responsibilities8-8 8.5 Review and Updating of the Emergency Plan and Emergency Plan Procedures8-10 8.6 Maintenance and Inventory of Emergency Equipment and Supplies8-11 VI Revision 44 01/01 GG FSAR SECTION 8.7 Educational Information to the Public8-12 8.8 News Media Information8-12 9.0 REENTRY AND RECOVERy9-1 9.1 Reentry/Recovery "9-1 9.2 Reentry9-1 9.3 Recovery ,9-2 vii Revision 44 01/0 1 GG FSAR LIST OF APPENDICES APPENDIX TITLE A Emergency Plan Cross Reference&List of Procedures that Implement the Emergency PlanA-1 B List of Emergency Equipment and Supplies for Emergency Facilities and Hospitals B-1 C Reserved C-1 D Letters of AgreementD-1 E Evacuation Time Estimate Study E-1 F List of Supporting PlansF-1 G Reserved:G-1 H News Media Emergency Information Program for GGNS&Public Education and Information Program for GGNSH-1 viii Revision 44 01/01 TABLE 2-1 2-2 2-3 4-1 4-2 5-1 6-1 7-1 GG FSAR LIST OF TABLES TITLE PAGE Public Facilities and Institutions2-9 Resident Population Distribution in Evacuation Area by Sector2-10 Pennanent Resident Population by Protective Action Areas2-10a Summary of Emergency Actions Levels4-5 FSAR Accident Classification4-23 Shift Staffmg and Augmentation Capabilities5-29 Protective Actions Guides for the Early Phase of a Nuclear Incident.6-14 GGNS Operational Hot Line7-25 IX Revision 70 11/13 GG FSAR LIST OF FIGURES FIGURE TITLE 2-1 General Area SUIToundingThe Grand Gulf Nuclear Station,2-11 2-2 Site Layout2-12 2-3 Pennanent Resident Population Distribution2-13 24 Ten-Mile Emergency Planning Zone2-14 2-5 Fifty-Mile Emergency Planning Zone2-15 5-1 Deleted5-31 5-2 Nonnal Station Organization 5-32 5-3 Emergency Organization5-33 54 Emergency Organization5-34.5-5 Interrelationships of Emergency Response Organizations5-35 5-6 Federal Response Management Diagram"5-36 6-1 Deleted6-15 6-2 Emergency Notification Fonn6-16 7-1 Emergency Facilities7-26 7-2 Technical Support Center7-277-3 Operations Support Center 7-28 7-4 Emergency Operations Facility-Level I.7-29 7-5 Emergency Operations Facility-Level II'"7-30 7-6 Emergency Operations Facility Location7-31 7-7 Backup Emergency Operations Facility7-32 7-8 Deleted','7-33 7-9 Joint Infonnation Center7-34 7-10 Deleted7-35 7-11 Deleted7-36 7-12 Communications Interfaces7-37 7-13 Siren Locations7-38 x Revision 61 03/09 GG FSAR 1.0 DEFINITIONS This section provides defmitions which include various terms that are unique or given connotations that differ from normally accepted usage.The list below includes terms used throughout this Emergency Plan along with the definitions that are applied to these terms.1.1 Accident-An unintentional or unexpected event resulting in radiological exposure or physical injury to individuals and/or physical damage to property.1.2 Activation
-Actions taken to staff and setup an emergency facility for operation. Includes notification of emergency personnel, equipment setup and equipment operability testing.1.3 Affected Persons-Individual(s) who have been radiologically exposed or physically injured as a result of an accident to a degree requiring special attention, e.g., protective actions, decontamination, first aid, or medical services.1.4 Alarm-An indication of abnormal plant conditions and/or equipment status.1.5 Alert-An emergency classification in which events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety'of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of Hostile Action.Any releases are expected to be limited to small fractions of the Environmental Protection Agency (EPA)Protective Action Guideline exposure levels.1.6 Annual-As used for scheduling purposes, means that the event will be scheduled no later than 12 months after the previous event's original schedule date.If the event is not completed within 15 months of the previous events original schedule date, it will be considered late.This defmition does not apply to ERO Training.ERO Training frequency is described and defmed in Training&Qualifications procedure TQ-ll O.1.7 Assessment Action-Those actions taken during or after an accident to obtain and process 1-1 Revision 56 01/06 GG FSAR infonnation that is necessary to make decisions to implement specific emergency measures.1.8 Augmentation -Actions taken to support onshift Personnel prior to emergency facilities becoming fully operational. 1.9 CDB-Committed Dose Equivalent 1.10 Control RoomThe location at the GGNS from which the reactor and most of its auxiliary systems are nonnally controlled. 1.11 Control Room Personnel-Shift Manager, Senior Reactor Operator (SRO), Reactor Operators (RO), Auxiliary Operators, and Shift Technical Advisor (STA).1.12 Corrective Actions-Those emergency measures taken to lessen the severity of or terminate an emergency situation at or near the source of the problem in order to prevent or control a release of radioactive material or to minimize the damage to plant equipment, e.g., shutting down equipment, firefighting, repair and damage control.1.13 County-Claiborne County or Tensas Parish;same as"local.II 1.14 Design Basis Accident (DBA)-One of the most important parts of the site criteria is the requirement to identify the worst case accident based on detailed analysis of hypothesized accidents. As part of the Final Safety Analysis RePort (FSAR), the licensee is required to assume a fission product release from the core based upon a major accident, hyPothesized for PurPOses of site analysis, or postulated from considerations of possible accident hazards not exceeded by those from any accident considered credible.1.15 Decontaffiination -The removal of surface radioactive material from individuals, equipment, surfaces, food stuffs, etc.1.16 Emergency-A sudden, urgent, usually unforeseen occurrence or occasion requiring immediate action.It may result from accidental causes,naturalcauses, or malicious1-2 Revision 44 01/01 I GG FSAR man-made actions.There are four classes of emergencies considered: Unusual Event, Alert, Site Area Emergency, and General Emergency. 1.\7 Emergency Action Levels (EAL)-Radiological dose rates, specific contamination levels of airborne, waterborne, or surface-deposited concentrations of radioactive materials; or specific instrument indications (including their rates of change)that are used as thresholds for initiating such specific emergency measures as designated for a particular class of emergency, initiating a notification procedure, or initiating a particular protective action.1.18 Emergency Director-An individual designated onsite having the authority and responsibility to initiate the Emergency Plan and coordinate efforts to reduce the consequences of the event and bring it under control (Equivalent to the position of Emergency Coordinator referenced in NUREG 0654 Rev.1), The Shift Manager will assume this responsibility at the declaration of an Emergency. 1.19 Emergency Operations Facility (EOF)-A near-site emergency center from which the offsite emergency support activities are controlled. 1.20 Emergency Plan Procedures -Procedures providing the means to-implement the Emergency Plan.1,21 Emergency Planning Zone (EPZ)-Areas designated for which planning is provided to assure that prompt and effective action is initiated to protect the public in the event of an emergency. 1.22 Emergency Preparedness Owner Controlled Area (EPOCA)-the area at the site, which is owned and controlled by the station, for which the station has the responsibility to evacuate, except for any defined areas covered by agreements with State or other governmental agencies.1-3 Revision 61 03/09 GG FSAR 1.23 Emergency Plant Manager-an individual designated the responsibility for accident'mitigation at the plant.1.24 EOF Emergency Director-an individual designated the for the total emergency response effort and is the central figure for the emergency organization. The EOF Emergency Director relieves the Shift Manager of the Emergency Director responsibilities at which time the Shift Manager resumes Control Room duties.1.25 Exclusion Area-The area surrounding the plant owned by the reactor licensee in which he I has the authority to determine all activities including exclusion or removal of persons and property from the area during accident conditions. 1.26 Fitness For Duty (FFD)-A company policy implementing requirements under 10CFR26 that provides reasonable assurance that employees and other individuals directly associated with GGNS facilities will perform their tasks in a reliable and trustworthy manner.This is accomplished in part by assuring they are not under influence of any substance, legal or illegal, or mentally or physically impaired from any cause, which in any way adversely affects their ability to safely and competently perform their duties.This policyprovidesmeasures for early detection of persons who are not fit to perform their assigned duties.1.27 General Emergency-An emergency classification in which events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity or Hostile Action that results in an actual loss of physical control of the facility.Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.1.28 Hostile Action-An act toward the plant or its personnel that includes the use of violent force to destroy equipment, take hostages, and/or intimidate the plant staff to achieve an end.This includes attack by air, land or water using guns, explosives projectiles, vehicles, or other devices used to deliver destructive force.Other acts that satisfy the overall intent may be included.HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the plant.Non-1-4 Revision 61 03/09 GG FSAR terrorism based EALs should be used to address such activities, (e.g.violent acts between individuals in the owner controlled area).1.29 Hostile Force-One or more individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destructions. 1.30 Ingestion Exposure Pathway-An area with a radius of about 50 miles from the reactor site.Predetermined protective action plans are in place for this EPZ and are designed to avoid or reduce dose from potential ingestion of radioactive materials. These actions include a ban of contaminated food and water.1.31 Joint Information Center (nC)-An area designated outside the protected area that provides a location for the media so that communication and information can be disseminated concerning plant conditions and emergency operations. 1.32 Low Population Zone (LPZ)-As defined in 10CFR100.3, the area immediately surrounding the exclusion area which.contains residents, the total number and density are such that appropriate protective measures could be taken in their behalf in the event of a serious accident.The low population zone for the Grand Gulf Site is the area within a 2-mile radius from the plant.1.33 Monitor and Prepare-A type of precautionary action intended to advise the public within the EPZ that a serious emergency at the nuclear power plant exists and that it should monitor the situation and prepare for the possibility of evacuation, Shelter In*Place (SIP), or other protective actions.1.34 Non-Essential Personnel-employees not having emergency assignments (ERO), visitors, contractors/construction personnel, and members of the public who may be in public access areas within the Exclusion Area or Emergency Preparedness Owner Controlled Area.essential personnel and non-emergency personnel are equivalent and used interchangeably. 1-5 Revision 72 11/14 GG FSAR 1.3 5 Offsite-As used for accountability purposes, any area outside the GGNS protected area.As used for plume tracking survey purposes, all areas beyond the site boundary.1.36 Onsite-As used for accountability purposes, the area within the GGNS protected area.As used for plume tracking survey purposes, all areas external to the power block, out to and including the site boundary.1.37 Operational-Status of an emergency facility declared by the appropriate facility manager upon determining that the facility is adequately staffed and equipment is setup and available to assume perform the emergency functions assigned to that facility.1.38 Operations Support Center (OSC)-Location from which onsite non-control room activities are staged and implemented. 1.39 Pathway-Method by which radiological exposure is received.1.40 Plan-The Grand Gulf Nuclear Station Emergency Plan.1.41 Plume Exposure Pathway-The process by which a person receives exposure from direct interaction with the products of a radiological release.This includes receiving direct gamma radiation from sources external to the body, both instantaneous and short term due to being in the presence of the products of the release.It also includes direct gamma, beta, and alpha radiation from sO,urces inside the body due to inhalation. 1.42 Plume Tracking Survey-Onsite or offsite surveys performed to support offsite dose assessments which are ultimately used to provide state and local agencies with Protective Action Recommendations. 1.43 Population-at-Risk -Those persons for whom protective actions are being or would be taken upon implementation of the plan.1.44 Population Center-A densely populated area with 25,000 or more inhabitants. 1-6 Revision 72 11/14 GG FSAR 1.45 Protective Actions-Those emergency measures taken, either in anticipation of or after a release of radioactive material has occurred, for the purpose of preventing or minimizing radiological exposure to individuals. 1.46 Protective Action Guides (P AGs)-Guidelines for protective action recommendations to state and local agencies based on predetermined projected radiological dose or dose commitment values to individuals in the general population that warrant protective action in anticipation of or following a release of radioactive material.1.47 Protected Area-As defined in 10CFR73.2, an area encompassed by physical barriers to which access is controlled for security purposes.1.48 Rapidly Progressing Severe Accident-A significant reactor event with immediate orimmediate offsite consequences that is intended by the regulator to be easily recognizable. lfthe decision maker is not sure whether or not such an event is occurringthenthey should assume that a rapidly progressing severe accident is not in progress.1.49.Recovery Action-Those actions taken after the emergency to restore the plant as nearly as possible to pre-emergency conditions. 1.50 Restricted Area-As defined in 1 OCFR20.1 003, any area towhichaccess is controlled by the licensee for purposes of protection of individuals from exposure to radiation and radioactive material.1.51 Security Owner Controlled Area-SOCA.The Security area between the OCA detection fence and the protected area boundary.1.52 SDE-Shallow Dose Equivalent 1.53 Shift Manager-The senior management representative in charge of overall plant operations during each shift.1-7 Revision 72 11/14 GG FSAR 1.54 Site Area Emergency-An emergency classification in which events are in process or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or Hostile Action that result in intentional damage or malicious acts;(1)toward site personnel or equipment that could lead to likely failure of or;(2)prevents effeGtive access to equipment needed for the protection of the public.Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.1.55 State-The State of Mississippi or Louisiana. 1.56 Station-The Grand Gulf Nuclear Station.1.57 Technical Support Center (TSC)-An area which accommodates personnel acting in support of the command and control functions but separate from the control room.These personnel, under the guidance of the Emergency Plant Manager, supply in-depth diagnostic and corrective engineering and radiological assistance to the plant operations staff.1.58 TEDE-Total Effective Dose Equivalent 1.59 Unrestricted Area-As defined in 10CFR20.1003, any area to which access is not controlled by the licensee for the purpose of protection of individuals from exposure to radioactive materials. 1.60 Unusual Event-An emergency classification in which events are in process or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.(This is the same as the Notification of Unusual Event defined in NUREG-0654; the two expressions are used interchangeably in the Plan and related procedures as appropriate.) 1-8 Revision 72 11/14 GG FSAR 2.0 SCOPE AND APPLICABILITY 2.1 CriteriQn fQr Grand Gulf Nuclear StatiQn Emergency Plan DevelQPment The Grand Gulf Nuclear StatiQn Emergency Plan (the Plan)has been developed in accQrdance with NUREG-0654/FEMA-REP-I, Rev.1,"Criteria fQr Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants." Theformatparallels the guidance given in NRC RegulatQry Guide 1.101,"Emergency Planning for Nuclear Plants," Revision 1, dated March, 1977.2.2 Am>licability Qf the Plan 2.2.1 General InfQrmatiQn and Site DescriptiQn The Grand Gulf Nuclear Station is a nuclear power plant Qperated by Entergy OperatiQns, Inc.An area map showing the geographical locatiQnQf the facility is provided in Figure 2-1.The design Qf the Grand Gulf Nuclear StatiQn is that Qf a bQiling water nuclear steam supply system supplied by the General Electric CQmpany.A diagram identifying the station facilities is prQvided in Figure 2-2.The plant is located in Claiborne County, Mississippi. The site is on the east bank of the Mississippi River, apprQximately 25 miles south, southwest Qf Vicksburg and 37 miles nQrth-northeast Qf Natchez.The Grand Gulf Military Park borders a portiQn of the nQrth side Qf the property, and the small cQmmunity Qf Grand Gulf is approximately 1-1/2 miles to the north.The tQwn of Port Gibson is abQut 6 miles southeast Qf the site.TWQ lakes, Gin Lake and Hamilton Lake, are located in the western portion of the site.These lakes were once the channel Qf the Mississippi River and average about eight tQ ten feet in depth.The site and its environs cQnsist primarily of woodlands divided between two2-1 Revision 23 6/92 GG FSAR physiographic regions.The western half of the sife is in the alluvial plain of the Mississippi River;the eastern half is in the Loess or Bluff Hills.The elevation of the site varies between 60 and 80 feet above mean sea level in the alluvial plain region, while the Loess Hills portion varies from 80 to more than 200 feet above mean sea level (MSL).The plant site property boundary encompasses approximately 2100 acres of property that makes up the Grand Gulf Nuclear Station (GGNS)plant site.System Energy Resources, Inc.(SERI), South Mississippi Electric Power Association (SMEPA), and EntergyMississippi own the plant site property as noted in Section 2.1.1.2 of the GGNS FSAR.There are no unrelated industrial, commercial, institutional or residential structures, with the exception of a Branch Office for Riverland Credit Union, located within the site boundary.Riverland Credit Union Branch Office is located in the Site'Processing Facility which is inside the exclusion area.The boundary lines of the plant exclusion area consist of semicircles drawn from the center\of each containment joined by tangent straight lines.The minimum distance from each reactor to the exclusion area is 696 meters.This is the closest distance from the center of Unit 1 containment to the plant property line.There are no railroads or waterways that the site.One county road runs through the site;Bald Hill Road traverses the exclusion area and cuts through the south-southeast, south, south-southwest, and southwest sectors.The site area is accessible by two highways.U.S.Highway 61 and State Highway 18 connect Port Gibson (6 miles southeast of the site)with Natchez, Jackson and Vicksburg. 2-2 Revision 64 11/10 GG FSAR There are no military installations located near the site,area and no known missile sites in either Mississippi or Louisiana. -The nearest military facility is England Air Force Base in Alexandria, Louisiana, about 100 miles to the southwest. The Independent Spent Fuel Storage Installation (ISFSI)is located within the protected area boundary for interim dry storage of spent fuel.The HOL TEC spent fuel storage casks are designed to ensure protection of public health and safety through the use of physical barriers to guard against the uncontrolled release of radioactivity and through the use of shielding to minimize radiation dose to the public from both normal and off-normal conditions of operation. The analysis summarized in the HOLTEC Cask FSAR demonstrate that under assumed accident conditions, the consequences of accidents challenging the integrity of the barriers will not exceed limits established in 10 CFR 72.106.2-2 a Revision 58 12/06 GG FSAR 2.2.2 Pqpulation and PQpulation Distribution The individuals residing in the LPZ are distributed such that appropriate measures could be taken in their behalf in the event of a serious accident.Figure 2-3 illustrates the LPZ and indicates population distribution within a lo-mile radius of the site.Table 2-1 lists the facilities and institutions within approximately ten miles of the GGNS which may require special consideration in preparing emergency plans.Seasonal and peak daily transient population within the LPZ is mainly due to recreational use of the Grand Gulf Military Park, hunting and sport fishing.The closest population center is Vicksburg, Mississippi, located approximately 25 miles north-northeast of the site, with a 1990 population of 27,496.The nearest major city is Jackson, Mississippi. Jackson is located about 55 miles east-northeast of the site and has a population of 196,637 according to a 1990 population survey.Table 2-2 shows the resident population distribution in evacuation area by sector.2.2.3 EmereenCj' Plannine Zones In defining the Emergency Planning ZOnes (EPZs), Grand Gulf Nuclear Station has taken into consideration such things as organizational capabilities, method of implementation for various emergency plans and the availability of onsite and offsite emergency facilities and equipment. EPZs are designated areas for which planning is recommended to assure that prompt and effective actions are taken to protect the public in the event of an emergency. Two primary zones have been identified for the purpose of development and implementation of emergency planning.The frrst Emergency Planning ZOne has amile radius.This EPZ is established in response to the possible direct exposure to the 2-3 Revision 25 12/93 GG FSAR plume.Within this zone, shelter, evacuation and consideration of propp.ylactic use of potassium iodide are the protective actions recommended for the general public, as necessary. The principal concern in the 10 mile EPZ is the plume exposure pathway.The counties within the 10 mile EPZ are Claiborne County and Warren County, in Mississippi, and Parish in Louisiana (refer to figure 2-4).Beyond a ten mile radius the effect of direct exposure to the'plume is no longer of significant concern because the plume is sufficiently dispersed so as not to present an immediate hazard.The second EPZ has a fifty mile radius.This EPZ is established in response to possible exposure to deposited radionuclides, whether in water or on the ground or vegetation. The principal concern in the 50 mile EPZ is the ingestion exposure pathway.This may necessitate monitoring of such pathways as crops, dairy cows, farm animals, and pastures.Those counties in Mississippi within the 50-mile EPZ include Issaquena, Sharkey, Yazoo, Warren, Madison, Hinds, Rankin, Copiah, Simpson, Lincoln, Amite, Franklin, Adams, Jefferson, Wilkinson, and Claiborne. Those parishes in Louisiana within the 50-mile EPZ include East and West Carol, Richland, Madison, Tensas, Catahoula, Concordia, Franklin, and Caldwell (refer to Figure 2-5).Figure 2-4 is a detailed 10-mile sector map.2.3 Scope of the Emergency Plan The principles of effective emergency preparedness incorporate not only the emergency response for systems but also include response for people.Engineered safety systems at the Station are designed to ensure that the consequences of a major malfunction are to be mitigated prior to any adverse effect on the general public or the Station.The basis for emergency planning is to provide human emergency response in much the same way as safety systems do for the physical plant.2-4 Revision 56 01/06 GG FSAR 2.3.1 Regulatory Requirements lOCFR50,"Licensing of Production and Utilization Facilities, II requires that each application for a license to operate a facility include in a Final Safety Analysis Report 2-4a Revision 52 07/04 I GG FSAR (FSAR), along with other information, the applicant's plans for coping with emergencies, including the items specified in lOCFR50.34, lOCFR50.47, and lOCFR Part 50, ApPendix E.IOCFRlOO.3"Reactor Site Criteria," in the definitions of Exclusion Area and Low Population Zone, establishes additional criteria for plans to cope with emergencies and serious accidents. Specific requirements of.the Nuclear Regulatory Commission are detailed in NUREG 0654/FEMA-REP-l, Rev.1,"Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.II 2.3.2 Objectives of the Emergency Plan The objectives of the Emergency Plan are: a.Enable classification of the emergency b.Assign responsibilities c.Provide for assessment of on site and offsite radiological conditions during and/or following an emergency. d.Outline the most effective course of action required to safeguard the public and plant personnel in the event of an emergency. e.Recommend implementation of any protective actions deemed appropriate. f.Enable mitigation of the radiological consequences of an emergency, both on site and offsite.g.Provide for the training of all emergency organization Personnel. 2.4 Emergency Plan Interrelationships The Plan is designed tocompatible with radiological incident plans developed by local, state and Federal agencies through establishment of communication channels with these agencies, and by setting criteria for the notification of such authorities. The Plan should not, in itself, be considered >the sole working document to be used during an emergency. The purpose of the Plan is to classify emergencies according to their 2-5 Revision 2S 12/93 GG FSAR severity, to assign responsibilities for actions, and to establish the lines of authority and communication so that the most effective course of action can be developed to safeguard the public and plant personnel in the event of an emergency. Detailed instructions and guidelines for emergency actions are included in various emergency procedures. The principal emergency facilities that the major function from, are shown in Figure 7-1, including general locations from GGNS.2.4.1 EmergenCY Plan Procedures Detailed procedures required to implement the Plan have been developed. Emergency PlanProcedures(EPPs), which*direct the actions of emergency organization, are safety related and located in Volume 10 of the GONS Plant Operating Procedures Manual.An index of these procedures is included in Appendix A.Detailed implementing procedures for emergencies considered to be special events, such as civil disturbances, bomb threats, and breaches in security are included as part of the GGNS Physical Security Plan.Separate emergency procedures are not provided for activities already covered by plant or section operating procedures (Le., calibration of survey instruments). The Plan incorporates certaffi aspects of the plant's operating procedures, radiation protection procedures, fire procedures and security procedures, where they are required for clarification. 2.4.2 Related Plans.Programs and Procedures Several plans, programs and procedures have been developed to assure the safe operation of the Station.The Plan and Emergency Plan Procedures have been written to coordinate with these other plans, programs and procedures. During emergency situations, the coordination and utilization of all plans and procedures is essential. The Security Plan and procedures have been coordinated with the Plan and Emergency Plan Procedures to minimize the consequences of an emergency situation. Security 2-6 Revision 2S 12/93 GG FSAR Procedures contain an explanation of the duties and responsibilities for security personnel in the event of an emergency. Provisions for radiological control at the Station have been covered in Administrative and Radiation Protection Procedures. These Procedures establish controls and protective measures to be placed on work being conducted within the Restricted Area.A number of emergency operating procedures have been develOPed to control plant operation during emergency situations. These emergency oPerating procedures work in conjunction with the Emergency Plan Procedures and are safety related procedures. A site fIre plan for the control of fIres has also been developed and procedurally implemented to assure\the safe oPeration of the station.Fire Plan procedures are referenced in the Emergency Plan Procedures. 2.4.3 Participating Governmental Agencies Participating governmental agencies whose plans are interrelated with this plan for action include the'following: a.Mississippi Emergency Management Agency (MEMA)Charged with direct responsibility for the planning and coordination of the activities of State and local government agencies in the event of a radiological emergency. b.Mississippi State Department of Health (MSDH)Has overall responsibility to protect the public health and safety of the general populace from the hazards of radiation. The Division of Radiological Health (DRH)is that division within the MSDH which is assigned the specific responsibility with regard to the hazards of radiation. c.Louisiana Department of Environmental Quality (LDEQ)Has overall responsibility for-plcinning as well as the lead technical response role in the event of a radiological emergency. 2-7 Revision 39 7/99 GG FSAR d.Governor's Office of Homeland Security and Emergency Preparedness (GOHSEP)Has responsibility for coordination of state agencies as well as logistical and resource support to local governments in the event of a radiological emergency. e.Department of Energy (DOE)The DOE, a Federal agency, provides radiological monitoring assistance. There are trained personnel on staff to provide additional expertise onsite/offsite during a radiological accident.f.Nuclear Regulatory Commission (NRC)The role of the NRC during a radiological emergency is that of verifying that emergency plans and procedures have been implemented, assuring that the public health and safety are protected, and conducting investigative activities associated with the incident.The NRC assists in the coordination of Federalresponseresources and provide to the licensee, state, and local agencies advisory assistance associated with assessing and mitigating hazards to the public.The NRC's actions are governed by NUREG-728,"NRC Incident Response Plan", and NUREG-0845,"Agency Procedures for the NRC Incident Response Plan." g.County and Parish Emergency Services Claiborne County in Mississippi and Tensas Parish in Louisiana are the local governmental jurisdictions within the 10 mile radius of the Grand Gulf Nuclear Station.They have developed plans to be implemented in the event of a radiological emergency. Claiborne County Civil Defense and Tensas Parish Office of Homeland Security and Emergency Preparedness have communication centers which serve as the means for notifying various support services (fire and rescue, transportation, law enforcement). 2-8 Revision 58 12/06 GG FSAR TABLE 2-1 PUBLIC FACILITIES AND INSTITUTIONS Facility Port Gibson Middle School Port Gibson High School Watson Elementary SchoolRichardson(MAP) Headstart Chamberlain-Hunt Academy Claiborne Education Foundation Alcorn State University Patient's Choice Medical Center Claiborne County Health Center Claiborne County Courthouse Grand Gulf Military Park Lake Bruin State Park Port Gibson City Hall Distance From Reactor Centerline (mU 5.1 6.5 4.1 4.5 5.5 5.3 10.5 5.5 4.9 4.7 1.5 9.5 5.2 2-9 Direction SE ESE SE SE SE SE SSW SE SE SE N WSW SE Revision 61 03/09 GG FSAR TABLE 2-2 Resident Population Distribution in Evacuation Area by Sector*Sector 0-1 1-2 2-3 3-4 4-5 5-10 10-15 Total A 0 11 0 0000 11 B0000 0 0325325 C0700 24 101 422 554 D 0 1 0 35 94 125 74 329 E0009 17 111 247 384 F0500 417 821 547 1790 G0008 573 1992 655 3228 H00 4 40 0 577 755 1376 J00 0 4 0 38 426 468 K 0 0 200 2765 95 2862 L00 400 74 92 170 M00000 1520 4 1524 N00000 310 7 317 P00000 1210 106 1316 Q00000 68 0 68 R00000000*Centerline of Sector In Degrees True North From Facility Sector 0&360 AB 45 CD 90 EF 135 GH 180 JK 225 LM 270 NP 315 QR NOTES: l.The letters I and 0 have been omitted from sector designators so as to eliminate possible confusion between letters and numbers.2.Source of data: 2012 Grand Gulf Evacuation Time Estimate Study pages 3-6&3-8.2-10 Revision 70 11/13 GG FSAR TABLE 2-3 Permanent Resident Population and Vehicles by P AS/P AA PASIPAA.2010 Population 2010 Resident Vehicles 1 43 24 2A 305 166 2B 151 83 3A 961 519 3B 388 209 4A 2,407 1,298 4B 453 248 5A 138 75 5B 356 193 6 2,629 1,686 7 28 15 8 126 71 9 1,185 642 10 394 214 11 1,403 755 12--TOTAL 10,967 6,198 2-10a Revision 70 11/13 +AIRPORTINTERSTATE HIGHWAY-@--US HIGHWAY.............. RAILROADS GG FsAR o 5 121 15 20*General Area Surrounding the Grand Gulf Nuclear Station FIGURE 2-12-11 Revision 26 6/94 /GG FSAR 1 EnQ S8vices Center 2 Urit 2 wamoouse 3 CoosIndoo BUijog5 Slte Processi'1 Cert9r 6 Adm&1ratioo Bulding 7 Modfil:aINI &Eng, IIdG.8 GenefalCf 9Jilditg 9 CAmtroI B1iktlg 10 11 T urbile12 Un[t wamoouse 13 RadNaste 14 CodWigT_15 Old T rainirJJ BlifirV 16 Tower 17 Comtitalill Slop 18lSFSIPil 19lBrge"_--',__..J.Site Layout FIGURE 2-2 Page 2-12 Rev 68 08/12 GG FSAR NNW[IJ N[li]NNE[IJ Resident Population E ESE 11,2431 ENE 1.255 I E o I[Jl[],\\\SE 1,?,i§T?1 NE I 1321 10 Miles to EPZ Boundary N-....'SSE[]I[]-,}-....w s'**42**1 f....'...ssw 12;76 7 1 5,647 42.92 10,9&7 ,...96 130 10 34 o 0 24 24 516 4,038 ,347 154 2.207 3,462 5..320 1;008 1,125 1.255$yhtQtalby Ring'tiJmulatfiieTotill NW[][J sw QD ,/..., 1-1$6-7 1*2 0*1 9"10 to*EPZ WNW 11,2101 W D:!QJ.;62 Total: 10.9G1 0-2MiI"'$5 Pennanent Resident Population Distribution FIGURE 2-3 2-13 Revision 70 11/13 GG FSAR$Ourre of Qata SCale 1 j nch equals!'niles nmmforma1irin mntailled on thiS map was deriveilJrom .and private sources.The sOard of TruiteesOf the Te&:.tmkaI cerne roow,ammtiesas to accuracy,... PROTECTIVEACTION AREA BOUNDARY PROTECTiVEACTiON AREA NUMBERAND*EVACUEEPOPULATiON LEGEND EMERGENCY PLANNING ZONE BOUNDARY TEN MILE fMERGEriCY PLANNING ZONE ORiGiNAL MAp*PRODUCED BY MARlS.JUNE 1993 Prot&'lNi- ..Aclion.AreaBolmdariesalWi mJnl)a$5.fORdigiliz.iMi .by the. iOads*aiui Strums TeduJicaI caner froinUnited statesOepartiJl>!!lntaf
- .TIGER.fie fromttte 2.01,2G(iNS E1faclJal,ilm 2.012 N/\/.-,'>11._ltll...3!,.6 i Ten-Mile Emergency Planning Zone FIGURE 2-4 2-14 Revision 70 11/13 GG FSAR Fifty Mile Emergency Planning Zone Fig 2-5 Page 2-15 STATE EOC*COUN1Y EOC*GRAND GULF o I Rev 64 Other Roads Water'0!MILES (11/10)20 I GG FSAR 3.0
SUMMARY
OF EMERGENCY PLAN OF EMERGENCY PLAN OF EMERGENCY PLAN 3.1 EmergencyPlanningPlanningPlanning In accordance with the requirements of 10CFR50.47 and Appendix E to 10CFR50, and supplemented by the guidance issued by the Nuclear Regulatory Commission in NUREG-0654 and other documents, the Plan and its associated Emergency Plan Procedures have been established to cope with the various types of emergencies in an orderly and effective manner.Grand Gulf Nuclear Station maintains the capability to assess, classify, and declare an emergency condition within 15 minutes after the availability of indications to plant operators that an emergency action level has been exceeded and shall promptly declare the emergency condition as soon as possible following identification of the appropriate emergency classification level.The Plan shall be implemented by the appropriate procedures in Appendix A whenever a real or potential plant emergency is identified that meets the Emergency Action Level criteria described in Section 4.0.The details of the Emergency Plan Procedures are not included herein, but the information contained within the Plan includes a description of procedures to an extent sufficient to demonstrate that the Plan provides assurance that appropriate actions can be taken by the Station and support agencies to protect Station personnel and the general public during emergencIes. The Plan establishestheconcepts, evaluation and assessment criteria, and protective actions that are necessary to mitigate the consequences of any of the four classes of emergencies. The Plan also provides the necessary pre-arrangements, directions, and organizations so that all Station emergencies can be effectively resolved in order tosafeguardStation personnel, property, and the general public.3-1 Revision 68 08/12 GG FSAR 3.2 Emergency Plan Steps In general, the Plan encompasses the following: a.Detection of the emergency b.Classification of the emergency c.Activation of the responding organization(s) d.Assessment of the event e.Initiation of corrective actions f.Recommend initiation of protective actions 3-la Revision 68 08/12 I GG FSAR g.Aid to affected persons h.Re-entry and Recovery 3.3 Emergency Direction and Assignments At the onset of all station emergencies, the Shift Manager shall assume the position of Emergency Director and is responsible for initiating the immediateactionsrequired to safeguard the public, onsite personnel and equipment. Utilizing the Emergency Plan Procedures, he orders the activation of the necessary portions of the Emergency Organization. Upon notification of an Unusual Event from the Shift Manager, theEOFEmergency Director may report to the plant and assume the position of Emergency Director as deemed necessary. Upon notification of an Alert or higher emergency classification, the EOF Emergency Director reports to the site and assumes the position of Emergency Director from the Shift Manager.The Shift Manager will resume control room duties upon relief by the augmentingEOFEmergency Director when the EOF is declared operational. Section 5.0 describes, in detail, the assignments and duties of key Emergency Organization Personnel. The criteria which are to be considered for the safe operation of the plant and/or for actions during an emergency are summarized below: a.Protection of plant personnel and the general public has the highest priority.Plant system and equipment protection is secondary. b.Whenever there is doubt as to the classification of the'emergency condition, the more conservative case shall be considered. c.Operators are to believe and respond conservatively to all alarms.Alarms and instrumentation are only to be considered erroneous if proven so by 2 independent indications. d.Alarms shall be promptly acknowledged and the required response action taken.e.Indications of situations and actions taken are to be made a matter of record.Notifications to personnel and/or offsite agencies are also to be made a matter of record.3-2 Revision 64 11/10 GG FSAR 4.0 EMERGENCY CONDITIONS 4.1 Emergency Classification System There are four classes of emergency conditions used in emergency planning.These four classes cover the entire spectrum of possible emergency situations, from minor local incidents to hypothetical major radiological emergencies, and allow for classification of an accident, notification of the appropriate offsite agencies and support groups, and the activation of emergency organizations. The system also provides for the notification and implementation of actions immediately applicable to a specific condition, and for upgrading the response to the appropriate level of classification in the event of a change in the severity of the condition. These actions are further described in Section 6.0.Emergency Action Levels (EALs)are used to proyide indication that an initiating condition exists.These levels are composed of a combination of plant parameters (such as instrument readings and system status)that can be used to give relatively quick indication to the Station operating staff of the severity of the accident situation. The purpose of the EALs is to provide the earliest possible indication of actual or potential accident situations. In most cases further assessment action is conducted both on site and offsite before actual protective actions are initiated. EALs associated with radiological releases are related to the Environmental Protection Agency's Protective Action Guides (PAGs)summarized in EPA 400-R-92-001"Manual of Protective Action Guides and Protective Actions for Nuclear Incidents." A determination by the station emergency organization, along with state and local support agencies, of the potential of reaching or exceeding the PAGs is performed in accordance with dose assessment procedures in the event of a radiological release to the environment. The EALs discussed in this section are found in Table 4-1.The EALs were developed from guidance in NEI 99-01, Revision 4"Methodology for Development of Emergency Action Levels" and from accidents analyzed in the GGNS Final Safety Analysis Report.When EALs are observed in conjunction with plant or equipment status due to planned maintenance or testing activities, an emergency condition may or may not exist and the situation must be evaluated on a case by case basis.4-1 Revision 59 06/07 Revision 61 03/09 GG FSAR The four emergency classes that comprise the emergency classification system are: a.Unusual Event b.Alert c.Site Area Emergency d.General Emergency 4.1.1 Unusual Event The Unusual Event classification is an emergency in which events are in process or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No release of radioactive material requiring off site response or monitoring are expected unless further degradation of safety systems occurs.The EALs Table 4-1, while comprehensive, are not meant to be all inclusive. The Emergency Director may declare an Unusual Event based on other plant conditions and the potential for the degradation of these conditions. Training of the Emergency Organization members should emphasize the need to evaluate the potential for more serious plant conditions to occur at a future time.4.1.2 Alert The Alert classification is an emergency classification in which events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of Hostile Action.Because of the increased potential for more serious offsite consequences, the emergency organization is activated, as well as notification of key offsite authorities and the news media.The Alert class also addresses limited releases of radioactive material and therefore might require some radiological monitoring and assessment actions by the emergency organizations. 4-2 GG FSAR The Alert class assures that emergency personnel are readily available to respond to a change in plant conditions and to provide assessment support as required.4.1.3 Site Area Emergency Site Area Emergency is an enlergency classification in which events are in process or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or Hostile Action that result in intentional damage or malicious acts;(1)toward site personnel or equipment that could lead to likely failure of or;(2)prevent effective access to equipment needed for the protection of the public.Immediate protective actions are not required upon notification of a Site Area Emergency condition; however, preliminary steps are initiated in anticipation of possible protective actions.These preliminary steps include complete activation of the emergency organization, alerting and/or mobilizing of monitoring teams, and notification of all offsite authorities and the news media.The Site Area Emergency classincludesaccidents which have a significant potential for the release of radioactive material.Unlike the two previously described classes of emergencies, the Site Area Emergency is very likely to involve some radiation exposure to the near-site public.Also, many of the accidents included in this class have the potential for escalation to the General Emergency class.4.1.4 General Emergency The most severe emergency class used in emergency planning is the General Emergency. General Emergency is an emergency classification in which events are in process or have occurred which involve actual or imminent substantial core degradation or*melting with potential for loss of containment integrity or Hostile Action that results in an actual loss of physical control of the facility.4-3 Revision 65 04/11 GG FSAR Protective actions shall be recommended upon declaration of the General Emergency, as the accidents considered could result in the exceeding of the lower limits of the P AGs.The General Emergency EALs that require dose projections offsite use actual meteorology rather than the adverse meteorology assumptions used in the Site Area Emergency action levels.None of the accidents analyzed in the FSAR would normally be classified as a General Emergency. However, the Loss of Coolant Accident (LOCA)within the reactor coolant pressure boundary analyzed in the FSAR could lead to a General Emergency classification in a situation where there was a subsequent loss of plant safety systems leading to a possible core melt and failure of containment. Criteria to be used for declaration of a General Emergency includes core and containment status as well as actual radiation release data.4.2 Classification of Postulated Accidents A thorough analysis of each of the postulated accidents is included in the Grand Gulf Nuclear Station Final Safety Analysis Report (FSAR).All of the postulated accidents could be classified into one of the four emergency classes (See Table 4-2).In classifying each of the postulated accidents, the conservative assumptions used in the FSAR analysis were considered. It is possible that occurrence of some of the postulated accidents results in a classification lower in severity.4-4 Revision 61 03/09 I GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS (1 or 2 or 3)Emergency Action Level(s): OR 3.Confirmed sample analyses for gaseous or liquid releases indicate concentrations or release rates>2 times the aDCM limit for60 minutes.OR 2.VALID reading on any effluent monitor>4 times the Hi-Hi alarm setpoint established by a current radioactivity discharge permit for60 minutes.Any release of gaseous or liquid radioactivity to the environment> 2 times the aDCM limit for60 minutes.1.VALID readings on the radiation monitors in Table R1"UNUSUAL EVENT">the reading shown for60 minutes.NOTE: The Emergency Director should not wait until the applicable time has elapsed, but should dectare the event as soon as it is determined that the release duration has exceeded, or will likely exceed, the applicable time.In the absence of data to the contrary, assume that the release duration has exceeded the applicable time if an ongoing release is detected and the release start time is unknown.(1 or 2 or 3)Emergency Action Level(s): Any release of gaseous or liquid radioactivity to the environment> 200 times the aDCM limit for15 minutes OR 3.Confirmed sample analyses for gaseous or liquid releases indicate concentrations or release rates>200 times the aDCM limit for15 minutes.1.VALID readings on the radiation monitors in Table R1"ALERT">the reading shown for15 minutes.OR 2.a.For liquid release SD17K606 Radwaste Effluent Radiation Monitor: EITHER VALID reading>400 times the Hi-Hi alarm setpoint established by a current radioactivity discharge permit for15 minutes.OR VALID reading1 E6 cpm for15 minutes.OR b."""VALID reading on any effluent monitor>400 times the Hi-Hi alarm setpoint established by a current radioactivity discharge permit for15 minutes.NOTE: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the release duration has exceeded, or will likely exceed, the applicable time.In the absence of data to the contrary, assume that the release duration has exceeded the applicable time if an ongoing release is detected and the release start time is unknown.1.VALID readings on the radiation monitors in Table R1"SITE AREA EMERGENCY">the reading shown for15 minutes.OR 2.Dose assessment using actual meteorology indicates doses>100 mR TEDE or>500 mR thyroid CDE at or beyond the site boundary.OR 3.Field survey results indicate closed window dose rates>100 mRlhr expected to continue for60 minutes;or analyses of field survey samples indicate thyroid CDE>500 mR for one hour of inhalation, at or beyond the site boundary.NOTE: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.If dose assessment results are available, the classification should be based on EAL#2 instead of EAL#1.Do not delay declaration awaiting dose assessment results.OR 3.Field survey results indicate closed window dose rates>1000 mRlhr expected to continue for60 minutes;or analyses of field survey samples indicate thyroid CDE>5000 mR for one hour of inhalation, at or beyond the site boundary.OR 2.Dose assessment using actual meteorology indicates doses>1000 mR TEDE or>5000 mR thyroid CDE at or beyond the site boundary.1.VALID readings on the radiation monitors in Table R1"GENERAL EMERGENCY">the reading shown for15 minutes.[iJ2J3J4[51 0 1 AS1[11*[4[5101 affsite dose resulting from an actual or IMMINENT affsite dose resulting from an actual or IMMINENT release of gaseous radioactivity >1000 mR TEDE or release of gaseous radioactivity> 100 mR TEDE or 5000 mR Thyroid CDE for the actual or projected 500 mR Thyroid CDE for the actual or projected duration of the release using actual meteorology duration of the release Emergency Action Level(s): (1 or 2 or 3)Emergency Action Level(s): (1 or 2 or 3)NOTE: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.If dose assessment results are available, the classification should be based on EAL#2 instead of EAL#1.Do not delay declaration awaiting dose assessment results.c: Q):;,:E w'jij u"C!o'0:c/}.Table R1: EAL THRESHOLD Method GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Computer Point I Threshold Computer Point I Threshold Computer Point Threshold Computer Point Threshold Release Point Total: OG/Radwaste Vent FHA Vent CTMTVent 0173004 In Alarm 3.37E+02 Ci/sec 0173003 In Alarm 3.37E+01 Cilsec 0173002 In Alarm 3.73E+00 Ci/sec 0173001 In Alarm 3.73E-Q2 Ci/sec Turb Bldg Vent SBGT AlB 4-5 Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS OR 1.A water level drop in the Upper Ctmt Pools.Aux Bldg Fuel Pools or Fuel Transfer Canal that will result in irradiated fuel becoming uncovered."Normal can be considered the highest reading in the past 24 hours excluding the current peak value.NOTE: For area radiation monitors with ranges incapable of measuring 1000 times normal*levels, classification shall be based on VALID full scale indications unless surveys confirm that area radiation levels are below 1000 times normal*within 15 minutes of the Area Radiation Monitor indications going full scale.2.UNPLANNNED VALID Area Radiation Monitor readings or survey results indicate a rise by a factor of 1000 over normal*levels OR NOTE: For Control Room Envelope review Initiating Condition AA3.I I/21 3 1 4 1 5 1 n l UNPLANNED rise in plant radiation levels Emergency Action Level(s): (lor 2)1.a.UNPLANNED water level drop in a reactor refueling pathway as indicated by water level drop in Upper Ctmt Pools.Aux Bldg Fuel Pools or the Fuel Transfer Canal.personnel observation or indication on area camera.AND b.VALID Area Radiation Monitor reading rise on any of the following: Ctmt 209 Airlock------------ (1021 K630)Ctmt Fuel Hdlg Area-------(1D21K626) Aux Bldg Fuel Hdlg Area-(1D21K622)(lor 2)Emergency Action Level(s): 2.A VALID alarm on any of the following radiation monitors due to damage to irradiated fuel or loss of water level:-Ctmt Vent---------------------------------(P601-19A-G9) FH Area Vent----------------------------(P601-19A-e11) Ctmt 209 Airlock------------------------(P844-1A-A1) Ctmt Fuel Hdlg Area-------------------(P844-1A-A3) Aux Bldg Fuel Hdlg Area-------------(P844-1A-A4) AA3 I*1 3 1 4 1 5 1 n l Rise in radiation levels within the facility that impedes operation of systems required to maintain plant safety functions Emergency Action Level(s): 1.Dose rate>15 mR/hr in any of the following areas requiring continous occupancy to maintain plant safety functions: Control Room Envelope I*1 3 1 4 1 5 1 n l Damage to irradiated fuel or loss of water level that has resulted or will result in the uncovering of irradiated fuel outside the reactor vessel l/I Cii>Q)...J c: o:;:cni E o c:..0<<4-6 Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS COLD SHUTDOWN/REFUELING CG1*CONTAINMENT CLOSURE not established*>2.9%hydrogen concentration inside containment
- UNPLANNED rise in containment pressure*Secondary Containment area radiation monitor reading above the value below: 1.RCS leakage results in the inability to maintain or restore RPV level>+11.4 in.(Level 3)for15 minutes.RCS leakage Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.(1 or 2)RCS level cannot be monitored for15 minutes with a loss of RCS inventory as indicated by an unexplained rise in floor or equipment sump level, Suppression Pool level, vessel make-up rate or observation of leakage or inventory loss.Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.1.Loss of RCS inventory as indicated by RPV level<-41.6 in.(Level 2).OR 2.Containment High Range Radiation Monitor reading>100 Rlhr Erratic Source Range Monitor indication Unexplained rise in floor or eqUipment sump level, Suppression Pool level, vessel make-up rate or observation of leakage or inventory loss OR 2.With CONTAINMENT CLOSURE established, RPV level<-167 in.(T AF)OR 3.RCS level cannot be monitored for30 minutes with a loss of RCS inventory as indicated by any of the following:
1.With CONTAINMENT CLOSURE not established, RPV level<-47.6 in.Table C1: Containment Challenge Indications OR 2.a.RCS level cannot be monitored with core uncovery indicated by any of the following for30 minutes.Containment High Range Radiation Monitor reading>100 Rlhr Erratic Source Range Monitor indication Unexplained rise in floor or equipment sump level: Suppression Pool level.vessel make-up rate or observation of leakage or inventory loss AND b.Any containment challenge indication in Table C1 Loss of RCS inventory affecting fuel clad integrity with I Loss of RCS/RPV inventory affecting core decay heat I Loss of RCS/RPV inventory containment challenged removal capability ..Emergency Action Level(s): (1 or 2).Emergency Action Level(s).Emergency Action Level(s): (1 or 2 or 3)Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.1.a.RPV level<-167 in.(TAF)for30 minutes AND b.Any containment challenge indication in Table C1,g c II)>.5 6: lX: en o lX:....o en en o..J C).E Qj.2 II)lX: "2'a.r;en'a'0 o Area I Max Safe Operating Value RHR Room A8x 10 4 mRlhr RHR Room B8x 10 4 mRlhr RHR HX A Hatch8x 10 4 mRlhr RHR HX B Hatch8x 10 4 mRlhr RCIC Room8x 10 4 mRlhr MSL Rad Monitor8x 10 4 mRlhr SGTS Fltr.Trn.8x 10 2 mRlhr 4-7 Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS GJ Cold Shutdown 15 CU2 UNPLANNED loss of RCS/RPV inventory o Emergency Action Level(s): (1 or 2)\o'E Q)>.=>D.0:: en ()0:: '0 1/1 1/1 o..J C).5'ii.2 Q)0:: 4-8 Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.1.UNPLANNED RCS level drop as indicated by either of the following: a.RCS water level drop below the RPV flange for15 minutes when the RCS level band is established above the RPV flange.OR b.RCS water level drop below the RPV level band for15 minutes when the RCS level band is established below the RPV flange.OR 2.RCS level cannot be monitored with a loss of RCS inventory as indicated by an unexplained rise in floor or equipment sump level.Suppression Pool level.vessel make-up rate or observation of leakage or inventory loss.Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS CA3 Inability to maintain plant in Cold Shutdown UNPLANNED loss of decay heat removal capability with irradiated fuel in the RPViiiE CIl 0:::-;CIl::J:l'O U CIl c'0 III III o-I 4-9 Emergency Action Level(s): (1 or 2)1.An UNPLANNED event results in RCS temperature >200 of>the specified duration in Table C2.OR 2.An UNPLANNED event results in RCS pressure rise>10 psig due to a loss of RCS cooling.Table C2 RCS Reheat Duration Thresholds RCS I Containment I Duration Closure Intact I N/A I 60 minutes'Not intact I Established 20 minutes'Not Established 0 minutes'If an RCS heat removal system is in operation within this time frame and RCS temperature is being reduced, then the EAL is not applicable. Emergency Action Level(s): (1 or 2)Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.1.An UNPLANNED event results in RCS temperature exceeding 200 of.OR 2.Loss of all RCS temperature and RPV level indication for15 minutes.Revision 69 11/12 1.a.AC power capability to Div I and II ESF busses reduced to a single power source for15 minutes.Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.1.Loss of all offsite and all onsite AC power to Div I and II ESF busses for15 minutes.CASCUS Loss of all offsite and all onsite AC power to Div I and II AC power capability to Div I and II ESF busses ESF busses for15 minutes reduced to a single power source for15 minutes such that any additional single failure would result Emergency Action Level(s): in Station Blackout Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.GG FSAR TABLE 4-1 EMERGENCY ACTION;o D.o<<o 111 111 o...J AND b.Any additional single power source failure will result in station blackout.Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely exceed the applicable time.Q.o c a 1/1 1/1 o....I CU6 Loss of required DC power for15 minutes1.<105 VDC on required vital DC busses for15 minutes.c>-Q)-t::=Q)Cll>Cll"-.EO CU7 Inadvertent criticality Emergency Action Level(s): I.UNPLANNED sustained positive period observed on nuclear instrumentation.4-10 Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS 41 Cold Shutdown CU8 Loss of all onsite or offsite communications capabilitiesEmergency Action Level(s): (1 or 2)2.Loss of all offsite communication methods affecting the ability to perform offsite notifications (See Table C4).Table C3 I Table C4 Onsite Communications Offsite Communications Methods Methods 1.Loss of all onsite communication methods affecting the ability to perform routine operations (See Table C3).OR III c: o:;CJ"E:::J E E o o....o III III o..J 4-11 Plant Radio System Plant Paging System Sound Powered Phones In-plant Telephones
- All telephone lines (commercial
&fiber optic)*Satellite telephone*NRC phones (ENS.HPN.MCL.RSCL.PMCL)Revision 69 11/12 ISFSI MALFUNCTION -QI C)III E III C.:.: (/)III o GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS o Power Operations 0 Startup 0 Hot Shutdown AREA EMERGENC 4-12 Damage to a loaded cask CONFINEMENT BOUNDARY Emergency Action Level(s): 1.Damage to a loaded cask CONFINEMENT BOUNDARY.Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS Emergency Action Level(s): 1.ANY Loss or ANY Potential Loss of Primary Containment ca..C S o D.I/)I/)o..J m D.&L FG1 Loss of ANY Two Barriers AND Loss or Potential Loss of Third Barrier Emergency Action Level(s): 1.Loss of ANY Two Barriers AND Loss or Potential Loss of Third Barrier.FS1 Loss or Potential Loss of ANY Two Barriers Emergency Action Level(s): 1.Loss or Potential Loss of ANY Two Barriers FA1_ANY Loss or ANY Potential Loss of EITHER Fuel Clad ORRCS Emergency Action Level(s): 1.ANY Loss or ANY Potential Loss of EITHER Fuel Clad or RCS FU1 ANY Loss or ANY Potential Loss of Primary Containment'\4-12a Revision 69 11/12 Fuel Clad Parameter Loss Potential Loss FCi Primary Coolant activity>300 Coolant IJCilgmdose eq.1'3'.None Activity FC2 RPV RPV water level cannot be RPV water level cannot Water be restored and Level restored and maintained maintained above-167 in.above-191 in.or cannot be determined. FC3 Drywell Radiation Drywell radiation monitor None Monitoring reading>3000 R1hr FC4 ED Any condition in the opinion Any condition in the Judgment of the Emergency Director opinion of the Emergency that indicates a loss of the Director that indicates a Fuel Clad Barrier.potentialloss of the Fuel Clad Barrier.Table F1 Area TemDerature Parameter Alert Limit SAEIGE Limit 185°F 250°F MSL Pipe Tunnel Temp.(P601-19AJ18A-(E31-A3/A4)N604A,B,C,D,E,n 165°F 225°F RHR-A Equip Area Temp.(P601-20A-Bl )(E31-N608A.N610A) 165°F 225°F RHR-B Equip Area Temp.(P601-20A-Bl )(E31-N608B,N610B) 185°F 212°F RCIC Equip Area Temp.(P601-21 A-G3)(E31-N602AJBl RWCU Pmp Rm 1 Temp 170°F NA (P680-11 A-A 1)RWCU Pmp Rm 2 Temp 170°F NA (P680-11A-A2) Fuel Clad Area Radiation Level Parameter Alert Limit SAEIGE Limit RHR Room A Rad 10<MR/HR8x 10 4 MR/HR (P844-1 A-D4)RHR Room BRad 10<MR/HR 8x 10 4 MR/HR (P844-1A-D41 -RHR HX A Hatch Rad 10'MR/HR-8x 10 4 MR/HR (P844-1A-C41 RHR HX B Hatch Rad 10'MR/HR8x 10 4 MR/HR (P844-1 A-C41 RCIC Room Rad 10<MR/HR8x 10 4 MR/HR (P844-1A-D41 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS Fission Product Barrier Matrix Reactor Coolant System Parameter Loss Potential Loss RCi Drywell Drywell pressure>1.39 psig Pressure with indications of a reactor None coolant leak in the drywell.RPV water level cannot be RC2 RPVWater restored and maintained None Level above-167 in.or cannot be determined. RC3 RCS 1.a.UNISOLABLE MSL 1.RCS leakage>50 Leak Rate break as gpm inside the drywell.indicated by the failure OR of both MSIVs in any 2:uNISOLABLE RCS one line to close leakage outside AND Primary Containment High MSL flow as indicated by any (P601-19A-El) Area Temperature or annunciator Area Radiation level OR>Alert Value in Table High Steam Tunnel Fl.Temperature (P601-19A-E3)annunciator OR Directreport of steam release.OR b.""" Indication of an UNISOLABLE feedwater, RWCU or RCIC break.OR 2.Emergency RPV depressurization is reQuired.RC4 Drywell Drywell radiation monitor Radiation reading>100 R1hr with None Monitoring indications of a leak in the drywell.RCS ED Any condition in the opinion Any condition in the Judgment of the Emergency Director opinion of the that indicates a loss of the Emergency Director that RCS Barrier.indicates a potential loss of the RCS Barrier.4-13 Primary Containment Parameter Loss Potential Loss PCi Primary 1.Rapid unexplained 1.Primary Containment Containment loss of pressure pressure>15 psig Conditions following initial and rising.pressure rise.OR OR 2.a DW H 2 concentration >9%2.Pressure response OR not consistent with b.Ctmt H 2 LOCA conditions. concentration in HDOL Unsafe Zone.OR 3.RPV pressure and suppression pool temperature cannot be maintained below the HCTL.PC2 RPV Water Primary Containment Level None flooding required by:.SAPs PC3 Primary 1.a.Failure of all valves Containment In anyone line to Isolation close.Failure or AND Bypass b.Direct downstream pathway to the environment exists after Primary Containment Isolation signal.OR 2.Intentional venting per EOPs or SAPs.None OR 3.UNISOLABLE RCS leakage outside Primary Containment as indicated by any Area Temperature or Area Radiation level>SAE I GE Value in Table Fl.Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS Fission Product Barrier Matrix 4-13a Primary Containment Cont.)PC4 Primary Containment Containment radiation Radiation None monitor reading Monitoring >10,000 R1hr.PCS ED Judgment Any condition in the Any condition in the opinion of the opinion of the Emergency Emergency Director that Director that indicates a indicates a loss of the potential loss of the Primary Containment Primary Containment Barrier.Barrier.Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS Emergency Action Level(s): o Power Operations 0 Startup 0 Hot Shutdown GJ Cold Shutdown HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY 1*1 3 1 4 1 5 1 0 1 HOSTILE ACTION resulting in loss of physical I HOSTILE ACTION within the PROTECTED AREA control of the facility HOSTILE ACTION within the OWNER CONTROLLED AREA or airborne attack threat IQ2j31 4 1 5 101 Confirmed SECURITY CONDITION or threat which indicates a potential degradation in the level of safety of the plant 1.A HOSTILE ACTION has occurred such that plant personnel are unable to operate equipment required to maintain safety functions..;::::J U G)(/)Emergency Action Level(s): (1 or 2)1.A HOSTILE ACTION is occurring or has occurred within I Emergency Action Level(s): (1 or 2)the PROTECTED AREA as reported by the GGNS 1.A HOSTILE ACTION is occurring or has occurred within security shift supervision. the OWNER CONTROLLED AREA as reported by the GGNS security shift supervision OR Emergency Action Level(s): (1 or 2 or 3)1.A SECURITY CONDITION that does not involve a HOSTILE ACTION as reported by the GGNS security shift supervision. OR OR 2.A HOSTILE ACTION has caused failure of Spent Fuel Cooling Systems and IMMINENT fuel damage is likely for a freshly off-loaded reactor core in pool.HG2 1 1 12j31 4 1 5 1 0 1 Other conditions exist which in the judgment of the Emergency Director warrant declaration of a GENERAL EMERGENCY 2.A validated notification from NRC of an airliner attack threat within 30 minutes of the site.HS2 1*1 3 1 4 1 5 1 0 11 HA2 Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Emergency Director warrant declaration of a Emergency Director warrant declaration of an ALERT SITE AREA EMERGENCY 2.A credible site specifIC security threat notifICation. OR 3.A validated notifICation from NRC proViding information of an aircraft threat 1*1 3 1 4 1 5 1 0 1 Other Conditions exist which in the judgment of the Emergency Director warrant declaration of an UNUSUAL EVENT Emergency Action Level(s):1.Other conditions exist which in the judgment ofthe Emergency Director indicate that events arein progress or have occurred which involveactual or IMMINENT substantial coredegradation or melting with potential for loss of C containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility.Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.Emergency Action Levells): 1.Other conditions exist which in the judgment of the Emergency Director indicate that events are in progress or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or HOSTILE ACTION that results in intentional damage or malicious acts;(1)toward site personnel or equipment that could lead to the likely failure of or;(2)that prevent effective access to equipment needed for the protection of the public.Any releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.Emergency Action Level(s): 1.Other conditions exist which in the judgment of the Emergency Director indicate that events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of HOSTILE ACTION.Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.Emergency Action Level(s): 1.Other conditions exist which in the judgment of the Emergency Director indicate that events are in progress or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.4-14 Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS 31 Hot Shutdown 1.1 Cold Shutdown Control Room evacuation has been initiated Emergency Action Levells);1.05-1-o2-1I-1,Shutdown from the Remote Shutdown Panel requires Control Room evacuation. 11 Power qperations Emergency Action Level(s)'1.a.Control Room evacuation has been initiated. 8m b.Control of the plant cannot be established in acx:ordance with 05-1-02*11-1, Shutdown from the Remote Shutdown Panel, within 15 minutes.H!a Control Room evacuation has been Initiated and plant control cannot be established Plant Modes:./HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY E o o c-;: 2ca...:::lIcuc WHA4 DI FIRE or EXPLOSION affecting the operability of plant FIRE in any table H*2 area not extinguished within safety systems required to establish or maintain safe 15 minutes of detection or EXPLOSION within the shutdown PROTECTED AREA!ii: Emergency Action Levells);1.FIRE or EXPLOSION resulting in VISIBLE DAMAGE to any of the structures or areas in Table H2 containing safety systems or components or Control Room indication of degraded performance of those safety systems.Emergency Action Leyells);Note: The Emergency Director should not wait until the appOcable time has elapsed, but should declare the event as soon as it is determined that the duration has exceeded, or will Dkely exceed, the appOcable time.1.Fire in any Table H-2 structure or area NOT extinguished: a.Within 15 minutes of Control Room notification QB b.Within 15 minutes of verification of a Control Room FIRE alarm.Q.B 2.EXPLOSION within the PROTECTED AREA.4-15 Revision 71 06/14 HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY II)Q):c III E E III u: 5 uGG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS[2]Power Operations 0 Startup 0 Hot ShutdownCold Shutdown Access to a VITAL AREA is prohibited due to toxic.corrosive. asphyxiant or flammable gases which jeopardize operation of operable equipment required to maintain safe operations or safely shutdown the reactor Emergency Action Level(s): Note: If the equipment in the stated area was already inoperable, or out of service, before the event occurred, then this EAL should not be declared as it will have no adverse impact on the ability of the plant to safely operate or safely shutdown beyond that already allowed by Technical Specifications at the time of the event.1.Access to the Control Room while in any operating mode or the Reactor Auxiliary Building while in modes 3.4.or 5 ONLY is prohibited due to toxic.corrosive, asphyxiant or flammable gases which jeopardize operation of systems required to maintain safe operations or safely shutdown the reactor.4-16 I Ij21 3 1 4 1 s l n l Release of toxic.corrosive. asphyxiant or flammable gases deemed detrimental to NORMAL PLANT OPERATIONS Emergency Action Level(s): (1 or 2)1.Toxic, corrosive. asphyxiant or flammable gases in amounts that have or could adversely affect NORMAL PLANT OPERATIONS. OR 2.Report by Local, County/Parish or State Officials for evacuation or sheltering of site personnel based on an offsite event.Revision 69 11/12 Emergency Action Level(s): HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY lU c: Gl E o c: Gl.c: Q.2 Ui Gl C (;:;, 76 z\GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS E]Power Operations 0 Startup 0 Hot Shutdown 81 Cold Shutdown (1 or 2 or 3 or 4 or 5 or 6)1.a.Seismic event>Operating Basis Earthquake (OBE)as indicated by: Receipt of EITHER of the following indications on SH 13P856:*Containment Operating Basis Earthquake (P856-1 A-A3)OR:-Drywell Operating Basis Earthquake (P856-1 A-A5)AND b.Earthquake confirmed by any of the following: Earthquake felt in plant National Earthquake Center Control Room indication of degraded performance of systems required for the safe shutdown of the plant.OR T Tornado striking resulting in VISIBLE DAMAGE to any of the Table H2 structures or areas containing safety systems or components or Control Room indication of degraded performance of those safety systems.OR 3.Internal flooding in any of the Table H1 areas resulting in an electrical shock hazard that precludes access to operate or monitor safety equipment or Control Room indication of degraded performance of those safety systems.OR (continued on next page)4-17 I*1 3 1 4 1 5 1 D I Natural or destructive phenomena affecting the PROTECTED AREA Emergency Action Level(s): (1 or 2 or 3 or 4 or 5)1.Seismic event identified by any 2 of the following: Seismic event confirmed by activated seismic switches as indicated by activation of the Seismic Monitoring System: Strong Motion Accelerometer System Activation (P856-1 A-A 1)Earthquake felt in plant National Earthquake Center.OR 2.Tornado striking within PROTECTED AREA boundary.OR 3.Internal flooding that has the potential to affect safety related equipment required by Technical Specifications for the current operating mode in any Table H1 area.OR 4.Turbine failure resulting incasingpenetration or damage to turbine or generator seals.OR 5.Severe weather with indication of sustained high winds74 mph within PROTECTED AREA boundary.Revision 69 11112 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS HAZARDS AND OTHER CONDITIONS AFFECTING PLANT SAFETY i: oIV c: Q)E o c: Q)a.Q)>n:::J b In Q)C o.a IV z Plant Modes: 11 Power Operations 31 Hot Shutdown 141 Cold Shutdown OR (continued from previous page)4.Turbine failure-generated PROJECTILES resulting in VISIBLE DAMAGE to or penetration of any of the Table H2 structures or areas containing safety systems or components or Control Room indication of degraded performance of those safety systems.OR 5.Vehicle crash resulting in VISIBLE DAMAGE to any of the Table H2 structures or areas containing safety systems or components or Control Room indication of degraded performance of those safety systems.OR 6.Severe weather with indication of sustained high winds 2: 74 mph within PROTECTED AREA boundary and resulting in VISIBLE DAMAGE to any of the Table H2 structures or areas containing safety systems or components or Control Room indication of degraded performance of those safety systems.Area RHR Room A RHR Room B RHR RoomC RCIC Room LPCS Room HPCS Room In Q):0 IV t-Table H1 Auxiliary Parameters Max Safe Operating Value 93 FT.6 IN.(P870-2A-E1) 93 FT.61N.(P870-10A-G1) 93 FT.6 IN.(P870-10A-G2) 93 FT.61N.(P870-2A-A1) 93 FT.6 IN.(P870-2A-F1) 93 FT.6 IN.(P870-5A-H1) Table H2 Structures or Systems Required for Safe Shutdown Unit I Containment Unit I Auxiliary Building Control Building Unit 1 Turbine Building Diesel Generator Rooms SSW PumD&Valve Rooms 4-17a Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS SG1 EEElI SS1 EEElI SA1 EEEl Prolonged loss of all offsite and all onsite AC power Loss of all offsite and all onsite ACpowerto DivI,II AC power capability to Div I&II ESF busses reduced to Divl;II&III ESF busses&III ESF busses for15 minutes to a single power source for minutes such that any additional single failure would result in station blackout SU1 Loss of all offsite AC power to Div I&II ESF busses for15 minutes EEEl;o Q.o-o 1/1 1/1 o..J Emergency Action Level(s): 1.a.Loss of all offsite and all onsite ACpowerto Div I, II&III ESF busses.AND b.Either of the following: Restoration of at leastoneemergency bus in<4 hours is not likely.OR RPV level can not be maintained >-167 in.Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.1.Loss of all offsite and all onsite ACpowerto Div I, II&III ESF busses for2:.15 minutes.Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.1.a.AC power capability to Div I&II ESF busses reduced to a single power source for15 minutes.AND b.Anyadditional single power source failure will result in station blackout.Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.1.Loss of all offsite AC power to Div I&II ESF busses for15 minutes.4-18 Revision 69 11/12 GG FSAR Emergency Action Level(s): 1.a.An automatic scram failed to shutdown the reactor as indicated by reactor power4%AND b.Manual actions taken at the reactor control consolesuccessfullyshutdown the reactor as indicated by reactor power<4%.AND b.Manual actions taken at the reactor control console do not shutdown the reactor as indicated by reactor power4%.Emergency Action Level(s): 1.a.An automatic scram failed to shutdown the reactor utomatic scram fails to shutdown the reactor and the scram fails to shutdown the reactor and the manual actions taken from the reactor control console manual actions taken from the reactor control console iare not successful in shutting down the reactor are successful in shutting down the reactor AND b.All manual actions do not shutdown the reactor as indicated by reactor power4%AND c.Either of the following exist or have occurred due to continued power generation: Core cooling is extremely challenged as.indicated by RPV level can not be restored and maintained> -191 in.OR Automatic scram and all manual actions fail to shutdown the reactor and indication of an extreme challenge to the ability to cool the core exists Emergency Action Level(s): 1.a.An automatic scram failed to shutdown the reactor E QI iii>.en c: oD-O t)IV QI 0::....o.a"iij LL Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time....QIo D-O c'0 III III o..J Heat removal is extremely challenged as indicated by RPV pressure and Suppression Pool temperature cannot be maintained in the EOP Heat Capacity Temperature Limit (HCTL)Safe Zone.554 Loss of all vital DC power for15 minutes1.<105 VDC on all vital DC busses for15 minutes.4-19 Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELSUNPLANNED loss of safety system annunciation or indication in the Control Room for15 minutes SU7 RCS Leakage Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.OR 2.Identified leakage>35 gpm.1.UNPLANNED loss of>approximately 75%of the following for15 minutes: a.Control Room safety system annunciation. OR b.Control Room safety system indication. Emergency Action Level(s): (1 or 2)1.Unidentified or pressure boundary leakage>10 gpm.Control Room safety system indication. OR AND b.Either of the following: A SIGNIFICANT TRANSIENT is in progress.OR*Compensatory indications are unavailable. Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.OR Control Room safety system indication. Arm b.A SIGNIFICANT TRANSIENT is in progress.AND c.Compensatory indications are unavailable. 556 E:E@]ISA6 Inability to monitor a SIGNIFICANT TRANSIENT in UNPLANNED loss of safety system annunciation or progress indication in the Control Room with either (1)a SIGNIFICANT TRANSIENT in progress, or (2)compensatory indicators unavailable 1.a.UNPLANNED loss of>approximately 75%of the following for>15 minutes:-11.a.UNPLANNED loss of>approximately 75%of the Control Room safety system annunciation. following for15 minutes: Control Room safety system annunciation. Emergency Action Level(s): Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.C o:;u.=l!?o n;*u C:::J C C'0!Il!Il o...J-Q)COl co coo co o Q)0...J o E oJ!!co!Il Q)>a D:::(/)4-20 Revision 69 11/12 GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS Emergency Action Level(s): (1 or 2)1.loss of all Table S1 onsite communications methods affecting the ability to perform routine operations. OR 2.loss of all Table S2 offsite communications methods affecting the ability to perform offsite notifications. c::8 IV u"EE E o o'0 Ul Ul o..J Table 51 Table 52 5US Onsite Communications Methods Offsite Communications Methods-l-f II.ff...oss 0 a onslte or 0 site commUnications Plant Radio System All telephone lines (commercial &fiber optic)capabilities Plant Paging System Satellite Sound Powered Phones NRC phones (ENS, HPN, MCl.RSCl.PMCl)In-plant TelephonesTable S3 Offgas Pre-TreatriieiiiRadiation Monitor SU9 460 310 700 230 66-130 301-400 201-300 131-200 I------------r------------; Fuel clad degradation Offgas Flow Radiation Monitor Limit (cfm)(mr/hr)Emergency Action Level(s): (1 or 2)1400 1.Offgas Pre-Treatment radiation monitor 0-65 (D17R604 or 1D17K612)reading>the Table S3 Limit forthe actual indicated Offgas flow indicating fuel clad degradation> 1.S.allowable limits.OR I I I T Reactor coolant sample activity value indicating fuel clad degradation >T.S.allowable limits>4.0 IJCi/gm dose equivalent 1-131.OR0.2 IJCi/gm dose equivalent 1-131 for>48 hours.c: o'0 E C)cu C C)c::c'0 IV o C:o.cu IV>IV...:0 5U10 Inadvertent criticality Emergency Action Level(s): 1.UNPLANNED sustained positive period observed on nuclear instrumentation o 4-21 Revision 69 11/12 Q)'C E Q).-'CCJ Q)Q)CJ Q,)(",W-,=:!:: CJ E GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS 4-22 Emergency Action Level(s): 1.Plant is not brought to required operating mode within Technical Specifications LCO Action Statement Time Revision 69 11/12 GG FSAR TABLE 4-2 Classification of FSAR Design Bases Accidents Design Bases Accident Classification Seizure of one recirculation pump Unusual Event Recirculation PUll\P shaft break Unusual Event Rod drop accident Alert Instrument line break Unusual Event Steam system pipe break outside containment Site Area Emergency LOCA within reactor coolant pressure boundary Site Area Emergency Feedwater line break outside containment Site Area Emergency Main condenser Off Gas treatment system failure Site Area Emergency Liquid radwaste tank failure Alert Fuel handling accident outside primary containment Site Area Emergency Fuel handling accident inside primary containment Alert Note: This table is provided for example purposes only.Classification was determined by applying Table 4-1 EAL criteria to each FSAR Design Bases Accident.This table is not procedurally implemented. 4-23 Revision 57 09/06 GG FSAR 5.0 ORGANIZATIONAL CONTROL OF EMERGENCIES 5.1 GGNS Organization The Grand Gulf Nuclear Station operating and licensing activities are under the control of the Site Vice President. The Site Vice President reports directly to the Senior Vice President and Chief Operating Officer.The Site Vice President is also assisted by the Director, Regulatory and Performance Improvement and the General Manager, Plant Operations. 5.2 Normal Station Organization The General Manager, Plant Operations is responsible for the overall management of the station.Theoperatingorganization is in conformance with GGNS Technical Specification 5.3.1 and includes personnel encompassing both the management and operating units.An organizational chart showing the functional levels is given in Figure 5-2.The administrative and technical support personnel staffmg the GGNS organization are normally onsite daily Monday through Friday, holidays and off Fridays excluded.Plant Operations, Security, Maintenance, Chemistry, and Radiation Protection personnel are on duty 24 hours per day.The Senior Manager, Operations; Senior Manager, Maintenance; Senior Manager, Production; Manager, Radiation Protection; and Manager Chemistry report directly to the General Manager, Plant Operations, who, in turn, reports to the Site Vice President. Figure 5-3 indicates the emergency positions usually filled by these individuals. 5.2.1 General Manager, Plant Operations The General Manager, Plant Operations is responsible for the technical and administrative management of the day-to-day physical operation and maintenance of the plant as carried out by the Operations,Maintenance,RadiationProtection and Chemistry Departments. 5-1 Revision 70 11/13 GG FSAR 5.2.2 Senior Manager, Operations The Senior Manager, Operations is responsible for the functional, safe and efficient day to day operation of the plant in accordance with established procedures and the Technical Specifications. He reports to the General Manager, Plant Operations and is assisted by the Operations Manager, Shift;Operations Manager, Support;and Manager, Shift Ops.Training.5.2.3 Senior Manager, Maintenance The Senior Manager, Maintenance is responsible for the maintenance of all plant components /equipment and plant modifications and construction. He reports to the General Manager, Plant Operations and is assisted by the Superintendents from Mechanical, Electrical, I&C, Support and FIN Teams.5.2.4 Manager, Radiation Protection The Manager, Radiation Protection is responsible for establishing and implementing the GGNS Radiation Protection program.The Manager, Radiation Protection reports to the General Manager, Plant Operations and is assisted by Radiation Protection Supervisors. 5.2.5 Senior Manager, Production The Senior Manager, Production manages and directs the activities of daily maintenance scheduling, ongoing scheduling evaluations and site integrated schedule activities. He is assisted by the Superintendent, Online Maintenance Scheduling, Supervisor Planning and Outage Manager.The Senior Manager, Production reports to the General Manager, Plant Operations. 5-2 Revision 70 11/13 GG FSAR 5.2.6 Manager, Training The Manager, Training is responsible for the*overall administration and documentation of the GGNS Training program.This position reports to the Director, Regulatory and Performance Improvement with a direct line of communication to the Site Vice President, and is assisted by the Training Superintendents. 5.2.7 Shift Technical Advisor The Shift Technical Advisor (STA)provides advanced technical assistance to the operating shift complement during normal and abnormal operating conditions. During his shift, the STA is available to perform the general duties described in GGNS FSAR Section 13.1.The Shift Technical Advisor reports directly to the Shift Manager.5.2.8 Manager, Materials,Purchasingand Contracts The Manager Materials, Purchasing and Contracts is responsibleforthe coordination of Material Management,Purchasingand Contracts. Although this is a Corporate function, this position has a direct line of communication with the General Manager, Plant Operations. The Supervisor, Procurement; and Supervisor, Materials; report directly to the Manager Materials,Purchasingand Contracts. 5.2.9 Director, Regulatory &Performance Improvement The Director, Regulatory &Performance Improvement is responsible for all licensing activities, administering the Corrective Action Program, and overseeing Emergency Preparedness activities. He reports to the Site Vice President and is assisted by the Manager, Regulatory Assurance; Manager, Performance Improvement; and Manager, Emergency Planning.5-3 Revision 70 11/13 GG FSAR 5.3 Nonnal Station Shift Staffmg During off-hour shifts, the plant is manned to maintain continuous operation as required by GGNS Technical Specifications. 5.4 Emergency Organization In the event of an emergency as defmed in Section 4.0, the Emergency Organization is activated. The organization has predefmed primary and alternate personnel for the various positions specified to provide for an automatic manning of the Emergency Organization within the time necessary to respond to the emergency. The Emergency Organization is shown in Figure 5-3.The prerequisites for personnel who fill the emergency positions are listed in EN-TQ-IIO-Ol. The Site Vice President, through GGNS Management, designates personnel for these emergency positions. The extent to which the Emergency Organization is activated depends upon the classification of the emergency (see Section 6.2).5.4.1 Nonnal Station Shift The initial Emergency Organization consists of the nonnal operating shift with the Shift Manager serving as the Emergency Director.When the designated Emergency Organization personnel are available to augment the nonnal shift complement, the Shift Manager is relieved as EOF Emergency Director and the organizational control of the emergency shifts from the Shift Manager to the EOF Emergency Director.Shift staffing and augmentation capabilities are shown in Table 5-1.5-4 Revision 70 11/13 GG FSAR 5.4.2 EOF Emergency Director (ED)The ED is responsible for the direction of the total emergency response.The ED's responsibilities include: a.Activation/operation of the EOF, assuming responsibility from the Shift Manager;b.Classification of the emergency (non-delegable); c.Recommend protective action recommendations (PAR's)to the offsite agencies(non-delegable );d.Notification of the event to the offsite agencies(non-delegable); e.Coordinate accident information with offsite governmental agencies;f.Request assistance from offsite agencies to support recovery operations; g.Authorize radiation exposure in excess oflOCFRlimits for the EOF personnel; h.Approve press releases (non-delegable); I.Direct the activities of the EOF organization in support of the Technical Support Center and offsite agencies.5.4.3 EOF Manager The EOF Manager reports to the ED and oversees the activities in the EOF.Responsibilities include: a.Assures timely activation of the EOF;b.Obtains additional resources as necessary to support EOF activities; c.Assists the Radiological Assessment Coordinator with EOF Habitability; d.Assist offsite authorities responding to the EOF;e.Ensures the offsite notifications are conductedwithinthe regulatory requ irements.5-5 Revision 61 03/09 I GG FSAR 5.4.4 Radiological Assessment Coordinator (RAC)The Radiological Assessment Coordinator is responsible for conducting assessment activities for offsite radiological conditions. During operation of the EOF, the Radiological Assessment Coordinator reports to the ED.Responsibilities include: a.Direct the activities of the Dose assessment/radiological field monitoring. b.Provide input to the ED regarding protective actions.c.Provide radiological/radiation protection support to the EOF.d.Keep the ED appraised of offsite radiological conditions. e.Provide overall liaison and coordination of efforts in the area of field team data with State Radiological Personnel. f.Contact for NRC on Health Physics Network (HPN)Line (Can be designated to a RP staff member)5.4.5 Technical Advisor (TA)The Technical Advisor reports to the ED.Responsibilities include: a.Maintaining contact with the TSC and Control Room and obtains current plant status and emergency operations. b.Monitor plant computer system parameters. c.Recommend actions on classification of emergencies. 5-6 Revision 61 03/09 I GG FSAR 5.4.6 Admin.&Logistics Coordinator The Admin.&Logistics Coordinator is ,responsible for providing support to the EOF Manager and the TSC Emergency Response Organization. Responsibilities include: a.Manage logistics for supporting the onsite and offsite emergency response\such as additional support personnel or equipment, meals, lodging, etc.b.Manage 24 hr staffing for ERF's 5.4.7 Public Information Liaison The Public Information Liaison reports to the EOF Manager and provides the primary interface between the lIC and EOF.Responsibilities include: a.Ensuring lIC is provided with current plant status.b.Reviews press releases and provide to the ED for approval 5.4.8 Offsite Communicator The Offsite Communicator reports to the ED.Responsibilities include: a.Transmitting information to the offsite agencies as required by regulations. b.Ensuring ED approves all notification forms to State/Local agencies.5-7 Revision 61 03/09 I 5.4.9 EOF Communicator \GG FSAR The EOF Communicator reports to the EOF Manager.Responsibilities include: a.Transmitting anq receiving information from onsite ERF's.b.Reviewing plant data and ensuring the EOF is notified of changing plant conditions. 5.4.10 Lead Offsite Liaison The Lead Offsite Liaison reports to the EOF Manager.Responsibilities include obtaining plant information and ensuring the offsite agencies located in the EOF and the offsite liaisons are briefed on the plant conditions. 5.4.11 Offsite Liaison The Offsite Liaison reports to the Lead Offsite Liaison.Responsibilities include: a.Obtaining plant information and ensuring the offsite agencies located in the EOC are briefed on the plant conditions. b.Clarifying plant conditions, responding to questions, etc.for the offsite agencies.5.4.12 Dose Assessor The Dose Assessor reports to the Radiological Assessment Coordinator. Responsi bilities include: a.Calculate offsite dose projections. b.Provide offsite dose projection information to the RAC.5-8 Revision 62 10/09 GG FSAR 5.4.13 Offsite Team Coordinator COTC)The Offsite Coordinator reports to the Radiological Assessment Coordinator. Responsibilities include: a.Maintain communications with offsite monitoring teams (OMT).b.Direct OMT based on radiological fmet information. c.Log communications with OMT to include dose lair sample survey results, d.Ensure radiological information is communicated to the RAC for possible modifications to the dose calculations. 5.4.14 Offsite Monitoring Team (OMT)The Offsite monitoring team reports to the Offsite Team Coordinator (OTC).Responsibilities include: a.Perform activities directed by the OTC to support plume tracking and measurements. b.Monitor self reading dosimeters and report results back to the OTC.5.4.15 Information Technology (IT)Specialist -EOF The Information Technology (IT)Specialist reports to the Admin.&Logistics Coordinator and is responsible for monitoring facility equipment (computer related and communications) to ensure adequate operation. 5-9 Revision 61 03/09 I GG FSAR 5.4.16 EOF Log Keeper The EOF Log keeper reports to the ED.Responsibilities include: a.Maintain facility log b.Ensure timeliness of facility briefs.c.Support the EOF MariagerlED as requested. 5-9a Revision 71 06/14 GG FSAR 5.4.17 Emergency Plant Manager CEPM)The EPM has the direct responsibility for accident mjtigation at the plant and performs these duties from the Technical Support Center (TSC).The EPM reports to the EOF ED.Responsibilities include: a.Provide information and recommendations to the ED regarding the declaration of an emergency. b.Coordinate the of the CR, TSC and OSC.c.Direct personnel assembly, accountability and evacuation of non-essential personnel. d.Provide information and recommendations to the ED regarding plant activities. e.Direct the organization and coordination of repair corrective action teams.f.Initiate protective actions at the site.g.Authorize radiation exposure in excess of lOCFR20 limits to onsite personnel. h.Make operational decisions involving the safety of theplantand its personnel and make recommendations to the Control Room Personnel. 5.4.18 TSC Manager-The TSC Manager reports to the EPM.Responsjbilities include: a Perform technical assessments and communicating the conclusions to the EPM.b.Assures staffmg/timely activation of the TSC.c.Set priorities for the Engineering and Technical personnel. d.In conjunction with the EPM, make operational decisions concerning the safety of the plant.5-10 Revision 71 06/14 GG FSAR 5.4.19 TSC Communicator The TSC Communicator reports to the TSC Manager.Responsibilities include: a.Maintain facility log b.Ensure timeliness of facility briefs c.Support the EPMlTSC Manager as requested. 5.4.20 Security Coordinator The Security Coordinator is located in the Incident Command Post and reports to the EPM.Responsibilities include: a.Overall coordination of the offsite assistance for the security related reSponse.b.Designated NIMS Liaison between the Incident Command Post and Site'Organization. 5.4.21 ENS Communicator The ENS Communicator reports to the TSC Manager.Responsibilities include: a.Establishes and maintains communications with the NRC via the ENS phone.b..Monitor plant computer parameters and provide plant status to the NRC as requested. 5-11 Revision 71 06/14 GG FSAR 5.4.22 Maintenance Coordinator The Maintenance Coordinator reports to the TSC Manager.RespoIl$ibilities include: a.Communicate the request for repair and corrective teams to the OSC Work Control Coordinator. b.Prioritizes the requests with the TSC Manager.5.4.23 Engineering Coordinator The Engineering Coordinator reports to the TSC Manager.He is responsible for coordinating Engineering work requests with the Engineering support team.5.4.24 Radiological Coordinator The Coordinator reports to the TSC Manager.Responsibilities include: a.Radiological assessments and the development of radiological plans.b.Keeping the TSC Manager informed of the radiological conditions. c.Advise the TSC, OSC and EOF of changes in radiological release status.d.Coordinate with the Security Coordinator to determine the routes to be used for evacuation of non-essential personnel and BRE's.e.Arranging for additional radiation protection personnel, as necessary 5-12 Revision 71 06/14 GG FSAR 5.4.25 Operations Coordinator The Operations Coordinator reports to the TSC Manager.Responsibilities include: a.Coordinate TSC efforts in determining the nature and extent of emergencies pertaining to equipment and plant facilities in support of Control Room actions.b.Assist the EPM in evaluating changes in event classification. c.Ensure the Control Room, TSC, and EOF is informed of significant changes in event status.d.Coordinate operations activities outside of the Control Room with the TSC Manager and OSC Manager.5.4.26 Engineers (Mechanical! I&C/Electrical) The Engineers' report to the Engineering Coordinator. The Engineers are responsible for responding to engineering requests form the Engineering Coordinator. 5.4.27 Reactor Engineer The Reactor Engineer reports to the TSC Manager.Responsibilities include: a.Support the TSC*in calculating and tracking core reactivity (core damage assessment). b.Assist in Severe Accident Procedure 5-13 Revision 71 06/14 GG FSAR 5.4.28 OSC Manager The OSC Manager hastheoverall responsibility for the activation and operation of the Operational Support Center.The OSC Manager reports to the EPM located in the TSC.Responsibilities Include: a.Direct the activation, operation and deactivation of the OSC.b.Ensures timely dispatching of the repair/corrective action teams, search and rescue teams, onsite monitoring teams and mobilizing other required support personnel. c.Ensures work task priorities are being d.Maintain OSC accountability. 5.4.29 Log Keeper OSC The Log Keep-OSC reports to the,OSC Manager.Responsibilities include: a.Maintain facility log.b.Ensure timeliness of facility briefs.c.Support the OSC Manager as requested. 5.4.30 Operations Support The Operations Support position reports to the OSC Manager and is manned by a spare Non-Licensed Operator.The Operations Support is responsible for supporting the OSC in locations of plant equipment. This position is filled as needed.a.Supports OSC, as needed.b.Ensures Shift Manager is informed of OSC teams and activities. c.Identifies potential operational support needs.5-14 71 06/14 GG FSAR 5.4.31 Work Control Coordinator The Work Control Coordinator reports to the OSC Manager.Responsibilities include: a.Direct the formation, briefmg and debriefmg of repair and corrective action teams and offsite monitoring teams.b.Maintain communications with the Maintenance Coordinator in the TSC.5.4.32 Mechanical II&C/Electrical Coordinator The Mechanical, I&C, and Electrical Coordinators report to the Work Control Coordinator. Responsibilities include: a.Assist the conduct of the briefing and debriefmg for the assigned tasks.b.Ensures communications with repair and corrective action teams.5.4.33 Rad Chem Coordinator The Rad Chem Coordinator reports to the Work Control Coordinator. Responsibilities include: a.Determining emergency radiological survey requirements. b.Ensure use of protective clothing, respiratory protection, and access control within the plant is deemed appropriate to control personnel exposures. c.Ensures the dispatching of the onsite monitoring teams.d.Ensures habitability of the OSC e.Conduct/provide assistance for the rad briefings to support the dispatching of the repair/corrective action teams and chemistry/RP sampling.f.Communicate rad/chemistry sample results to the TSC and CR.5-15 Revision 71 06/14 GG FSAR 5.4.34 Company Spokesperson The Company Spokesperson is responsible for overall public information. Responsibilities include: a.Obtain briefing from the EOF ED to ensure timely development of news releases.b.Ensures that news media briefings are held regularly during the course of the emergency. c.Serves as spokesperson at media briefings. 5.4.35 Technical Advisor-JIC The Technical Advisor reports to the Company Spokesperson and is responsible for answering technical questions from the news media regarding the emergency situation. 5.4.36 JIC Manager The JIC Manager reports to the Company Spokesperson. Responsibilities include: a.Overall activation and operation of the Joint Information Center.b.Notify the Corporate Emergency Center.5.4.37 Log Keeper-nc The Logkeeper-JIC reports to the JIC Manager.Responsibilities include: a.Maintain facility log.b.Support the nc Manager as requested. 5-16 Revision 71 06/14 GG FSAR 5.4.38 Inquiry Response Coordinator The Inquiry Response Coordinator reports to the Information Coordinator. Responsibilities include: a.Ensures activation of rumor control activities for response to questions from the general public.b.Monitor the public/media inquiry calls and track trends.5.4.39 Press Release Writer The Press Release Writer reports to the Information Coordinator and generates press releases as directed by the JIC Manager.5-17 Revision 71 06/14 GG FSAR TEXT DELETED 5-18 Revision 71 06/14 I.! GG FSAR 5.5 Recovery Organization Recovery after an emergency condition is handled by the Emergency Organizations. The EOF Emergency Director and Emergency Plant Manager may relieve personnel of their emergency duties and return them to their normal responsibilities, retaining such personnel as necessary to staff a recovery organization. The recovery organization depends upon the nature of the emergency and the situation which exists after the emergency. Specific organization structure and staffing is the responsibility of the Site Vice President at the time the recovery organization is instituted. Authority and responsibility of individuals who fill key positions in the recovery organization are the same as that held in the respective emergency organizations. 5-19 Revision 61 03/09 I GG FSAR 5.6 Local Services Supoort The potential nature of some emergencies may warrant the utilization of offsite individuals, organizations, and;agencies.As a result, local support service arrangements have been made with offsite groups to provide aid in the event of an emergency situation, including hostile action situations, at Grand Gulf.Support services encompass such things as medical assistance, fire control, evacuation, ambulance services, and law enforcement. Since it is imperative that the availability of these support agencies be on short notice, written agreements have been entered into with the organizations. The agencies, in the Letters of Agreement, have outlined their responsibilities, assuring their response to a call for aid.Copies of the appropriate Letters of Agreement have been included in Appendix D.The local services support groups are described in the following subsections. 5.6.1 Medical Support In certain instances, medical emergencies may require the transport of an injured person from the Station to an offsite medical facility.Transportation of injured persons to the medical facility is normally provided by the regional ambulance service.In the event that these services are unavailable, provisions are in place to transport injured persons in company owned or private vehicles.Ambulances are equipped with radios to maintain communications with the hospital.The primary medical facility for injured personnel, with or without contamination, is the Patient's Choice Medical Center located in Port Gibson approximately six miles from the plant site.This hospital has agreed to accept injured personnel and/or victims ofradiation-relatedaccidents for emergency medical and surgical treatment and observation. River Region Medical Center has agreed to serve as a back-up with the same emergency medical capabilities as Patient's Choice Medical Center.5-20 Revision 71 06/14 GG FSAR Hospital emergency kits for treatment of contaminated personnel are maintained at these fad I ities.If medical treatment of the injured and/or contaminated personnel requires assistance or medical expertise beyond the capabilities of*the local facilities, the patients would be transferred to a support hospital.GGNS has an agreement with The Ochsner Clinic to provide hospital and medical services for injured/contaminated or overexposed personnel. 5.6.2 Fire Support When it is determined by emergency management personnel that offsite fire support is needed, the Claiborne County Fire Department, located approximately six miles from the plant and available 24 hour per day, is alerted.Notification of a need for offsite fire fighting assistance is made by means of a telephone call.The Claiborne County Fire Department has an informal aid pact with the Port Gibson Fire Department. These two fire fighting groups have agreed, upon request, to furnish each other with fire fighting personnel, resources, and facilities and to render such fire protection services which may be necessary to suppress any fire or disaster which goes beyond the control of either of the agencies.In all cases where additional fire support groups would be brought in to assist at the Station, the Claiborne County Fire Department Fire Chief directs all offsite fire fighting personnel, while the GGNS Emergency Director retains overall responsibility for onsite emergency response.In instances where offsite fire fighting assistance is needed to fight a fire involving radioactive materials, radiological information and assistance is provided by knowledgeable members of the Emergency Organization.5-21 Revision 64 11/10 GG FSAR 5.6.3 Law Enforcement Agencies The nature of a radiological emergency at the Grand Gulf Nuclear Station may require that the local law enforcement agencies be activated to assist in the emergency effort.Because it is essential that they be available during certain emergency situations, the Claiborne County Sheriffs Department and the Port Gibson Police Department have agreed to provide the following emergency support: a.Controlling matters of civil disorder within Claiborne County (provided by Sheriffs Department) and within the city limits ofPortGibson (provided by Sheriffs Department and Port Gibson Police Department) b.Communications c.Furnishing personnel and equipment in accordance with Security Plans.d.Controlling access to areas affected by the erp.ergency e.Directing area evacuation. 5.7 Coordination with Governmental Agencies The close coordination between the local, State, and Grand Gulf Nuclear Station Emergency Plans serves to better ensure the safety and health of the general public.It also enables all emergency organizations to participate in the emergency effort with a minimum of confusion and hesitation. All participating agencies must have a clear picture of their responsibilities during an emergency effort,includinghostile actions, which is provided for in their respective emergency plans arid procedures. Figure 5-5 depicts the interrelationships among some of the various state and federal organizations which may respond to an emergency at GGNS.The Federal Response Management Organization is shown in Figure 5-6.5-22 Revision 71 06/14 GG FSAR 5.7.1 Mississippi Emergency Management Agency CMEMA)and Mississippi State Department ofHealth/Division of Radiological Health (DRH)The Mississippi Emergency Management Agency is the designated' State authority and as such, has the responsibility for the general planning and coordination of the State of Mississippi's response to nuclear plant accidents as detailed in the"Mississippi Radiological Emergency Preparedness Plan, Volume III, to the Mississippi Comprehensive Emergency Management Plan".Some of the functions ofMEMA are (1)development and maintenance of State Plans and Procedures, (2)operation of the State Emergency Operation Center (EOC), (3)notification and warning in coordination with the Mississippi Highway Safety Patrol and the operators of fixed nuclear facilities, (4)communications, (5)assist local governments in the development and maintenance of plans and procedures, (6)public information, (7)training, (8)providingpersonnelfor the Radiological Emergency Response Teams and (9)providing continuity of technical, administrative, and material resources. A letter (see Appendix D)from the Governor of Mississippi which implements the Mississippi Radiological Emergency Plan is a commitment from all state agencies to perform their functions delineated in the State plan as required by Mississippi law.The Mississippi State Department of Health/Division of Radiological Health is charged with the responsibility to protect the public health and safety of the general populace from the hazards of radiation. With respect to radiological hazards resulting from incidents involving fixed nuclear facilities, the functions of DRH include (l)act as lead agency for technical response, (2)accident assessment, (3)provide personnel and equipment for the Radiological Emergency Response Team, (4)advise State and local officials on implementation of protective actions based on accident assessment, (5)establish radiological exposure controls, (6)access/egress and reentry criteria, (7)Laboratory services, (8)coordinate offsite decontamination activities. 5-23 Revision 61 03/09 I GG FSAR 5.7.2 Louisiana Department of Environmental Ouality (LDEO)and Governor's Office of Homeland Security and Emergency Preparedness CGOHSEP)The Secretary of the Louisiana Department of Environmental Quality under Act 97 of 1983 (L.R.S.30:2001 et.seq.), also known as the Louisiana Environmental Quality Act, and specifically L.R.S.30:2109, has the authority to develop an9 implement a statewide radiological emergency preparedness plan and coordinate the development of specific emergency plans for nuclear power facilities, including planned protective action for the population and the establishment of appropriate boundaries for which planning for nuclear emergencies is undertaken; to respond to any emergency which involves possible or actual release of radioactive material;to coordinate offsite decontamination efforts;to issue relocation and evacuation recommendations; and to otherwise protect the public welfare and safety in any manner deemed necessary and appropriate. As a result, the"Louisiana Peacetime Radiological Response Plan," which includes Attachment 2 for the Grand Gulf Nuclear Station, has been developed. Federal, State and local agencies are notified as required to provide assistance in evaluating the radiological hazard and providing implementation of appropriate protective actions in accordance with this plan.The Secretary of the LDEQ or his designee is responsible for notifying the public that a radiological incident has occurred and for providing an evaluation of the incident in terms ofpublic health.If protective actions are indicated, specific guidance can be provided and the information released.The Governor's Office of Homeland Security and EmergencyPreparedness(GOHSEP) is responsible for coordinating all emergency actions of the various State and local agencies in the event that evacuation is necessary. Local law enforcement agencies, rescue squads, medical facilities and other parish and municipal agencies provide assistance pursuant to their agreements with local civil defense organizations as delineated in the local civil defense plans.The GOHSEP immediately notifies LDEQ in the event of a radiological emergency. A letter (see Appendix D)from the Governor of Louisiana to implement the Louisiana Peacetime Radiological Response Plan is a commitment from all State agencies to perform their functions as delineated in the State plan as required by Louisiana law.5-24 Revision 61 03/09 I GG FSAR 5.7.3PortGibson/Claiborne County Civil Defense The Port Gibson/Claiborne County Civil Defense Director is the designated County authority and as such, has executive authority and responsibility for,theplanning and coordination of the County's emergency response.The Director has delegated responsibilities and tasks to the local support agencies and has established operating procedures to implement the"Port Gibson/Claiborne County-Radiological Emergency Preparedness Plan." Upon notification ofa major emergency at the Grand Gulf Nuclear Station, the Civil Defense Director, as a primary duty, provides direction within the County boundaries. This duty includes, if required, the coordination with other agencies to inform the public in affected portions of the County to take protective actions.The Port Gibson/Claiborne County Civil Defense Director is responsible for activation of the Claiborne County Emergency Operations Center (EOC).5.7.4 Tensas Parish Office of Homeland Security and Emergency Preparedness The President of the Tensas Parish Police Jury as the Chief Executive ofTensas Parish is responsible by law for emergency preparedness operations. The Emergency Preparedness Coordinator acts as his Chief of Staff and ensures continuity of resources for sustained emergency operations. The Emergency Preparedness Coordinator is responsible for initiating the manning of the Tensas Parish Emergency Operations Center and for coordinating the involved agencies during the course of the radiological emergency as detailed in the"Tensas Parish Radiological Emergency Implementing Plan for Grand Gulf Nuclear Station." 5-25 Revision 61 03/09 I GG FSAR 5.7.5 Nuclear Regulatory Commission (NRC)The United States Nuclear Regulatory Commission, Region IV, dispatches an Initial Response Site Team (IRST)to GGNS upon declaration of a Site.Area Emergency or General Emergency and may dispatch the team upon declaration of an Alert.Members of the team are assigned to the TSC, EOF and ENMC.Primary functions of the IRST are: a.Oversee licensed activities to ensure a reasonable effort is being made to mitigate the accident.b.Evaluate protective actions taking place and make an independent evaluation of recommended protective actions.c.Evaluate direction being given to reactor operators to bring the plant to a stable condition, and d.Oversee GGNS's ability to provide information to the news media and the public concerning information about the status of the plantandthe offsite consequences. The IRST has the capability to arrive at GGNS in approximately4-6 hours.Once notified, the plant shall maintain an open continuous communication channel with the NRC Operations Center via the NRC Emergency Notification System until tenninated by the NRC Operations Center.The NRC Operations Center can be activated within 15-30 minutes during normal working hours and within 1-2 hours after nonnal working hours.5-26 Revision 61 03/09 I GG FSAR 5.7.6 Department of Energy (DOE)The Department of Energy assists during an emergency by providing monitoring assistance throughtheirRadiological Assistance Plan (RAP)and Interagency Radiological Assistance Plan (IRAP)when requested in support of state and local monitoring operations. In addition, the Emergency Director may also request this assistance. Some of the specialized equipment and services that DOE can provide are: alpha detection equipment, low energy gamma detectors and special aircraft monitoring. The Department of Energy can also assist in the radiation monitoring of food, water, livestock, and agricultural products.When deemed necessary, the DOE makes available special aerial radiological surveys and meteorological services.The estimated arrival time to the GGNS area for the DOE Region III Oak Ridge Operations team is 12 hours.5.7.7 Institute of Nuclear Power Operations (INPO)The Institute of Nuclear Power Operations provides emergency response as requested by GGNS.INPO can provide assistance in the following areas: a.Location of sources of emergency manpower and equipment b.Analysis of the operational aspects of the event c.Organization of industry experts who could advise GGNS on technical matters.d.INPO may be contacted by means of its 24-hour telephone number in the event of a radiological emergency at GGNS.5.7.8 U.S.Coast Guard.The U.S.Coast Guard has jurisdiction over the traffic on the Mississippi River.Upon notification by the Mississippi State Emergency Management Agency of an emergency requiring traffic exclusion, the Captain of the Port exercises his authority to control marine traffic through the establishment of a safety zone in the immediate area.5-27 Revision 68 08/12 GG FSAR 5.8 Contractor Assistance GGNS has made provisions with General Electric (NSSS Supplier), to provide both routine and emergency technical assistance and support in accordance withGEServices Letter GE-SIL-324. 5.9 Support for Federal Response Office and communications facilities are provided for responding NRC personnel within the TSC, EOF, and nc, and for responding DOE personnelwithinthe EOF.Additional State and County (Parish)resources available to support the Federal response, such as air fields, emergency operations centers, and communications capabilities are described in Grand Gulf Nuclear Station Supporting Emergency Response Plans.5-28 Revision 70 11/13 GG FSAR TABLE 5-1 SHIFT STAFFING AND AUGMENTATION CAPABILITIES Major Position Title On Capability for Additions Functional Area Emergency Tasks or Expertise Location Shift (e)90 Min(h)Plant Operations and Emergency Direction and Control (f)Shift Manager (SRO)CR 1-Assessment of Emergency Director CRlEOF--1 (g)Operational Aspects Control Room Supervisor (SRO)CR 1-Nuclear Operator A (RO)CR 3(i)-Auxiliary Operator (AO)CR 3--Firefighting, firefighting communications Shift Personnel (Operations) CR 5(a)Provided by Claiborne County/Port Gibson Technical Support and CorefThermal Hydraulics(d) Shift Technical Advisor CR l(c)-Core/Thermal Hydraulics Reactor EngineersiSRO/ST A TSC/CR--1 (g) Off site Notifications (State, Local, Federal)and Communicator CRlEOF 2 2 (g)Communication maintain communications, Notification of Plant On-Call emergency personnel Radiological Accident EOF Direction and Control Senior Management EOF--I iAssessment and Support of Operational Offsite Dose Assessment Radiological Assessment CRlEOF 1 (a)1 (g)IAccident Assessment ChemistrylRadio-Chemistry Chemist OSC 1 1!plant System Technical Support Electrical TSC/OSC--I IEngineering Mechanical TSC/OSC--I lRepair and Corrective Mechanical Maintenance OSC 1 (a)2 IActions Radwaste Operator OSC 1 (a)1 Electrical MaintenanceJ I&C Maintenance OSC 2--Electrical Maintenance OSC-2 I&C Maintenance OSC--I 5-29 Revision 71 05/14 GG FSAR TABLE 5-1 SHIFT STAFFING AND AUGMENTATION CAPABILITIES Major Position Title On Capability for Additions Functional Area Emergency Tasks or Expertise Location Shift (e)90 Min(h)Radiation Protection-Access Control Health Physicist EOF/OSC 2II (b)-HP coverage for repair, corrective actions, search and rescue/first-aid, and fire fighting-Personnel monitoHng-Dosimetry-Surveys (offsite, onsite, and in-plant surveys on as needed basis only)Rescue/First aid Rescue and First Aid OSC 2(a)Provided by Claiborne County/Port Gibson Security Security, personnel accountability Security Personnel (See Security Plan)Notes: (a)May be provided by ShiftPersonnelassigned other duties.(b)Mustbe trained for the Emergency Task being performed.(c)STA staffing in accordance with GGNS Technical Specification.(d)CorelThermal Hydraulics is part of normal STA duties as listed in the Updated Final Safety Analysis Report and Technical Specifications.(e)These ERO positions may be vacant for not more than 2 hours, in order to provide for unexpected absences, provided action is taken to fill the required position.This allowance is not applicable during declared emergencies.(f)Overalldirection of facility response is assumed from the Shift Manager (SRO)by the Emergency Director.Upon relief, the Shift Manager (SRO)resumes plant operational duties.(g)These personnel will report and augment shift personnel as soon as possible without delay but no later than 75 minutes.(h)If personnel are onsite they will report and augment the onshift personnel as soon as possible without delay, but no later than 45 minutes.Off site personnel will report to their assigned facility as soon as possible without delay, but no later than 90 minutes.(i)The role of the third RO may be fulfilled using an AO as allowed by TRM based upon GGNS on-shift staffing analysis.5-30 Revision 69 11/12 Q-IVi...:lQ-C)- GG FSAR-NORMAL STATION ORGANIZATION , SITE VICE PRESIDENT I I I I DIRECTOR, I DIRECTOR, I GENERAL MANAGER, I EXECUTIVE I ENGINEERING REGULATORY &PLANT OPERATIONS ASSISTANCE, SITE VP PERFORMANCE MANAGER, 1 I I I I I DESIGN&MANAGER, PROGRAM PERFORMANCE to-MANAGER, MANAGER, MANAGER, ENGINEERING IMPROVEMENT MANAGER, MANAGER RADIATION MANAGER, SITE OPERATIONS CHEMISTRY PRODUCTION PROJECTS&PROTECTION MAINTENANCE MANAGER,MANAGER,MAINT SYSTEMS&COMPONENTS REGULATORY SERVICESMANAGER ,COORDINATOR I I ASSURANCE H SUPERVISOR, I DPIC, I TEC=ORT OUTAGE MAINTENANCE I I MANAGER, I H SUPERVISOR, I EQUIPMENT EMERGENCYSUPERINTENDENT, PLANNING H SUPERINTENDENT, I RELIABILITY PLANNING ASSISTANT MANAGER, ASSISTANT MANAGER, OPERATIONS SHIFT OPSSUPPORT .RPOPS I&C SENIOR ADMINSUPT., ONLINE I ASSISTANT, MANAGER,I Y SUPERVISOR I MAl NT-H SUPERINTENDENT'I SITE ENG SECURITY I I RPSUPPORT SCHEDULING I I MECHANICAL WORK OPERATORS CONTROL MANAGER,H SUPERINTENDENT,' TRAINING ELECTRICAL -I SUPERVISOR, REACTOR I Y SUPERINTENDENT, I SUPT.,OPS ENGINEERING FIN TEAMTRAINING MANAGER, SUPT., MATERIALS MAINTENANCE PURCHASING -&TECHNICAL&CONTRACTS TRAININGSUPERVISOR, I SUPT., PROCUREMENT SIMULATOR&-TRAINING., SUPERVISOR, J SUPPORT MATERIALS MATERIAL, PROJECTS COORDINATOR SUPERVISOR, STORES FIGURE 5-2 5-32_._._line of communication line of responsibility Revision 70 11/13 FIGURE 5-3 5-33--Revision 70 11/13 GG FSAR EMERGENCY ORGANIZATION GO FSAR EMERGENCY ORGANIZATION e.C.f' !tcor A (Figure 5-3)I ,....It.lt'(."(Jl'.'a.'LlU:AIUoC .';:'Hr.r'lAnn'l " ,rY.;u;n;::;"lY."",aNol.TCfl IT I 'IE!!O::l eaF"'151i A:'N:SliO'l r.rr-f--O='F&rrE R£StCE6.EOf 1 OOW"/N";;FO"S6I'EP"".oC*o" f'\E$1lE6. Jt:: I I W4::ES.*JiC I..C IU.......GEP, P£51DE&:1'l1!1.1C I t:u.* '-0-: L::.-D CffSlTE-w.lSO'l ......RnIIl'Jfir ..Iilr I 'lUo:.&.......-.... Rr7!"aJ;:r:!f" rcr CF""SITE 1'E.NII COCflD.WO:S.E.t."f f--T TEM..4i> I....ut<':! COA"lfl'lrA ......rCfl 1l£S1:::E5: "C I AE$I'(NS: T!,/.'J R£f1!:ES.*.ie I I'JRIlr.n* 'lE5tlES.*1;I I;.oq.(E;.eA-.;Ie'I£90:3.JiC FIGURE 5-4 5-34 Revision 71 06/14 FSAR INTERRELATIONSHIPS OF EMERGENCY RESPONSE ORGRANIZATION ONSITE OFFSITE .. X. .. t****E*NT*E*RGY******i !OPERATIONS !L i I OPERATIONS I..SUPPORT cENTER CONTROL ROOM ,.'(NRC)FEMA (NRC)I l .FEDERAL SUPPORT (NRC)>lIP ... o NRC o FEMA ..<I_!IIIII!IIIII_I-- ""'-"I_"'" .::t!'X'\:Y"<"""",,'><.&,\,.X.,"-";X)<<1:-<,,)(;i*SUPPORT GGNS ENTERGY OPERATIONS GGNS/AGENCY AGENCY SUPPORT"...........................*
- "':FIGURE 5-5 5-35 ReVision 61 03/09 I GG FSAR FEDERAL RESPONSE MANAGEMENT DIAGRAM GOVERNOR OR DESIGNATED REPRESENTATIVE i NRCIFEMA JOINT COORDINATION FEDERAL TECHNICAL SUPPORT NRC COORDINATES TECHNICAl ASPECTS Of FEDERAl RESPONSE i DOE FEDERAL NON*TECHNICAL SUPPORT FEMA SOURCE: FEDERAL REGISTER: 4SFR84911 FIGURE 5-6 5-36 Revision 61 03/09 I GG FSAR 6.0 EMERGENCY MEASURES 6.1 Initiating Emergency Measures Emergency measures must be taken in response to an emergency condition.
Upon recognizing and officially declaring that one of the four classes of emergencies exists, the emergency organization is activated. Once activation has taken place, assessments of the condition are made, corrective and protective actions are taken and aid to affected persons is administered as required.6.1.1 Emergency Suspension of Normal Ouality Assurance Procedures and Administrative Controls, License Conditions, and Technical Specifications Should emergency circumstances require, reasonable actions that depart from normal Quality Assurance Procedures, Administrative Controls, License Conditions or Technical Specifications may be taken when this action is immediately needed to protect the public health and safety.These action may only be taken if no action consistent with normal Quality Assurance Procedures, Administrative Controls, License Conditions and Technical I Specifications that can provide adequate or equivalent protection is immediately apparent.At a minimum, approval by a licensed senior reactor operator is required before any such action may be taken.6.1.2 Suspension of Normal Emergency Actions for Security Emergencies The Emergency Director and Emergency Plant Manager, upon the Emergency Director's evaluating and classifying a security emergency into any of the four emergency classifications discussed in 4.0, should only activate those personnel and facilities necessary to mitigate the emergency situation. This is the only exception to the personnel and facility activations described in the Plan and related implementing procedures; it is permitted because of the potential risk to personnel which a security emergency may present.6-1 Revision 61 03/09 GG FSAR 6.2 Activation of Emergency Organization The initial step in declaring an emergency is to recognize that an unusual condition exists or has the potential for existing.The Emergency Action Levels, as specified in Section 4.0, provide the criteria for determining when an abnormal situation exists that requires the declaration of an emergency and the subsequent activation of the applicable portions of the Emergency Organization. 6.2.1 Control Room Operators Normally, initial recognition of conditions requlnng emergency actions occurs in the Control Room.Sometimes these conditions are signaled by alarms or instrument readings.If control room operators, or any other shift personnel, recognize an unusual condition or occurrence, it is their responsibility to immediately notifytheShift Manager.6.2.2 Shift Manager Upon notification of a real or potential emergency condition, the Shift Manager is responsible for determining whether or not the declaration of an emergency is required.If it is, he is then responsible for the activation of the Plan and assuming the role of Emergency Director.If a specific action level has been reached or exceeded, he declares the appropriate emergency classification. The Shift Manager takes the following actions to ensure the safety of plant personnel and the general public and the safe operation of the plant.1.Classify the emergency and make the required notifications 2.Perform assessment actions 3.Perform any other emergency actions as appropriate. 6-2 Revision 43 10/00 GG FSAR 6.2.3 Shift Technical Advisor The Shift Technical Advisor advises and assists the Shift Manager on matters pertaining to the safe operation of the plant.6.2.4 Emergency Director The Plan is activated with the declaration of an.emergency. The Shift Manager continues as the Emergency Director until properly relieved by the EOF Emergency Director.The Emergency Director shall ensure that notification is initiated within 15 minutes of an emergency declaration. Primary 1.(a)Mississippi Emergency Management Agency 2.(a)Governor's Office of Homeland Security and Emergency Preparedness 3.(a)Claiborne County Sheriff's Dept 4.(a)T ensas Parish Sheriff's Dept Secondary (b)Mississippi Hwy Patrol (b)Louisiana Dept.of Envir.Quality (b)Claiborne County Civil Defense An example of the form that is used for Emergency Notification is shown in Figure 6-2 and included as part of the Emergency Preparedness Forms Control Process.Copies of this notification form are available in the appropriate emergency centers.In accordance with 10CFR50.72 the NRC Operations Center shall be notified by telephone immediately after notification of the appropriate state and local agencies and not later than one hour after the declaration of one of the Emergency Classes.Upon arrival in the EOF, the EOF Emergency Director assumes the position of Emergency Director in accordance with Emergency Plan Procedures. 6-3 Revision 64 11/10 GG FSAR The Emergency Director evaluates the accident conditions and verifies that the correct emergency classification has been declared.He then activates the appropriate portions of the Emergency Organizations if that has not already been done by the Shift Manager.In any case, the Emergency Plant Manager is notified.If an Unusual Event has been declared, those members of the operating shift needed to handle the emergency are activated. If the Emergency Director feels there is a reasonable possibility of escalation of the emergency to a higher classification, applicable portions of the Emergency Organization are activated. If an Alert, Site Area Emergency or General Emergency has been declared, the entire Emergency Organization is activated. 6.3 Assessment Actions Continuous assessment throughout the course of an emergency is necessary to effectively coordinate and direct the elements of the Emergency Organization. The initial assessment actions are dictated, in part, by the Emergency Action Level that has been reached or exceeded.6.3.1 Assessment Actions During Unusual Events An Unusual Event condition requires basic emergency assessments. Attention must be paid to parameters that may indicate a possible worsening of conditions, (Le.radioactive releases). 6-4 Revision 61 03/09 GG FSAR 6.3.2 Assessment Actions During Alerts The existence of an Alert condition requires the following assessment actions as applicable. a.Increased surveillance of applicable in-plant instrumentation. b.Visual observation of the affected plant area.c.Onsite and offsite radiological monitoring if a radioactive release has taken place or is suspected. d.Determination of offsite doses if applicable. 6.3.3 Assessment Actions During Site Area Emergencies In the event of a Site Area Emergency, assessment activities are more extensive than for an Alert.In addition to the that would be carried out during an Alert, the following activities would be performed as appropriate: a.Monitor Meteorological data.b.Dispatch radiological monitoring teams to offsite locations downwind of a , release in conjunction with state radiological monitoring efforts.c.Assess Off site radioiodine thyroid doses.d.Assess Offsite whole body dose.6.3.4 Assessment Actions During General Emergencies In the event of a General Emergency, aLI assessment activities described for a Site Area Emergency will be conducted. Assessment of onsite and offsite exposures are performed regularly to determine if and when siteorpublic sheltering and evacuations may be required;and the results, including methods and assumptions, are communicated to offsite officials. 6-5 Revision 43 10/00 GG FSAR 6.4 Corrective Actions Corrective Actions are performed by ,plant personnel who are technically trained and capable of implementing the station's Plan and procedures. 6.5 Protective Actions The protective actions to be implemented onsite are the responsibility of GGNS, while the States of Mississippi and Louisiana and the counties within the 10-mile EPZ are responsible for providing offsite protective actions.The states are specifically responsible for protective actions for the 50-mile ingestion pathway EPZ.A range of protective actions to protect onsite personnel during hostile action is provided to ensure the continued ability to safely shut down the reactor and perform the functions of the emergency plan 6.5.1 Protective Cover, Evacuation, Personnel Accountability a.Grand Gulf Nuclear Station 1.When an Alert, Site Area Emergency orGeneralEmergency is declared, all personnel in the protected area are advised of the emergency classification by use of the public address system.If a site evacuation is ordered, the evacuation siren is sounded over the public address system in the protected area followed by an evacuation announcement and any special instructions. Non-essential personnelwillevacuate immediately upon being notified.2.Emergency personnel not assigned to the Control Room, Technical Support Center, Central Alarm Station, and Secondary Alarm Station, report to the Operations Support Center for accountability.emergency personnel are accounted for as they exit the protected area through Security Island.GGNS Security is responsible for performing an accountability survey of personnel in the protected area.It is anticipated that accountability and identification of missing persons can 6-6 Revision 70 11/13 GG FSAR be accomplished in approximately 30 minutes.This information is reported to the Emergency Plant Manager.3.GGNS employees, contract personnel and visitors outside of the Protected Area, but within the Emergency Preparedness Owner Controlled Area are notified promptly of a site evacuation and given instructions by public address systems, telephone or security personnel equipped with portablePA systems.Non-essential personnel will evacuate immediately upon being notified.GGNS Security checks to ensure that all persons located in the Emergency Preparedness Owner Controlled Area were notified and evacuated as directed, and report the results to the Emergency Plant Manager.Security will complete the checks as soon as possible but not to exceed 2 hours under most conditions. 4.Persons outside the Emergency Preparedness Owner Controlled Area, but in public access areas or passing through the site are notified of an emergency classification by the Alert Notification System activated by local authorities. 5.All site personnel are trained on site evacuation routes, escorted by someone who has been trained or receive a map which gives instructions and routes off of the site.Site evacuation instructions and routes are specified in the evacuation announcement. Non-essential personnel are expected to evacuate GGNS property in the same vehicles which were used for initial access.6.Emergency situations, as discussed in this section, include natural events as well as radiological incidents. The procedures to be followed in these evacuations are included in the Emergency Plan Procedures. Provisions are made for consideration of weather conditions, traffic or radiological impediments to evacuation. 6-7 Revision 61 03/09 GG FSAR b.Offsite Areas The administration of protective actions for persons residing offsite is the responsibility of the States of Mississippi and Louisiana. Mississippi's responsibility is outlined in the"Mississippi Emergency Operations Plan" and Louisiana's responsibility is outlined in the"Louisiana Peacetime Radiological Response Plan." These plans are implemented in addition to the county or parish emergency plans.The county and parish within the 1 O-mile EPZ surrounding the Station are responsible for developing and submitting emergency plans wPich are coordinated with those of the States and Station.GGNS provides protective action recommendations to the state/local civil defense agencies.The minimrun standard PAR for a General Emergency is to evacuate the 2 mile radius and 5 miles downwind, moilitor and prepare the remainder of the 10 mile EPZ, and consideration of the use of potassium iodide in accordance with State Plans.(Source: NUREG 0654 FEMA Rep 1, Rev 1, Supplement 3"Guidance for Protective Action Strategies".) Evacuation will be recommended for5-10 miles in the down wind sectors, if dose projections or actual field measurements correspond to radiation levels to the public that exceed the EPA Protective Action Guides (P AG's).Sheltering may be recommended instead of evacuation when appropriate. Recommendations are based upon emergency classification and projected dose to the public, and are consistent with EPA P AGs and FDA guidance.The Protective Actions Guides are summarized in Table 6-1.The methodology normally used for determining appropriate protective action recommendations is described in the Emergency Plan Procedures. Warning and/or advising the population-at-risk of an impending emergency is the responsibility of the counties or parishes affected.These counties or parishes are also responsible for the preparation and dissemination of informational material concerning protective actions for the general public.Written messages for emergency dissemination to the public have been prepared by the State of Mississippi with supporting information provided by GGNS.These prepared messages are documented in the Mississippi Emergency Operations Plan, Volume IT, Part 3, Radiological Emergency Response Plan, 6-8 Revision 72 11/14 GG FSAR Appendix 1 to AnnexG-Public Information. Figure 2-5 shows the evacuation centers within the 50-mile EPZ.6.6 Contamination Control Measures A monitoring and decontamination station is established at the Emergency Operations Facility (EOF)when directed by the Emergency Director.Emergency Organization personnel perform monitoring and decontamination in accordance with plant procedures. When a site evacuation is ordered, non-essential personnel will be routed, as necessary, to evacuation/decontamination centers established by the state/local governments. Onsite contamination control measures are implemented in Plant Administrative Procedures and other lower level procedures. Plant procedures are designed to meet the requirements of 10CFR20, Appendix B.Contamination control for offsite areas is provided for by the States of Mississippi and Louisiana. Guidelines are provided through the emergency response plans of those two states.6.7 Aid to Affected Personnel This section of the plan describes measures which are used to provide necessary assistance if individuals are injured and/or radiologically exposed or contaminated. 6.7.1 Emergency Personnel Exposure Although an emergency situation transcends the nonnal requirements for limiting exposure, there are suggested levels of exposure acceptable in emergencies. Three categories of risk versus benefit must be considered: a.Saving of human life and reduction of injury b.Protection of health and safety of the public and c.Protection of property 6-9 Revision 61 03/09 I GG FSAR In certain emergency situations, the acceptance of above normal radiation exposure may be warranted. The following are exposure guidelines for individuals inclusive of support personnel and Entergyemployees: a.Support personnel are restricted to GGNS administrative limits and are equipped with appropriate dosimetry. In situations where it appears that the administrative limits may be exceeded, the individuals are relieved of duties involving additional radiation exposure.b.Guidance for Emergency worker exposure is given in the following table, which represents those extensions of GGNS administrative exposure limits for which authorization, by the Emergency Director or Emergency Plant Manager, is required prior to the exposure being received: Guidance on Dose Limits for Workers Performing Emergency Services DOSE LIMITS ACTIVITY CONDITIONS (TEDE)>5 up to 10 Rem Protecting Valuable Property Lower dose not practicable >10 up to 25 Rem Life saving or Protection of large Lower dose not practicable populations >25 Rem Life saving or Protection oflarge Only on a voluntary basis to populations persons fully aware of the risks involved Source: EPA 400-R-92-00 1"Manual of Protective Action Guides and Protective Actions for Nuclear Incidents" Table 2-2 6-10 Revision 61 03/09 , GG FSAR Provisions have been made for 24-hour-per-day capability to determine the doses received by emergency personnel. Specific emergency procedures have been writtenforthe issuance of permanent record dosimetry devices (or systems)and self reading dosimeters to emergency personnel. These procedures also provide instructions on how often to read dosimeters and keeping appropriate dose records.The Emergency Director or Emergency Plant Manager may also authorize the use of radioprotective drugs for thyroid protection. Emergency personnel would take ameasured dose of the drug (such as KI tablets).These drugs are made available in the Control Room, Operations Support Center, Technical Support Center, Emergency Operations Facility, and the RCA entrance.6.7.2 Decontamination and First Aid Onsite personnel decontamination stations for emergency conditions are fully equipped with decontamination material and portable fITst aid kits.The primary decontamination center is located on the 133 foot level of the Unit II Turbine Building in the Radiation Protection Access Control Area.Alternate facilities are the showers in the Maintenance Shop (adjacent to the Administration Building)or EOF.The decontamination centers have provisions for disrobing, collecting contaminated clothing, showering of contaminated personnel, and clean clothing.All personnel exiting from the controlled access area at Grand Gulf are monitored for contamination. The instruments used for this monitoring procedure are portal monitors and portable contamination survey instruments. In situations when the portal monitors and/or the portable contamination survey instruments detect contamination, preventive measures must be initiated to mitigate the possibility of the spread of contamination. 6-11 Revision 65 04/11 GG FSAR The most effective measure for the decontamination of the hands and other parts of the body is thorough washing of the affected areas.A member of the Health Physics Section is to supervise any decontamination effort.First Aid Courses are conducted for selected members of the Emergency Organization. Personnel trained in first aid/CPR are available on each shift to administer first aid as required.6.7.3 Medical Transportation Transportation of injured persons from GGNS to the medical facility is nonnally provided by regional ambulance service in accordance with Letter(s)of Agreement (See Appendix D).In the event that these services are unavailable, provisions are in place to transport injured persons in company owned or private vehicles.Ambulance service can be requested by the local hospitals or GGNS.The ambulance maintains radio communications with the hospital while in transit.GGNS uses telephone communication to contact the hospital, therebymaintainingindirect communications with the ambulance. 6.7.4 Medical Treatment In the event of a serious accident at Grand Gulf requiring medical treatment, Patient's Choice Medical Center has agreed to provide the required assistance. The hospital is equipped to handlecontaminatedinjuries as well as injuries not related to contamination or over exposure.The River Region Medical Center and the Patient's Choice Medical Center have emergency plans for the decontamination and treatment of the radioactively contaminated patient.Appendix B includes a list of typical equipment located at the hospitals. 6-12 Revision 61 03/09 GG FSAR River Region Medical Center and The Ochsner Clinic provide backup medical services if the Patient's Choice Medical Center is unable to provide the required services.Letters of Agreement (Appendix D)have been obtained to document these arrangements. 6-13 Revision 61 03/09 GG FSAR TABLE 6-1*Protective Actions Guides for the Early Phase of a Nuclear Incident Projected Dose 1 Protective Action Recommendation or Classification
- TEDE 1,000 to 5,000 mRem*Evacuation.
- CDE (Thyroid)5,000 to 25,000 mRem*Sheltering may be considered ifbenefit outweighs'cost'of evacuation
- SDE (Skin Dose)50,000 to 250,000 mRem*Sheltering up to 10,000 mRem may be justified for special populations
- General Emergency Classification
- Consider prophylactic use of potassium iodide in accordance with State Plans.Note1-Dose that can be avoided if theprotectiveaction is implemented.
Source: 1)EPA 400-R-92-001"Manual of Protective Action Guides and Protective Actions for Nuclear Incidents" Table 2.;,;1 2)Food and Drug Administration Guidance, December 2001,"Potassium Iodide as a ThYroid Blocking Agent in Radiation Emergencies" 6-14 Revision 61 03/09 GG FSAR FIGURE DELETED FIGURE 6-16-15 Revision 26 6/94 GG FSAR1 of 1 Example of the GGNS Emergency Notification Form Grand Gulf Emergency Notification Form 1.THIS IS GRAND GULF NUCLEAR STATION WITH MESSAGE NUMBER 2.Message was sent at___from the Control Room at phone number 3.A(n)has been Declared as of EAL#_on due to_4.EAL
Description:
_5.Recommended Protective Actions:_6.Reactor was shutdown as of_7.Current Meteorological data is: Wind Direction from_degrees at_MPH Affected Sectors:_Stability Class:_Precipitation: on_8.Current Release Conditions are as follows: A RELEASE is occurring BELOW federally approved operating limits.Release started at_on__.Release stopped at_on__.Release duration was_hours.9.Type of Release is as follows:_10.Release rates are as follows: Noble gases Ci/sec-lodines Ci/sec 11.ESTIMATE OF PROJECTED OFF-SITE DOSE A.Projections for hours based on Plant Data Dose Metric I Site Boundary 2 miles Smiles I 10 miles I III.I I I 12.Approved by:_FIGURE 6-2 6-16 Revision 71 06/14 GG FSAR 7.0 EMERGENCY RESPONSE FACILITIES AND EQUIPMENT 7.1 Facilities and Equipment and Equipment and Equipment Emergency planning requires the preinstallation of both facilities and equipment that allows the emergency organization to perform the following actions: a.Assess the extent of the emergency b.Perform thepropercorrective actions to mitigate the effects of the emergency c.Perform actions to protect onsite and off site personnel d.Provide information to offsite support agencies e.Perform the proper recovery actions Emergency facilities have been established by GGNS and offsite support agencies.Figure 7-1 identifies these facilities and their locations. 7.2 Control Room The Control Room contains those controls, instruments and communications equipment necessary for operation of the plant under both normal and emergency conditions. The ventilation system, shielding, and structural integrity are designed and built to permit continuous occupancy during postulated accidents. During emergencies, the Control Room will provide for the classification, accident assessment, notification, and dose assessment functions if these functions are unavailable at the EOF or when being relocated to the Backup EOF.7.3 Emergency Response Facilities 7.3.1 Technical Support Center CTSC)The Technical Support Center (Figure 7-2)provides an area outside the Control Room that can accommodate management, engineering personnel and the NRC acting in support of the command and control function during emergency conditions and the emergency recovery operations. The TSC personnel primarily assist in accident assessment, provide 7-1 Revision 61 03/09 GG FSAR advice to the control room and communicate with Emergency Operations Facility (EOF)personnel regarding plant conditions and actions.Communications are also provided with the Control Room and OSC.The TSC area contains approximately 2,250 square feet.The TSC area is.large enough'to accommodate 25 people, including five NRC personnel, as well as furnishings, data displays, plant reference material, and communications equipment. The TSC is located directly above and overlooking the Control Room on the mezzanine level (EL 177')of the control building.The control building which houses the TSC is designed Safety Class 3.The control building structure is seismic Category I, and is designed to withstand tornadoes and extreme wind phenomena. The TSC is habitable to the same degree as the Control Room for all postulated accident conditions and is served by the Control Room ventilation system.The Backup TSC is located in the Maintenance &Engineering Building.Emergency lighting is powered by the ESF AC buses, with backup emergency lighting provided by battery pack lighting units.The TSC may be activated at any time, and shall be activated at an Alert, Site Area Emergency, or General Emergency. Once activated the TSC shall become operational as soon as possible (without delay)after declaration of any of these emergency classifications. When facility staffing can be accomplished with onsite personnel, it is the goal to become operational within 45" minutes.Otherwise offsite personnel shall provide shift augmentation in 75 minutes and be fully operational in 90 minutes.A set of drawings and other records are accessible to the TSC personnel under emergency conditions. The documents**include but are not limited to: Plant Technical Specifications, Plant Operating Procedures, Emergency Operating Procedures, and hard copies(stick file)7-2 Revision 61 03/09 GG FSAR of P&ID's, architectural, electrical one lines, electrical schematics, logic diagrams, and loop diagrams.Radiation Control and Chemistry procedures to be used during an emergency situation are also available. A Plant Display System (PDS)and a Safety Parameter Display System (SPDS)are provided to supply data which enable TSC personnel to evaluate the status of the plant and radiological and meteorological conditions. Status boards are used to display data needed in the TSC to analyze plant conditions. A computer based system designed to provide atmospheric dispersion and radiological dose assessments of radioactive materials released from GGNS during emergency conditions is available. 7.3.2 Operations Support Center COSC)The OSC (Figure 7-3)provides an area for operations, maintenance, health physics, and chemistry personnel to assemble and be assigned to duties in support of emergency operations. The location of the OSC is the Maintenance Shop of the GGNS Administration Building.In addition, an in-plant staging area is located at the Radiation Protection Access Control Area of the Unit II Turbine Building to which certain individuals are assigned in the event of an emergency. Other shift personnel and additional support personnel assemble at the OSC to provide assistance as necessary. A radio control console located in the maintenance area provides communications with the Control Room, TSC and EOF.The OSC is required to be activated at the declaration of an Alert, Site Area Emergency, and General Emergency. Once activated, the OSC shall become operational as soon as possible (without delay)after declaration of any of these emergency classifications. When facility staffing can be accomplished with onsite personnel, it is the goal to become operational within 45 minutes.The backup OSC is located in the Control Building(Elevation 148').7-3 Revision 70 11/13 GG FSAR 7.3.3 Emergency Operations Facility CEOF)The EOF (Figures 7-4 and 7-5)provides a location from which evaluation and coordination of all licensee activities related to an emergency is carried out.The facility provides classification, accident assessment, notification, dose assessment, information to offsite groups, assesses the impact of the emergency offsite and provides the necessary support to assist the Emergency Organization. The location for the EOF is in the Energy Services Center approximately 0.6 miles from the GGNS site.Figure 7-6 indicates the location of the EOF in relation to the plant.The EOF has a protection factor of 50 and its own ventilation system.The EOF contains the key technical personnel of the Emergency Organization. Space and communications are provided for federal, State, and local representatives at the EOF.The EOF provides a base of operation for Offsite Monitoring Teams and is the central point for the receipt of field monitoring data.The EOF may be activated at any time, and shall be activated at an Alert, Site Area Emergency, and General Emergency declaration. Once activated, the EOF shall become operational as soon as possible (without delay)after declaration of any of these emergency classifications. When facility staffing can be accomplished with onsite personnel, it is the goal to become operational within 45 minutes.Otherwise offsite personnel shall provide shift augmentation in 75 minutes and be fully operational in 90 minutes.7.3.4 Backup Emergency Operations Facility CBEOF)The BEOF (Figure 7-7)is located at the Entergy Mississippi Baxter Wilson Steam Electric Station in Vicksburg, MS.In the unlikely event that the EOF had to be evacuated, the key EOF 7-4 Revision 61 03/09 GG FSAR personnel evacuate the area and relocate to the BEOF in accordance with Emergency Plan Procedure EN-EP-609. The BE OF is seventeen miles from the reactor.It is outside the ten mile EPZ but close enough to that responders can travel quickly to the site when it is deemed accessible by appropriate authorities. The'Control Room is notified of the situation and certain emergency response functions are transferred to the Control Room upon deactivation of the EOF.Once activated, the BEOF establishes communications with the Control Room The BE OF contains the following:
- Communications equipment that allows contacting the other Emergency Response Facilities, Federal, State and local officials as well as the capability of making Emergency Notifications.
- Equipment necessary to perform radiological assessment and communicate with field monitoring teams.*Capability to access plant drawings and procedures and computer links to the site.*Capability to access plant data systems and perform event classification.
7.3.5 Media Centers GGNS utilizes the Joint Information Center (JIC)in Mississippi as an information center during an emergency. The Joint Information Center (Figure 7-9)is the principle location for.disseminating information about the emergency, arranges for timely exchange of information among designated GGNS, state, and federal spokespersons, media monitoring activities, responding to public and media inquires during emergencies, and performing rumor control function.Press conferences are held periodically, and equipment and facilities are available to support timely communication and information dissemination concerning plant conditions. The Joint Information Center is activated at an Alert, Site Area Emergency and General Emergency. 7-5 Revision 72 11/14 GG FSAR 7.3.6 Alternate Facilities In the event that primary and back-up facilities are unavailable at GGNS there is an alternate facility available for the ERO a.The Muster/Staging area is located at the Baxter Wilson Steam Electric Station (BWSES)in Vicksburg, Mississippi approximately 17 miles from Grand Gulf This facility, which is co-located with the BEOF, is intended to host GGNS personnel, ERO, Security, RP etc., while preparing for reentry to the plant b.The Alternate TSC is located next to the Staging/Muster area at BWSES in the Vicksburg Area Engineering Office.This office building has phones, a copier, a FAX and various computers, plotters and printers available. 7.4 County and State Emergency Centers 7.4.1 Claiborne County Emergency Operations Center The Claiborne County Emergency Operations Center is located in the Port Gibson/Claiborne County Civil Defense Office in Port Gibson.The center is equipped with communications to the Control Room, TSC, EOF, the State Emergency Operations Center in Jackson and State supporting agencies.Functionally, the center coordinates all local emergency operations. 7.4.2 Mississippi State Emergency Operations Center The State Emergency Operations Center (EOC)is located in the Mississippi Emergency Management Agency Building in Jackson, approximately 75 miles from the site.The center has supplies and equipment to support state emergency operations activities, including communication links with other emergency operations centers.During an emergency, representatives from appropriate state agencies and GGNS assemble in the State 7-6 Revision 72 11/14 GG FSAR 7.4.3 Tensas Parish Emergency Operations Center The Tensas Parish Emergency Operations Center is located adjacent to the Tensas Parish Sheriffs Office.The center is equipped with communications to the Technical Support Center, Control Room, Emergency Operations Facility, Mississippi State Emergency Operations Center,the Louisiana State Emergency Operations Center (in Baton Rouge)and with Louisiana state supporting agencies.Functionally, the Tensas Parish EOC acts in parallel to the Claiborne County, Mississippi EOC and coordinate local emergency operations. 7.4.4 Louisiana State Emergency Operations Center The LDEQ and GOHSEP representatives report to the Louisiana Emergency Operations Center in Baton Rouge, approximately 125 miles from the site, in the event of a nuclear emergency which requires activation of State resources. The center has equipment and supplies to support state emergency operations activities including communications links with other emergency centers.7.5 Communications Systems The communications systems are designed to ensure the reliable, timely flow of information and action directives between all parties having jurisdiction and a role to play in the mitigation of emergencies at GGNS.Reliability is provided via (1)extensive redundancy, (2)dedicated communication equipment to preclude delays due to system overload, and (3)routine use and testfng of many of the systems, which lowers the probability of undetected system failures.Timeliness of infonnation flow is achieved by (1)prompt notification, (2)predefmed lines of communications, (3)predefmed emergency action levels and (4)predefmed levels of 7-7 Revision 58 12/06 GG FSAR authority and responsibility. The GGNS communications network is formulated around this basic concept and is designed to channel information directly to the key parties having closely related functions, thus eliminating errors often associated with second hand information. By providing well defined and dedicated communications links, better accident management from physically separate control and support centers can be achieved.Provisions. are made for State representatives to call and verify the authenticity of the accident and obtain additional information. The essential communications links are manned continuously and are periodically tested to assure availability. Figure 7-12 shows the communications interfaces between the onsite and offsite emergency facilities. 7.5.1 Telephone System GGNS maintains telephone communication with the entire Entergy Corporation system via a Company-owned fiber-optic transmission system.Access to this mode of transmission is made via plant telephone system.The GGNS plant telephone system also provides communications among the CR, TSC, OSC, EOF, HC and public.7.5.2 Plant Paging System&Sound Powered Phones The plant paging system links together permanent plant structures, including the TSC and OSC, through a network of phone stations and speakers.Sound powered phones are provided in the TSC and OSC to enable direct communication with the Control Room and all areas of the plant containing sound poweredoutletboxes. Amplified headsets are provided in high noise areas to ensure adequate communications capability with the Control Room.7-8 Revision 61 03/09 GG FSAR 7.5.3.Emergency Communications Equipment a Dedicated Communication Links The following dedicatedtelephoneand/or system links are established to provide a continuous (24 hour)means of communication during an emergency situation. 1.GGNS ORO Notification System An internet based notificatiop system to connect the facilities listed in Table 7-1.The GGNS ORO Notification System is used for initial notification and.ongoing communications to the locations listed in Table 7-1 for the duration of the eII.lergency. Utilization of this system by GGNS activates the emergency response network by notifying each location simultaneously. The GGNS Operational Hotline (OHL)is used as a back-up to the ORO Notification System.2.NRC Emergency Telecommunication System-Consists of the following dedicated Federal Telephone System circuits to provide direct.!communication with the NRC Operations Center, Bethesda, MD: a.Emergency Notification System (ENS)-is used to provide initial notification to, and ongoing communication with, NRC personnel in an emergency. The ENS is available in the Control Room, TSC, and EOF.b.Health Physics Network (HPN)-is used to provide requested radiological data to the NRC in an emergency. The HPN is available in the TSC and EOF.c.Reactor Safety Counterpart Link (RSCL)-is used by the NRC Site team and NRC Base Team to conduct internal NRC discussions on plant parameters without interfering with exchange of information between GGNS and NRC.This link may be used for discussions with the NRC Reactor Safety 7-9 Revision 71 06/14......_...._.._....._------ GG FSAR personnel and GGNS plant Management. The RSCl is available in the TSC and EOF.d.Protective Measures Counterpart Link (PMCl)-is used by the NRC Site team and NRC Base Team to conduct internal NRC discussions on radiological releases and meteorological conditions, and the need for protective actions with,out interfering with the exchange of information between GGNS and NRC.This link may also be used for discussions with NRC Protective Measures personnel and GGNS plant management. The PMCl is available in the TSC and EOF.e.Emergency Response Data System (EROS)-is used to transmit raw reactor parametric data from GGNS balance of plant computer to the NRC Operations Center.The EROS is activated by GGNS at an Alert or higher declaration. The EROS is available in the GGNS Control Room.f.Management Counterpart Link (MCl)-is used for any internal discussion between NRC Executive Team Director and NRC Director of Site Operations or GGNS site management. The MCl is available in the TSC and EOF.g.Operational Counterpart link (OCl)or local Area Network (lAN)Access-is used by the NRC Base Team and NRC Site T earn to access products and services provided on the NRC Operations Center's local area network.The OCl is available in the TSC and EOF.3.The GGNS Computerized Emergency Notification System is used to notify GGNS emergency response personnel upon declaration of an emergency. 7-10 Revision 64 11/10 GG FSAR a.The GGNS Computer Notification System is a hosted system that is a robust notification system that allows the ERO to be notified via a number of modalities (i.e.telephone, pager, SMS text, email, etc.)This system utilizes two data centers for all its productions systems in an Active-Active configuration. Data is continuously replicated between the two separate sites, and each site is capable of providing a full range of services.If service is disrupted at either site, all traffic is dYnamically rerouted to the other site so that systems remain constantly available. b.The GGNS Computer Notification System is activated using any internet connected computer or touch tone telephone. Use of a password guards against unintended activation. The password is readily available to the control room operating staff.c.The GGNS Computer NotificationSystemcan be activated for any emergency classification. On call or alternate emergency response personnel will be notified to fill required response positions. b.UHF Radios 1.Radios to connect the following facilities: a.Control Room/TSC/EOF /CAS/SAS b.Tensas Parish Sheriff Department c.Claiborne County Sheriff Department The above mentioned UHF radio system serves as an alternate means of communications to notify local authorities of an emergency at GGNS.2.UHF radios connect the Onsite and Offsite Monitoring Teams with the OSC and EOF respectively. 3.UFH radios are issued to OSC Emergency Response Team to connect them to the OSC.c.Alarnns A number of warning devices are used onsite to indicate unsafe or emergency conditions. 7-11 Revision 66 08/11 GG FSAR 1.Local Inplant Radiation Alarms.2.Fire Alarm.3.Site Evacuation Alarm.7.5.4 Alert Notification System An Alert Notification System has been provided that meets the design objectives of NUREG-0654, Appendix 3.The basic system consists of 43 sirens located in Claiborne County and Tensas Parish.Institutions located in the 10-mile EPZ are supplied with tone activated receivers which supplement the siren system.Port Gibson/Claiborne County Civil Defense and Tensas Parish Office of Homeland Security and Emergency Preparedness are responsible for activating the portion of the system within their respective jurisdictions. Additional alert notification details are addressed in local and state emergency plans, the GGNS Emergency Public Information publication, and the Alert Notification System Final Report.Figure 7-13 indicates the siren locations for the 10-mile EPZ.As discussed in Section 8.7, an effort is made to provide information to the transient population concerning protective measures.The means of notifying the transient population is the Alert Notification System.7.6 Assessment Facilities 7.6.1 Onsite Systems and Equipment a.Control Room Parameters Appropriate parameters indicative of the status of the reactor and various plant systems are displayed in the control room./7-12 Revision 51 02/04 Control Room Radwaste building Auxiliary building Fuel storage and handling area GG FSAR The safety related control room display instrumentation that can be used to assess the condition of the plant is discussed in GGNS FSAR Section 7.5.b.Area Radiation Monitoring System The area radiation monitoring system detects and measures gamma radiation levels at various locations. It also provides audible and visual alarms in areas monitored and in the control room, if gamma radiation exceeds a specified limit.It provides visual indication in the area monitored and at a control room annunciator if there is a malfunction in any area monitor.The containment area radiation monitors also provide information that can be used to determine the source term of a fission product release in the containment. An Emergency Plan Procedure contains guidance for the conversion of containment area radiation monitor readings in mR/hr or R/hr to offsite exposure.Each area radiation monitoring channel consists of a detector and a local alarm unit at a remote an indicator and trip unit in the control room.A control room channel is provided with a detector in the control room.The area radiation monitor provided in the control room has no local alarm unit since the control room annunciatorsystemprovides alarms to the operators. The following general areas are monitored by the Area Radiation Monitoring System: 1.2.3.4.7-13 Revision 46 8/01 GG FSAR 5.Various valve operating stations 6.Containment 7.Drywell 8.Various Sampling rooms 9.Turbine building 10.Radwaste Solidification Areas c.Process and Effluent Radiation Monitoring Systems.The main objective of required radiation monitoring systems is to initiate appropriate protective action to limit the potential release of radioactive materials from the primary and secondary containment ifpredetermined radiation levels are exceeded in major process/effluent streams.An additional objective is to have radiation monitoring systems available during all operating and emergency conditions to provide control room personnel with an indication* of the radiation levels in the major process/effluent streams and alarm annunciation if high radiation levels are detected.Certain effiuent radiation monitoring systems also provide information that can be used to determine the source term of an unplanned radioactive release.They are used to correlate the activity levels in an effiuent stream along with system flow rates to determine release rates in Ci/sec.Using the determined release rates and the appropriate meteorological stability class, radiation dose projections can be estimated for various distances from the site.Emergency Plan Procedures include guidance for the determination of release rates and dose projections when the effluent monitors are off scale or inoperable. 7-14 Revision 61 03/09 GG FSAR The radiation monitoring systems (RMS)provided to meet these objectives are: 1.Main Steam Line RMS 2.Containment and Drywell Ventilation Exhaust RMS 3.Auxiliary Building Fuel Handling Area Ventilation Exhaust RMS 4.Auxiliary Building Fuel Handling Area Pool Sweep Exhaust RMS 5.Turbine Building Ventilation Exhaust RMS 6.Radwaste Building Ventilation Exhaust RMS 7.Standby Gas Treatment System RMS d.F ire Protection The fife protection system consists of an outside yard loop with three flIe pumps and one jockey fIre pump, hydrants, sprinkler systems, deluge CO 2 systems, Halon systems, standpipe hose stations, portable fITe extinguishers, ionization smoke detectors, heat sensors, alann systems, fIre barriers, two fITe water storage tanks and associated piping, valves and instrumentation. Three redundant 50 percent capacity pumps (1 electric and 2 diesel driven)and closed-loop pipingensuredelivery of extinguishing water with one pump and one leg of the piping loop out of service.Fire and smoke detection systems are provided for the switchgear areas, battery rooms, control room, cable penetration areas, and other areas, based on the results of the fIre hazards analysis included in the FSAR.In addition, aowned fIre truck is maintained onsite.The fITe truck may be taken off site for various reasons (i.e.training, vehicle maintenance, etc.).7-15 Revision 59 06/07 GG*FSAR e.Geophysical Monitoring 1.Seismic Monitoring Activation of the seismic triggers causes an audible and visualunciation in the control room to alert the plant operator that an earthquake has occurred.This annunciation is set to occur at 0.01 g vertical acceleration on the containment base or at 0.01 g horizontal I acceleration on the drywell wall.These triggers cause initiation of the strong-motion accelerometers recording system at horizontal or vertical acceleration levels slightly higher than the expected background level, including induced vibrations from sources such as traffic elevators, people, and machinery. System equipment includes: a.Six triaxial time/history strong-motion accelerometers (SMA)b.Seven triaxial peak-recording accelerographs c.Two seismic triggers (vertical and horizontal) d.Four triaxial seismic switches e.Recording and playback equipment A cabinet located in the Control Room houses the recording playback, and.calibration units that are used in conjunction with the SMA sensors to produce a time/history record of the earthquake. It also contains the audible and visual annunciators wired to display initiation of the SMA recorder, and the power supply components for all equipment contained within the cabinet.Should the GGNS seismic monitoring system fail, backup seismic information would be obtained through a coordinated effort with the7-16 Revision 25 12/93 GG FSAR Mississippi Bureau of Geology.That agency receIves seIsmIc information from Memphis, Tennessee, Panola County, Mississippi, and Mobile, Alabama.The Mississippi Bureau of Geology would be requested to obtain real-time seismic information and to relay this information by telephone to GGNS.Although these seismic monitoring stations are located some distance from GGNS, because of the sophistication of the detection equipment, they should be able to keep the GGNS site informed of any seismic activity within the state of Mississippi. 2.Meteorological Monitors The onsite meteorological tower, located approximately 5,300 feet northwest of the control buildingis162 feet high and has the following instruments installed: Surface 33 feet 162 feet Tipping bucket rain gauge Delta Temperature translator (utilizes 33 and 162 foot temperature sensors)Wind speed sensor Wind direction sensor Temperature sensor Relative Humidity Wind speed sensor Wind direction sensor Temperature sensor The meteorological system utilizes local digital storage modules and Plant Data System digital storage.7-17 Revision 45 02/01 GG FSAR GGNS also utilizes a back-up meteorological system which provides meteorological information to the control room, if the primary meteorological system fails.The instrumentation on the backup system is listed below: 33 feet Wind speed sensor Wind direction sensor Temperature Sensor In the unlikely event that both the primary and backup meteorological systems were inoperable, the tertiary means of obtaining wind speed and direction data would be through the National Weather Service or the U.S.Corps of Engineers, Waterways Experiment Station.An Uninterruptible Power Supply (UPS)is utilized to power the meteorological system instrumentation and components to ensure that a 90%data recovery is achieved.All components of the UPS/Back-up Power Supply are located at the Meteorological Station.f.Hydrological Monitors A groundwater level monitoring program is established to provide data on the seasonal fluctuations of the regional groundwater operations to define the zone of depression caused by plant pumping operations and to monitor the level of the perched groundwater table at the plant site.In the event that GGNS personnel were unable to conduct the hydrological sampling program, this information could be supplied by the U.S.Geological Survey, which monitors groundwater levels in the town of Port Gibson.7-18 Revision 45 02/01 GG FSAR g.In-Plant Airborne Iodine Monitoring In reference to Section 7.6.3.1 of GGNS Technical Requirements Manual, a program is established which ensures the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program includes the following: 1.Training of personnel 2.Procedures for Monitoring, and 3.Provisions for maintenance of sampling and analysis equipment. 7.6.2 Offsite Monitoring Equipment and Facilities GGNS has been conducting and continues to conduct an environmental radiological monitoring program for the Station.The ongoing objectives of the program are: a.To determine whether any statistically significant increase occurs in the concentration of radionuclides in critical pathways.b.To detect any buildup of long-lived radionuclides in the environment. c.To detect any change in ambient gamma radiation levels.d.To verifY that radioactive releases are within allowable limits and that plant operations have no detrimental effect on the health and safety of the public or on the environment. e.To fulfill the radiological environmental surveillance requirements of the GGNS Technical. Specifications.Themonitoring program provides the following: (1)the gathering of data on environmental radiation levels and the Station's degree of influence on these levels;(2)checks for specific radioisotopes to detect their introduction into the surroundings; (3)7-19 Revision 28 3/95 GG FSAR a background for a continually developing program of radiological assessment. Ambient radiation is measured by dosimeters of legal record (DLR).These DLRs are installed at various onsite and offsite locations. The locations have been selected based on available meteorological data, prevailing wind direction and population concentration. During normal operating conditions, quarterly measurements of the environmental dose rates are made.During an emergency, incremental and time integrated dose measurements can be made by selective and periodic changing of DLRs.The locations of existing environmental monitoring stations are given in the GGNS Technical Requirements ManuaL Environmental monitoring stations have been located to ensure compliance with the NRC Radiological Assessment Branch Technical Positions for the Environmental Radiological Surveillance Program.7.6.3 Radiological Assessment Laboratories The GGNS Chemistry Department has isotopic analysis capability available for onsite I radiological analysis.The Mississippi State Department of Health Laboratory, located in Jackson, MS, would be setup to receive samples in the event of a Site Area Emergency or General Emergency. \They could be expected to be ready within 1 to 2 hours of notificatipn. This laboratory has the capability to measure beta-gamma emitters, including radioiodine in environmental samples (soil, vegetation, water, and air).Data from this laboratory may be provided to each agency's representative in the Emergency Operations Facility by radio communications established by each agency or by normal phone communications with the Mississippi State Department of Health or Louisiana Department of Environmental Quality.Additional mobile laboratories with similar capabilities are available from DOE, Region Ill, Oak Ridge, TN (estimated response time 12 hours)and EPA, Region IV, AL (estimated response time 9 hours).7-20 Revision 65 04/11 GG FSAR 7.6.4 Post-Accident Sampling Capability Through the use of installed emergency sampling equipment, measurements and analysis can be performed onsite toassessthe magnitude of the radiological hazards associated with an emergency condition. Specifically, a system is installed to obtain samples from the following locations: a.RHRAandB b.Containment Atmosphere c.Suppression Pool The off site radiation monitoring teams have the capability to determine the extent of the radiological hazard in the environment. Environmental air samplers and portable equipment are available for the following assessment in the field within the I O-mile EPZ: a.Beta-gamma radiation from the plume and/or ground contamination. b.Iodine concentration and assessment of inhalation and thyroid dose by using air samplers with iodine specific cartridges and portable and fixed analyzers. The technique to be used to determine radioiodine concentrations in a radioactive plume is described in Emergency Plan Procedures. This technique allows the determination of radioiodine concentrations in the field with a minimum detectable activity ofIx 10-7 uCi/cc in the presence of interfering noble gases and background radiation. c.Water sampling for later analysis to assess contamination due to liquid release pathways can also be done by offsite monitoring teams.The offsite monitoring teams dispatched from GGNS consist of 2 members.Transportation is available using designated GGNS vehicles, with normal deployment7-21 Revision 61 03/09 GG FSAR expected to be within approximately 90 minutes following notification. Emergency Plan Procedures have been established that relate the various measured parameters to integrated doses.Provisions have been made for estimating integrated dose from the projected and actual dose rates and for comparing these estimates with the protective action guides.7.7 Protective Facilities Emergency situations may arise, whether it be man-made or natural causes, which require that protective action be initiated to assure the safety of personnel. Predetermined procedures -.J to be initiated in the event of a fire, tornado, or earthquake are contained within the plant operating procedures. An important consideration in the protection of the Grand Gulf personnel is for the immediate removal of those personnel not essential for the control of the plant.Security Personnel would be examples of those required to remain onsite.In the event of an emergency situation, the appropriate, notification is made.Upon notification, all personnel onsite should either assume their prearranged emergency responsibilities or should follow instructions given over thePA system.This permits accountability of personnel before leaving the site or being assigned to an emergency team.7.8 First Aid and Medical Facilities First aid equipment and facilities at Grand Gulf are available to handle a wide range of emergency situations from minor frrst aid to transporting a seriously injured individual to an offsite medical facility.Readily availablefirstaid is provided by Plant Staff personnel that are frrst aid trained.First aid kits containing items typically needed to care for minor injuries are located in the following areas: a.Control Room b.Maintenance Shop 7-22 Revision 51 02/04 GG FSAR c.EOF A first aid treatment room is located in the Health Physics Access ControlAreaon the 93 foot level of the Control Building and is equipped with normal industrial first aid supplies.7.9 Rescue and Damage Control Equipment Rescue and damage control equipment consists of normal and special purpose tools and devices used in the course of maintenance and operational functions throughout GGNS.Personnel who are assigned to use rescue and damage control equipment in an emergency are familiar with the locations and use of specific equipment. To ensure that adequate supplies are available for usage during plant emergency conditions, rescue and damage control equipment is located in the Maintenance Shop.Typical supplies contained in these cabinets are listed in Appendix B.Bulky items, such as hydraulic jacks, cutting and burning rigs, and portable generators, are not stored in emergency facilities and may be obtained from maintenance control areas, the Warehouse, or Maintenance Shop.The GGNS Maintenance and Operations Sections are responsible for inventories of tools, equipment, and vehicles assigned to their respective section.As such, during work days, Supervisors in each section may authorize the use of tools, equipment, and vehicles as the situation demands.Furthermore, the Shift Manager has immediate access to shops, tool cribs, lockers, vehicles, rescue and damage control equipment, and other material during backshifts and weekends.7.10 Personal Protective Equipment To protect personnel remaining onsite and/or arriving onsite during the emergency, quantities of personal protective equipment, including anti-contamination clothing and individual respiratory equipment are maintained on site.Protective clothing and individual respirators/7-23 Revision 43 10/00 GG FSAR masks are stored in the emergency cabinets located in the Control Room, the TSC, the OSC, and the EOF.This equipment is inspected, inventoried, and operationally checked on at least a quarterly basis in accordance with Section 8.6.7-24 Revision 61 03/09 GG FSAR TABLE 7-1 GGNS ORO NOTIFICATION SYSTEM LOCATION (USUAL)CONTACT ALTERNATE Control Room Control Room Communicator Control Room Operator Emergency Operations Facility EOF Offsite Communicator Alt.EOF Off site Communicator Entergy Operations Corporate Emergency Center Infonnation Coordinator Logistics Coordinator Mississippi Emergency Management Agency Director, MEMA Comm.Officer, MEMA Mississippi Highway Safety Patrol Comm.Officer, MHP Dispatcher, MHP Claiborne County Civil Defense Director, CCCD Asst.Director, CCCD..Claiborne County Sheriffs Department Sheriff, CCSD Dispatcher, CCSD Louisiana Department of Environmental Quality Secretary ofLDEQ Radiological Emergency Planning&Response-Staff Tensas Parish Sheriffs Office Sheriff, TPSO Dispatcher, TPSO Governor's Office of Homeland Security and Emergency Assistant Secretary, GOHSEP Comm.Officer, GOHSEP Preparedness7-25 Revision 71 06/14 GRAND GULF NUCLEAR STATION EMERGENCY FACILITIES GG FSAR OFFSITE SUPPORT AGENCIES AND CONTRACTORS EMERGENCY FACILITIES (ON OR NEAR SITE)CONTROL ROOM Location: EI.166'Control Bldg.TECHNICAL SUPPORT CENTER Location: Adjacent To Control Room OPERATIONS SUPPORT CENTER Location: Maintenance Shop EMERGENCY OPERATIONS FACILITY Location: Energy Services Center (OFFSITE)JOINT INFORMATION CENTER Location: Jackson, MS ENTERGY OPERATIONS CORPORATE EMERGENCY CENTER Location: Jackson MS MISSISSPPI STATEEOC Location: Jackson, MS CLAIBORNE COUNTY EOC Location: Port Gibson, MS LOUISIANA. STATE EOC Location: Baton Rouge, LA TENSAS PARISH EOC Location: SI.Joseph, LA NRC HEADQUARTERS Location: Rockville, MD NRC REGION IV Location: Arlington, TX GENERAL ELECTRIC Location: San Jose, CA EMERGENCY FACILITIES FIGURE 7-1 7-26 Revision 61 03/09 GG FSAR UPPER PART OF CONTROL ROOM q GLASS COMMAND CENTER COMM.ROOMROOM D 11-..__ST_OR_A_O_EOOWNTO CONTROL ROOM J CAS NRCCAUCAS EMEROECV OORM I TECHNICAL SUPPORT CENTER FIGURE 7-2 7-27 Revision 41 3/00 GG FSAR Maintenance Sho Ground Floor SECURITY BREAK ROOM KITCHEN WOMEN MEN ACCOUNTABILITY READER MACHINE SHOP I L=r I I asc PERSONNEL STAGING AREA 1-:',,5','d-,__---1 I Maintenance Shop, Mezzanine I OSC COMMAND CENTERosc osc OSC TEAM BRIEF ENG.ROOM I ROOM ROOM OPERATIONS SUPPORT CENTER FIGURE 7-3 7-28 Revision 46 08/01 GG FSAR STAIRS Exit L1 I;/FEMAIDOE IPUSUC ,'NFO--"l NRC , MEN'S RESTROOM/SHOWER
- nIl I Ii:LJ LJLJ__I l/.........
I..."""cow"'.y EXIT EMERGENCY OPERATIONS FACILITY Decontaminallon and OMf Storage LEVELl FIGURE 7-47-29 Revision 61 03/09 GG FSAR EMERGENCY OPERATIONS FACILITY STAIRS-2-""-1.omce 1 2.Storage 3.Klchen 4.Oormatory 3 4 CONFERENCE AREA-2 I EXIT EMERGENCY OPERATIONS FACILITY LEVEL II FIGURE 7*57-30 EXIT Revision 29 9195 GG FSAR SW1TCH YARD SITE PLAN SCALE-It4. a 4OOfT.EMERGENCY OPERATIONS FACILITY LOCATION FIGURE 7-67-31 Revision 24 6/93 GG FSAR Restrooms I Exit Computer Entrance BEOF Command Center Office Dose Calc Computert Receptionis Office Office I I Office Office Office Office Office Kitchen Telecom Equipmen opier/FAX BEOF Supply Cabinet Office Exit BACKUP EMERGENCY OPERATIONS FACILITY FIGURE 7-77-32 Revision 72 11/14 GG FSAR Overflow Parking Area'-'1 1 I I I I I I I I From Highway 61 South i Vicksburg Area Engineering Office (Alternate TSC)_._._._._._._._._._._._._._._._._.--............ ",,\1\1 1 1 1 I I I I Alternate Facilities Two Story Building (Staging/Muster Area)Security Baxter Wilson Steam/Electric Station (BWSES), I.-----I 1 1 I I I , I 1 1 I 1 1 , I 1 , I 1 1 I I 1 I 1 1'._'-._-. 1 1 Figure 7-87-33 Rev 68 08/12 GG FSAR ,Eirnlitelrg[!(labl'e: DDOElf' ....: Ii.II, , OOOEJP ilUE);EQI iJi;El\niEJP tl:IIi'Ul' Graphces GGNS tflJqjlJiiry Coordinstor
- 1?110 iM'a
- I":n i.*, ,'ill!11 iPrii:ntelr:1 FAX:P"*:a*'C:':;-;"Ilfi).,e,i::!'un..Iiil:.I..w;1 S;:;..e I*t 11.1*.-'"'IiI i]1 2 , b 7-34 Revision 71 06/14 GG FSAR FIGURE DELETED7-35 Revision 53 02/05 GG FSAR FIGURE 7-11 DELETED7-36 Revision 53 02/05 GG FSAR GG FSAR Communications Interfaces ION ERS IV GOVERHORS NRC LOUISIANA DEPARTMENT OFFICE OF HOMElAND TENSAS PARISH REGION I OF ENVIRONMENTAL SECURITY AND SHERIFF EMERGENCY QUALITY PREPAREDNESS I I I I i-SECURITY EAOQUART CASlSAS I I i**-**----
_...-..---:------------r-j------------- fI ENTERGY OPERATIONS OPERATIONS TECHNICAL EMERGENCY BACKUP CORPORATE SUPPORT CONTROL ROOM SUPPORT OPERATIONS EMERGENCY EMERGENCY CENTER CENTER FACILITY OPERATIONS CENTER FACILITY I I______+_L_______+_1 I I I l______I I I I I I JOINT I I I I 1-__*___._._._._INFORMAT MISSISSIPPI CLAIBORNE EMERGENCY MISSISSIPPI ClAIBORNE COUNTY MANAGEMENT HIGHWAY COUNTY CIVIL AGENCY PATROL SHERIFF DEFENSE GGNS ORO Notificalicn System and Operations! Hot Line(OHl)NRC FEDERAL EMERGENCYCOMMUNICASYSTEM UHF RADIO SOUND POWERED PHONES EOF/ENMC HOTLINECommunicationsInterfaces FIGURE 7-127-37 Revision 71 06/14 !.:\.,}'\'I"."'::\..,::(.l/:/'I/II I J.)/-._-\".'"\' U 1\\_'_.JL.-... ... GG FSAR Siren Locations Figure 7-13 7-38 Revision 61 03/09 GG FSAR 8.0 MAINTAINING EMERGENCY PREPAREDNESS 8.1 Organizational Preparedness GGNS recognIzes its responsibilities to take measures necessary to maintain emergency preparedness for all personnel who may be involved in a station emergency. The Site Vice President, through the Director, Regulatory and Performance Improvement has'authority and I responsibility for establishing management direction and control to assure that preparedness is maintained and that any required corrective actions are implemented. The Manager, Emergency Planning is delegated the overall responsibility for implementation of the emergency preparedness program, including training, drills and exercises involving GGNS Emergency Organization Personnel. The Manager, Emergency Planning has access to and reporting relationships with Corporate Emergency Preparedness senior management and GGNS site senior management with oversight responsibility for Emergency Preparedness. These relationships assure site emergency preparedness and fleet emergency preparedness resources, priorities and performance standards are balanced for best performance. The Manager, Training&Development is responsible for providing required Emergency Preparedness Training for personnel who are part of the GGNS Emergency Response Organization, commensurate with their positions in the emergency organization. 8.2 Training All Entergy Operations personnel who are part of the GGNS Emergency Response Organization are required to participate in a formal Emergency Preparedness Training Program.The overall program consists of the following: a.Plant Access Training for all unescorted personnel in the protected area.b.Emergency Preparedness Training Specialized (EPTS)and Emergency Plan Procedure training for all emergency response personnel as required.c.Fitness For Duty (FFD)training for all emergency response personnel in the protected area and the EOF.8-1 Revision 70 11/13 GG FSAR An orientation and training program is offered for all outside support agencies such as the local fire department, law enforcement, ambulance,* hospital services, and civil defense!emergency preparedness. 8.2.1 General Emergency Plan Training A program is developed to provide information on the Emergency Plan to all personnel (excluding visitors)coming on site for the first time and to all personnel participating in the annual retraining program.The following objectives are met: a.To train personnel with respect to their responsibilities during an emergency situation b.To keep personnel informed of any applicable changes to the Emergency Plan.In order to meet these objectives, instructions concerning the following are given to all personnel: a.Signals and Alarms b.Evacuation routes and procedures c.Response during an emergency 8.2.2 Emergency Preparedness Training Specialized and Emergency Plan Procedure Trainin&Emergency Organization Personnel receive on an annual basis, training in emergency response.This training program ensures continued emergency preparedness of all persons who may participate in a station emergency. Emergency Preparedness TrainingSpecialized(including the scope, nature and frequency) is provided and includes, but is not limited to, the following categories: a.Directors or coordinators of the response organizations; b.Personnel responsible for accident assessment; c.Radiological monitoring teams and radiological analysis personnel; 8-2 Revision 23 6/92 GG FSAR d.Security;e.Repair and damage control/correctional action teams;f.First aid and rescue personnel; g.Corporate support personnel filling GGNS Emergency Response Organization Positions; h.Personnel responsible for transmission of emergency information and instructions. 1.Fire fighting Specific emergency training courses and frequency are referenced in the Emergency Preparedness Training Program.8.2.3 Orientation and Training Program forOffsiteSupport Agencies The Manager, Emergency Planning ensures training is provided for appropriate offsite support agencies.These agencies include local fire, law enforcement, ambulance, and hospital services.Assistance may be provided as needed by personnel from Training, Health Physics, Operations, Security, or Corporate Communications. This emergency plan training includes the following topics as a minimum: a.Grand Gulf Nuclear Station site layout b.Communications interfaces and procedures between the onsite organizations and the offsite support agencies c.Expected responses to emergencies d.Anticipated protective actions e.Basic health physics and radiation protection f.Primary and alternate plant access routes and access procedures. Local civil defense/emergency preparedness personnel are provided training through participation in joint utility/state/local status meetings, through invitations to attend the training offered to the agencies listed above, and through their respective state emergency 8-3 Revision 70 11/13 GG FSAR preparedness organization(s). Grand Gulf Nuclear Station may also provide assistance in the training of other county/parish emergency organization personnel, if requested to do so.Emphasis is placed on the interfaces between the station and the state and local emergency organizations, communications procedures, basic radiation protection, and the expected roles of the offsite response agencies.8.3 Drills and Exercises Periodic exercises are conducted to evaluate major portions of emergency response capabilities; periodic drills are conducted to develop and maintain skills;and deficiencies identified as a result of exercises and drills are utilized to update the Plan and procedures. The general purposes of drills and exercises are as follows:..a.To test the effectiveness, timing and content of the Emergency Plan and Emergency Plan Procedures b.To test the emergency facilities and equipment c.To ensure that emergency organization personnel are familiar with their duties and responsibilities. An exercise is an event that tests the integrated capability and a major portion of the basic elements existing within emergency preparedness plans and organizations. An exercise simulates an emergency resulting in potential or actual offsite radiological releases that would require response by offsite authorities. A limited exercise is an event that has limited objectives and tests one or more specific portions of the basic elements existing within emergency preparedness plans and organizations. A drill is a supervised instruction period designed to test, develop and maintain skills.A drill may be a component of an exercise or limited exercise.Drills are supervised by qualified personnel and on-the-spot correction of erroneous performance is8-4 Revision 26 6/94 GG FSAR 8.3.1 Drill and Exercise Scenarios Exercises and limited exercises are based upon preplanned scenarios with observers assigned to various locations to monitor the actions of the Emergency Organization personnel. The sequence of events normally followed for exercises is: a.Prepare the scenariosandreview them with key officials of participating organizations (the actual details of exercise scenarios are kept confidential) b.Assign and brief observers-qualified observers from the utility, state/local government as well as observers from the NRC, FEMA, and the Regional Assistance Committee c.Conduct the drill/exercise d.Critique the drill/exercise as soon as practicable after it is conducted e.Makenecessary changes as a result of the critique review, and;f.Provide documentation to the Manager, Emergency Planning, Director, Regulatory and Performance Improvement and Site Vice President. Drill scenarios are prepared by the individual responsible for conducting the drill, and are approved by the appropriate level of management. Drills may involve a single individual, section or department, or they may involve parts of the emergency organization. State and local support agency participation during exercises are conducted under the biennial exercise requirements of 44CFR350.The scenarios to be used for exercises are varied from year to year;operations in various weather conditions; during each six-year cycle one drill or exercise is held between 6:00 p.m.and 4:00 a.m.;some of the drills or exercises are unannounced. The scenarios include the following: a.Basic objectives and appropriate evaluation criteria b.Dates, locations, and organizations expected to participate c.Listing of simulated events 8-5 Revision 70 11/13 GG FSAR d.Time schedule (real and simulated) e.Narrative summary including information such as simulated casualties, offsite fire department assistance, rescue of personnel, use of protective clothing, deployment of radiological monitoring teams, public information activities, etc.f.Observer assignments and advance materials consisting of the scenario,evaluationcriteria, performance objectives, and observer check sheets.8.3.2 Drill and Exercise Schedule The following drills and exercises are conducted to ensure that the Emergency Organization maintains a high degree of readiness. a.Communications Drills Communications are tested on a monthly basis with the State and local governments within the plume exposure pathway of the Emergency Planning Zones (10 mile EPZ), and with the NRC.Communications are tested on a quarterly basis with those State Emergency Response Organizations within the ingestion pathway (50 mile EPZ).Communications drills include the aspect of understanding of the contents of messages.In addition, the communications drills may be utilized to review and update emergency telephone numbers.b.Emergency Repair Team A drill is conducted on an annual basis to determine the effectiveness of the Emergency Repair Team members and their equipment. 8-6 Revision 64 11/10 GG FSAR c.Fire Brigade Each fire brigade is drilled as required by UFSAR Section 9B.9.2.A drill is conducted on an annual basis to determine the effectiveness of the local fITe department working in conjunction with the Fire Brigade.d.Medical Emergency Drill A drill involving the First Aid Team and local support hospitals is conducted on an annual basis and includes simulated radiological emergencies. e.Radiological Monitoring Drill Plant environs and radiological monitoring drills, both onsite and offsite, are conducted on an annual basis to determine the effectiveness of the collection and analysis of sample media.The drills include the utilization of communication equipment and demonstrate proper record keeping procedures. f.Health Physics Drill A Health Physics Drill is conducted on a semiannual basis and involves response to and analysis of simulated elevated airborne and liquid samples and direct radiation measurements in the environment. g.Text Deleted h.Radiation Emergency Exercise An exercise is conducted on a biennial basis.The exercise involves 8-7 Revision 51 02/04 GG FSAR participation of offsite emergency support personnel within the local and State Emergency Organizations. This exercise simulates emergency conditions requiring the declaration of a Site Area Emergency or General Emergency. At least every five years, a joint exercise appropriate to a Site Area Emergency or General Emergency that involves Federal, State, and local emergency response personnel, organizations, and agencies is conducted. The scope of the exercise tests as much of the emergency plan (i.e., GGNS, State, and local)as is reasonably achievable. The degree of public participation in this exercise is determined by the appropriate State agencies.Provisions are made to start exercises between 6:00 p.m.and 4:00 a.m.once every six years.1.Radiation Emergency Drill Drill(s)are conducted periodically between exerCIses to ensure emergency response capabilities are maintained. At least one.of the drill(s), include management and coordination of the emergency response, accident assessment, protective action decision making, and plant system repair and corrective actions.State and local agencies shall be allowed to participate in the drill(s)when requested. 8.4 Responsibilities The Manager, Emergency Planning is responsible for coordinating the implementation of the overall radiological emergency response planning and preparedness effort to include, but not be limited to: a.Ensuring that the Emergency Plan complies with all Federal regulations, and that it is coordinated with the Grand Gulf Nuclear Station Physical Security Plan and the emergency response plans of Claiborne County, Tensas Parish, and the States of Mississippi and Louisiana. 8-8 Revision 70 11/13 GG FSAR b.Ensuring that Emergency Plan Procedures are consistent with Administrative, Security, Radiation Control, and Training Procedures, the Emergency Plan, and with each other.c.Ensuring that training is offered annually for the emergency response personnel and local off site support agencies and that training commitments for on-call emergency response personnel are met.d.Ensuring that drills and exercises are conducted in accordance with Section 8.3, and that necessary corrective actions are implemented. e.Ensuring that the Plan and procedures are reviewed and updated on an annual basis f.Ensuring that the commitments of the Public Information Program are met on an annual basis g.Ensuring that maintenance and inventory of emergency equipment and supplies IS performed on a quarterly basis.The Manager, Emergency Planning interfaces with several organizations who have specific responsibilities for some of the above areas.The Manager, Emergency Planning is responsible for ensuring that the commitments of the News Media Emergency Information 'Program and the Public Information Program are met.Re is also responsible for conducting specialized training and drills for personnel directly involved with these programs.The Security Manager is responsible for revisions to the GGNS Physical Security Plan.The Manager, Emergency Planning works with the above individuals, as well as with federal, state and local personnel having responsibilities to the GGNS emergency preparedness program, to ensure that the commitments of the Plan are fully implemented. Training opportunities are afforded to the Emergency Preparedness Staff to ensure that they are able to effectively carry out their assigned responsibilities. 8-9 Revision 70 11/13 GG FSAR 8.5 Review and Updating of the Emergency Plan and Emergency Plan Procedures The Plan shall be reviewed and updated as necessary on at least an annual basis.Letters of Agreement with offsite organizations and agencies are reviewed during the annual Plan review and updated as necessary. A change in original signatory(ies) to a given Letter of Agreement does not in itself require revision of that Letter.A change in applicability of content of a Letter of Agreement, however, does require a revision to that Letter.Emergency Plans of offsite organizations and agencies are reviewed as requested. The Manager, Nuclear Oversight is responsible for conducting an independent review of the Emergency Preparedness Program, to verify compliance with the Quality Assurance Program Manual, the Fire Protection Plan, federal regulations, and operating license provisions. The review shall be conducted at intervals not to exceed 12 months or, as necessary, based on an assessment of performance indicators, and as soon as reasonably practicable after a change occurs in personnel, procedures, equipment, or facilities that potentially could adversely affect emergency preparedness, but no longer than 12 months after the change.In any case, all elements of the emergency preparedness program must be reviewed at least once every 24 months.The review must include an evaluation for adequacy of interfaces with State and local governments and drills, exercises, capabilities, and procedures. The results of the review, along with recommendations for improvements, mustbedocumented, maintained for a period of five years and reported to the Manager, Emergency Planning, Director, Regulatory and Performance Improvement, Site Vice President, and affected groups.The part of the review involving the evaluation for adequacy of interface with State and local governments must be available to the appropriate State and local governments. In addition, the Manager, Emergency Planning, by virtue of his involvement with the Emergency Preparedness Program, provides an ongoing review.Personnel performing reviews or audits of the Emergency Plan and/or Emergency Plan Procedures take into account and review corporate policy, state policy and plans, local plans, and the various agreements and understandings with federal, state, and local support agencies and organizations. 8-10 Revision 70 11/13 GG FSAR The Plan is a part of the GGNS FSAR, but is maintained as a separate document.Document holders receive revisions to the Plan in a controlled manner as they are issued.Revised pages are dated and marked to show where revisions have been made.The Manager, Emergency Planning is responsible for coordinating reviews and audits of 8-lOa Revision 70 11/13 GG FSAR the Emergency Plan and implementing procedures. In addition, the Manager, Emergency Planning, through letters, meetings, seminars, or other means available, ensures that all elements of the total emergency organizations are informed of revisions to the Plan.Results of all exercises and each annual revision and change to the plan are reported to/reviewed by the Site Vice President, and Director, Regulatory and Performance Improvement, who provides management direction and control to ensure that all corrective actions are implemented. 8.6 Maintenance and Inventory of Emergency Equipment and Supplies The Manager, Emergency Planning, or his designee, is responsible for planning and scheduling the quarterly inventory and inspection of designated emergency equipment and supplies at GGNS.He, or his designee, ensures that identified deficiencies are corrected in a reasonable period of time.All emergency equipment/instruments are inspected, inventoried and operationally tested on a quarterly basis and after each use.Lists of telephone numbers used in emergency response are reviewed and updated quarterly. Designated emergency equipment and supplies and their storage locations are listed in Appendix B.Supplies having shelf-lives are checked and replaced as necessary. Any deficiencies found during the inventory and inspection are either cleared immediately or documented for corrective action.There are sufficient reserves of emergency equipment/instruments available to replace any equipment which is removed from the emergency kits for calibration or repair.All emergency instruments are calibrated at the intervals specified by the FSAR, Section 12.A summary report of each inventory and inspection is prepared and submitted to file.8-11 Revision 70 11/13 GG FSAR 8.7 Educational Information to the Public Grand Gulf Nuclear Station, in conjunction with State and local agencies, provides the following written infonnation to those members of the general public that reside within the 10 mile Emergency Planning Zone: a.Educational inf6nnation on radiation b.Personnel to contact for further information c.Protective measures, e.g.evacuatio{1 routes and relocation centers, sheltering, respiratory protection, radioprotective drugs d.Special needs of the handicapped. This infonnation is disseminated via an Emergency Public Information publication mailed annually to residents of the 1 Q-mile EPZ, in accordance with the Public Education and Infonnation Program included in Appendix H..This program addresses providing information to the transient population. The Public Education and Information Program annually ensures the pennanent andtransientadult population within the plume exposure EPZ are provided an adequate opportunity to become aware of the above information. 8.8 News Media Information A News Media Emergency Information Program was developed that includes details on arrangements for timely exchange of information among the designated spokespersons and news media representatives. This program is included in Appendix H.The details for dealing with rumors are included in Emergency Plan Procedure lQ-S-Ql-34. GGNS provides supporting information to state and local authorities to develop messages intended for the public.Messages to state and local authorities include information concerning recommended protective actions.This program also provides for an annual training session to acquaint the news media with the. to obtain infonnation during an emergency, as well as information about overall emergency preparedness for GGNS.8-12 Revision 31 9/96 GG FSAR 9.0 REENTRY AND RECOVERY 9.1 Reentry/Recovery In any Site Area Emergency or General Emergency, the immediate action is directed toward limiting the consequences of the incident in a manner that affords the maximum protection to the plant personnel and the general public.Once the corrective and protective actions have established an effective control over the situation, the emergency actions shift into the reentry and the subsequent recovery phases during which all actions are planned and deliberate. 9.2 Reentry During the period immediately following an emergency, radiation monitoring functions involve gross hazard evaluations and the definition of radiological problem areas.This initial radiation surveillance activity is utilized to provide the basic information required for the reentry and recovery operations. The following is a brief description of the actions that are prior to authorizing reentry into the affected areas: a.Review available radiation surveillance data.Determine plant areas potentially affected by radiation and/or contamination. b.Review radiation exposures of personnel to participate in the recovery operations. Determine the need for additional personnel and the sources for these additional personnel. c.Review adequacy of radiation survey instrumentation and equipment (tyPe, ranges, number, calibration, etc.).d.Preplan survey team activities to include: 1.Areas to be surveyed 2.AnticiPated radiation and contamination levels 3.Radiation survey equipment required 4.Shielding requirements and availability 5.Protective clothing and equipment required 9-1 Revision 46 8/01 GG FSAR 6.Access control procedures 7.Exposure control limits and personnel dosimetry required 8.Decontamination requirements 9.Communications The initial reentry into the plant areas encompasses the following goals (in order of priority): a.Determination of the initial required recovery operations (application of clearance tags, etc.)b.Visual observation of hazards or potential hazards associated with the recovery operations c.Conduct comprehensive radiation surveillance of plant facilities and define radiological problem areas d.Isolate and post areas in the plant with radiological warning signs, and rope barriers, as appropriate. 9.3 Recovery The nature and extent of the emergency determines what recovery operations are required and the extent of the recovery organization that must be formed.A recovery plan must be flexible enough to adapt to the existing conditions. It is not possible to anticipate in advance all of the conditions that may be encountered as a result of the emergency. General principles are addressed in this section that serves as a guide for developing a flexible plan of action.It is the responsibility of the Emergency Director to determine when the Recovery Phase of the emergency can be initiated. The following criteria must be met before recovery operations can begin: a.The plant must be in a controlled and stable condition b.The release of radioactive material to the environment must be controlled and must 9-2 Revision 61 03/09 GG FSAR be below any of the Emergency Action Level criteria c.The radiation levels must be stable or decreasing in all plant areas.The Emergency Director discusses existing offsite conditions with appropriate State officials prior to terminating a Site Area Emergency or General Emergency classification. Recovery may be completed by the Emergency Organization before the termination of the emergency. If recovery has not been accomplished by the termination of the emergency, a recovery organization is activated as described in Section 5.5.Its function is to safely and effectively place the plant back in a safe operating condition. Appropriate GGNS and outside assistance is mobilized to accomplish the objective. The Emergency Director is responsible for transmitting the notification that the incident is terminated and reentry/recovery may begin to those agencies connected to the GGNS Operational Hot Line (see Section 7.5.3.a.l)The initial objectives of the recovery program are the detennination of the damage to equipment, the installation of shielding, rope barriers and signs, the application of clearance tags, decontamination, and cleanup as required to place the plant in an acceptable long term condition. Other recovery operations are not initiated until the area affected by the emergency has been detined.Particular attention is directed toward isolating and tagging out components and systems as required to control or minimize hazards.A systematic investigation is conducted to determine the equipment that has been damaged and the extent of the damage.Once the initial objectives are completed, a detailed investigation of the accident causes and consequences, both to the plant and to the environment, is conducted. Determinations are made as to the repair work required to perform necessary modifications to plant equipment and/or operating procedures. Repair work and approved modifications are carried out as authorized. Test programs to confirm fitness for return to services are to be developed and executed.9-3 Revision 61 03/09 GG FSAR Recovery operations are conducted in compliance with normal operational radiation exposure levels specified in 10CFR20.When possible, significant releases of radiation during recovery is planned, controlled, evaluated in advance for radiological impact, and appropriate offsite organizations and agencies informed of the scheduled release and estimated impact.Emergency Plan Procedures provide methods of periodically estimating total population exposure.9-4 Revision 43 10/00 APPENDIX A Emergency Plan Cross Reference and List of Procedures that Implement the Emergency Plan GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION ADMINISTRATIVE PROCEpURES EMERGENCY PLAN'PRocepURES CEPP)COMMENTS SECflON 1.0 DEFINITIONS requires no procedures. SECTION 2.0 SCOPE AND APPUCABIUTY contains no explicit actions or responsibilities which should be implemented by procedures. There is an implicit requirement for a procedure to assure that cbaqes to any procedure-administrative, operational, security, radiation protection, or emergency-be reviewed with respect to all related procedures to assure a.coordinated enagency response will be provided when required.2.1 2.2 2.2.1 2.2.2 2.2.3 2.3 2.3.1 Criterion for GGNS Emergency Plan Development Applicability of the Emergency Plan Geoeral Information and Site Description Population and Population Distribution Emergency Planning Zones Scope of the Emergency Plan Regulatoxy RequiRments 2.3.2 2.4 2.4.1 2.4.2 2.4.3 Table 2-1 J All emergency plan procedures prefaced with 10-8-01-1 1 A-I Objectives of the Emergency Plan Emergency Plan Interrelationships Emergency Plan Procedures Related Plans, Programs and Procedures Participating Governmental Agencies Public Facilities and Institutions Revision 28 3/95 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION Table 2-2 Figure 2-1 Figure 2-2 Figure c 2-3 Figure 2-4 Figure 2-5 3.1 3.2 3.3 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.2 Table 4-1 5.1 5.2 ADMINISTRATIVE PROCEDURES EMERGENCY PLAN l PROCEDURES (EPP)1,6 1,6 1,6,34, EN-EP-609, 610&611 1,6,34, EN-EP-609, 610&611 1,6,34, EN-EP-609, 610&611 1,38 COMMENTS Resident Population Distribution in Evacuation Area by Sector General Area Surrounding GGNS Site Layout Permanent Resident Population Distribution Ten-Mile Emergency Planning Zone Fifty-Mile Emergency Planning Zone Emergency Planning Emergency Plan Steps Emergency Direction and Assignments Emergency Classification System Unusual Event Alert Site Area Emergency General Emergency Classification of postulated accidents. Emergency Classification Statement of GGNS organization. Statement of normal station organization. 1 All emergency plan procedures prefaced with 10-5-01-A-2 Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN l SECTION PROCEDURES PROCEDURES (EPP)5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 5.2.7 5.2.8 5.2.9 5.3 5.4 5.4 5.4.2 01-S-10-6 22, EN-EP-609 5.4.3 01-S-10-6 EN-EP-609 5.4.4 01-S-10-6 EN-EP-609 5.4.5 01-S-10-6 EN-EP-609 5.4.6 01-S-1O-6 EN-EP-609 5.4.7 01-S-1O-6 EN-EP-609,34 5.4.8 01-S-10-6 6, EN-EP-609 1 All emergency plan procedures prefaced with 10-5-01-A-3 COMMENTS General Manager, Plant Operations Manager, Operations Manager, Maintenance Manager, Radiation Protection Manager, Planning, Scheduling and Outage Manager, Training&Development Shift Technical Advisor Manager, Materials, Purchasing, and Contracts Director, Nuclear Safety Assurance Statement of normal station shift staffing.Emergency Organization Normal Station Shift Emergency Director EOF Manager Radiological Assessment Coordinator Technical Advisor Admin.&Logistics Coordinator Public Information Liaison Off site Communicator Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION ADMINISTRATIVE PROCEDURES EMERGENCY PLAN l PROCEDURES (EPP)COMMENTS 5.4.9 01-S-1O-6 EN-EP-609 EOF Communicator 5.4.10 01-S-10-6 EN-EP-609 Lead Off site Liaison 5.4.11 01-S-10-6 EN-EP-609 Off site Liaison 5.4.12 01-S-10-6 12, EN-EP-609 Dose Assessor 5.4.13 01-S-1O-6 EN-EP-609 Off site Team Coordinator 5.4.14 01-S-10-6 EN-EP-609 Off site Monitoring Team 5.4.15 01-S-1O-6 EN-EP-609 Information Technology (IT)Specialist 5.4.16 01-S-1O-6 EN-EP-610 EOF Log Keeper 5.4.17 01-S-10-6 EN-EP-610 Emergency Plant Manager (EPM)5.4.18 01-S-10-6 EN-EP-610 TSC Manager 5.4.19 01-S-1O-6 EN-EP-610 TSC Communicator 5.4.20 01-S-10-6 1, EN-EP-610 Security Coordinator 5.4.21 01-S-1O-6 EN-EP-610 ENS Communicator 5.4.22 01-S-1O-6 EN-EP-610 Maintenance Coordinator 5.4.23 01-S-10-6 EN-EP-610 Engineering Coordinator 5.4.24 01-S-10-6 EN-EP-610 Radiological Coordinator 1 All emergency plan procedures prefaced with 10-5-01-A-4 Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN l SECTION PROCEDURES PROCEDURES (EPP)COMMENTS 5.4.25 01-S-10-6 EN-EP-610 Operations Coordinator 5.4.26 01-S-1O-6 30 Engineers (Mech./I&C/Elect.) 5.4.27 01-S-1O-6 EN-EP-610,35 Reactor Engineer 5.4.28 01-S-10-6 EN-EP-611 OSC Manager 5.4.29 01-S-10-6 EN-EP-611 Log Keeper-OSC 5.4.30 01-S-1O-6 EN-EP-611 Operations Support 5.4.31 01-S-10-6 EN-EP-611 Work Control Coordinator 5.4.32 01-S-10-6 EN-EP-611 Mechanical/I&C/Electrical Coordinator 5.4.33 01-S-1O-6 EN-EP-611 Rad Chern Coordinator 5.4.34 01-S-10-6 34 Company Spokesperson 5.4.35 01-S-10-6 34 Technical Advisor-HC 5.4.36 01-S-1O-6 34 HC Manager 5.4.37 01-S-1O-6 34 Log Keeper-HC 5.4.38 01-S-1O-6 34 Inquiry Response Coordinator 5.4.39 01-S-10-6 34 Press Release Writer 1 All emergency plan procedures prefaced with 10-5-01-A-5 Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE" EMERGENCY PLAN SECTION 5.5 5.6 5.6.1 5.6.2 5.6.3 5.7 5.7.1 5.7.2 5.7.3 5.7.4 5.7.5 ADMINISTRA TIVE PROCEDURES EMERGENCY PLAN l PROCEDURES CEPP)EN-EP-611 6 COMMENTS Recovery Organization Local services support (normal 10CFR20 limits on exposure or contamination) Description of medical support Fire Support Law Enforcement Agencies Coordination with Governmental Agencies.MEMA and Miss.Div.of Radiological Health LDEQ AND LHLSIEP Port Gibson/Claiborne Co.Civil Defense Tensas Parish Office of Homeland Security and Emergency Preparedness NRC 1 All emergency plan procedures prefaced with 10-5-01-A-Sa Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION 5.7.6 5.7.7 5.7.8 5.8 5.9 Table 5-1 Figure 5-1 Figure 5-2 Figure 5-3 Figure 5-4 Figure 5-5 Figure 5-6 6.1 6.1.1 6.1.2 6.2 6.2.1 6.2.2 ADMINISTRATIVE PROCEDURES Control room operators EMERGENCY PLAN l PROCEDURES (EPP)EN-EP-609 6 22 EN-EP-61O COMMENTS DOE INPO U.S.C.G.Contractor Assistance Support for Federal Response Minimum shift staffing Deleted Normal Station Organization Emergency Organization Emergency Organization Interrelationships of Emergency Response Organizations Federal Response Management Diagram Initiating emergency measures Plant Administrative Procedures Security Plan Activation of emergency organization Shift Superintendent 1 All emergency plan procedures prefaced with 10-5-01-A-6 Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION 6.2.2 6.2.3 6.2.4 6.3 6.3.1 6.3.2 6.3.3 6.3.4 6.4 6.5 6.5.1 6.5.1.a 6.5.1.b 6.6 6.7 6.7.1 6.7.2 6.7.3 ADMINISTRATIVE PROCEDURES EMERGENCY PLAN 1 PROCEDURES (EPP)1,6,34 11, EN-EP-609 11 11 17,20 11 19 COMMENTS Shift Manager STA Emergency Director Assessment ActionsAssessmentactions during Unusual Events Assessment actions during Alerts Assessment actions during Site Area Emergencies Assessment actions during General Emergencies Corrective Actions Protective actions Protective cover, evacuation, personnel accountability GGNS Offsite areas Contamination Control Measures Aid to affected personnel Emergency Personnel Exposure Decontamination and First Aid Medical Transportation I 1 All emergency plan procedures prefaced with 10-5-01-A-7 Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION Table 6-1 Figure 6-1 Figure 6-2.7.1 7.2 7.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.4 7.4.1 7.4.2 7.4.3 ADMINISTRATIVE PROCEDURES EMERGENCY PLAN l PROCEDURES (EPP)12 6, EN-EP-609 39 EN-EP-610 EN-EP-611 EN-EP-609 EN-EP-609 34 COMMENTS Recommended Protective Actions Deleted Emergency Notification Form Facilities and Equipment Control Room Emergency Response Facilities TSC OSC EOF BEOF Joint Information Center County and State Emergency Centers Claiborne County EOC Mississippi State EOC Tensas Parish EOC 1 All emergency plan procedures prefaced with 10-5-01-A-8 Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION 7.4.4 7.5 7.5.1 7.5.2 7.5.3 7.5.4 7.6 7.6.1 7.6.2 7.6.3 7.6.4 7.6.4 7.7 7.8 7.9 7.10 Table 7-1 Figure 7-1 ADMINISTRATIVE PROCEDURES 01-S-10-5 01-S-10-5,6 01-S-1O-5 01-S-1O-5 01-S-10-5 01-S-10-5 EMERGENCY PLAN l PROCEDURES (EPP)1,6, EN-EP-611 12 14 28 11 EN-EP-609 COMMENTS Louisiana State EOC Communications Systems Telephone System Plant Paging System&Sound Powered Phones Emergency Communications Equipment Alert Notification System Assessment Facilities Onsite Systems and Equipment Off site Monitoring Equipment and Facilities Radiological Assessment Laboratories Post-Accident Sampling Capability Designated Emergency Vehicles Protective Facilities First Aid and Medical Facilities. Rescue and Damage Control Equipment Personal Protective Equipment GGNS Operational Hot Line Emergency Facilities 1 All emergency plan procedures prefaced with 10-5-01-A-9 Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION Figure 7-2 Figure 7-3 Figure 7-4 Figure 7-5 Figure 7-6 Figure 7-7 Figure 7-8 Figure 7-9 Figure 7-10 Figure 7-11 Figure 7-12 Figure 7-13 8.1 8.2 8.2.1 8.2.2 ADMINISTRA TIVE PROCEDURES EN-TQ-110 EN-TQ-110 EN-TQ-110 EMERGENCY PLAN'PROCEDURES CEPP)COMMENTS Technical Support Center Operations Support Center Emergency Operations Facility Level I Emergency Operations Facility Level II Emergency Operations Facility Location Backup Emergency Operations Facility Deleted Joint Information Center Layout Deleted Deleted Communications Interfaces Siren Locations Organizational Preparedness Training General Emergency Plan Training Emergency PreparednessTrainingSpecialized and Emergency Plan Procedure Training 1 All emergency plan procedures prefaced with 10-5-01-A-10 Revision 70 11/13 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION 8.2.3 8.3 8.3.1 8.3.2 8.4 8.5 8.6 8.7 8.8 9.1 9.2 9.3 Appendix A Appendix B Appendix C Appendix D Appendix E ADMINISTRA TIVE PROCEDURES 01-S-10-3 01-S-1O-3 01-S-10-3 01-S-10-3,5 01-S-10-3 EMERGENCY PLAN l PROCEDURES (EPP)37 39 34 22,23, EN-EP-609 23, EN-EP-609 1,22, EN-EP-609 COMMENTS Orientation and Training Program for Off site Support Agencies Drills and Exercise Drill and Exercise Scenarios Drill and Exercise Schedule Responsibili ties Review of Emergency Plan and Emergency Plan Procedure Maintenance and Inventory of Emergency Equipment and Supplie Educational Information to the Public News Media Information Reentry/Recovery Reentry Recovery Reserved List of supplies Reserved Letters of Agreement from off site organizations Evacuation Time Estimates 1 All emergency plan procedures prefaced with 10-5-01-A-II Revision 72 11/14 GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN SECTION Appendix F Appendix G Appendix H Appendix I ADMINISTRA TIVE PROCEDURES EMERGENCY PLAN l PROCEDURES CEPP)34 COMMENTS Index of Supporting Plans Reserved News Media Emergency Information Program and Public Education and Information Program Reserved 1 All emergency plan procedures prefaced with 10-5-01-A-12 Revision 70 11/13 10-5-01-1 10-5-01-2 10-5-01-3 10-5-01-4 10-5-01-5 10-5-01-6 10-5-01-7 10-5-01-8 10-5-01-9 10-5-01-10 10-5-01-11 10-5-01-12 10-5-01-13 GG FSAR LIST OF PROCEDURES THAT IMPLEMENT THE EMERGENCY PLAN Activation of Emergency Plan (EPP-1)(EPP-1)Upon recognition that abnormal plant or site conditions exist, this procedure will be used by the operator to determine the appropriate EAL(s), properly classify the emergency condition and action to be taken for the emergency classification. Unusual Event (EPP-2)DELETED-Superseded by 10-5-01-1. Alert (EPP-3)DELETED-Superseded by 10-5-01-1. Site Area Emergency (EPP-4)DELETED-Superseded by 10-5-01-1. General Emergency (EPP-5)DELETED-Superseded by 10-5-01-1. Notification of Offsite Agencies and Plant On-Call Emergency Personnel (EPP-6)This procedure lists the methods of notifying Emergency Organization Personnel; for notifying Federal, State, and local authorities; for notifying outside service agencies;and for keeping the proper communication record Activation of Emergency Facilities (EPP-7)DELETED-Superseded by 10-5-01-3, 10-5-01-29, 10-5-01-30, and 10-5-01-33 Fire (EPP-8)DELETED-Superseded by 10-5-03-2 Release of Toxic Material (EPP-9)DELETED-Superseded by 10-5-01-1 (EPP-l)and 10-5-01-29 (EPP-29)Natural Occurrences (EPP-I0)DELETED-Superseded by 05-1-02-VI-1, OS-1-D2-VI-2, and OS-S-02-VI-3. Evacuation of Onsite Personnel (EPP-tl)This procedure provides the guidelines for evacuation and accountability of personnel during an emergency. Radiological Assessment and Protective Action Recommendations (EPP-12)This procedure provides guidance for performing radiological assessment during.emergencies. Onsite Radiological Monitoring (EPP-13)DELETED-Superseded by 10-5-01-14 (EPP-14)Emergency Radiological Monitoring (EPP-14)This procedure provides guidelines for performing radiological surveys outside of the restricted area during emergency conditions. Instructions for dose rate measurements and collection and analysis of radioiodines are included.A-13 Revision 31 9/96 10-5-01-15 10-5-01-16 10-5-01-17 10-5-01-18 10-5-01-19 10-5-01-20 10-5-01-21 10-5-01-22 10-5-01-23 10-5-01-24 10-5-01-25 10-5-01-26 10-5-01-27 10-5-01-28 uu FSAR LIST OF PROCEDURES THAT IMPLEMENT THE EMERGENCY PLAN Site Access Point Operations (EPP-15)DELETED Personnel Accountability (EPP-16)DELETED-Superseded by 10-5-01-11 (EPP-11)Emergency Personnel Exposure Control (EPP-17)This procedure provides guidelines for the issuing dosimetry and RWP access during emergencies. Personnel Search and Rescue (EPP-18)This procedure provides guidelines for performing search and rescue operations in order to locate and/or rescue individuals that have not been accounted for.Personnel Injury (EPP-19)This procedure provides for handling those individuals who have been injured and must be transported off site.Administration of Thyroid Blocking Agents (EPP-20)This procedure provides guidance on the use of potassium iodide as a thyroid blocking agent to prevent thyroid uptake of radioactive iodine and the subsequent dose.Evacuating Personnel and Vehicle Contamination Control (EPP-21)DELETED-Superseded by 10-5-01-11 (EPP-11)Recovery (EPP-22)This procedure provides guidance for the Recovery phase of on emergency and the formation of a Recovery organization ..Reentry (EPP-23)This procedure provides general guidance for the Reentry phase of on emergency. Maintenance of Emergency Preparedness (EPP-24)DELETED-Superseded by 01-5-10-5. Onsite Personnel Response (EPP-25)DELETED-Superseded by 10-5-01-11 (EPP-11)Offsite Emergency Response (EPP-26)This procedure provides instructions for offsite emergency personnel that are ordered to report to the site during an emergency. Public Information (EPP-27)DELETED-Superseded by 10-5-01-34 Control of Designated Emergency Vehicles (EPP-28)This procedure provides a description of the administrative controls over company-ownedA-14 Revision 39 7/99 EN-EP-611 EN-EP-610 EN-EP-609 10-S-01-34 10-S-01-35 10-S-01-36 10-S-01-37 10-S-01-38 GG FSAR LIST OF PROCEDURES THAT IMPLEMENT THE EMERGENCY PLAN vehicles designated for use during an emergency. Operations Support Center (OSC)Operations I This procedure provides general instructions for the Operations Support Center (OSC)including: facility activation, personnel responsibilities, staffing and coordination of Emergency Response Teams.Technical Support Center (TSC)Operations I I This procedure provides general instructions for the TSC including: facility activation, personnel responsibilities, staffing and coordination between the Control Room, and the Operations Support Center.Emergency Operations Facility (EOF)Operation This procedure provides instructions for the activation operation of the EOF.Public Information and ENMC/EIC Operations (EPP-34)This procedure provides instruction for dissemination of public information and the activation and operation of the ENMC and EIC.Core Damage Assessment (EPP-35)This procedure provides guidance for determining* if core damage mayor has occurred, and estimating amount of reactor core damage under accident conditions. Incident Command Post (ICP)Operation This procedure provides general instructions for the activation and operation of the Incident Command Post Communication Drill This procedure provides guidance for performing communication drills.EAL Contingency Planning This document identifies the plant instruments that are the designated indicators of Emergency Action Level (EAL)entry criteria.It then analyzes each primary instrument for backup/alternative indications allowed by the EAL, Instrument redundancy and Correlation between EAL requirements by Operating Mode versus related Tech Spec/TRM/ODCM. This procedure is entered when any of the equipment listed in the attachments is identified to be out of service 10-S-01-39 EN-TQ-110 Grand Gulf Equipment Important to Emergency Preparedness This procedure ensures that when equipment important to emergency response(emergency preparedness [EP]equipment) is removed from service for maintenance or is in a degraded condition, the correct restoration priority is.assigned, compensatory measures are implemented, and the equipment is restored to a functional condition promptly Emergency Preparedness Training Program This procedure describes and implements training for GGNS ERO to ensure a constant state of preparedness for and during emergencies.A-15 Revision 72 11/14 01-5-10-3 EN-EP-306 01-5-10-5 01-5-10-6 01-5-01-8 GG FSAR LIST OF PROCEDURES THAT IMPLEMENT THE EMERGENCY PLAN Emergency Preparedness Department Responsibilities This procedure describes the responsibilities and organizational structure of the Emergency Preparedness staff, provides guidance for the overall maintenance of the Emergency Preparedness program, and defines the responsibilities for maintenance and control of the GGN5 Emergency Plan.Drills and Exercises I This procedure describes the type and frequency of drills and exercise, procedure for conducting a drill or exercise, and method for management review and approval of drills and exercises. Control of Emergency Response Equipment and Facilities This procedure prescribes the requirements for the inventory, inspection, maintenance and operability checks of Emergency Facilities and Equipment. Emergency Response Organization This procedure describes the responsibilities of various site personnel with respect to the Emergency Response Organization (ERO).This procedure also describes minimum staffing requirements for each classifications, site specific positions used to meet staffing requirements, required augmentation times for ERO personnel, requirements for assignment to the ERO, standards for ERO personnel, and notification of ERO.Emergency Preparedness Action Tracking 5ystem DELETED-5uperseded by 01-5-10-3.A-16 Revision 72 11/14 GG FSAR This appendix contains a list of supplies by general category maintained in the emergency kits and lockers located in the various emergency facilities. Detailed lists of the inventory are maintained in accordance with 0 I-S-1 0-5, Control of Emergency Response pquipment and Facilities. EMERGENCY EQUIPMENT MAINTAINED IN THE CONTROL ROOM/TSC/OSC/EOF A.Protective Equipment B.Radiological Monitoring Equipment C.Communications Equipment D.Emergency Supplies EMERGENCY EQUIPMENT MAINTAINED IN THE BEOF A.Communications Equipment EMERGENCY EQUIPMENT MAINTAINED AT RIVER REGIQN MEDICAL CENTER AND CLAIBORNE COUNTY HOSPITAL A.Protective Equipment B.Radiological Monitoring Equipment C.Emergency Supplies B-1 Revision 47 02/02 GG FSAR APPENDIX C Reserved C-l Revision 23 6/92 APPENDIX 0 Letters of Agreement GG FSAR APPENDIXD-LIST OF LETTERS OF AGREEMENT Page No.u.S.Department of Energy, Oak Ridge Operations State of Mississippi State of Louisiana Port Gibson/Claiborne County Civil Defense Council Tensas Parish Office of Homeland Security and Emergency Preparedness Port Gibson Police Department Claiborne County Sheriffs Department Claiborne County Fire Department Claiborne County Hospital River Region Medical Center Text Deleted INPO Text Deleted Governor's Office of Homeland Security and Emergency Preparedness The Ochsner ClinicMetroAmbulance Services (Rural), Inc.D-1 D-2 D-5 D-6 D-7 D-8 D-9 D-ll D-12 D-13 D-15 D-17 D-19 D-23 D-29 D-34 D-37 Revision 70 11/13 GG FSAR Department of Energy ORNL Site Office P.O.Box 2008 Oak Ridge.Tennessee 37831-6269 July 14, 2014 Alain Grosjean Senior Project rvlanager Entergy Nuclear 450 Broadway Buchanan, New York 10511
Dear Mr.Grosjean:
LET'.'Elt OF AGREElVIF:NT -ll.AlHATION El\'IERGENCY ASSISTANCE CENTERfrr{AINING SITE (ltF:ACrrS) SUPPORT Please reference your lctter dated July 12014, requesting that the Department of Energy (DOE)REAC/TS nlcilities and tcam continue to be available to provide back-up capability and assisUU1ce to the Entergy Nuclear's nuclear HlCilities in the event of a radiological emergency. This response constitutes our agreement to provide this service upon your request.The agreemcnt remains in effect until terminated in writing by either party.\Ve wish to rcmind yOll that our REAC;TS facilities in the Oak Ridge Inst.itute for Science and Education (aRISE)m'c govcrnment controlled and operated by thc Oak Ridge Associated Universities under contract with DOE.Therefore, REAC/TS is prohibited from competing with commercial films that call provide radiological emergency scrvices.Only if the magnitude or uniqncness of a radiological emergency excceds your in-house and commercially available capabilities would REACrrS bc authorized to provide back-up services.Since these fhcilities are government controlled, no fee or retainer i.s required to assure the availability of back-up services if you utilize the services ofREAC/TS, we should expect to recover those costs that could reasonably be related to handling such an incident, including all charges billed to DOE or ORISE by hospitals and physicians. Information concerning the REAC/TS staff, services available, and procedures for seeking REACrrs assistance can be obtained by direct contact with the REl\C/TS Dr.Aibert Wiley, ORISE, Post Office Box 117, Oak Ridge, Tennessee 37831, or at telephone number (86S'}576*3131.Sincerely, Mlchele G.Branton Contracting Officer's Representative cc: rvlatlhc\v P.Albert, OR1Sr:: AlbertL.\Viley, ORISE D-2 Revision 72 11/14 GG FSAR TEXT DELETED D-3 Revision 70 11/13 GG FSAR TEXT DELETED D-4 Revision 51 02/04 GG FSAR PHIL BRYANT GOVERNOR October2012 Mike Perita Vice President Operations Grand Gulf Nuclear Station P.O.Box 756 Port Gibson, Mississippi 39150 Dcar Mr.Perito: security and other emergencies could occur at the Grand GuJfNuciear Station and pose threats to the people of the State of Mississippi and jeopardize the safety of plant employees. As Governor of the State of Mississippi t I assure you that in the event of an emergency at the Grand Gulf Nuclear Station, 1 wiJl exercise my authority to provide assistance as delineated in the Mississippi Radiological Emergency Preparedness Plan, Volumeof the Mississippj Comprehensive Emergency Management. Plan.111is letter may be made part of the Grand Gulf Nuclear Station Emergency Plan, and may be used to indicate a commitment by the State of Mississippi to respond to an emergency at the Grand GuJfNuclear Station. Governor'It:...cc: Robert R.Latham, Jr., MEMA Executive Directorr: ........ .... ..HOY-8 2012 f f Ll.......----......---..**STATE OF MISSISSIPPI
- OFFICE OF THE GOVERNOR POST OFFICE DQX 139*JACKSON.MISSISSIPPI 39205*TELEPHONE:
(600 359*3150*FAX: (601)359*3741*www.govemorbryanc.coD-5 Revision 70 09/13 GG FSAR LETIER OF AGREEMENT between ENTERGY OPERATIONS, INC.and the MISSISSIPPI EMERGENCY MANAGEMENT AGENCY LOA No.10008476 March 3, 2008 Page 1 of 4 This re-stated Letter of Agreement hereby supercedes and replaces Letter of Agreement No.10008476 dated October 24,2002 between Entergy Operations, Inc.and the Mississippi Emergency Management Agency.In regard to the preparation, maintenance, and implementation of the Emergency Plan required by the Nuclear Regulatory Commission, Entergy Operations, Inc.(Entergy Operations), acting as agent for the Owners of Grand Gulf Nuclear Station (Grand Gulf), and the Mississippi Emergency Management Agency (MEMA), acting on behalf of the State of Mississippi, undertake and agree as follows: MEMA will maintain the Mississippi Radiological Emergency Preparedness Plan, Vol III, of the Mississippi Comprehensive Emergency Management Plan, prepared pursuant to the Letter of Agreement between the parties dated June 3, 1981, for the State of Mississippi and approved by the Federal Emergency Management Agency (FEMA)and will provide assistance to Entergy Operations and will support the Grand Gulf Emergency Plan, as required by the Nuclear Regulatory Commission, in the following areas: A.MEMA shall provide overall coordination of emergency management arrangements between Entergy Operations and various Mississippi state agencies and local governments, which are providing assistance 'to Entergy Operations in the event of an emergency at Grand Gulf.B.MEMA shall assist in maintaining the Grand Gulf Emergency Plan and in conducting a program of training for the State and local personnel involved in providing emergency assistance to Entergy Operations. C.MEMA shall maintain and operate a communications system necessary for the effective implementation of the Grand Gulf Emergency Plan.D.MEMA shall ensure evacuation signs are available as necessary for the effective implementation of the Grand Gulf Emergency Plan.D-Sa Revision 60 07/08 GG FSAR LOA No.10008476 Page 2 of 4 E.MEMA agrees to take whatever additional action and to provide additional services, as Entergy Operations shall reasonably request, in the implementation of the Grand Gulf'Emergency Plan.If it is determined that Entergy Operations' request for additional servicesunreasonable due to excessive costs or due to the fact that the additional services differ materially from other services performed uhder this Agreement, then MEMA shall have no obligation to perform such services unless the parties mutually agree upon an equitable adjustment and modify this Agreement accordingly. II A.MEMA agrees to provide the above described assistance and support, and Entergy Operations agrees to provide MEMA, in consideration thereof, an amount of money, not to exceed$266,250 per year as allocated to MEMA and county governments as shown on Attachment A hereto.Distribution to MEMA will be made on January1, April 1, July 1, and October 1 of each year and paid directly to the counties on an annual basis.These funds shall be used to cover the actual expenses incurred by state agencies and local governments in support of the Grand Gulf Emergency Plan.B.MEMA and local governments agree to keep and maintain detailed records of expenses incurred in support of the Grand Gulf Emergency Plan.Such records shall be in auditable form and will be subject toauditby Entergy Operations at any time within a five-year period following expenditures. III All of the equipment and facilities purchased pursuant to this or any previous Agreement shaN remain the property of the Owners of Grand Gulf Nuclear Station.IV Unless terminated in accordance with this paragraph, this Agreement will remain in effect throughout the operational term of Grand Gulf which has an estimated forty (40)year operational design life.Entergy Operations may terminate this Agreement atanytime upon thirty (30)days written notice.If the parties are unabre to negotiate and equitabfe adjustment for changed conditions in accordance with Articre V, MEMA may terminate this agreement by giving Entergy Operations thirty (30)days prior written notice.D-Sb Revision 60 07/08 GG FSAR LOA No.10008476 Page 3 of 4 v The Parties recognize that MEMA's performance of its obligationsunderthis Agreement in the manner and for the amounts of money set forth herein, is predicated upon conditions prevailing on the effective date of this Agreement. The conditions referred to include, but are not limited to, economic and monetary conditions, and conditions resulting from actions created by governmental authorities, laws, and regUlations in force on and after the date of this Agreement. If it is mutually determined that such conditions change so as to materially differ from such conditions existing on the effective date of this Agreement, and significantly impair or make economically impractical the ability of MEMA to fulfill its obligations hereunder, then an equitable adjustment will be negotiated by the parties and the costs and other applicable terms of this Agreement will be modified accordingly. Accepted and Agreed ENTERGY OPERATIONS, INC., as Agent for the Owners MISSISSIPPI EMERGENCY MANAGEMENT AGENCY By: lrLTil 1e: Date: Vice President, Operations D-5c Title:&n£d'P,;<Date: '1/-;}.;.-!Df)Revision 60 07/08 GG FSAR LETTER OF AGREEMENT NO.10008476 CHANGE ORDER NO.15 THIS CHANGE ORpER is issue'd pursuant to Letter of Agreement No.10008476 effective October 24, 2002 between Entergy Operations, Inc.("Entergy Operations") and Mississippi Emergency Management Agency ("Contractor"). Inasmuch as it has been agreed to by both parties concerned, the following changes are herebyincorporatedinto the Letter of Agreement NO.1 0008476 effective August 28, 2013.1.Paragraph II.A of the Agreement is hereby amended to read as follows: "A.MEMA agrees to provide the above described assistance and support, and Entergy Operations agrees to provide MEMA, in consideration thereof, an amount of money, not to exceed$269,100.00 per year as allocated to MEMA and county governments as shown on Attachment A hereto.Distribution to MEMA will be made on January 1, April 1, July 1, and October 1 of each year and paid directly to the counties on an annual basis.These funds shall be used to cover the actual expenses incurred by state agencies and local governments in support of the Grand Gulf Emergency Plan." 2.Replace Attachment A with the new Attachment A, Annual Funding Distribution &Schedule, attached hereto and made part of the Letter of Agreement. All other terms and conditions, except as duly modified by this Change Order, shall remain in full force and effect.Accepted and Agreed to: By: TlUe: Date: ENTERGY OPERATIONS, INC., as Agent OWners'} .1*C-H: c:n-fr-.ChlpAPy,-'llJN:.. ...So .(MIlt. 08.,4:1'.(JS'ClO'Sr.Procurement Speclalrst, Contracts September 4,2013 By;Titre: Date: D-5d ERGENCY MANAGEMENT AGENCY q-4/=-,+.Q13 Revision 70 11/13 GG FSAR ATTACHMENT A ANNUAL FUNDING DISTRIBUTION &SCHEDULE MEMA I Annual January 1 April 1 July 1 October 1 Total Annual Funding Annual Totals to be given to the Risk and Host counties: Claiborne County/annual$21,600.00 Adams County/annual$7,200.00 Copiah County/annual$9,600.00 Hinds County/annual$7,200.00 Warren County I annual$7,200.00 D-5e$67,275.00 $67,275.00 $67,275.00 $67,275.00 $269,100.00 Revision 70 11/13 GG FSAR LOA NO.10008476 AMENDMENT NO.17 to the LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.and the MISSISSIPPI EMERGENCY MANAGEMENT AGENCY 1.The first paragraph of Section I the letter of Agreement is hereby amended to read as follows: "MEMA will maintain the Mississippi Radiological Emergency Preparedness Plan Vol.III of the Mississippi Comprehensive Emergency Management Plan, prepared pursuant to the letter of Agreement between the parties dated June 3, 1981, for the State of Mississippi and approved by the Federal Emergency Management Agency (FEMA)and will provide assistance to Entergy Operations and will support the Grand Gulf Emergency Plan, including events involving hostile actions against the plant;as required by the Nuclear Regulatory Commission, in the following areas:" All other terms and conditions, except as duly modified by this Amendment, shall remain in full force and effect.Accepted and Agreed to: By: Title: Date: ENTERGY OPERATIONS, INC., as Agent for the Owners..David Bauer 16:31:52-05'00'Dave Bauer Manager, Strategic Sourcing Materials March 27,2014 MISSISSIPPI EMERGENCY MANAGEMENT AGENCY By: U), LL lIl\M b BaeOUJN Title: Date: D-5f Revision 71 06/14 BOB8Y JINDAL GOVERh7I)r(May 8,2013 GG FSAR of'louisiana Governor's Office of:Honleland Security and Elnergency Preparedness KEVIN DAVIS Mr.Kevin MUlligan Vice President of Operations Grand Gulf Nuclear Station Post Office Box 756 Port Gibson, MS 39150
Dear Mr.Mulligan:
I am fully aware that emergencies (radiological, security, etc.)could occur at Grand Gulf Nuclear Station.These emergencies could pose a threat to the people of the State of Louisiana. As Director of Emergency Management for the State of Louisiana, I assure you that in the event of an emergency at Grand Gulf Nuclear Station, I will exercise my authority to provide assistance as delineated in the LouisianaPeacetimeRadiological Plan for the health and safety of Louisiana citizens.This letter may be part of the Grand Gulf Nuclear Station Emergency Plan and may be used as an indication of the commitment by the State of Louisiana to respond to an emergency at Grand Gulf Nuclear Station.Sincerely, Kevin Davis"7667 Indeocndence Boulevard*Haron HOtI!W, Louhi:m:'l 70806*(225)925-7500*Fax (225)9:'6750i D-6 Revision 70 11/13 GG FSAR LOA No.10008488 October 24, 2002 Page 1 of 2 LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.and the PORT GIBSON/CLAIBORNE COUNTY CIVIL DEFENSE COUNCIL This re-stated Letter of Agreement hereby supercedes and replaces the Agreement (NGSM1148) between Entergy Operations, Inc.and the Port Gibson/Claiborne County Civil Defense Council dated July 16, 2002 as amended.In regard to the protection of the residents of Port Gibson and Claiborne County, Mississippi in the event of a nuclear incident at Grand Gulf Nuclear Station, Entergy Operations, Inc.(Entergy Operations), acting as agent for the Owners of, Grand Gulf Nuclear Station (Grand and the Port Gibson/Claiborne County Civil Defense Council undertake and agree as follows: Entergy Operations shall be responsible for: All onsite operations relating to an incident at Grand Gulf;Notification of the Port Gibson/Claiborne County Civil Defense Council during declared emergencies in accordance with the Grand Gulf Emergency Plan;Providing training for appropriate local offsite support agencies in accordance with the Grand Gulf Emergency Plan;Inviting the Port Gibson/Claiborne County Civil Defense Council to participate in all exercises; Reviewing the Port Gibson/Claiborne County Radiological Emergency Plan as requested; and, Disseminating a Public Information pUblication to the residents of the 10-mile Emergency Planning Zone (EPZ)in accordance with the Grand Gulf Emergency Plan.100084B8-1-Revision 49 03/03 GG FSAR LOA No.10008488 Page 2 of 2 II In the event of a nuclear incident at Grand Gulf the Port Gibson/Claiborne County Civil Defense Council shall be responsible for: Implementation of the Port Gibson/Claiborne County Radiological Emergency Plan;Activation of the Port Gibson/Claiborne County Emergency Operations Center (EOC);Initiation of protective actions for Claiborne County, inclUding GGNS site property located outside the GGNS Emergency Preparedness Owner Controlled Area, based on the..emergency classification of the incident;and, Coordination of additional emergency actions as may necessary. III Unless terminated in accordance with this paragraph, this Agreement will remain in effect throughout the operational term of Grand Gulf which has an estimated forty (40)year operations design life.Either party may terminate this Agreement at any time upon sixty (60)days written notice to the other.Accepted and AgreedENTERGYOPERATIONS, INC., as Agent for the Owners PORT GIBSON/CLAIBORNE COUNTY CIVIL DEFENSE COUNCIL Title: Date: 10008488 Vice President, Operations D-7a By: Title: Date: Revision 49 03/03 GG FSAR LOA NO.10008488.AMENDMENT NO.08 to the OF AGREEMENT between ENTERGY OPERATIONS, INC.and the PORT GIBSON/CLAIBORNE COUNTY CIVIL DEFENSE COUNCIL 1.Section II of the letter of Agreement Is hereby amended to read as follows: "In the event of a nuclear or hostile action incident at Grand Gulf Nuclear Station.the Port Gibson/Claiborne County Civil Defense Council shall be responsible for the foJ/owlng: Implementation of the Port Gibson/Claiborne County Radiological Emergency Plan;Activation of the Part Gibson/Claibome County EmergencyOperatians Center (EOC);Initiation of protective actions based on the emergency of the incident;and, Coordination of additional emergency actions as may be necessary.".All other terms and conditions, except as duly mae;tified by this Change Order, shall remain In full force and effect Accepted and Agreed to: By: TiUe: Date: ENTERGY OPERATIONS, INC., as Agent far the Owners , DkJllaDJ,._byl.llft(nOlI'" J.DN:cn"'lIl4'nChlpIty.owMP&c' --...a=::::....lttVY.CDlft. ...'" O&I..,2014.0U7 Sr.ProaJremeril Specialist March 27.2014 PORT GIBSON/CLAIBORNE COUNTY CIVIL DEFENSE COU'NCIL By: TWe: Date: D-7b Revision 71 06/14 GG FSAR LOA No.10008371/02 June 1,2004 Page 1 of 2 LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.and the TENSAS PARISH OFFICE OF HOMELAND SECURllY AND EMERGENCY PREPAREDNESS This re-stated letter of Agreement replaces the existing Agreement dated April 1, 1999 and Amendment No.01 thereto, dated March 1, 1999.In regard to the protection of the residents of Tensas Parish, Louisiana in the event of a nuclear incident at Grand Gulf Nuclear Station, Entergy OperatIons, Inc.(Entergy Operations), acting as agent for the Owners of Grand Gulf Nuclear Station (Grand Gulf), and the Tensas Parish Office of Homeland Security and Emergency Preparedness undertake and agree as follows: Entergy Operations shall be responsible fOf: All onsite operations relating to an incident at Grand Gulf;Notification of the Tensas Parish Office of Homeland Security and Emergency Preparedness during declared emergencies in accordance with the Grand Gulf Emergency Plan;Providing training for appropriate local offsite support agencies in accordance with the Grand Gulf Emergency Plan;Inviting the Tensas Parish Office of Homeland Security and Emergency Preparedness to participate in all exercise;Reviewing the Tensas Parish Radiological Emergency Plan as requested; and, Disseminating a Public Information publication to the residents of the 10-mile Emergency Planning Zone (EPZ)in accordance with the Grand Gulf Emergency Plan.II In the event of a nuclear incident at Grand Gulf the Tensas Office of Homeland Security and Emergency Preparedness shall be responsible for: Implementation of the Tensas Parish Radiological Emergency Plan;Activation of the Tensas Parish Emergency Operations Center (EOC);Initiation of protective actions based on the emergency classification of the incident;and, Coordination of additional emergency actions as may be necessary. D-8, Revision 52 07/04 GG FSAR LOA No.10008371/03 June 1,2004 Page 20f2 III Unless terminated in accordance with this paragraph, this Agreement will remain In effect throughout the operational term of Grand Gulf, which has an estimated forty (40)year operations design life.Either party may terminate this Agreement at any time upon sixty (60)days written notice to the other.Accepted and Agreed: ENTERGY OPERATIONS, INC., as Agent for System Energy Resources, Inc.and South Mississippi Electric Power Association , Title: V<<.g... /.7 Date: f.p I/Ltloy TENSAS PARISH OFFICE OF HOMELAND SECURITY AND EMERGENCY PREPAREDNESS__ _ _D-8a Revision 52 07/04 GG FSAR LOA NO.10008371 AMENDMENT NO.03 to the LEITER OF AGREEMENT between ENTERGY OPERA nONS, INC.and the TENSAS PARISH OFFICE OF HOMELAND SECURITY 1.Section If of the Letter of Agreement is hereby amended to read as follows: "In the event of a nuclear or hostile action incident at Grand Gulf Nuclear Station, the Tensas Parish Office of Emergency Preparedness shall be responsible for the following: Implementation of the Tensas Radiological Emergency Plan;Activation of the Tensas Parish Emergency Operations Center (EOC);Initiation of protective actions based on the emergency classification of the incident;and,.Coordination of additional emergency actions as may be necessary." All other terms and conditions, except as duly modified by this Change Order, shall remain in full force and effect.Accepted and Agreed to: Title: Date: 'ENTERGY OPERATIONS, INC., as Agent for the Owners Sr.Procurement Specialist March 27,2014 TENSAS PARISH OFFICE OF HOMELAND SECURITY Title: Date: D-8b Revision 71 06/14 GG FSAR LOA No.1 0008370 April 1, 1994 AMENDMENT NO.02 to the LEITER OF AGREEMENT between ENTERGY OPERATIONS, INC.and the PORT GIBSON POLICE DEPARTMENT This restated Letter of Agreement, in regard to the protection of the residents of Port Gibson and Claiborne County, Mississippi in the event of a nuclear incident at Grand Gulf Nuclear Station, Entergy Operations, Inc.(Entergy Operations), acting as agent for the Owners of Grand Gulf Nuclear Station (Grand Gulf), and the Port Gibson Police Department undertake and)agree as follows:.Entergy Operations shall be responsible for: All onsite operations relating to an incident at Grand Gulf;Providing training for appropriate local offsite support agencies in accordance with the Grand Gulf Emergency Plan;and, Inviting the Port Gibson Police Department to participate in all exercises. D-9 Revision 60 07/08 GG FSAR LOA No.10008370 Page 2of2 II In the event of a nuclear incident at Grand Gulf the Port Gibson Police Department shall be responsible for: Assisting in traffic control;Providing back-up communications as necessary; Initiating protective actions as required;Coordinating the evacuation of personnel within the Port Gibson city limits as necessary; and, Coordinating additional emergency actions as may be necessary. III Unless terminated in accordance with this paragraph, this Agreement will remain in effect throughout the operational term of Grand Gulf which has an estimated forty (40)year operations design life.Either party may terminate this Agreement at any time upon sixty (60)days written notice to the other.Accepted and Agreed ENTERGY OPERATIONS, INC., as Agent for the Owners PORT GIBSON POLICE DEPARTMENT By: Title: Date: h By: Title: Date: D-9a Revision 60 07/08 GG FSAR LOA NUMBER: NGS00060/01 EFFECTIVE DATE: March 1, 1999 AMENDMENT NO.01 to the LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.and the PORT GIBSON POLICE DEPARTMENT This Amendment is issued pursuant to the terms and conditions of Agreement No.NGS00060 (formerly G-3908)effective April 1, 1994 by and between Entergy Operations, l':1c.(Entergy Operations) and the Port Gibson Police Department. Inasmuch as it has been agreed to by both parties concerned, the following change is hereby incorporated into the Agreement. The effective date of this Change Order is November 18, 1998: 1)The following new Section IV, Year 2000 Warranty, is hereby added to the Agreement: IV If the Port Gibson Police Department, in providing materials and/or services to Entergy Operations under this Agreement in any way uses or relies upon any hardware,* software, or firmware of the Port Gibson Police Department, and/or materials of services to one or more third parties, that is dependent in any manner on the use of date-related data (collectively, the"Support Items"), the Port Gibson Police Department will ensure that such Support Items are Year 2000 Compliant. If the Port Gibson Police Department is or becomes aware that any Support Item is not Year 2000 Compliant, the Port Gibson Police Department shall immediately notify Entergy Operations in writing of such noncompliance without delay.Without limiting any other remedies Entergy Operations has under this Agreement or by law, the Port Gibson Police Department agrees to work diligently to correct any such noncompliance at no cost to Entergy Operations and to a schedule satisfactory to Entergy Operations. D-9b Revision 39 7/99 GG FSAR.Au other terme conditions. except as duly modifIed Ghsnge Order. remai U'i fuU force and Aocepted and Agreed: GY QPERATIONS, INC.*as Agent em Resources, Inc.and i SlISSlPPI Electrlo.power Association /-r..J4/ltJc.&..c 10"t:)Ii., D-9c PORT GIBSON POLlCE pEPARMENT..'Revision 39 7/99 GG FSAR LOA No.10008370 AMENDMENT NO.oa to ttle lJinER OF AGREI;MENT between ENTERGV OPIM nONS, INC. PORT GIBSON POLICE DEPARTMENT 1.The ftrst paragraph of the Letter of Asl't:8m8nt Is"Beby amended to read as foIlcWS: "'is rlJStabld LII_of Agreement, in regard to the prot.eeacn of the residents of Port GibeOn end Claiborne County, M"lSsissippi int-I.nt of a nudear or hostile action incident at Grand Gulf Nuclear Station, Entergy Operaaons, Inc.(Entergy Operationa), adJng as agent for the Ownet1l of Grand Gulf Nuclear Statton (Grand GUlf).and tt1e Port Gibson Police Department underiake and agree a9 Accepte(f and Agreed ENTERGY OP&AAnONS, INC., as Agent for the Owrter.a ," ..dHt at=f'dnI:es Cldl*J.
- .
/."ORT GIBSON POUCS DEPARTMENT TItle: Qate: Sr.Procurement Specialist March XT.2014 Title: Date: " PORT GIBSON POlfCE DEPARTMENT 806 fARMER STREET MS 39150 (60 U 43 Z::5.l01 D-9d Revision 71 06/14 GG FSARTheClaiborne Count Sheriff Department Letter Agreement.dated September 3, 1998, which details support for an emergency involving GGNS, is on ftIe in accordance with federal regulations dealing with protection oftion concerning the physical security system at a nuclear power plant, NUREG-0794 (10CFR73.21). D-lO Revision 49 03/03 GG FSAR ORIGINAL LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.and the CLAIBORNE COUNTY SHERIFF's DEPARTMENT LOA No.G-3762 July 1, 1993 Page 1 of 2 In regard to the protection of the residents of Claiborne County, Mississippi in the event of a nuclear incident at Grand Gulf Nuclear Station, ENTERGY OPERATIONS, INC.(Entergy Operations), acting as agent for the Owners of Grand Gulf Nuclear Station (Grand Gulf), and the CLAIBORNE COUNTY SHERIFF's DEPARTMENT undertake and agree as follows: Entergy Operations shall be responsible for: All onsite operations relating to an incident at Grand Gulf;Notification of the Claiborne County Sheriff's Department during declared emergencies in accordance with the Grand Gulf.Emergency Plan;Providing training for appropriate local offsite support agencies in accordance with the Grand Gulf Plan;Inviting the Claiborne County Sheriff's Department to participate in all exercises: Maintaining a two-way radio at the Claiborne County Sheriff's Department to provide a backup means of communication with Grand Gulf: Reviewing the Port Gibson/Claiborne County Radiological Emergency Plan as requested: and, Disseminating a Public Information publication to the residents of the 10-mile Emergency Planning Zone (EPZ)in accordance with the Grand Gulf Emergency Plan.*1*D-11 Revision 25 12/93 GG FSMt LOA No.G*3762 Page 2 012 II'n the event of a nuclear incident at Grand Gult the Claiborne County Sheriff's Department shall be responsible for: Implementation of the Port Gibson/Claiborne County Emergency Operations Plan as soon as possible after notification; Initiation of protective actions based on the emergency classification of the incident;and, Coordination of additional emergency actions as may be necessary. III Unless terminated in accordance with this paragraph, this Agreement will remain in effect throughout the operational term of Grand Gulf which has an estimated forty (40)year operations design life.Either party may terminate this Agreement at any time upon sixty (60)days written notice to the other.Accepted and Agreed ENTERGY OPERATIONS, INC., CLAIBORNE COUNTY SHERIFF's DEPARTMENT as Agent for the I-IJ-.f) Title: VI'at?fLtzlCHF-AiS Date: ,-2-90.3782*2*0-lla Revision 2S 12/93 GG FSAR LETTER OF AGREEMENT NO.10411959 (formerly G-3909)April 24.2014 LETTER OF AGREEMENT Between ENTERGY OPERA nONS, INC.and the COUNTY FIRE DEPARTMENT In regard to the protection of the residents of Port Gibson and Claiborne County, Mississippi in the event of a nuclear or hostile action incident at Grand Gulf Nuclear Station, Entergy Operations, Inc.(Entergy Operations). acting as agent for the Owners of Grand Gulf Nuclear Station (Grand Gulf).and the Claiborne County Fire Department undertake and agree as follows: Entergy Operations shall be responsible for.All onsite operations relating to an incident at Grand Gulf;Notification of the Port Gibson/Claiborne County Civil De1ense Council during declared emergencies in accordance with the Grand Gulf Emergency Plan;Providing training for appropriate local offsite support agencies in accordance with the Grand Gulf Emergency Plan;and.InViting the Claiborne County Fire Department to participate if!annual fire drills.II In the event of a nuclear incident at Grand Gulf the Claiborne County Fire Department shall be r:esponsible for.Dispatching men and equipment as available to fight fires: Assisting local Jaw enforcement officials in evacuation; Maintaining fire protection surveillance: and.Assisting in decontamination, as necessary. D-12 Revisipn 71 06/14 GG FSAR III Entergy Operations will, to the extent possible, fill Self Contained Brea1hing Apparatus bottles for the Clabome County Fire Department. This service will be coordinated through a representative designated by Entergy Operations. Entergy Operations will only fill those bottles with a ament hydrostatic test date and that exhibit no signs of damage.IV Unless terminated in accordance with this paragraph, this Agreement will remain in effect throughout the operational term of Grand Gulf which has an estimated forty (40)year operations design life.Either party may tenninate this Agreement at any time upon sixty (60)days written notice to the other.Accepted and Agreed ENTERGYOPERA liONS.INC., acting as agent for the.Owners CLAIBORNE COUNTY FIRE DEPARTMENT By.Title: Sr.Procurement Specialist Date: April 24, 2014 litle: ....._Date:_u.A.Lp..!-rJ.J; D-12a Revision 71 06/14 GG FSAR LOA No.1 0008493*06 January2009 LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.and the CLAIBORNE COUNTY HOSPITAL (Note: Amendment 05 was internal to Entergy Operations.) This restated Letter of Agreement (designated as Change Order 06 to Change Order 04)is issued to reflect the change in name from Patient's Choice Medical Center of Claiborne County to Claiborne County Hospital.In regard to the treatment and care of radioactively contaminated/Injured individuals Entergy Operations, Inc., acting as agent for the Owners of Grand Guff Nuclear Station C'Entergy Operations"), and Claiborne County Hospital ("Claiborne County Hospital") undertake and agree as follows in this restated Letter of Agreement: A.The Claiborne County Hospital will accept and treat injured or ill personnel from Grand Gulf Nuclear Station that are radioactively contaminated or overexposed as a result of an incident during the operation of Grand Gulf Nuclear Station.As a minimum, the Claibome County Hospital will maintain the capability and facilities to provide decontamination, first aid and emergency medical treatment of injured or ill Grand Gulf Nuclear Station personnel that are radioactively contaminated or overexposed. These services and facilities will be available 24 hours per day.Patients may be transferred to another hospital should the treatment required extend beyond the capabilities of the Claiborne County Hospital.B.The Claiborne County Hospital will, with Entergy Operations assistance, develop and maintain the procedures to be followed by the hospital personnel in admitting radioactively contaminated/exposed personnel. C.Entergy Operations will supply to the Claiborne County Hospital an emergency kit containing supplies not normally stocked by the hospital, and necessary to treat contaminated personnel. This emergency kit will be maintained by Entergy Operations. The Claiborne County Hospital will provide storage space for the kit and use it as directed in the procedures developed pursuant to Paragraph I.B above.O.Entergy Operations will provide training on treatment and decontamination of radioactively contaminated individuals for the Claiborne County Hospital personnel on an annual basis at a time and location mutually agreeable to both parties.E.The Claiborne County Hospital will participate in the emergency drills designed to test the competence of the emergency planning for Grand Gutf Nuclear Station.These drills will be scheduled on dates and at times mutually agreeable to both parties.looo849;3.{)6 Claiborne Coonty .,.0-13 GONS Revision 70 11/13 GG FSAR LOA No.10008493-06 Page 2 of 2 II A.Charges for the services specified in Section l.A.above will be paid to the Claiborne County Hospital by Entergy Operations on the basis of the standard fee charged by the Claiborne County Hospital for each service provided.8.The Claiborne County Hospital will submit invoices to Entergy Operations when services as provided by this Agreement have been rendered.Such invoices shall reference the Agreement No.shown on the first page of this Agreement and shall be mailed to: Entergy Operations. Inc'l P.O.Box 756.Port Gibson.MS 39150.Attn: Accounts Payable.Contracts. III A.If the Claiborne County Hospital, in providing services to Entergy Operations under this Agreement, in any way uses or relies upon any hardware, software, or firmware of the Claiborne County Hospital, and/or materials or services of one or more third parties, that is dependent in any manner on the use of date-related data (collectively, the USupport Items"), the Claiborne County Hospital shall ensure that such Support Items are Year 2000 Compliant. If the Claiborne County Hospital is or becomes aware that any Support Item is not Year 2000 Compliant, the Claiborne County Hospital shall immediately notify Entergy Operations in writing of such noncompliance without delay.The Claiborne County Hospital agrees to work diligently to correct any such noncompliance at no cost to Entergy Operations and to a schedule satisfactory to Entergy Operations. B.Unless terminated in accordance with this Paragraph 111.8, this Agreement will remain in effect through the operational term of Grand Gulf Nuclear Station, which has an estimated forty (40)year operational design life.Either party may terminate this Agreement at any time upon thirty (30)days written notice to the other.Accepted and agreed to: By: Title: Date: ENTERGY OPERATIONS, INC., as Agent for the Owners JA-.t.I.i. S eh'Pl<Y, )0, 3 M.07 13:49:07 4S'OO'Sr.Procurement Specialist. Contracts June 7.2013 CLAIBORNE COUNTY HOSPITAL 10008493-<l6 CltlibOme County Hospital*2-D-14 GONS Revision 70 11/13 GG FSAR LOA No.NGS00807 Effective Date: February 17, 2002 LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.and VICKSBURG HEAL THCARE LLC, d/b/a RIVER REGION HEALTH SYSTEM This Letter Of Agreement No.NGS00807 supercedes and replaces Letter of Agreement No.NGSM1190/01, dated January 20, 2000.In regard to the treatment and care of radioactively contaminated/injured individuals Entergy Operations, Inc., acting as agent for the Owners of Grand Gulf Nuclear Station (aEntergy Operations*), and Vicksburg HealthCare LLC, d/b/a River Region Health System (hereinafter"The Medical Center")undertake and agree as follows:.A.The Medical Center will accept and treat injured or ill personnel from Grand Gulf Nuclear Station that are radioactively contaminated or overexposed as a result of an incident during the operation of Grand Gulf Nuclear Station.As a minimum, The Medical Center will maintain the capability and facilities to provide decontamination, first aid and emergency medical treatment of injured or ill Grand Gulf Nuclear Station personnel that are radioactively contaminated or overexposed. These services and facilities will be available 24 hours per day.Patients may be transferred to another hospital should the treatment required extend beyond the capabilities.of The Medical Center./8.The Medical Center will, with Entergy Operations assistance, develop and maintain the procedures to be followed by the hospital personnel in admitting radioactively contaminated/exposed personnel. C.Entergy Operations will supply to The Medical Center an emergency kit containing supplies not normally stocked by the hospital, and necessary to treat contaminated personnel. This emergency kit will be maintained by Entergy Operations. The Medical Center will provide storage space for the kit and use it as directed in the procedures developed pursuant,to Paragraph 1.8 above.D.Entergy Operations will provide training on treatment and decontamination of radioactively contaminated individuals for The Medical Center personnel on an ann*ual basis at a time and location mutually agreeable to both parties.NGS00807 D-15 Revision 47 02/02 GG FSAR LOA No.NGSOOB07 Page 2 of 2 E.The Medical Center will participate in emergency drills designed to test the competence of the emergency planning for Grand Gulf Nuclear Station.These drills will be scheduled on dates and at times mutually agreeable to both parties.II A.Charges for the services specified in Section I.A.above will be paid to The Medical Center by Entergy Operations on the basis of the standard fee charged by The Medical Center for each service provided.B.The Medical Center will submit invoices to Entergy Operations when services as provided by this Agreement have been rendered.Such invoices shall reference the Agreement No.shown on the first page of this Agreement and shall be mailed to: Site Business Management, Entergy Operations, Inc., P.O.Box 756, Port Gibson, MS 39150.III Unless terminated in accordance with this paragraph, this Agreement will remain in effect through the operationalof Grand Gulf Nuclear Station, which has an estimated forty (40)year operational design life.Either party may terminate this Agreement at any time upon thirty (30)days written'notice to the other.Accepted and agreed: ENTERGY OPERATIONS, INC., as Agent for System Energy Resources, Inc.and South Mississippi Electric Power Association By:/!t.(d<<a'a<Title: Vice President. Operations -GG NS Date:...:;-a<A.2-13;Z,U(JNG500807 D-16 VICKSBURG HEAL THCARE LLC, d/b/a RIVER REGION HEALTH SYSTEM Revision 47 02/02 GG FSAR TEXT DELETED 0-17 Revision 47 02/02 GG FSAR TEXT DELETED D-18 Revision 47 02/02
Dear Ladies and Gentlemen:
GG FSAR Institute of Nucleaf Power Operations October 30,2012 Suite 100 100 Galleria Parkway.SE Atlanta.GA 30339-5943 170-644-8000 FAX 770*644*8549 This letter certifies that the plant emergency assistance agreement between INPO and its member utilities remains in effect.In the event of an emergency at yourutiJity, INFO i will assist you in acquiring the help of other organizations in the industry, as described in Section 1 of the Emergency Resources Manual, INPO 03-001, and in the United States Nuclear lndustry Response Framework. If requested, INPO will provide the following assistance:
- technical information flow from the affected utility to the nuclear industry and government agencies*coordinate the procurement and shipping of equipment and supplies*locate personnel with technical expertise*facilitate.
industry vendor and commercial supplier support*obtain technical infonnation and industry operating experience regarding plant components and systems*provide an INFO liaison to facilitate interface This agreement will remain in effect until terminated in writing.Should you have any questions, call Steve Meng at (770)644-8548 or e-mail at MengSW@inpo.org. Sincerely, Jeffrey T.Gasser Vice President Emergency Response JTG:cjrn D-19 Revision 70 11/13 GG FSAR TEXT DELETED 0-20 Revision 37 9/98 GG FSAR TEXT DELETED ReJision 26 6/94 GG FSAR TEXT DELETEDD-22 Revision 26 6/94 GG FSAR TEXT DELETED D-23 Revision 70 11/13 GG FSAR TEXT DELETED D-24 Revision 70 11/13 GG FSAR TEXT DELETE D-25 Revision 70 11/13 GG FSAR TEXT DELETED-26 Rev!ision 70 11/13 I GG FSAR TEXT DELETE D-27 Revision 70 11/13 GG FSAR.TEXT DELETED 0-28 Revision 57 09/06
GG FSAR Grand Gulf Nuclear Station 7003*Bald Hill Road PO Box 756 Port Gibson, MS 39150 LOA No.10008376104 Jantiary 1, 2012 LETfER OF AGREEMENT BETWEEN ENTERGY OPERATIONS, INC.AND GOVERNORtS OmCE OF HOMELAND SECURITY AND EMERG"ENCY PREPAREDNESS (GOHSEp)Be it known, on this I" day of January, Dn.the Governor's Off tee of Homeland Security and Emergency Preparedness (hereinafter sometimes referred to as"GOUSEPj and the Entecgy Operations, Inc.P.O.Box 756, Port Gibson, MS 39 t SO (hereinafter sometimes referred to as UEntergy Operations") do hereby*enter into a Letter of Agreement under the following conditions. This ro-stared Letter of Agreement (LOA)replaces the existing Agreement dated August 29, 2006.rt}-Stated LOA dated.June I, 2004,\and the original Agreement dated April 1, 1996 thereto.The following constitutes an agreement between Entergy Operations. acting as agent for the owners ofGraad Gulf Nuclear Station and the OORSEP in regards to support of the emergency preparedness efforts of GONS.The parties undertake and agree as follows: 'I DESCRIPTION OF SERVICES.On an on-going basis, GOHSEP agrees to provide the following services:. A.GOHSEP will maintain adequate and well trained staff to provide 24n Communications Desk Operations and response capability, serving as the primary warning point for notifICation of fixed nuClear facility emergencies. B.GOUSEP will provide a fuD-time professional level staff member to conduct, as appropriate, radiological emergency preparedness training for local and Louisiana state personnel. C.GOHSEP will participate in drills, exercises and exercise scenario development, and will*serve as an exercise evaluator/controller in support ofooNS as these activities are conducted tbroughoutthe year.D.GOHSEr will develop, coordinate and maintain Louisiana state level implementing procedures which address Louisiana state response to a Fixed Nuclear Facility (FNF)emecgency. E.GORSEP will provide response to actual events as requested by the GONS, or as required by law, the Federal Mamge!"...erl!
- ."ldStlltee Mudtat'RegutaU7.y Commission (NRC).F.GOHSEP will provide annual calibrations and non-technical maintenance to all radiation detection equipment furnished to the local otT Site ilesponse Organizations by the GONS., II PAYMENT TERMS A.OOHSEP agrees to provide the above described assistance and support and Entergy Operations agrees to provide to GOHSEP.in consideration thereof, the sum of$62,,156.64 per year.Enrergy<>penttions shall make equal payments of$15,539,16 per quatta-to OOHSEP at the beginnina of each quarter, except the initial payment which will be made within thirty (30)days following execution of this AgreeMent.
8.GOHSEP shaD submit quarterly invoices.referencing Agreement No.10008376, at least thirty (30)days prior to the start of each quarter.Such invoices shall be mailed to: Site Business Management EDtergy Operations, Inc.P.O.Box 756 Port Gibson, MS 39150 Page I of'!D-29 Revision 68 08/12 -.--Entergy GG FSAR III TERMINATION Grand Gulf Nuclear Station 7003 Bald Hill Road PO Box 756 Port Gibson, MS 39150 LOA No.10008376104 January 1.2012 ENTERGY OPERATIONS,as Agent for Entergy Mississippi and Sil Powa" As8ociation By: _Print Name:\.". A Unless taminated in accordance with this paragraph, this Agreement will remain in effect throughout the operational term of GONS which bas an estimated forty (40)years operational design life.B.Either party may terminate this Agreement upon one hundred twenty (120)days written notice to the other.In the event of termination., OOHSEP, subsequent to its!"eceipt of any quart.erty payment as specified in Paragraph II above.shall return to Entergy Operations a pro-rata portion of such compensation, based on GOHSEP's costs actually incurred pursuant to the Agreement prior to the termination.
- IV PERIOD OF PERFORMANCE The Parties reCognize GOHSEP's performance of its obligation under this Agreement in the manner and in the amounts set forth, is predicated upon conditions prevailing on the effective date of this Agreement.
The conditions referred to include.but are not limited to.economics and monetary conditions. and conditions created by actions of governmental authorities, laws and regulations on the date of this Agreement. If it is mutually determined that conditions change so as to materially differ from such conditions existing on the effective date of this Agreement and threaten to significantly impair (B" to make economically impractical the ability'to GOHSEP to fulfill its contractual obligations hereunder, then an equitable adjustment will be negot,iated by the parties and compensation and other applicable terms of this Agreement will be modified in writing.I'" V TERM OF AGREEMENT This Agreement will be effective on theday of January, 1011.and will remain in effect hereafter, unless the terms are negotiated and agreed to in writing by both parties based on changes as described in ParagraphIV above.ACCEPTED AND AGREED: GOVERNOR'S OFFiCE OF HOMELAND SECURITY AND EMERGENCY 1/Print Name:"",V I N. IJ'\(Jtlc-r,?;).:;-NtTitle:___,_V2_' ._Date:_--='Z-s./_'..,.p..;..f_'-_______ Date:__ ..;..,_:2.-_,_ fEB 13 2U\'l.GO\1S*'P Pqelof1 0-30Revision 68 08/12'0<;:7 GG FSAR LOA No.1 0008376 AMENDMENT NO.14 to the\LETTER OF AGREEMENT between ENTERGY OPERA INC.and the GOVERNOR'S OFFICE OF HOMELAND SECURITY 1.Section I Item E is hereby amended to read as follows: "E.GOHSEP will coordinate response-efforts to actual events, including hostile actions directed toward the plant, as requested by Grand Gulf Nuclear Station, or as required by law, the Federal EmergencyManagementAgency (FEMA), and the United States Nuclear Regulatory Commission (NRC)." , Accepted and Agreed: ENTERGY OPERATIONS, INC., as Agent for System Energy Resources, Inc.and South Mississippi Electric Power Association GOVERNOR'S OFFICE OF HOMELAND, SECURITY By: Title:Date:-0I11III0, II9necIAn_1Ieny An n ette BerryIh-Do!SbalellkMalaJlIb.lllP6",""ClIaI'Io De aug ter=;::::5 Annette Delaughter for Frances ChipleY Category Leader March 31,2014 By: Title: Date: D-31 Revision 71 06/14 GG FSAR TEXT DELETED D-32 Revision 27 10/94 GG FSAR TEXT DELETEDD-33 Revision 27 10/94 GG FSAR LOA No.10008477/05 February 19,2013 Page 1 of 2 LEITER OF AGREEMENT between ENTERGV OPERATIONS, INC.and OCHSNER CLINIC FOUNDATION This Letter of Agreement supersedes and cancels Agreement No.10008477/04 dated June I, 2004 between the parties, including all amendments thereto.In regard to the transportation and treatment of injured or ill personnel from Grand Gulf Nuclear Station (Grand Gulft Entergy Operations, rnc.(Entergv Operations), acting as agent for the Owners, and the Ochsner Clinic Foundation (OCF)undertake and agree as follows: A.OCF will accept and treat injured or ill personnel from Grand Gulf Nuclear Station whether or not they are radioactively contaminated or overexposed, provided that the maximum contamination does not exceed 5R/hr at one (1)meter from the patient.As a minimum, OCF shall maintain the capability and facilities to provide decontamination, first aid, and emergency medical treatment to injured or ill personnel from Grand Gulf Nuclear Station.These services and facilities will be available 24 hours per day.Patients may be from OCF to another hospital should the treatment required as a result of the injury extend beyond the capabilities of the Ochsner Clinic Foundation. B.OCF will accept, via the appropriate helicopter carrier, injured or ill personnel from Grand Gulf Nuclear Station, Claiborne County Hospital, or River Region Medical Center.It will be left to these facilities to determine the helicopter carrier, D-34 Revision 79 11/13 GG FSAR LOA No.10008477/05 February 19, 2013 Page 20f2 II A.Entergy Operations,shall pay one hundred percent (100%)of OCF's biUed fees for the services specified In this of Agreement within thirty (30)days following receipt of OCF's invoice(s). B.OCF will submit invoices to Entergy Operations when services as provided by this Agreement have been rendered.Such invoices shall reference the Agreement No.shown on the first page of this Agreement and shall be mailed to: Site Business Management, Entergy Operations, Inc.P.O.Box 756, Port Gibson, MS 39150.c.If Ochsner's emergency room or hospital is on patient diversion due to exceeding their patient treatment capacity Ochsner has the right to refuse care under this agreement. UI Unless terminated in accordance with this paragraph, this Agreement will remain in effect through the operational term of Grand Gulf Nuclear which has an estimated forty (40)year operational design life.Either party may terminate this Agreement at any time upon thirty (30)days written notice to the other.Accepted and agreed: I'tiP SIA-pply eha IV'I ,-, ... Date: Title: February 19}2013 Sr.Procurement Specialist -Contracts ENTERGY OPERATIONS, INC., OCHSNER CLINIC FOUNDATION as Agent for the Owners Alexander H.: D.N: cn",All!xlI ndet IUlt>lchel, 0, 0'1, By: F I et c her cma{l::;anE!lCl@enle I 9Y*(Om,C=US 201102,19 W.43:04-{I(j'OO'Date: Title: By: D-35 Revision 70 11/13 GG FSAR TEXT DELETED D-36 Revision 53 02/05 GG FSAR LOA No.10195761 Page 1 of 3 LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.and METRO AMBULANCE SERVICE (RURAL), INC., D/B/A AMERICAN MEDICAL RESPONSE In regard to the transportation and treatment of radioactively contaminated/injured individuals, Entergy Operations, Inc., acting as agent for the Owners of Grand Gulf Nuclear Station (UEntergy Operations"), and Metro Ambulance Service (Rural), Inc., d/b/a American Medical Response ("AMR")undertake and agree as follows: A.AMR will provide, when requested by Entergy Operations, ambulance service to treat and transport injured or ill personnel from Grand Gulf Nuclear Station to the Claiborne County (Mississippi) Hospital or other local hospitals. B.AMR will, with EntergyOperations assistance, develop and maintain procedures to be followed by AMR personnel when transporting radioactively contaminated personnel from Grand Gulf Nuclear Station.C.AMR will maintain radio communications with local hospitals and will respond to calls for assistance at Grand Gulf Nuclear Station forwarded by those hospitals for Entergy Operations. D.AMR agrees to comply with all applicable Grand Gulf Nuclear Station security and radio communications procedures. Entergy Ope'rations will provide copies of applicable procedures and will brief AMR personnel on applicable portions ofthose procedures. E., AMR agrees that, upon request, Entergy Operations Health Physics personnel may accompany, in AMR's ambulance(s), Entergy Operations personnel being transported by AMR.F.Entergy Operations will provide training on the treatment and decontamination of radioactively contaminated individuals for AMR personnel on an annual basis at a time and location mutually agreeable to both parties.0-37 Revision 60 07/08 GG FSAR LOA No.10195761 Page 2 of 3 G.AMR will participate in emergency drills designed to test the competence of the emergency planning for Grand Gulf Nuclear Station.These drills will be scheduled on dates and at times mutually agreeable to both parties.II A.Charges for the services specified in Section I.A above will be paid to AMR by Entergy Operations on the basis'of the standard fee charged by AMR for each service provided..B.Entergy Operations will reimburse AMR for a temporary replacement ambulance while any AMR ambulance used to provide services under this Agreement is inoperative due to clean-up and decontamination after transporting a patient from Grand Gulf Nuclear Station.Entergy Operations will reimburse AMR for a permanent replacement ambulance if any AMR is rendered permanently inoperative due to contaminationfromthe Grand Gulf Nuclear Station.Until such time as a replacement ambulance becomes available, Entergy Operations agrees to reimburse AMR for any lost transport revenues.C.AMR will submit invoices to Entergy Operations when services as provided by this Agreement have been rendered.Such invoices shall reference Agreement No.1019576'1 and shall be mailed to: Site Business Management, Entergy Operations, Inc., P.O.Box 756, Port Gibson, MS 39150.III A.AMR agrees to at all times to carry at least the minimum standards of insurance as set forth by the Department of EMS of Mississippi for ambulances; to include General Liability, Medical Malpractice, Workers'Compensation and Automotive Liability coverages. IV A.AMR agrees to notify the Grand Gulf Nuclear Station Office of Emergency Preparedness within two (2)workings days of the termination of AMR's contract with the Claiborne County Hospital.B.Unless terminated in accordance with this Section IV.B, this Agreement will remain in effect through the operational term of Grand Gulf Nuclear Station, which has an estimated forty (40)year operations life.Either party may terminate this Agreement at any time upon thirty (30)days written notice to the other.0-38 Revision 60 07/08 GG (FSAR Loa No.10195761 Page 3 of 3 v A.Compliance. The parties will comply in all material respects with all applicable federal and state laws and regulations including, the federal Anti-kickback statute.B.Compliance Program and Code of Conduct.AMR has made available to each party a copy of its Code of Conduct, Anti-kickback policies and other compliance policies, as may be changed from time-to-time, at AMR's web site, located at: www.amr.net. and each party acknowledges receipt of such documents. AMR warrants that its personnel shall comply with AMR's compliance policies, including training related to the Anti-kickback Statute.C.Non-Exclusion. Each party represents and certifies that neither it nor any practitioner who orders or provide Services on its behalf hereunder has been convicted, of any conduct that constitutes grounds for man"datory exclusion as identified in 42 U.S.C.§1320a-7(a). Each party further represents and certifies that it is not ineligible to participate in Federal health care programs or in any other state or federal government payment program.Each party agrees that if DHHS/OIG excludes it, or any of its practitioners or employees who order or provide Services, from participation in Federal health care programs, the party must notify the other party within five (5)days of knowledge of such fact, and the other party may immediately terminate this Agreement, unless the excluded party is a practitioner or employee who immediately discontinues ordering or providing Services hereunder. D.Referrals. It is not the intent of either party that any remuneration, benefit or privilege providedforunder the Agreement shall influence or in any way be based on the referral or recommended referral by either party of patients to the other party or its affiliated providers, if any, or the purchasing, leasing or ordering of any services other than the specific seNices described in this Agreement. Any payments specified herein are consistent with what the parties reasonably believe to be a fair market value for the services provided.Accepted and Agreed: ENTERGY OPERATIONS, INC., as Agent for the Owners METRO AMBULANCE SERVICE (RURAL), INC., D/B/A AMERICAN MEDICAL;RESPONSE Title: Date: (;:k./.,_-,..,.,,--By: Title: Date: D-39 Revision 60 07/08 ,.GG FSAR LOA No.1 0195761 AMENDMENT NO.01 to the LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.and METRO AMBULANCE SERVICE (RURAL), INC., D/B/A AMERICAN MEDICAL RESPONSE 1.Section I Item A of the Letter'of Agreement is hereby amended to read as follows: "A.AMR will provide, when requested by Entergy OperatiC?ns, ambulance service to treat and transport injured or ill personnel, including thQse persons injured in a hostil$action directed ,toward ,the Plant;from Grand Gulf Nuclear Station to the'Claiborne County (Mississippi) Hospital or other local hospitals." Accepted and Agreed: By: ENTERGY OPERATIONS, INC., as Agent for the Owners OI;llaUy signed by Frances ChIpley ON: c"",Frances
- Chipley, ema!l:;rchlplll81entergy.com.
,..US.Doll&: 2014.03.27 16:03:47 I METRO AMBU,LANCE SERylCE INC., DIS/A AMERICAN MEDICAL RESPONSE I Title: Date: Sr.Procurement Specialist March 27.2014 0-40 TItle: Date: ManagerOperations April J, 2014 Revisi*on 71 06/14 GG FSAR APPENDIXE Executive Summary of the Evacuation Time Estimates For Grand Gulf Nuclear Station November 2012 The entire Evacuation Time Estimates Study can be found in GIN 2013/00190. E-ii Revision 70 11/13 GG FSAR EXECUTIVE
SUMMARY
This report describes the analyses undertaken and the results obtained by a study to develop Evaluation time Estimates (ETE)for the Grand G_ulf Nuclear Station (GGNS)located in Claiborne County, Mississippi. ETE are part of the required planning basis and provide Entergy and State and local govemments with site-specific informatiQn needed for Protective Action decision-making. In the performance of this effort, guidance is provided'by documents published by Federal Governmental agencies.Most important of these are:*Criteria for Development of Evacuation Time Estimate Studies, NUREG/CR-7002, November 2011.*Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, NUREG 0654/FEMA-REP-1, Rev.1, November 1980.*Development of Evacuation Time Estimates for Nuclear Power Plants, NUREG/CR-6863, January 2005.*10CFR50, AppendixE-"Emergency Planning and Preparedness for Production and Utilization Facilities" Overview of Project Activities This project began in April, 2012 and extended over a period of six months.The major activities performed are briefly described in chronological sequence:*Attended"kick-off' meetings with Entergy personnel, and emergency management personnel representing state and local governments.
- Accessed U.S.Census Bureau data files for the year 2010.Studied Geographical Information Systems (GIS)maps of the area in the vicinity of the GGNS, then conducted a detailed field survey of the highway network*Synthesized this information to create an analysis network representing the highway system topology and capacities within the Emergency Planning Zone (EPZ), plus a Shadow region covering the region between the EPZ boundary and approximately 15 miles radially from the plant*Designed and sponsored a telephone survey of residents within the EPZ to gather focused data needed for this ETE study that were not contained within the census database.The survey instrument was reviewed and modified by the licensee and offsite response organization (ORO)personnel prior to the survey*Data collection forms (provided to the OROs at the kickoff meeting)were returned with data pertaining to employment, transients, and special facilities in each county and parish.Grand Gulf Evaluation Time Estimates ES-1 E-1 KLD Associates.
Inc Rev.1 Revision 70 11/13 GG FSAR*The traffic demand and trip-generation. rates of evacuating vehicles were estimated from the gathered data.The trip generation rates the estimated mobilization time (Le., the time required by evacuees to prepare for the evaluation trip)computed using the results of the telephone survey of EPZ residents.
- Following Federal guidelines, the EPZ is subdivided into 16 PAS I PAA.These PAS I PAA are then grouped within circular areas or"keyhole" configurations (circles plus radial sectors)that define a total of 41 Evacuation Regions.*The time-varying external circumstances are represented as Evacuation Scenarios, each described in terms of the following factors: (1)Season (Summer, Winter);(2)Day of Week (Midweek, Weekend);(3)Time of Day (Midday, Evening);and (4)Weather (Good, Rain).One special event scenario involving a football game at Alcorn State University was considered.
One roadway impact scenario was considered wherein in a single lane was closed on US 61 northbound for the duration of the evacuation.
- Staged evacuation was considered for those regions wherein the 2-mile radius and sectors downwind to 5 miles were evacuated.
- As per NUREG/CR-7002, the Planning Basis for the calculation of ETE is:;.A rapidly escalating accident at GGNS that quickly assumes the status of General Emergency such that the Advisory to Evacuate is announced in a timely manner following the siren notification, and no early protective actions have been implemented.
- While an unlikely accident scenario, this planning basis will yield ETE, measured as the elapsed time from the Advisory to Evacuate until the stated percentage of the population exits the impacted Region, that represent"upper bound" estimates.
This conservative Planning Basis is applicable for all initiating events.*If the emergency occurs while schools are in session, the ETE study assumes that the children will be evacuated by bus directly to reception centers located outside the EPZ.Parents, relatives, and neighbors are advised to not pick up their children*at school prior to the arriyal of the buses dispatched for that purpose.The ETE for schoolchildren are calculated separately.
- Evacuees who do not have access to private vehicle will either ride-share with relatives, friends or neighbors, or be evacuated by buses provided as specified in the county evacuation plans.Those in special facilities will likewise be evacuated with public transit, as needed: bus, van, or ambulance, as required.Separate ETE are calculated for the transit-dependent evacuees for homebound special needs population, and for those evacuated from special facilities.
Computation of ETE A total of 492 ETE were computed for the evacuation of the general public.Each ETE quantifies the aggregate evacuation time estimated for the population within one of the 41 Evacuation Regions to evacuate from that Region, under the circumstances defined for one of the 12 Grand Gulf Evaluation Time Estimates ES-2 E-2 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Evacuation Scenarios (41 x 12=492).Separate ETE are calculated for transit-dependent evacuees, including schoolchildren for applicable scenarios. Except for Region R03, which is the evacuation of the entire EPZ, only a portion of the people within the EPZ would be advised to evacuate.That is, the Advisory to Evacuate applies only to those people occupying the specified impacted region.It is assumed that 100 percent of the people within the impacted region will evacuate in response to this Advisory.The people occupying the remainder of the EPZ outside the impacted region may be advised to take shelter.The computation of ETE assumes that 20%of the population within the EPZ but outside the impacted region, will elect to"voluntarily" evacuate.In addition, 20%of the population in the Shadow Region will also elect to evacuate.These voluntary evacuees could impede those who are evacuating from within the impacted region.The impedance that could be caused by voluntary evacuees is considered in the computation of ETE for the impacted region.Staged evacuation is considered wherein those people within the 2-mile region evacuate immediately, while those beyond 2 miles, but within the EPZ, shelter-in-place. Once 90%iof the 2-mile region is evacuated, those people beyond 2 miles begin to evacuate.As per federal guidance, 20%of people beyond 2 miles will evacuate (non-compliance) even though they are advised to shelter-in-place. )The computational procedure is outlined as follows: A link-node representation of the highway network is coded.Each link represents a unidirectional length of highway;each node usually represents an intersection or merge point.The capacity of each link is estimated based on the field survey observations and on established traffic engineering procedures. The evacuation trips are generated at locations called"zonal centroids" located within the EPZ and Shadow Region.The trip generation rates vary over time reflecting the mobilization process, and from one location (centroid) to another depending on population density and on whether a centroid is within, or outside, the impacted area.The evacuation model computes the routing patterns for evacuating vehicles that are compliant with federal guidelines (outbound relative to the location of the plant), then simulate the traffic flow movements over space and time.This simulation process estimates the rate that traffic flow exits the impacted region.The ETE statistics provide the elapsed times for 90 percent and 100 percent, respectively, of the population within the impacted region, to evacuate from within the impacted region.These statistics are presented in tabular and graphical formats.The 90th percentile ETE have been identified as the values that should be considered when making protective action decisions because the 100th percentile ETE are prolonged by those relatively few people who take longer to mobilize.This is referred to as the"evacuation tail" in Section 4.0 of NUREG/CR-7002. The use of a public outreach (information) program to emphasize the need for evacuees to minimize the time needed to prepare to evacuate (secure the home, assemble needed clothes, Grand Gulf Evaluation Time Estimates ES-3 E-3 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR medicines, etc.)should also be considered. Traffic Management This study references the comprehensive traffic management plans provided by Claiborne County, MS and Tensas Parish, LA.Due to the limited traffic congestlon within the EPZ, no additional traffic or access control measures have been identified as a result of this study.Selected Results A compilation of selected information is presented onfollowing pages in the form of Figures and Tables extracted from the body of the repo"i1;these are described below.Figure 6-1 displays a map of the GGNS EPZ showing the layout of the 16 PAS I PAA that comprise, in aggregate, the EPZ.Table 3-1 presents the estimates of permanent resident population in each PAS I PAA based on the 2010 Census data.Table 6-1 defines each of the 41 Evacuation Regions in terms of their respective groups of PAS I PAA.Table 6-2 lists the Evacuation Scenarios. Tables 7-1 and 7-2 are compilations of ETE.These data are the times needed to Clear the indicated regions of 90 and 100 percent of the population occupying these regi,ons, respectively. These computed ETE include consideration of mobilization time and of estimated voluntary evacuations from other regions within the EPZ and from the Shadow Region.Tables 7-3 and 7-4 presents ETE for the 2-mile region for un-staged and staged evacuations for the 90 th and 100 th percentiles, respectively. Table 8-7 presents ETE for the schoolchildren in good weather.Table 8-10 presents ETE for the transit-dependent population in good weather.Figure H-8 presents an example of an Evacuation Region (Region R08)to be evacuated under the circumstances defined in Table 6-1.Maps of all regions are provided in Appendix H.ConclusionsGeneralpopulation ETE were, computed for 492 unique cases-a combination of 41 unique Evacuation Regions and 12 unique Evacuation Scenarios. Table 7-1 and Table 7-2 document these ETE for the 90th and 100th percentiles. These ETE range from 1:25 (hr:min)to 2:30 at the 90th percentile. Inspection of Table 7-1 and Table 7-2 indicates that the ETE for the 100th percentile are significantly longer than those for the 90th percentile (see Figures 7-8 through19).This is due to the fact that the resident mobilization curve has a long"tail";relatively few evacuees take a long time to mobilize.Inspection of Table 7-3 and Table 7-4 indicates that a staged evacuation provides no benefits to evacuees from within the 2 mile region and unnecessarily delays the evacuation of those beyond 2 miles (compare Regions R02, R04 through R09 with Grand Gulf Evaluation Time Estimates ES-4 E-4 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Regions R35 through R41, respectively, in Tables 7-1 and 7-2).See Section 7.6 for additional discussion. Comparison of Scenarios 10 (winter, midweek/weekend, evening)and 11 (winter, weekend, evening)in Table 7-2 indicates that the special event does not materially affect the ETE at the 100 th percentile,butincreases the*ETE at the 90 th percentile for regions including PAS I PAA 6 by up to 35 minutes.See Section 7.5 for additional discussion. Comparison of Scenarios 1 and 12 in Table 7-1 indicates that the roadwaythe closure of one lane on US 61 northbound from the boundary of Port Gibson to the EPZ boundary (by theClaiborneCounty line)-does not have an impact on the 90 th percentile ETE.See Section 7.5 for additional discussion. Throughout the evacuation the EPZ is free from congestion, with the exception of the exit roadways from the Alcorn State University. The most congested area in the network is SR 522 from the University to US 61 SB.By 2 hours and 20 minutes after the Advisory to Evacuate, traffic is moving at free-flow speed (LOS A)on all roadways within the EPZ (Scenario 6, R03).See Section 7.3 and Figures 7-3 through 7-7.Separate ETE were computed for schools, medical facilities, transit-dependent persons, homebound special needs persons and correctional facilities. The average single-wave ETE for schools and medical facilities are within a similar range as the general population ETE at the 90 th percentile; the ETE for transit-dependents, homebound special needs persons and the correctional facility are slightly longer on average.See Section 8.Table 8-5 indicates that there are sufficient transportation resources available to evacuate the public schools in both the county and parish, but not all the transit dependent population within the EPZ in a single wave.There are also not enough ambulances to evacuate the bedridden population in a single wave.The second-wave ETE for ambulances and special needs population does exceed the general population ETE at the 90 th percentile. See Sections 8.4 and 8.5.The general population ETE at the 100 th percentile closely follows the trip generation time due to a lack of congestion within the EPZ.The 90 th percentile ETE are less sensitive to truncating the tail of the mobilization time distribution, since the mobilization time of the bulk of evacuees is unchanged. See Table M-1.The general population ETE is insensitive to the voluntary evacuation of vehicles in the Shadow Region (tripling the shadow evacuation percentage does not increase 90 th or 100 th percentile ETE).See Table M-2.Population changes of 50 and 75%do not result in ETE changes which meet the criteria for updating ETE between decennial Censuses.A population increase of 160%is needed to increase the 90 th percentile ETE by 30 minutes.See Section M.3.Grand Gulf Evaluation Time Estimates ES-5 E-5 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Figure 6.1 GGNS EPZ PAS/PAA E-6 Revision 70 11/13 GG FSAR I Table 3-1.EPZ Permanent Resident Population I PAS/PAA I 2000 Population 2007 Population I 2010 Population 1 104 100 43 2A 356 342 305 28 150 144 151 3A 983 946 961 38 506 487 388 4A 2,892 2,778 2,407 48 564 541 453 5A 163 156 138: 58 396 381 356.6 2,057 2,258 2,629 7 3 3 28 8 163 148 126 9 1,892 1,708 1,185 10 431 388 394 11 1,530 1,381 1,403 12---TOTAL 12,190 11,761 10,967 EPZ Population Growth (2000 to 2010):-10.03%: Grand Gulf Evaluation Time Estimates ES-7 E-7 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Table 6.1.Description of Evacuation Regions PAS/PM Region Description 1 2A 2B 3A 3B 4A 4B SA 5B 6 7 8 9 10 11 12-R01 2-Mile Ring x R02 5-Mile Ring x x x x x x R03 Full EPZ x x X x x x x x x x x x x x x x Evacuate 2-Mile Radius and Downwind to 5 Miles PAS/PM Region Wind Direction Toward 1 2A 2B 3A 3B 4A/4B SA 5B 6 7 8 9 10 11 12 R04 WSW, W, WNW X x N1A NNE Refer to Region 01 R05 NE.ENE x X ROO E X x x R07 ESE,SE, SSE X X X R08 W x X X R09 SSW X x N1A SW Refer to Region 01 EvaOJate 2-Mile Radius and Downwind to EPZ Boundary PASIPM Region Wind Direction Toward 1 2A 2B 3A 3B 4A 4B SA 5B 6 7 8 9 10 11 12 N1A4 N Refer to Region 04 R10 NNE X X X R11 NE.ENE X X X-X R12 E X X XXX (R13 ESE X XXXXX X*R14 SE X XXX X X X R15 SSE X X X X X X R16 SX X XXX X R17 SSW XXX X R18 SW X X x x R19 WSW X X X X x x R20 W X x x x x X Grand Gulf Evaluation Time Estimates ES-8 E-8 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR PAS/PAA Region Description 1 2A 28 3A 38 4A 48 SA 58 6 7 8 9 10 11 12 R21 WNW xxxx X R22 NW,NNW x x x x x Evacuate 5-Mile Radius and Downwind to EPZ Boundary PAS/PAA Region Wind Direction Toward 1 2A 28 3A 38 4A 48 SA 58 6 7 8 9 10 11 12 N/A N Refer to Region 02 R23 NNE X X X X X X X R24 NE.ENE x X X X X X R25 E X x X X X X X X R26 ESE X X X X X X X X X R27 SE x X x X X X X X X X R28 SSE X X X X X X X X R29 S X X X X X X X X X R30 SSW X X X X X X X X R31 SW X X X X x X X X X X R32 WSW,W X X X X x X X X X X R33 WNW X X X X x X X X X X X R34 NW,NNW X x X X x X X X Evacuate 2-Mile Radius and Staged Downwind loS Miles PASIPAA Region Wind Direction Toward 1 2A 28 3A 38 4A 48 SA 58 6 7 8 9 10 11 12 R35 5-Mile Ring X X X X X R36 WSW, W, WNW, X X x NlA NNE Refer to Region 01 R37 NE, ENE X X R38 E X X X R39 ESE, SE, SSE X X X R40 S X X X R41 SSW X X NlA SW Refer to Region 01 Grand Gulf Evaluation Time Estimates ES-9 E-9 KLD Associates. Inc.Rev.1 Revision 70 11/13 GG FSAR Table 6-2.Evacuation Scenario Definitions
- Scenario Season 1 Day of Week Time of Weather Special Day 1 Summer Midweek Midday Good None 2 Summer Midweek Midday Rain None I 3 Summer Weekend Midday Good None 4 Summer Weekend Midday Rain None 5 Summer Midweek, Evening Good None Weekend 6 Winter Midweek Midday Good None 7 Winter Midweek Midday Rain None 8 Winter Weekend Midday Good None 9 Winter Weekend Midday Rain None 10 Winter Midweek, Evening Good None Weekend 11 Winter Weekend Evening Good Alcorn State University football game 12 Winter Midweek Midday Good Roadway Impact-Lane Closure on US 61 1 Winter assumes that school is in session (also applies to spring and autumn).Summer assumes that school is not in session.Grand Gulf Evacuation Time Estimate ES-10 E-10 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Table 7-1.Time to Clear the Indicated Area of 90 Percent of the Affected Population SummerSummerSummer Winter WinterWinterWinter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1)(2)(3)(4)(5)
(6)(7)(8)9)(10)(11)(12)Scenario: Middav Middav Eveninq Midday Midday Evening Evening Midday Region Good Rain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather WeatherWeatherWeather Weather Weather Event Impact Entire 2-Mile Reaion, 5-Mile Reqion, and EPZ R011:301:301:251:251:30 1:30 1:301:301:30 1:251:251:30 R01 R02 2:10 2:15 2:052:052:002:10 2:102:052:052:002:00 2:10 R02 R03 2:20 2:202:052:052:002:15 2:15 2:002:052:002:30 2:20 R03 2-Mile Reqion and Keyhole to 5 Miles R04 1:30 1:30 1:251:251:301:30 1:301:301:30 1:25 1:25 1:30 R04 R05 2:05 2:05 2:05 2:052:002:05 2:052:052:05 2:00 2:00 2:05 R05 R062:052:102:052:05 2:00 2:05 2:102:052:05 2:00 2:00 2:05 R06 R07 2:102:102:052:052:002:05 2:10 2:00 2:05 2:00 2:00 2:10 R07 R08 2:052:102:00 2:05 2:00 2:05 2:102:002:05 2:00 2:00 2:05 R08 R092:002:052:002:05 2:002:002:05 2:00 2:05 2:00 2:00 2:00 R09 2-Mileion and Keyhole to 10 Miles R10 2:05 2:05 2:05 2:05 2:05 2:05 2:05 2:05 2:052:002:00 2:05 R10 R112:052:05 2:05 2:052:002:052:052:05 2:05 2:00 2:00 2:05 R11 R12 2:05 2:10 2:05 2:05 2:00 2:05 2:10 2:05 2:052:002:002:10 R12 R13 2:152:152:052:05 2:002:102:152:052:052:002:00 2:15 R13 R142:152:152:052:102:052:15 2:15 2:05 2:05 2:05 1:55 2:15 R14 R152:102:152:002:052:00 2:102:102:05 2:05 2:00 1:55 2:10 R15 R16 2:102:152:002:05 2:002:102:102:00 2:05 1:552:302:10 R16 R17 2:102:102:002:00 1:55 2:00 2:05 2:00 2:00 1:55 2:30 2:10 R17 R18 2:102:102:002:00 1:55 2:052:052:00 2:00 1:55 2:30 2:10 R18 R19 2:10 2:10 2:00 2:00 1:55 2:05 2:05 2:00 2:00 1:55 2:30 2:10 R19 R20 2:15 2:20 2:00 2:00 2:00 2:15 2:15 2:00 2:00 1:55 1:55 2:15 R20 R212:102:102:00 2:00 1:552:102:10 1:55 2:001:551:55 2:10 R21 R22 2:05 2:05 2:00 2:00 1:552:052:05 1:55 2:00 1:55 1:55 2:05R22 Grand Gulf Evacuation Time Estimate ES-11.E-11 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR SummerSummerSummer Winter Winter Winter Winter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1)(2)(3)(4)(5)(6)(7)(8)9)(10)(11)(12)Scenario: Midday Midday EveninQ Midday MiddayEveninqEveninq Middav Region Good Rain Good Rain Good-Good Rain Good Rain Good Special Roadway Region Weather WeatherWeatherWeather Weather Weather Event Impact 5-Mile Re<ion and Keyhole to EPZ Boundary R23 2:10 2:15 2:05 2:10 2:00 2:10 2:152:052:05 2:00 2:00 2:10 R23 R24 2:10 2:152:052:10 2:002:102:15 2:05 2:05 2:002:002:10 R24 R25 2:102:152:052:052:002:102:152:05 2:052:002:002:10 R25 R26 2:15 2:15 2:05 2:102:002:102:152:05 2:05 2:00 2:00 2:15 R26 R272:152:152:052:102:00 2:15 2:15 2:05 2:05 2:00 1:55 2:15 R27 R28 2:15 2:15 2:05 2:10 2:00 2:102:152:052:052:00 1:55 2:15 R28 R29 2:15 2:152:052:052:002:10 2:10 2:05 2:05 2:00 2:30 2:15 R29 R30 2:152:152:052:052:002:102:10 2:002:052:002:30 2:15 R30 R31 2:15 2:15 2:05 2:05 2:00 2:102:102:002:052:00 2:30 2:15 R31 R32 2:15 2:15 2:05 2:05 2:00 2:152:152:052:052:002:002:15 R32 R332:152:15 2:05 2:05 2:00 2:15 2:152:052:05 2:00 2:00 2:15 R33 R34 2:102:152:052:052:002:102:152:05 2:05 2:002:002:10 R34 Staqed Evacuation Mile Reqion, 2-Mile Reqion and Keyhole to 5 Miles R35 2:10 2:15 2:05 2:052:002:102:102:052:052:002:002:10 R35 R361:351:351:451:45 1:45 1:35 1:35 1:40 1:401:451:45 1:35 R36 R37 2:05 2:05 2:052:052:002:052:05 2:052:052:00 2:00 2:05 R37 R38 2:05 2:10 2:052:052:00 2:052:102:052:052:002:002:05 R38 R39 2:10 2:10 2:052:052:002:052:102:002:05 2:002:002:10 R39 R40 2:05 2:10 2:00 2:052:002:052:102:00 2:001:551:55 2:05 R40 R412:002:05 2:00 2:00 1:55 2:00 2:05 2:00 2:00 1:55 1:55 2:00 R41 Grand Gulf Evacuation Time Estimate ES-12 E-12 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Table 7-2.Time to Clear the Indicated Area of 100 Percent of the Affected Population SummerSummerSummer Winter Winter Winter Winter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1)(2)(3)(4)(5)(6)(7)(B)9)(10)(11)(12)Scenario: Midday Midday Eveninq Midday Midday Eveninq Eveninq Midday Region Good Rain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather WeatherWeatherWeather Weather Weather Event Impact Entire 2-Mile Region, 5-Mile Region, and EPZ R01 4:45 4:454:454:454:454:45 4:454:454:454:454:454:45 R01 R02 4:50 4:504:504:50 4:50 4:50 4:504:504:50 4:50 4:50 4:50 R02 R03 4:55 4:554:554:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R03 2-Mile Region and Keyhole to 5 Miles R04 4:50 4:504:504:504:504:504:504:504:504:504:504:50 R04 R054:504:50 4:50 4:50 4:504:504:504:504:504:504:504:50 R05 R06 4:50 4:504:504:50 4:50 4:50 4:504:504:50 4:504:504:50 R06 R074:504:504:504:504:504:50 4:504:504:504:504:50 4:50 R07 ROB 4:50 4:50 4:50 4:504:504:50 4:50 4:50 4:504:504:50 4:50 ROB R09 4:50 4:504:504:50 4:50 4:50 4:504:504:50 4:504:504:50 R09 2-Mileion and Keyhole to 10 Miles R10 4:55 4:55 4:554:554:554:554:554:554:554:554:55 4:55 R10 R11 4:55 4:55 4:55 4:554:554:55 4:55 4:554:554:55 4:55 4:55 R11 R12 4:55 4:554:554:554:554:554:55 4:55 4:55 4:55 4:55 4:55 R12 R13 4:55 4:554:554:55 4:554:554:55 4:554:554:55 4:55 4:55 R13 R144:554:554:554:554:55 4:55 4:55 4:55 4:554:554:554:55 R14 R154:554:55 4:55 4:554:554:554:554:554:554:554:554:55 R15 R16 4:55 4:55 4:554:554:554:554:55 4:55 4:55 4:554:554:55 R16 R17 4:55 4:55 4:55 4:55 4:554:554:554:554:554:554:55 4:55 R17 R1B 4:55 4:55 4:55 4:554:554:554:554:554:554:554:55 4:55 R1B R194:554:55 4:55 4:55 4:554:554:554:55 4:55 4:55 4:55 4:55 R19 R204:554:55 4:554:554:554:554:554:554:554:554:554:55 R20 R21 4:55 4:55 4:554:554:554:554:55 4:55 4:55 4:55 4:55 4:55 R21 R22 4:55 4:554:554:554:554:554:55 4:55 4:55 4:55 4:55 4:55 R22 Grand Gulf Evacuation Time Estimate ES-13 E-13 KLD Associates, Inc.Rev.1 Revision70 11/13 GG FSAR Summer Summer Summer Winter Winter Winter Winter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek--'Weekend Weekend Scenario: (1)(2)(3)(4)(5)(6)(7)(8)9)(10)(11)(12)Scenario: Midday Middav Evenina Midday Midday Eveninq Eveninq Middav Region Good Rain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather Weather Weather Weather Weather Weather Event Imoact 5-Mileion and Keyhole to EPZ Boundary R23 4:55 4:55 4:55 4:55 4:554:554:55 4:55 4:55 4:55 4:55 4:55 R23 R24 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:554:554:55 4:55 R24 R25 4:554:554:55 4:55 4:55 4:55 4:55 4:55 4:554:554:55 4:55 R25 R26 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R26 R27 4:55 4:55 4:55 4:55 4:55 4:554:554:55 4:554:554:55 4:55 R27 R284:554:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R28 R29 4:55 4:55 4:55 4:55 4:55 4:55 4:554:554:55 4:554:554:55 R29 R30 4:55 4:55 4:55 4:55 4:55 4:55 4:554:554:554:554:55 4:55 R30 R31 4:55 4:55 4:55 4:55 4:55 4:55 4:554:554:55 4:55 4:55 4:55 R31 R32 4:55 4:55 4:55 4:55 4:55 4:554:554:55 4:554:554:554:55 R32 R33 4:55 4:55 4:55 4:554:554:55 4:55 4:55 4:554:554:554:55 R33 R34 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:554:554:55 4:55 R34 Staqed Evacuation Mile Region, 2-Mile Region and Kevhole to 5 Miles R35 4:504:504:50 4:50 4:50 4:50 4:50 4:504:504:504:50 4:50 R35 R36 4:504:504:50 4:50 4:50 4:50 4:50 4:50 4:504:504:50 4:50 R36 R37 4:504:504:50 4:50 4:504:504:50 4:504:504:504:50 4:50 R37 R38 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:504:504:50 4:50 4:50 R38 R39 4:50 4:50 4:504:504:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R39 R40 4:50 4:50 4:50 4:504:504:50 4:50 4:50 4:50 4:50 4:50 4:50 R40 R41 4:504:504:50 4:50 4:50 4:504:504:504:504:50 4:50 4:50 R41 Grand Gulf Evacuation Time Estimate ES-14 E-14 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Table 7-3.Time to Clear 90 Percent of the 2-Mile Area within the Indicated Region.SummerSummerSummer Winter WinterWinterWinter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1)(2)(3)(4)(5) , (6)(7)(8)9)(10)(11)(12)Scenario: Midday Midday EveninQ Midday Midday EveninQ EveninQ Midday Region Good Rain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather Weather Weather Weather Weather Weather Event Impact 2-Mile and 5-Mile Region R011:301:30 1:251:251:301:30 1:30 1:30 1:30 1:251:251:30 R01 R02 1:30 1:30 1:251:251:301:301:301:301:301:251:251:30 R02 2-Mile ReQion and Keyhole to 5 Miles R04 1:301:301:251:251:301:30 1:30 1:301:301:25 1:25 1:30 R04 R051:301:30 1:25 1:251:301:301:301:30 1:30 1:25 1:25 1:30 R05 R06 1:301:301:25 1:251:301:301:301:30 1:30 1:25 1:25 1:30 R06 R07 1:301:301:251:251:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 R07 R08 1:301:301:251:251:301:30 1:301:301:301:251:25 1:30 R08 R091:301:301:251:25 1:30 1:30 1:301:301:301:25 1:25 1:30 R09 StaQed Evacuation Mile Reqion, 2-Mile ReQion and Keyhole to 5 Miles R351:351:351:451:451:451:35 1:35 1:401:401:451:451:35 R35 R361:351:351:451:451:451:351:351:401:40 1:45 1:45 1:35 R36 R37 1:351:351:451:451:45 1:35 1:35 1:401:401:45 1:45 1:35 R37 R38 1:351:351:451:451:45 1:351:351:401:40 1:45 1:45 1:35 R38 R39 1:351:351:451:451:45 1:35 1:35 1:401:401:45 1:45 1:35 R39 R40 1:35 1:351:451:451:451:351:351:40 1:40 1:45 1:45 1:35 R40 R41 1:351:351:451:451:451:35 1:35 1:401:401:45 1:45 1:35 R41 Grand Gulf Evacuation Time Estimate ES-15 E-15 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Table 7-4.Time to Clear 100 Percent of the 2-Mile Area within the Indicated Region Summer Summer Summer Winter Winter Winter Winter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1)(2)(3)(4)(5)(6)(7)(8)9)(10)(11)(12)Scenario: Midday Midday EveninQ Midday Midday EveninQ Evenina Middav Region Good Rain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather Weather Weather Weather Weather Weather Event Impact 2-Mile and 5-Mile ReQion R01 4:45 4:45 4:45 4:45 4:45 4:45 4:454:454:454:454:45 4:45 R01 R02 4:50 4:50 4:50 4:50 4:50 4:504:504:504:50 4:50 4:50 4:50 R02 2-Mile Reaion and Kevhole to 5 Miles R04 4:50 4:50 4:50 4:504:504:50 4:504:504:50 4:50 4:50 4:50 R04 R05 4:50 4:50 4:50 4:50 4:50 4:504:504:504:50 4:50 4:50 4:50 R05 R06 4:50 4:50 4:50 4:50 4:50 4:50 4:504:504:50 4:50 4:50 4:50 R06 R074:504:50 4:50 4:50 4:50 4:50 4:50 4:50 4:504:504:50 4:50 R07 R08 4:504:504:50 4:504:504:50 4:504:504:50 4:50 4:50 4:50 R08 R09 4:50 4:50 4:50 4:50 4:50 4:504:504:50 4:50 4:50 4:50 4:50 R09 StaQed Evacuation Mile Region, 2-Mile Region and Keyhole to 5 Miles R35 4:504:504:50 4:50 4:50 4:504:504:50 4:50 4:50 4:50 4:50 R35 R36 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R36 R37 4:504:504:504:504:504:50 4:504:504:50 4:50 4:50 4:50 R37 R38 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R38 R39 4:50 4:50 4:50 4:50 4:50 4:50 4:504:504:50 4:50 4:50 4:50 R39 R40 4:50 4:50 4:504:504:504:504:50 4:50 4:50 4:50 4:50 4:50 R40 R41 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R41 Grand Gulf Evacuation Time Estimate ES-16 E-16 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Table 8-7.School Evacuation Time Estimates-Good Weather Travel Dist.Time Driver Dist.Travel EPZ from Mobili-To'Time to Bdry EPZSecondSecond zation Loading EPZ Average EPZ To Bdry to ETEto Bus Ready Wave Wave Time Time Bdry Speed Bdry ETE RC.RC.RC.For Second ETE ETEto School (min)(min)(mi)(mph)(min)(hr:min)(min)(min)(hr:min)Wave (min)(hr:min)RC.CLAIBORNE SCHOOLS A.W.Watson Elementary School 90 15 6.1 42.8 9 1:55 39.1 52 2:50 240 4:25 5:15 Richardson Headstart 90 15 5.9 43.8 8 1:55 39.1 52 2:45 240 4:25 5:15 Child Day Care Kindergarten 90 15 5.9 43.8 8 1:55 39.1 52 2:45 240 4:25 5:15 Heavenly angels Daycare 90 15 4.2 51.3 5 1:50 39.1 52 2:45 238 4:20 5:10 Port Gibson High 90 15 5.6 47.0 7 1:55 39.1 52 2:45 239 4:25 5:15 Claibome County Va-Tech 90 15 5.7 45.0 8 1:55 39.1 52 2:45 240 4:25 5:15 Katherine's Daycare and Leaming 90 15 6.1 42.9 9 1:55 39.1 52 2:50 240 4:25 5:15 Port Gibson Middle School 90 15 4.7 48.0 6 1:55 39.1 52 2:45 238 4:20 5:15 Concemed Citizens Daycare 90 15 4.7 48.0 6 1:55 39.1 52 2:45 238 4:20 5:15 Chamberlain-Hunt Academy 90 15 4.7 48.0 6 1:55 39.1 52 2:45 238 4:20 5:15 Little Kids University 90 15 4.7 48.0 6 1:55 39.1 52 2:45 238 4:20 5:15 Claiborne Educational Foundation 90 15 4.2 51.3 5 1:50 39.1 52 2:45 238 4:20 5:10 God's Little Bee's Child Care 90 15 6.2 46.9 8 1:55 39.1 52 2:45 240 4:25 5:15 A1com State University 90 15 0.4 28.5 1 1:50 38.1 51 2:40 232 4:10 5:00 TENSAS SCHOOLS Newellton Christian Academy 90 15 1.3 31.0 3 1:50 25.9 35 2:25 2304:104:45 Newellton Elementary 90 15 1.3 31.0 3 1:50 25.9 35 2:25 2304:104:45 Little Green Nursery 90 15 3.7 33.7 7 1:55 25.9 35 2:30 180 3:25 4:00 Tensas Academy 90 15 3.7 33.7 7 1:55 35.4 47 2:40 180 3:25 4:10 Tensas High School 90 15 2.5 37.7 4 1:50 35.4 47 2:40 180 3:20 4:10 Tensas Elementary 90 15 2.5 37.7 4 1:50 35.4 47 2:40 180 3:20 4:10 Maximum for EPZ: 1:55 Maximum: 2:50 2:50 Maximum: 4:25 5:15 Average for EPZ: 1:50 Average: 2:45 2:45 Average: 4:10 5:00 Grand Gulf Evacuation Time Estimate ES-17 E-17 KLD Associates, Inc.Rev.1 Revision 70 11/13 GG FSAR Table 8-10.Transit-Dependent Evacuation Time Estimates-Good Weather One-Wave Two-Wave Route Bus Mobilization Route Speed Route Pickup ETE Distance Travel Unload Driver Route Pickup ETE Number Number (min)Length (mph)Travel Time (hr:min)to R.C.Time to (min)Rest Travel Time (hr.min)(miles)Time (min)(miles)R.C.(min)Time (min)(min)(min)(min)11 105 12.4 55.0 14 30 2:30 22.0 29 5 10 59 30 4:4523 105 6.0 52.4 7 30 2:25 39.1 52 5 10 67 30 5:10 2 120 6.0 51.7 7 30 2:40 39.1 52 5 10 67 30 5:25 3 1 105 7.5 55.0 8 30 2:25 25.9 35 5 10 53 30 4:40 4 2 105 5.6 39.8 8 30 2:25 35.4 47 5 10 63 30 5:00 2 120 5.6 42.6 8 30 2:40 35.4 47 5 10 64 30 5:15 5 1 105 1.2 41.4 2 30 2:20 33.4 45 5 10 48304:40 1 120 1.2 41.3 2 30 2:35 33.4 45 5 10 48 30 4:55 6 4 105 3.1 39.3 5 30 2:20 38.1 51 5 10 60 30 5:00 2 120 3.1 39.3 5 30 2:35 38.1 51 5 10 60 30 5:15 7 2 105 5.5 55.0 6 30 2:25 18.1 24 5 10 37 30 4:15 1 120 5.5 55.0 6 30 2:40 18.1 24 5 10 37304:30 Maximum ETE: 2:40 Maximum ETE: 5:25 Average ETE: 2:30 Averaae ETE: 4:55 Grand Gulf Evacuation Time Estimate ES-18 E-18 KLD Associates, Inc.Rev.1 Revision 70 11/13 Legend'*GGNS GJ PAS/PM\-::2, 5, 10 Mil.Ril1E\5 Se<tor!3oundilrles Grand Gulf Evacuation Time Estimate GG FSAR Figure H-8.Region R08 ES-19 E-19 KLD Associates. Inc.Rev.1 Revision 70 11/13 APPENDIX F List of Supporting Plans GG FSAR APPENDIX FLIST OF SUPPORTING PLANS 1.Mississippi Radiological Emergency Preparedness Plan;Volume ill, to the Mississippi Comprehensive Emergency Management Plan 2.Port Gibson/Claiborne County-Radiological Emergency Preparedness Plan*3.Louisiana Peacetime Radiological Response Plan;Supplement ll, Fixed Nuclear Facilities to Louisiana Emergency Operations Plan, Attachment 2, Grand Gulf Station 4.Louisiana Peacetime Radiological Response Plan;Supplement ll, Fixed Nuclear Facilities to Louisiana Emergency Operations Plan Attachment 2, Grand Gulf Nuclear IStation, Enclosure I, Tensas}Parish Radiological Emergency Response Plan 5.Hospital Emergency Department Management of Radiation Accidents F-l Revision 33 9/97 APPENDIXG RESERVED 0-1 Revision 29 APPENDIX H 1.News Media Emergency Information Program for GGNS n.Public Education and Information Program for GGNS GG FSAR INTRODUCTION This section of the Emergency Plan deals with responses to an emergency in relation to news media activities, employee information, inquiry response, and coordination of public information activities with local, state, and federal agencies.It also describes the training to be conducted to ensure effective dissemination of information during an emergency. The first part of this section is a brief synopsis of the overall news media emergency information program organized according to emergency classifications. This is implemented by 01-5-10-6,5-01-6,10-5-01-34. The final part of this document is a description of public information-education activities underway for residents in the Grand Gulf area and the general public.H-l Revision 61 03/09 GG FSAR I.NEWS MEDIA EMERGENCY INFORMATION PROGRAM 1.0 PURPOSE The News Media Emergency Information Program establishes the means of media personnel informed of an emergency situation at Grand Gulf Nuclear Station (GpNS).i 2.0 RESPONSIBILITIES FOR ACTIVATING THE PROGRAM I Activation of the news media program begins with a call from the GGNS Comphter I Notification System or Emergency Director to the Company Spokesperson. I I The Company Spokesperson determines, following consultation with the Emerg:ency Director, whether the situation warrants media notification. Initial decisions ar4 determined to a great extent by the classification given to the incident, of which there are fohr.I 3.0 Deleted 4.0 OVERALL INFORMATION FLOW 4.1 Company Spokesperson, GGNS management or designee fills the Company Spokesperson position t¥oughout an emergency. 4.2 Unusual Event Normally only the Company Spokesperson is called.He/she may: a.Stand by and follow developments b.Consider additional notifications c.Consider drafting news bulletin H-2 Revision 64 11/10 GG FSAR 4.3 Alert/Site Area Emergency/General Emergency Actions initiated at the Alert level continue through a Site Area Emergency and General Emergency. At these levels of an emergency the EOF sends information to the Company Spokesperson, or designee.4.3.1 Company Spokesperson: a.Reports to the Joint Information Center b.Establishes contact with the EOF c.Coordinates directly with State representatives at the JIC d.Ensures that the Inquiry Response is activated and provided with news bulletins to use in response to inquires from the media and public.e.Issues news bulletins and conducts news briefings once the JIC is operational 4.3.2 Inquiry Response Coordinator: a.Reports to the JIC I b.Ensures that the Inquiry Response is operational and establishes contact with theJIC c.Ensures that current news bulletins are provided to theInquiryResponse Staff 4.3.3 News Briefings-News briefings are conducted at the JIC as needed and ne1ws media inquiries are referred to the JIC.Copies of news bulletins are also available to the Inquiry Response and the Entergy Operations CEC.4.3.4 Coordinating News Releases from the JIC-GGNS Personnel issue bulletins concerning conditions at the plant.Statements relative to offsite conditions and H-3 Revision 61 03/09 GG FSAR operations are done by the Governor's Press Secretary and/or the Director of the Mississippi Emergency Management Agencyortheir designee.Statements relative to Louisiana conditions and operations are done by a representative for the State of Louisiana. 4.3.5 Contacts with other agencies-The JIC assumes responsibility when it is aC,tivated for sharing bulletin messages with CCCD, TPHS/EP, MEMA, LDEQ, NRC Regional Office, and other government agencies with representatives at the lIC.The JIC is responsible for sending bulletin messages to the Entergy Operations CEC, Inquiry Response, and SMEP A.5.0 EXCEPTIONS Exceptions to this information flow plan are made in case of either a rapidly developing -or rapidly terminating -emergency at Grand Gulf.5.1 Rapidly Developing Emergency-In this circumstance the Company Spokesperson, in consultation with the ED, is authorized to issue news bulletins. 5.2 Rapidly Terminating Emergency-In this case a public statement is developed by the Company Spokesperson detailing the nature of the incident and telling how it was resolved.This statement is given to the news media as rapidly as possible.6.0 TRAININGIndividualsinvolved in the GGNS News Media Emergency Information Program complete training activities and participate in drills/exercises in order to be thoroughly familiar with their duties.Training is documented by the Manager, Emergency Preparedness. H-4 Revision 61 03/09 GG FSAR 6.1 News Media Training-An annual program is provided to acquaint the news media with the methodology for obtaining information during an emergency as well as information about overall emergency preparedness for GGNS.The training includes information about the plant, radiation, and the roles of emergency news centers.6.2 Overall Training-Appropriatetraining activities are conducted annually for those involved in the News Media Emergency Information Program.II.PUBLIC EDUCATION AND INFORMATION PROGRAM FOR GGNS 1.0 Purpose and Objectives This program acquaints the general public with the emergency preparedness plans made in connection with the operation of Grand Gulf Nuclear Station (GGNS)located in Claiborne County in Southwest Mississippi. Entergy Operations, Inc., operator of the facility, has established a policy of full disclosure of any incident relating to the safety of operation of the plant.Entergy Operations therefore, maintains a free and open relationship with the public and others concerned with the safety of operations in the vicinity of GGNS.2.0 Methods To Reach The Public Prior To Emergency Situations Several communication methods are used to acquaint the public with plans made for their protection during any emergency at GGNS.These methods are described below: 2.1 Material Placed in Schools: Literature is offered to schools in the area, both in Claiborne County and Tensas Parish.The information tells locations of shelters and reception centers for students in Claiborne County, Mississippi, and Tensas Parish, Louisiana. H-5 Revision 61 03/09 I GG FSAR 2.2 Distribution of an Emergency Information Publication: This publication contains basic information on nuclear power and emergency planning to aid the public during any emergency. Mass distribution of the publication in the Claiborne County and Tensas Parish areas is conducted annually.2.3 Display of Posters: One of the ways to acquaint the overall population, especially transients, with the emergency plans is the placing in public places of posters with a map of the evacuation routes and other pertinent information. H-6 Revision 61 03/09 I}}