Letter Sequence Acceptance Review |
---|
TAC:MF2879, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) TAC:MF2880, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) TAC:MF2881, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) |
|
MONTHYEARML13280A2642013-09-27027 September 2013 Request to Amend Technical Specification 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip Project stage: Request ML13352A0072013-12-12012 December 2013 Supplemental Information Concerning Request for Amendment to Technical Specification (TS) 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip Project stage: Request ML13358A0492013-12-24024 December 2013 Acceptance Review Following Supplement, License Amendment Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip Project stage: Acceptance Review ML14202A3782014-09-0909 September 2014 Issuance of Amendment Nos. 194, 194, and 194, Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip (TAC Nos. MF2879-81) Project stage: Approval 2013-12-24
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML24248A2632024-09-0404 September 2024 Acceptance Review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Relief Request (RR) No. 71: Re?Submittal of RR?30 ML24120A2612024-05-0101 May 2024 Email Acceptance Review of Requested Licensing Action License Renewal Commitment 23A, Alloy 600 Management Program Plan ML24103A1222024-04-11011 April 2024 – Acceptance of Requested Licensing Action Re_ License Amendment Request to Revise Technical Specifications 3 ML18312A3322018-11-13013 November 2018 Acceptance Review for License Amendment and Exemption Requests Regarding the Implementation of Framatome High Thermal Performance Fuel ML16043A3892016-02-18018 February 2016 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML16012A0032016-01-11011 January 2016 Draft Unacceptable with Opportunity to Supplement Requested Licensing Action Email, Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML15303A0982015-11-0909 November 2015 Acceptance Review Letter, License Amendment Request, Adopt Technical Specification Task Force (TSTF)-505, Revision 1, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b ML15113A6362015-04-22022 April 2015 Acceptance of Relief Request 53 ML13358A0492013-12-24024 December 2013 Acceptance Review Following Supplement, License Amendment Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip ML13247A5512013-09-0404 September 2013 Acceptance Review E-mail, Review of Pressurized-Water Reactor Internal Aging Management Program Plan ML13032A5372013-02-0101 February 2013 Acceptance Review Email, License Amendment Request to Adopt TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13025A2482013-01-25025 January 2013 Acceptance Review Email, License Amendment Request to Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML12243A4662012-08-30030 August 2012 Acceptance Review Results Email - for Relief Request Related to Phased Array Ultrasonic Examination Techniques ML1213103802012-05-10010 May 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specifications to Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Revision 3 ML1202703432012-01-27027 January 2012 Acceptance Review Email, Request for Relief to Use Subsequent Edition/Addenda of ASME Code Section XI, for the 3rd 10-Year Inservice Inspection Interval ML1201800792012-01-18018 January 2012 Acceptance Review Email, Request for Approval of Proposed Changes to Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedules ML1135003762011-12-16016 December 2011 Acceptance Review E-mail, License Amendment Request to Modify Technical Specifications to Implement Administrative Changes Including Corrective Actions from U2 Event in LER 50-529/2011-001 ML1113101402011-05-11011 May 2011 Acceptance Review Email, Adoption of Technical Specification Task Force (TSTF)-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b ML1027102522010-09-28028 September 2010 Acceptance Review E-mail, License Amendment Request to Revise Updated Final Safety Analysis Report, Feedwater Line Break Analysis with LOOP and Single Failure Analysis ML1022405612010-08-12012 August 2010 Acceptance Review Email LAR for Cyber Security Plan ML1018102662010-06-30030 June 2010 Acceptance Review Email, License Amendment Request, Adoption of TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications ML1014404232010-05-24024 May 2010 Acceptance Review Email LAR to Revise TS 5.5.8, Inservice Testing Program (TAC Nos., ME3914/5/6) ML0830802872008-11-0303 November 2008 Acceptance Review of Application to Modify Technical Specification 5.5.16, Containment Leakage Rate Testing Program, Risk-Informed ML0828407002008-10-0909 October 2008 Acceptance Review Email, License Amendment Request to Revise TS 5.6.5, Core Operating Limits Report (COLR) ML0900801172008-09-0505 September 2008 Acceptance Review Email, License Amendment Request, Revise Technical Specification 4.2.2, Control Element Assemblies 2024-09-04
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 24, 2013 Mr. Randall K. Edington Executive Vice President Nuclearl Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 PALO VERDE NUCLEAR GENERATING STATION, UNITS 1,2, AND ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REQUEST TO REVISE TECHNICAL SPECIFICATIONS 3.3.3, CONTROL ELEMENT ASSEMBLY CALCULATORS (CEACS): AND 3.3.6, ENGINEERED SAFETY FEATURES ACTUATION SYSTEM (ESFAS) LOGIC AND MANUAL TRIP (TAC NOS. MF2879, MF2880, AND MF2881)
Dear Mr. Edington:
By letter dated September 27, 2013, as supplemented by letter dated December 12, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 13280A264 and ML 13352A007, respectively), Arizona Public Service Company (APS, the licensee), submitted a license amendment request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The proposed amendment would reinstate an inadvertently omitted 4-hour completion time to Technical Specification (TS) 3.3.3, Required Action B.2.2, and revise a test frequency note within a surveillance requirement under TS 3.3.6, which was overlooked during the licensee's request to adopt Technical Specifications Task Force (TSTF) change traveler TSTF-425-A, Revision 3 (ADAMS Accession No. ML090850642), as reflected in license Amendment No. 188 (ADAMS Accession No. ML 112620293), dated December 15. 2011. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications.
Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating charact.eristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review R. Edington -2 and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1530 or via e-mail at jennivine.rankin@nrc.gov. Sincerely, Jennivine K. Rankin, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530 cc: Distribution via Listserv R. Edington -2 and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1530 or via e-mail at jennivine.rankin@nrc.gov. Docket Nos. STN 50-528, STN 50-529, and STN 50-530 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 rlf RidsAcrsAcnw_MailCTR Resource RidsNrrLAJBurkhardt Resource RidsNrrPMPaloVerde Resource RidsRgn4MailCenter Resource RidsNrrDssStsb Resource RidsNrrDorlLpl4-1 Resource CSchulten, NRRlDSS/STSB ADAMS Accession No. ML13358A049 Sincerely, IRA by eLyon fori Jennivine K. Rankin, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICE NRR/DORULPL4-1/PM NRR/DORULPL4-1/PM JRankin (CLyon for) NRR/DORULPL4*1/LA JBurkhardt NRRlDORULPL4-1/BC MMarkley (BSingal for) NRRlDORULPL4*1/PM JRankin (CLyon for) NAME AGeorge DATE 12124/13 12/24/13 12/24/13 12/24/13 12/24/13 OFFICIAL RECORD COpy