MONTHYEARML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss Nuscale’S Us600 Exemption Request ML20274A1082020-09-30030 September 2020 Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics ML20199M1492020-08-19019 August 2020 Memo Transmitting Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss Nuscale'S Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20210M0772020-07-28028 July 2020 Memo - Category 1 Public Meeting - Audit Exit NuScale Emergency Core Cooling System Boron Redistribution Issue and Applicable Design Changes ML20160A2472020-07-28028 July 2020 Audit Summary Memo NuScale ECCS Boron Redistribution Issue ML20176A1582020-07-10010 July 2020 Audit Summary 2019 Memo NuScale Chapter 15 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20140A1892020-05-19019 May 2020 Public Meeting Summary May 14, 2020, NuScale Boron Redistribution Issue ML20114E2162020-05-0404 May 2020 Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20097C2292020-04-0707 April 2020 Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML20076D8852020-03-16016 March 2020 Summary Report for the January 2019 Regulatory Audit of NuScale Chapter 20 ML20072K5232020-03-11011 March 2020 Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) ML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML20054A0602020-02-28028 February 2020 Regulatory Audit Report for NuScale DCA Inadvertent Actuation Block (Iab) Operating Range Change ML20044E3522020-02-18018 February 2020 Memo to ACRS Rod Ejection Accident Methodology SER ML20049H1872020-02-18018 February 2020 Memo to ACRS Rea NON-LOCA TR SE ML20049H5442020-02-18018 February 2020 Letter to NuScale NON-LOCA TR SER ML20042E0242020-02-12012 February 2020 LOCA Topical Report Phase IV Audit Report - Public ML20042E0392020-02-12012 February 2020 NON-LOCA Topical Report Phases 3 and 4 Audit Report ML20010D1312020-01-16016 January 2020 Audit Summary Memo NuScale LOCA TR ML19345E9362020-01-13013 January 2020 Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference ML19340A9712020-01-13013 January 2020 U.S. Nuclear Regulatory Commission Report of the Regulatory Follow-Up Audit Performed Between May 1, 2019, Through September 19, 2019, Regarding the Nuscale Stress and Fatigue Analysis of Major Design Components (Public) ML20006G4202020-01-0808 January 2020 ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapters 2, 8 and 12 ML19343C7562020-01-0808 January 2020 Generator Tube - Siet Audit Report (Public) ML20006G5752019-12-20020 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 8, Electric Power ML19331A3972019-12-20020 December 2019 U.S. Nuclear Regulatory Commission Report of the Regulatory follow-up Audit Performed Between 8/22/19 - 9/24/19, Regarding NuScale Power, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19340A0152019-12-20020 December 2019 U.S. Nuclear Regulatory Commission'S Report of the Regulatory Audit Performed Between March 4, 2019, Through September 10, 2019, for Nuscale Power, LLC, Regarding Nuscale'S Power Module Leakage Flow Instability Analysis - Public Memo ML20006G4892019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters ML19340A0192019-12-19019 December 2019 U.S. Nuclear Regulatory Commission Report - Regulatory Audit Between 03/20/19 - 10/09/19 - Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items NuScale Power, LLC, Standard Plant Design Certification ML20006G7002019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 12, Radiation Protection ML19143A1042019-12-12012 December 2019 DCA - Safety Evaluation with No Open Items for Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors - Memo ML19168A1382019-12-12012 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 3, Design of Structures, Systems, Components and Equipment ML19169A2992019-12-11011 December 2019 Memo to ACRS Transmitting SER - Chapter 15 ML19169A1322019-12-10010 December 2019 Memo to ACRS Transmitting SER ML19165A2792019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 1, Introduction and General Discussion ML19168A1682019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 4, Reactor - Memo ML19168A2002019-12-0909 December 2019 Memo to ACRS Transmitting SER - Chapter 6 ML19169A3142019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 16, Technical Specifications - Memo ML19169A3322019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 20, Mitigation of Beyond-Design-Basis Events - Memo ML19169A2952019-11-26026 November 2019 Memo to ACRS Transmitting SER ML19319C2322019-11-26026 November 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory follow-up Audit of Design Documents for NuScale Containment Isolation Valves and Reactor Safety Valves ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19169A2912019-11-22022 November 2019 Memo to ACRS Transmitting SER ML19169A1192019-11-22022 November 2019 Memo to ACRS Transmitting Phase 4 SER for Chapter 8 ML19162A2732019-11-15015 November 2019 LLC, Design Certification Application Memo - Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19162A0962019-11-13013 November 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters 2024-01-31
[Table view] |
Text
February 21, 2018
MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of New Reactor Licensing
Office of New Reactors
FROM: Prosanta Chowdhury, Project Manager
/RA/ Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors
SUBJECT:
SUMMARY
OF THE JANUARY 24, 2018, AND JANUARY 31, 2018, U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS STAFF FEEDBACK ON REQUEST FOR ADDITIONAL INFORMATION NOS. 9179, 9182, AND 9185
On January 24, 2018, and January 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held Category 1 teleconference public meetings with NuScale Power, LLC (NuScale) to discuss staff feedback on NuScale response to the staff's Request for Additional Information (RAI) Nos. 9179, 9182, and 9185 (Agencywide Documents Access and Management Systems (ADAMS) Accession Nos. ML17349A980, ML17 355A157, and ML17345A957, respectively). These RAIs are related to NuScale Design Certification Application, Chapter 2.3, "Meteorology." One member of the public participated in the January 24, 2018, meeting. No members of the public participated in the January 31, 2018, meeting.
The public meeting notices can be found in ADAMS under Accession Nos. ML18024A295 (January 24, 2018) and ML18026A564 (January 31, 2018). These meeting notices were also posted on the NRC public web site.
Enclosed is the meeting agenda (Enclosure 1), list of attendees (Enclosures 2), and meeting summary (Enclosure 3).
Docket No.52-048
Enclosures:
- 1. Meeting Agenda
- 2. List of Attendees
- 3. Meeting Summary cc w/encl.: DC NuScale Power, LLC Listserv
CONTACT: Prosanta Chowdhury, NRO/DNRL 301-415-1647
ML18044A070 *via Email NRO-002 OFFICE NRO/DNRL/LB1: PM NRO/DNRL/LB1: LA NRO/DNRL/LB1: PM NAME PChowdhury* MMoore* PChowdhury DATE 2/13/2018 2/20/2018 2/21/2018 U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS STAFF FEEDBACK ON REQUEST FOR ADDITIONAL INFORMATION NOS. 9179, 9182, 9185 MEETING AGENDA January 24, 2018 and January 31, 2018 The purpose of this teleconference was for the U.S. Nuclear Regulatory Commission staff to discuss feedback on NuScale Power LLC's (NuScale) response to the staff's Request for Additional Information (RAI) Nos. 9179, 9182, and 9185, involving NuScale Design Certification Application, Chapter 2.3, "Meteorology." Times Topics 3:00 p.m. Welcome and Introductions 3:05 - 3:50 p.m. Discuss NuScale's response to RAIs 9179, 9182 and 9185 3:50 - 4:00 p.m. Public Comments 4:00 p.m. Adjourn Meeting Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS STAFF FEEDBACK ON REQUEST FOR ADDITIONAL INFORMATION NO. 9179, 9182, 9185 LIST OF ATTENDEES January 24, 2018 Name Organization Brad Harvey U.S. Nuclear Regulatory Commission (NRC) Michael Mazaika NRC Jason White NRC Prosanta Chowdhury NRC Richard Clement NRC Stephen Williams NRC Seshagiri Tammara NRC Russell Goff NuScale Power, LLC (NuScale) Evren Ulku NuScale Mark Shaver NuScale Nolan Bartlow NuScale Amber Berger NuScale JinPeng Li NuScale Marty Bryan NuScale Ryan Welch Public January 31, 2018 Name Organization Brad Harvey U.S. Nuclear Regulatory Commission (NRC) Michael Mazaika NRC Jason White NRC Prosanta Chowdhury NRC Russell Goff NuScale Power, LLC (NuScale) Evren Ulku NuScale Mark Shaver NuScale Nolan Bartlow NuScale Amber Berger NuScale JinPeng Li NuScale Paul Guinn NuScale Marty Bryan NuScale Enclosure 2
U.S. NUCLEAR REGULATORY COMMISSION
SUMMARY
OF THE CATEGORY 1 PUBLIC TELECONFERENCE WITH NUSCALE POWER, LLC TO DISCUSS STAFF FEEDBACK ON REQUEST FOR ADDITIONAL INFORMATION NOS. 9179, 9182, 9185 On January 24, 2018, and January 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held Category 1 teleconference public meetings with NuScale Power, LLC (NuScale) to discuss the NRC staff's feedback on NuScale's response to the NRC's Request for Additional Information (RAI) Nos. 9179, 9182, and 9185 (Agencywide Documents Access and Management Systems (ADAMS) Acce ssion Nos. ML17349A980, ML17355A157, and ML17345A957, respectively). These RAIs are related to NuScale Design Certification Application (DCA), Chapter 2.3, "Meteorology." Attendees for this meeting are listed in Enclosure 2. One member of the public participated in the January 24, 2018, meeting. No members of the public participated in the January 31, 2018, meeting.
The NRC staff provided feedback comments to the NuScale staff on its responses to RAIs 9179, 9182, and RAI 9185 during this teleconference. These RAIs were primarily concerned with meteorological related site parameters presented in the NuScale DCA, Final Safety Analysis Report (FSAR) Tier 1, Section 5.0, "Site Parameters," and FSAR Tier 2, Sections 2.0, "Site Characteristics and Site Parameters," and 2.3, "Meteorology," and covered topics related to Sections 2.3.1, "Reginal Climatology," 2.3.4, "Short-Term Atmospheric Dispersion Estimates for Accident Releases," and 2.3.5, "Long-Term Atmospheric Dispersion Estimates for Routine Releases." The discussions included citation of cross references; consistent use of terminologies throughout the DCA; consistency of information in FSAR Tier 2 table 2.0-1, "Site Design Parameters," and FSAR Tier 1, 5.0-1, "Site Design Parameters"; impact of snow load on the control building roof; appropriateness in using one dispersion model over another in calculating annual average X/Q parameters; need for inclusion of certain meteorological parameters necessary for future combined operating license (COL) applicants; consistency of parameter descriptions with those in regulatory guides; and unambiguous use of release stack height for consideration by future COL applicants.
A synopsis of the discussions is provided in Attachments A through C to this meeting summary as listed below:
- 1. Attachment A: Feedback on NuScale Response to RAI 9179 (ADAMS Accession No. ML18044A086).
- 2. Attachment B: Feedback on NuScale Response to RAI 9182 (ADAMS Accession No. ML18044A119).
- 3. Attachment C: Feedback on NuScale Response to RAI 9185 (ADAMS Accession No. ML18044A130).
Enclosure 3