MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] |
Text
FENOF-T Beaver Valley Power Station P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 December 23, 2013 L-13-387 Confirmatory Order EA-12-254 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Units No. 1 and 2 BVPS-1 Docket No. 50-334, License No. DPR-66 BVPS-2 Docket No. 50-412, License No. NPF-73 Application for License Amendment to Adopt NFPA 805, "Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)" The Code of Federal Regulations, Title 10, Part 50.48(c) (10 CFR 50.48(c)), allows a licensee to maintain a fire protection program that complies with National Fire Protection Association Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition" (NFPA 805) as an alternative to compliance with existing fire protection program requirements.
10 CFR 50.48(c)further requires the licensee to submit a request to comply with NFPA 805 in the form of an application for license amendment.
By letter dated August 29, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12243A245), FirstEnergy Nuclear Operating Company (FENOC) established a formal regulatory commitment to submit an application for license amendment to implement 10 CFR 50.48(c) at Beaver Valley Power Station, Units 1 and 2 (BVPS) on or before December 31, 2013. By letter dated February 20, 2013 (ADAMS Accession No. ML12335A270) the Nuclear Regulatory Commission (NRC) issued Confirmatory Order EA-12-254, modifying License Nos.DPR-66 and NPF-73, for BVPS Units 1 and 2, respectively, as follows: A. FENOC will submit an acceptable license amendment request for Beaver Valley Power Station, Units 1 and 2, to adopt NFPA Standard 805 by no later than December 31, 2013.Attachments C, D, E, G, S, V, and W of the enclosure to this letter contain security-related information, and should be withheld from public disclosure in accordance with 10 CFR 2.390. Upon removal of Attachments C, D, E, G, S, V, and W, this letter and its enclosure are uncontrolled.
Beaver Valley Power Station, Units No. 1 and 2 L-1 3-387 Page 2 B. FENOC will continue to receive enforcement discretion until December 31, 2013. If the NRC finds that the LAR is not acceptable, the NRC will take steps consistent with the Enforcement Policy.Pursuant to the above described Confirmatory Order, and in accordance with the Code of Federal Regulations, Title 10, Part 50.90, "Application for amendment of license, construction permit or early site permit," FENOC hereby requests amendment of the BVPS Unit Nos. 1 and 2 Facility Operating Licenses granting the approval of a performance-based, risk-informed fire protection program consistent with 10 CFR 50.48(c) and NFPA 805.FENOC is implementing the methodology described in Nuclear Energy Institute (NEI) 04-02, Revision 2, "Guidance for Implementing a Risk-Informed, Performance-Based Fire Protection Program Under 10 CFR 50.48(c)" to transition BVPS from the current fire protection licensing basis to the new requirements as outlined in NFPA 805.The NRC issued Regulatory Guide (RG) 1.205, Revision 1, "Risk-Informed, Performance-Based Fire Protection for Existing Light Water Nuclear Power Plants," endorsing NEI 04-02, with exceptions, in December 2009.The enclosure to this letter, "FirstEnergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, Transition to 10 CFR 50.48(c) -NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition," hereafter referred to as the Transition Report, describes the transition methodology utilized and documents how FENOC complies with the new requirements for BVPS. This Transition Report provides information: " Required by 10 CFR 50.48(c).* Recommended by NEI 04-02 and appropriate Frequently Asked Questions." Recommended by RG 1.205, Revision 1.The Transition Report is provided in a format consistent with a template developed by the industry with the support of NEI and used for prior industry applications for NFPA 805 license amendments.
Major topics addressed in the Transition Report are presented in attachments, including the technical and regulatory justifications required to support this application.
FENOC is fully committed to the improvement of fire protection programs through voluntary implementation of 10 CFR 50.48(c) at BVPS. Until such time that the proposed license amendment is approved and implemented, FENOC will continue to maintain fire safety at BVPS in accordance with the facility operating licenses.
FENOC requests a period of 180 days following the issuance of the amendments to fully implement the requirements of the new license conditions.
Attachments C, D, E, G, S, V, and W of the enclosure to this letter contain security-related information, and should be withheld from public disclosure in accordance with 10 CFR 2.390. Upon removal of Attachments C, D, E, G, S, V, and W, this letter and its enclosure are uncontrolled.
Beaver Valley Power Station, Units No. 1 and 2 L-13-387 Page 3 Regulatory commitments established in this letter and its enclosure are identified in the attachment.
If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -Fleet Licensing, at 330-315-6810.
I declare under penalty of perjury that the foregoing is true and correct. Executed on December23, 2013.Sincerely, Eric A. Larson
Attachment:
Regulatory Commitment List
Enclosure:
"FirstEnergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, Transition to 10 CFR 50.48(c) -NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition" cc: Director -NRC Office of Enforcement (w/o Enclosure)
NRC Regional Administrator
-Region I (w/o Enclosure)
NRC Resident Inspector (w/o Enclosure)
NRC Project Manager (w/o Enclosure)
Director -State of Pennsylvania BRP/DEP (w/o Enclosure)
Site Representative
-State of Pennsylvania BRP/DEP (w/o Enclosure)
Attachments C, D, E, G, S, V, and W of the enclosure to this letter contain security-related information, and should be withheld from public disclosure in accordance with 10 CFR 2.390. Upon removal of Attachments C, D, E, G, S, V, and W, this letter and its enclosure are uncontrolled.
Attachment L-1 3-387 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to in this document and its enclosure by FirstEnergy Nuclear Operating Company (FENOC) for Beaver Valley Power Station, Units No. 1 and 2. Any other intended or planned actions discussed in the submittal are described for information only and are not considered regulatory commitments.
Regulatory Commitment
- 1. Implementation of the new NFPA 805 fire protection program, including procedure changes, process updates, and training affected plant personnel, will occur within 180 days after issuance of the license amendments.
See enclosure Attachment S, Table S-3.2. Enclosure Attachment S, Tables S-1 and S-2, provides a listing of plant modifications associated with the transition to NFPA 805 and their implementation status (open or complete).
Modifications will be completed by the startup following the second refueling outage (for each unit) after the issuance of the license amendments.
Attachments C, D, E, G, S, V, and W of the enclosure to this letter contain security-related information, and should be withheld from public disclosure in accordance with 10 CFR 2.390. Upon removal of Attachments C, D, E, G, S, V, and W, this letter and its enclosure are uncontrolled.