MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] |
Text
Pacific Gas and Electric Company February 3, 2014 PG&E Letter DCL-14-009 Barry S. Allen Site Vice President Diablo Canyon Power Plant Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.4888 Internal:
691.4888 Fax: 805.545.6445 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(f) Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Request for Additional Information Regarding Response to NRC Bulletin 2012-01
References:
- 1. NRC Letter, "Bulletin 2012-01, 'Design Vulnerability In Electric Power System,"'
dated July 27, 2012 2. PG&E Letter DCL-12-1 04, "Ninety-Day Response to NRC Bulletin 2012-01: 'Design Vulnerability In Electric Power System,"'
dated October 25, 2012 3. NRC Letter, "Request for Additional Information Regarding Response to Bulletin 2012-01, 'Design Vulnerability in Electric Power System,"'
dated December 20, 2013 Dear Commissioners and Staff: In Reference 1, the NRC issued Bulletin 2012-01 to request information from licensees regarding open phase impacts on electric power system designs and verify compliance with regulatory requirements.
PG&E provided a response in Reference
- 2. The NRC has requested additional information in Reference 3 to verify that licensees have completed interim corrective actions and compensatory measures, and to determine the status of licensee's long-term corrective actions. Pacific Gas and Electric's (PG&E) response is provided in the Enclosure to this letter. PG&E is making a regulatory commitment (as defined by NEI 99-04) in this letter. The commitment is identified in the Enclosure to this letter. If you have any questions, or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Wolf Creek m Document Control Desk February 3, 2014 & Page 2 PG&E Letter DCL-14-009 I state under penalty of perjury that the foregoing is true and correct. Executed on February 3, 2014. Sincerely, 5. A&___ Barrys2 Site Vice President mjrm/4557/50601137 Enclosure cc Diablo Distribution cc/enc: Brian J. Benney, NRR Project Manager Marc L. Dapas, NRC Region IV Administrator Thomas R. Hipschman, NRC, Senior Resident Inspector Gonzalo L. Perez, Branch Chief, California Department of Public Health A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Wolf Creek Enclosure PG&E Letter DCL-14-009 Response to NRC Request for Additional, Information Regarding Response to NRC Bulletin 2012-01 Enclosure PG&E Letter DCL-14-009 Response to NRC Request for Additional Information Regarding Response to NRC Bulletin 2012-01 NRC Request 1 Provide a summary of all interim corrective actions that have been taken since the January 30, 2012, event at Byron Station, Unit 2, to ensure that plant operators can promptly diagnose and respond to open phase conditions on the offsite power circuits for Class-1 E vital buses until permanent corrective actions are completed.
Pacific Gas and Electric (PG&E) Response Lessons learned from the events at Byron station were reviewed and various interim corrective actions evaluated for safety and efficiency at Diablo Canyon Nuclear Power Plant (DCPP). Based on the plant's offsite power configuration, electrical design details, and lessons learned, the following actions were taken to ensure plant operators can promptly diagnose and respond to open phase conditions (OPC):
- Interim Corrective Actions o As an interim measure, DCPP performs a daily visual inspection of the 230 kV tie-line for an open phase. The scope of the inspection includes the line termination at the standby I startup transformers of each unit up to switchyard disconnect switches (i.e., interface with the 230 kV busses). o PG&E's system protection group performed an informal study to evaluate the effects of single open phase on DCPP's 230 kV offsite power source and concluded that for heavy loading levels on the standby startup source, existing relaying would detect the condition and provide alarms in the control room. o Operating instructions were reviewed and procedures for annunciator responses were revised to provide guidance for operators to diagnose and respond to an OPC. o Training has been provided to operations personnel on the OPC event and the procedural changes. o PG&E has performed a study to determine the voltage imbalance tolerance of a selected sample of engineered safety feature motors. This is similar to, but more limited in scope than, the NEI guidance document for the OPC initiative.
PG&E determined that a more detailed analysis is required.
1 NRC Request 2 Enclosure PG&E Letter DCL-14-009 Provide a status and schedule for completion of plant design changes and modifications to resolve issues with an open phase of electric power." PG&E Response
- Status o PG&E is monitoring and evaluating industry efforts and options being researched and developed by several vendors to detect OPC faults. There is currently no generic, off-the-shelf technology that has been proven to detect all the required open phase fault conditions for all plant and transformer designs. o PG&E is monitoring and/or participating in the development of the NEI OPC guidance document, as well as development of enhancements to software tools being used to analyze OPC faults. o Prior to implementation, new OPC technology will need to be thoroughly evaluated, tested, and analyzed.
- Schedule o PG&E will be performing a detailed study of OPC faults beginning in February of 2014. PG&E anticipates the results in the third quarter of 2014. o Based on the results of the above study, PG&E will determine any design changes necessary to address OPCs, and the schedule for implementation, taking into account refueling outage schedules, software and hardware availability, manufacturer's delivery capabilities, licensing delays, and etc. PG&E is making the following regulatory commitment:
o Based on the results of the study being performed in 2014 for DCPP, PG&E will submit a supplement to the NRC by December 31, 2014. The supplement will identify any changes to current actions taken to address OPCs, and will provide details of any additional actions needed including proposed design changes and their planned schedule for completion.
2