|
---|
Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24087A1962024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 2024-09-09
[Table view] Category:Status Report
MONTHYEARML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML21084A8092021-03-25025 March 2021 Entergy Operations, Inc - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) ML21055A0082021-03-0303 March 2021 2020 Annual Assessment Letter ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report GNRO-2016/00008, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-02-25025 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) GNRO-2016/00003, Sixth (Final) Six-Month Status Report in Response to March 12, 2102 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-25025 February 2016 Sixth (Final) Six-Month Status Report in Response to March 12, 2102 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) GNRO-2015/00050, Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) GNRO-2015/00052, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) GNRO-2015/00004, Entergy'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mititgation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-19019 February 2015 Entergy'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mititgation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) GNRO-2015/00005, Entergy'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Lnstrumentation (Order Number EA-12-051)2015-02-18018 February 2015 Entergy'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Lnstrumentation (Order Number EA-12-051) GNRO-2014/00055, Entergy'S Third Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-27027 August 2014 Entergy'S Third Six-Month Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) GNRO-2014/00011, Entergy'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses- with- Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-28028 February 2014 Entergy'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses- with- Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) GNRO-2013/00061, Entergy'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-08-28028 August 2013 Entergy'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report - Entergy Operations, Inc CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc2012-10-15015 October 2012 Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc ML12024A3762011-12-28028 December 2011 State-of-the-Art Reactor Consequence Analyses, Current Status and Next Steps CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc CNRO-2007-00018, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1)2007-03-29029 March 2007 Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1) CNRO-2005-00028, Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling2005-05-0505 May 2005 Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling CNRO-2005-00022, Entergy Operations, Inc., Status of Decommissioning Funding Report2005-03-31031 March 2005 Entergy Operations, Inc., Status of Decommissioning Funding Report 2023-03-21
[Table view] |
Text
Q GNRO-2015/00050 August 28,2015 u.s.NuclearRegulatoryCommissionATTN:DocumentControlDeskWashington,DC20555-0001 Entergy Operations, Inc.P.O.Box756PortGibson,MS39150 Kevin J.MulliganSiteVice President Grand Gulf Nuclear StationTel.(601)437-7500
SUBJECT:
Entergy'sFifthSix-MonthStatusReportinResponsetoMarch12,2012Commission OrderModifyingLicenseswithRegardtoReliableSpentFuelPool Instrumentation (Order Number EA-12-051)GrandGulfNuclearStation,Unit1DocketNo.50-416LicenseNo.NPF-29
REFERENCES:
1.NRCOrderNumberEA-12-051, Order to Modify Licenses with Regard to Reliable SpentFuelPool(SFP)
Instrumentation, datedMarch12,2012(ML12054A682)2.EntergyLettertoNRC, Overall IntegratedPlanin Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051),datedFebruary 26,20132013/00016, ML 13064A417)3.EntergyLettertoNRC, Entergy's First Six-Month Status Report in ResponsetoMarch 12, 2012 Commission Order Modifying License with RegardtoReliable Spent Fuel Pool Instrumentation (Order Number EA-12-051),datedAugust28,2013 2013/00061
)4.EntergyLettertoNRC, Entergy's Second Six-Month Status Report in ResponsetoMarch 12, 2012 Commission Order Modifying License with Regard to Reliable SpentFuelPool Instrumentation (Order Number EA-12-051),datedFebruary 28,20142014/00013)5.EntergyLettertoNRC, Entergy's Third Six-Month Status Report in ResponsetoMarch 12, 2012 Commission Order Modifying License with Regard to Reliable SpentFuelPool Instrumentation (Order Number EA-12-051),datedAugust 27,20142014/00055)
GNRO-2015/00050Page2of36.EntergyLettertoNRC, Entergy'sFourthSix-MonthStatusReport in ResponsetoMarch 12,2012 Commission Order ModifyingLicensewith RegardtoReliableSpentFuelPool Instrumentation (Order Number EA-12-051),datedFebruary18,2015 2015/00005)
DearSirorMadam:
OnMarch12,2012,theU.S.
Nuclear Regulatory Commission(NRC)issuedanorder(Reference1)toEntergyOperations,Inc.(Entergy).Reference1was immediatelyeffectiveanddirectsEntergytoinstallreliablespentfuelpoollevel instrumentation.Reference1requires submissionofastatusreportatsix-monthintervalsfollowingsubmittaloftheoverall integrated plan (Reference2).Thepurposeofthisletteristoprovidethefifthsix-monthstatusreport pursuanttoSectionIV,ConditionC.2,ofReference1,that delineatesprogressmadein implementing the requirements ofReference1.Theattachedreportprovidesanupdateof milestone accomplishmentssincethelaststatusreport,includingany changestothe compliancemethod,schedule,orneedforreliefandthebasis,ifany.Thislettercontainsnonewregulatory commitments.Shouldyouhaveany questionsregardingthissubmittal,pleasecontactMr.JamesJ.Nadeau,Regulatory AssuranceManager,at(601)437-2103.Ideclareunderpenaltyofperjurythattheforegoingistrueandcorrect;executedonAugust28,2015.
Sincerely,
__KJM/ras
Attachment:
Grand Gulf Nuclear Station'sFifthSixMonthStatusReportforthe Implementation of Order EA-12-051, OrderModifyingLicenseswithRegardto RequirementsforReliableSpentFuelPool Instrumentationcc:U.S.Nuclear Regulatory CommissionATTN:KrissKennedyDeputyRegional Administrator,RegionIV1600EastLamarBoulevardArlington,TX76011-4511U.S.Nuclear Regulatory CommissionAttn:Director,Officeof Nuclear Reactor Regulation Washington,DC20555-0001 GNRO-2015/00050Page3of3cc:U.S.Nuclear Regulatory CommissionATTN:Kriss KennedyDeputyRegional Administrator,RegionIV1600EastLamarBoulevardArlington,TX76011-4511U.S.Nuclear Regulatory CommissionAttn:Director,Officeof Nuclear Reactor Regulation Washington,DC20555-0001U.S.Nuclear Regulatory CommissionATTN:Mr.AlanWang, NRR/DORLMailStop OWFN/8B1 Washington,DC20555-0001 NRC Senior Resident Inspector Grand Gulf Nuclear StationPortGibson,MS39150 Attachment to GNRO-2015/00050 Grand Gulf Nuclear Station's Fifth Six Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation GNRO-2015/00050Page1of31Introduction Grand Gulf Nuclear Station (GGNS)developedanOverall IntegratedPlan(OIP-Reference1inSection8), documenting the requirementstoinstallreliable spentfuelpoollevel instrumentation(SFPI),in response to Reference2ofsection8.This attachment providesanupdateof milestone accomplishmentssincethelaststatusreport, including any changestothe compliancemethod,schedule,orneedfor relief/relaxationandthebasis,ifany.2MilestoneAccomplishmentsThefollowing milestone(s)havebeen completed since January31,2015andare currentasofJuly31,2015:
None.3MilestoneScheduleStatusThefollowing providesanupdatetothe schedule identifiedinSection2oftheOverall IntegratedPlan.Itprovidestheactivity statusofeachitem,and whether the expected completiondatehaschanged.Thedatesareplanningdates subject to changeasdesignand implementation detailsaredeveloped.
Target RevisedActivityTarget Milestone Completion Status Completion Date DateSpring2016InstallreliableSFPI Refueling Planned N/A OutageRespondtoNRC RAls(receivedJuly August 29, Submitted August 29, N/A 30,2013)2013 2013RespondtoISERAls(received September 30, Submitted February 27, N/A November25,2013)2015 2015 GNRO-2015/00050Page2of34ChangestoComplianceMethodThereareno additional changestothe compliance method.5NeedforRelief/RelaxationandBasisfortheRelief/RelaxationGGNSexpectstocomplywiththe order implementationdateandno relief/relaxationisrequiredatthistime.6OpenItemsfrom Overall IntegratedPlanandInterimStaffEvaluationGGNShasreceivedanInterim Staff Evaluation(ISE)that includes19RAls.ThefollowingtableprovidesastatusofanyRAls documentedintheISE.RAI#ResponseStatus 1 Submitted in Reference 10 2 Submitted in Reference 10 3 Submitted in Reference 10 4 Submitted in Reference 10 5 Submitted in Reference 10 6 Submitted in Reference 10 7 Submitted in Reference 10 8 Submitted in Reference 10 9 Submitted in Reference 10 10 Submitted in Reference 10 11 Submitted in Reference 10 12 Submitted in Reference 10 13 Submitted in Reference 10 14 Submitted in Reference 10 15'Submitted in Reference 10 16 Submitted in Reference 10 17 Submitted in Reference 10 18 Submitted in Reference 10 19 Submitted in Reference 10 7 Potential InterimEvaluationImpactsTherearenopotential impactstotheInterim Staff Evaluation identifiedatthistime.
GNRO-2015/00050Page3of38ReferencesThefollowing references support the updatestotheOverall Integrated Plan describedinthis Attachment.1."Overall IntegratedPlanin ResponsetoMarch12,2012, Commission Order ModifyingLicensewithRegardtoReliable SpentFuelPool Instrumentation (Order Number051),"dated February 26,2013 (GNRO-2013/00016, ML 13059A316).2.NRC Order Number EA-12-051,"Order ModifyingLicenseswithRegardtoReliableSpentFuelPool Instrumentation,"datedMarch 12,2012 (ML 12054A679).3."GrandGulf NuclearStation,Unit1-Interim StaffEvaluationand RequestforAdditional
.InformationRegardingOverall IntegratedPlanforReliable SpentFuelPool Instrumentation (Order Number EA-12-051)(TACNO.MF0955)," dated November 25,2013(ML 133168986).
4."Summaryofthe November26,2013,PublicMeetingtoDiscuss Industry Responses to Staff Interim EvaluationsforSpentFuelPool Instrumentation," dated December 26,2013(ML 133478030).
5."Request for Additional Information Regarding Overall IntegratedPlanforReliableSpentFuelPool Instrumentation (OrderEA-12-051),"datedJuly30,2013 (GNRI-2013/00129).6.EntergyLettertoNRC, Entergy's First Six-MonthStatusReportin ResponsetoMarch 12,2012 Commission Order ModifyingLicensewithRegardtoReliableSpentFuelPool Instrumentation (Order Number EA-12-051), dated August 28,20132013/00061)7.EntergyLettertoNRC, Entergy's Second Six-MonthStatusReportinResponsetoMarch12,2012 Commission Order ModifyingLicensewithRegardtoReliableSpentFuelPool Instrumentation (Order Number EA-12-051), dated February 28,20142014/00013)8.EntergyLettertoNRC, Entergy's Third Six-MonthStatusReportinResponsetoMarch12,2012 Commission Order ModifyingLicensewithRegardtoReliableSpentFuelPool Instrumentation (Order Number EA-12-051), dated August 27,20142014/00055)9.NE112-02, Industry Guidance for CompliancewithNRC OrderEA-12-051,"ToModifyLicenseswithRegardtoReliable SpentFuelPool Instrumentation,"Revision1,dated August2012(ML 12240A307)10.EntergyLettertoNRC,Entergy'sFourth Six-MonthStatusReportinResponsetoMarch12,2012 Commission Order ModifyingLicensewithRegardtoReliableSpentFuelPool Instrumentation (Order Number EA-12-051), dated February18,2015 2015/00005)