MONTHYEARML0704303782007-01-31031 January 2007 Mitigation of Alloy 600/82/182 Pressurizer Butt Welds Project stage: Request ML0704705252007-02-0808 February 2007 Proposed Alternative for PVNGS Use of Full-Structural Weld Overlays in the Repair of Dissimilar Metal Welds - Relief Request No. 36-10 CFR 50.55a(a)(3)(i) and Request to Use a Later Edition and Addenda of the ASME Boiler. Project stage: Request ML0705902122007-02-16016 February 2007 Commitment to Perform Enhanced Leak Monitoring Associated with Pressurizer Dissimilar Welds and Reactor Coolant System Project stage: Request ML0706603652007-02-21021 February 2007 2/21/2007 E-Mail to M. Markley, NRR/DORL/LPL4, from M. Glenn, Arizona Public Service Company, Subject: Revised Leakage Monitoring Commitment, Related to Confirmatory Action Letter Project stage: Other ML0706602982007-03-15015 March 2007 Confirmatory Action Letter Alloy 82/182 Pressurizer Butt Welds Project stage: Other ML0724102032007-08-0202 August 2007 Mitigation of Alloy 600/82/182 Pressurizer Butt Welds in 2008 Project stage: Other ML0726904222007-09-19019 September 2007 Aps'S 60-Day After Plant Restart Letter in Response to First Revised NRC Order EA-03-009, Item Iv.E and Confirmatory Action Letter, NRR-07-004, Dated March 15, 2007 - U1R13 Project stage: Other ML0728200012007-10-31031 October 2007 Completion of Actions for Confirmatory Action Letter NRR-07-004 Project stage: Other 2007-02-21
[Table View] |
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
A subsidiary of Pinnacle West Capital Corporation Palo Verde Nuclear Generating Station Robert S. Bement Vice President Nuclear Operations Tel (623) 393-6116 Fax (623) 393-6077 Mail Station 7602 PO Box 52034 Phoenix, Arizona 85072-2034 102-05643-RSB/SAB/RJR February 16, 2007 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos. STN 50-5281529/530 Commitment to Perform Enhanced Leak Monitoring Associated with Pressurizer Dissimilar Welds and Reactor Coolant System This letter documents the commitment made in a telephone call between the NRC and Arizona Public Service Company on February 15, 2007, to perform enhanced reactor coolant system leakage monitoring at PVNGS Units 1, 2 and 3. This new commitment will be implemented by March 1, 2007, as discussed with the NRC, and replaces the previous commitment made in APS letter 102-05640, dated January 31, 2007.Previous Commitment to be superseded:
Revise plant procedures to state that if a shutdown of a unit should occur due to excessive primary system unidentified leakage, and if the leakage cannot be confirmed to originate from a source other than the pressurizer, perform a bare metal visual examination of the Alloy 600/82/182 butt weld locations on the pressurizer to determine whether the leakage originated from those locations.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak 0 Diablo Canyon
- South Texas Project 0 Wolf Creek Aow NRC Document Control Desk Commitment Associated with Pressurizer Dissimilar Welds and Reactor Coolant System Page 2 New Commitment:
Pressurizer Dissimilar Welds and RCS Leak Monitoring RCS LeakReiscto Weld Inspection Date Monitoring RCS Leak Monitoring Action RCS Leak Monitoring Re-inspection Frequency (2)(3) Levels Actions Reporting Frequency Inspect by 12/31/07 Daily while the (1) A 0.1 gpm change from one Once the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Report details of Within every 4 plant is in day to the next, sustained for evaluation period is inspection results of years, until the OR MODES 1-3. (4) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with at least 0.1 gpm complete, and the any unmitigated weld welds are not confirmed from sources leakrate is still elevated, examination and any removed from Plant is shutdown with other than pressurizer nozzle place the unit in MODE corrective or mitigative service or inspections completed prior to welds. 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and action within 60 days mitigated.
plant operation above 200 MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> of unit restart.degrees F (average RCS (2) A 0.25 gpm above a and perform a bare temperature in Mode 5) after baseline (established using metal visual inspection Report bare metal 12/31/07 RCS leakrate information of unmitigated visual inspection OR collected within 7 days after pressurizer surge, spray, results within 60 days achieving steady state in safety and relief nozzle of the unit restart.Commit to develop contingency MODE 1 operation after the butt welds, and safe end plans to inspect welds prior to most recent bare metal visual butt welds containing 12/31/07 if MRP calculations do examination) sustained for 72 alloy 82/182 material not demonstrate adequate hours with 0.25 gpm not safety. (1) confirmed from sources other than the pressurizer nozzle welds.Notes: 1. This commitment was made for PVNGS Unit 2 in letter 102-05640, dated January 31, 2007, by stating that APS will accelerate the Unit 2 weld overlays currently scheduled for the spring of 2008 if analytical results do not demonstrate that current schedules are adequate or if new information is obtained during upcoming inspections that challenge current assumptions.
- 2. PVNGS Technical Specification Surveillance Requirement 3.0.2, which allows 1.25 times the interval specified in the Frequency applies to these intervals.
- 3. As specified in PVNGS Technical Specification 3.4.14, "RCS Operational Leakage," Surveillance Requirement 3.4.14.1, RCS water inventory balance [leak monitoring]
is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation and applies to this leak monitoring.
This same provision is provided in NUREG-1432 Volume 1, Revision 3.0, "Standard Technical Specifications Combustion Engineering Plants," Specification 3.4.13, "RCS Operational Leakage," Surveillance Requirement 3.4.13.1.4. "Daily" is defined as a frequency of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
NRC Document Control Desk Commitment Associated with Pressurizer Dissimilar Welds and Reactor Coolant System Page 3 If you have any questions, please contact Thomas N. Weber at (623) 393-5764.CDM/SAB/RJR/gt cc: B. S. Mallett M. B. Fields M. T. Markley G. G. Warnick NRC Region IV Regional Administrator NRC NRR Project Manager NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS