October 31, 2007 Mr. Randall K. Edington Senior Vice President, Nuclear Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 - COMPLETION OF ACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-004 (TAC NO. MD4169)
Dear Mr. Edington:
On March 15, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-004 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070660298) regarding dissimilar metal welds in the pressurizer surge, spray, and safety/relief nozzle-to-safe-end welds at Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3. This letter acknowledges receipt of the Arizona Public Service Company (APS) letter dated September 19, 2007 (ML072690422),
informing the NRC of actions taken at Palo Verde, Unit 1, in response to the CAL.
The APS letter dated September 19, 2007, notifies the NRC that the commitment made in APS letter 102-05640, dated January 31, 2007 (ADAMS Accession No. ML070430378), regarding the mitigation of the Palo Verde, Unit 1, pressurizer Alloy 82/182 butt welds was completed during U1R13 and post mitigation inspections were performed. The letter states that, as a result of the completion of the mitigation of the Palo Verde, Unit 1, pressurizer Alloy 82/182 butt welds, APS has satisfied the commitment to mitigate these welds and is no longer performing enhanced reactor coolant system (RCS) leakage monitoring at Palo Verde, Unit 1.
Based on the APS letter, the NRC staff concluded that all the commitments listed in the CAL and the supporting commitment letters (ADAMS Accession Nos. ML070430378 and ML070590212) have been met for Palo Verde, Unit 1. With respect to Palo Verde, Unit 1, no further response is required regarding the CAL and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the RCS. This action closes TAC No. MD4169.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Since the CAL addressed all Palo Verde units, it will remain open until all CAL commitments pertaining to Palo Verde, Units 2 and 3, are complete.
R. Edington Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
In accordance with Title 10 of the Code of Federal Regulations, Part 2, Section 390, of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Docket No. 50-528 cc: See next page
ML072820001/PKG. ML072780004 Incoming: ML072690422 OFFICE DCI/CPNB DCI/CPNB LPL4/PM LPL4/LA LPL4/BC NAME TLupold TChan MMarkley JBurkhardt THiltz DATE 10/18/07 10/18/07 10/11/07 10/11/07 10/19/07 OFFICE DCI/D DRP/D, RGN4 DORL/D NAME MEvans Bill Jones per E-mail AHowell, III CHaney DATE 10/19/07 10/30/07 10/31/07
Palo Verde Nuclear Generating Station cc:
Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Mr. Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 40 Buckeye, AZ 85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 Mr. Scott Bauer, Acting General Manager Regulatory Affairs and Performance Improvement Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Matthew Benac Assistant Vice President Nuclear & Generation Services El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy Bldg D21 San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. John Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Ms. Karen O'Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix AZ 85003