ML18088B285

From kanterella
Revision as of 08:01, 31 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
St. Lucie, Unit 1 - Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Repositioning Cea'S About Three Inches Different from Their Present Position to Minimize Potential Guide Tube Wear at Single Location
ML18088B285
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/04/1978
From: Uhrig R E
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
Download: ML18088B285 (19)


Text

DISTRfBGTD3N AFT'SSUANCE 0-ERATING LICENSE NRC PoRM 195 UA.NUCLEAR REGULATORY COMMISSI IX 78)NRC OISTRIBUTIQN FQR PART 50 OOCKET MATERIAL OQCKET NUM SSR mo-5 FILE NUMSER'O."~~TTS R QR IG IN A I SCOPY CSSCRIPTION GNQTORIZEO UNCLASSIFIED Hr.Victor Stello PROP INPUT FORM ENCI OSURS FROM: Florida Power L Light Company Robert E>>Uhrig CATE QF OOCUMSNT 1/4/78 OATS BECEIVSO 1/6/78 NUMBER QF COPIES RECEIVED Slb&CD License NO.DPR-67 Appl for Amend: tech specs proposed change concerning reposition<<

ing CEA's about three inches different from their present position to minimize potential guide tube wear at a single location>>~~~~~>>~notorized 1/4/78>>~~~~~~~(2-P)(3-P)+(4<<P)

PLANT NAME: St>>Lucie Unit No.1 RJL 1/6/78'RANCH CHIEF: 7 FOR ACTION/INFORMATION INTBRNAL OISTRI BUTION f2DR: ZIC HSING gGRS 1 GYS SENT CATEGP EXTERNAL OISTRIBUTION CONTROL NUMBER 780060168 t~~4 E S I h~,h~~pfgfjjO.BOX 013100, MIAMI, FL 33101 I ILL OUI 1, 0~FLORIDA POWER&LIGHT COMPANY h January 4, 1978 L-78-7 Director of Nuclear Reactor Regulation ATTN: Mr.Victor Stello, Director Division of Operating Reactors U.S.Nuclear Regulatory Commission

.Washington, D.C.20555

Dear Mr.Stello:

Re: St.Lucie Unit 1 Docket No.50-335 Propos'ed Amendment to Facilit 0 eratin License DPR-67 In accordance with 10 CFR 50.30, Florida Power 6 Light Company submits herewith three (3)signed originals and forth (40)copies of a request to amend Appendix A of Facility Operating License DPR-67.As described in our letter L-77-392 of December 27, 1977, Combustion Engineering (C-E)has recommended reposi-tioning CEA's about three inches different from their present position to minimize potential guide tube wear at a single location.In order to support a regulating rod withdrawal position less than that presently required by Technical Specifi-cation 3.1.3.6, a Technical Specification amendment is necessary.

The proposed amendment is described below and shown on the accompanying Technical Specification pages bearing the date of this letter in the lower right hand corner.Pa es 3/4 1-23, 3/4 1-27, and 3/4 1-28 Specifications 3.1.3.2 (Part Length CEA Insertion, Limits), 3.1.3.5,(Shutdown CEA Insertion Limit), and 3.1.3.6 (Regulating CEA Insertion Limits)are revised to allow the"fully withdrawn" CEA position to be anywhere within the range from the fully withdrawn mechan-ical limit to 3 inches less than their present withdrawal position.This will allow the long term"fully withdrawn" position of the end of the CEA to be varied over a small range thus minimizing guide tube wear at.a single location.To avoid affecting our compliance with other Specifications that refer to the fully withdrawn CEA position, we interpret the proposed amendment to mean that"fully withdrawn" will be at or above the new long term CEA position.h 7P0060168 PEOPLE...SERVING PEOPLE f Q+l Mr.Victor Stello, Director Division of Operating Reactors Page Two In addition, the Action statements of certain Specifications require immediate verification of full withdrawal, as indicated by the"Full Out" limit (Upper Electrical Limit light).However, when operating with CEA's repositioned, we will not have the UEL light.Should we be required to, have the light to satisfy these Specifications, it will take a finite length of time to withdraw CEA's to the"Full Out" limit.It is our interpretation that immediate action to withdraw CEA's to the"Pull Out" limit will meet the intent of the Action statements and will constitute compliance with the applicable Specifications.

The CEA's will be in the"Full Out" position only until the problem leading to their withdrawal is resolved (within the time constraints of the Action statement).

In the interim, we have implemented weekly cycling of shutdown and regulating CEA's as required by your staff during a telephone conversation on December 23, 1977.Upon NRC approval and FPL implementation of the proposed amendment, weekly cycling will be discontinued.

In order to reposition part length CEA's, it will be necessary to energize their drive mechanisms.'owever, since Technical Specification 4.1.3.2.b implicitly requiies that electric power be disconnected from the part, length CEA drive mechanisms,'e request temporary suspension',of this surveillance requirement to support repositioning part length CEA's.The suspension need be effective only, during brief periods of part length CEA movement since electric power can be disconnected again after repositioning.

Without suspension of Technical Specification 4.1.3.2.b, we would have to wait until the next shutdown to reposition part length rods.The proposed amendment has been reviewed by the St.Lucie Facility Review Group and the Florida Power s Light Company Nuclear Review Board.They have concluded that it does not involve an unreviewed safety question.A safety evaluation is attached.Additional information is contained in the CEA GUIDE TUBE WEAR REPORT forwarded by Combustion Engineering, Inc.to your office on December 23, 1977.Very'truly yours, Robert E.Uhrig Vice President REU/MAS/sl Attachment cc: Mr.James P.O'Reilly, Region II Robert, Lowenstein, Esquire Edward Reeves 0 g~t REACTIVITY CONTROI SYSTEl1S PART LENGTH CEA INS'ERTION LIMITS LIMITING CONDITION FOR OPERATION 3.1.3.2 All part length CEAs shall be withdrawn to at least 129.Oinches.r APPLICABILITY:

MODES 1*and 2*.ACTIOn: wt!lith.a maximum of one PLCEA withdrawn to less than 129.0 inches, either: a.Withdraw the pLCEA to at least229.0 inches within one hour, or\b.Be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE RE UIREMiENTS 4.1.3.2 Each part length CEA shall, be determined wi thdrawn to at least 129.0 inches by: a~Verifying the positions of the PLCEAs prior to increasing THERMAL POWER above 5%of RATED THERMAL POWER, and.b.Yerifying, at least once per 31 days, that electric power has been disconnected from its drive mechanism by physical removal of a breaker from the circuit.*See Special Test Exception 3.10.2.ST.LUCIE-UNIT'3/4 1-23 1/4/78

REACTIVITY CONTROL SYSTEMS SHUTDOMN CEA INSERTION LIMIT LIMITING CONDITION FOR OPERAlION 3.1.3.5 All shutdown CEAs shall be withdrawn to at least 3.29.pinches.APPLICABILITY:

MODES 1 and 2*8,.ACTION: Mith a maximum of'ne shutdown CEA withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, to less than 129.pinches, within one hour either: a.Irfithdraw the CEA to at least 129.pinches, or b.Declare the CEA.inoperable and apply Specification 3.1.3.'l.SURVEILLANCE REQUIREMENTS 4.1.3.5 Each shutdown CEA shall be determined to be wwithdrauin to at 1 east 129..pinches: I a.-Mithin 15 minutes prior to withdrawal of any CEAs in regulating groups during an approach to reactor criticality, and b.At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

See Special Test Exception 3.10.2.4 Msth K)1.0.ST.LUCIE-UNIT 1 3/4 1-27 1/4/78 t

REACTIVITY CONTROL SYSTEMS REGULATING CEA INSERTION LIMITS LIMITING CONDITION FOR OPERATION 3.1.3.6 The regulating CEA groups shall be limited to the with-'.: drawal sequence and to the insertion limits shown on Figure 3.1-2.Regulating CEA's are considered to be fully withdrawn in accor-dance with Figure 3.1-2 when withdrawn to at least 129.0 inches;'with CEA insertion between the Long Term Steady State Insertion Limits and the Power Dependent Insertion Limits restricted to: I a.<4 hours per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> interval, b.c<5 Effective Full Power Days per 30-Effective Full Power Day interval, and<14 Effective Full Power Days per calendar year.APPLICABILITY:

NODES 1*and 2*8.ACTION: a~1 With the regulating CEA groups inserted beyond the Power Dependent Insertion Limits, except for,'s'urvei1 lance'testing~pursuant to Specification 4.l.3.1.2,.within two hours either: I 1.Restore the regulating CEA groups to-within the limits, or 2.Reduce THERMAL POWER to less.than or equal to that fraction of RATED THERMAL POWER which is allowed by the CEA group'.'position using the above figure.With the regulating CEA groups inserted between the Long Term Steady State Insertion Limits and the Power.Dependent Insertion Limits for intervals)4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> interval, except during operation pursuant to the provisions of ACTION items c.and d.of Specification 3.1.3.1, operation may proceed pro-vided either: 1.The Short Term Steady.State Insertion'Limits of Figure 3.1-2 are not exceeded, or 2.Any,subseque'nt increase in THERMAL POWER is restricted.to<5A of RATED.THERMAL POWER per hour.See Special Test Ex"eptions 3.10.2 and 3.10.5.-With K'1.0.ST.LUCI E-UNIT 1 3/4 1-28 1/4/78

~'i I

~hy ATTACHMENT St.Lucie Unit l Docket No.50-335 CEA Position Introduction An analysis has been made of the effects produced by withdrawing all CEA's to a position other than that con-sidered to be fully withdrawn.

Specifically the analysis evaluated the effect of lowering the"fully withdrawn" CEA position by three inches.Calculations were performed for a typical C-E reactor where the position of the CEA groups, which are normally fully withdrawn during full power oper-ation, was systematically lowered three inches.Shutdown Mar in The fully withdrawn position for the shutdown and regulating CEA groups is assumed to be at the top of the fuel when scram reactivity calculations are performed.

The speci-fication of a lower position will diminish the available scram reactivity worth to a degree determined by the specified position.The reactivity worth of the CEA groups near the top of the active fuel is low.Therefore, a significant reduction in the available scram worth is not expected.Calculations show that an insertion of all CEA's of three inches has a reactivity worth of about, 0.035%hp.This is well within the 0.3%hp normally allowed for CEA bite as defined in safety analysis reports.Reduction of shutdown margin due to the lowering of all CEA's three inches is acceptable because adequate excess margins are available.

Shutdown margins consistent with the safety analysis are, therefore, assured.III.Power Distributions The effect on power distributions of lowering the CEA's three inches has also been examined by calculation.

Small insertion of the CEA's (with the resulting small reactivity worth)cause very minor changes in the 3-D power distri-bution below the CEA's.Insertion of the CEA's of up to three inches causes a barely detectable change in the axial peaking factor.A change of approximately 0.5%was cal-culated for the nominal full power shape.This increased peak is well within the bounds of the power distributions used in the Reactor Protective System setpoints as des-cribed in,"C-E Local Power Density and DNB LSSS and LCO St.Lucie Unit 1 Docket No.50-335 CEA Position Pa e Two Setpoint Methodology for Analog Protection System, CENPD-199-P.

It'is therefore concluded that repositioning the CEA's three inches is acceptable."E-"'""" To allow the increased operational flexibility previously defined, a minor modification to the Control Element Drive System (CEDS)will be implemented.

Technical Specification Limiting Conditions for Operation define administrative controls on the insertion and withdrawal sequences for the control, rods.To assist the operator in implementing these administrative controls, the CEDS and Metrascope contain an automatic inhib'it function to limit certain rod motion sequences not permitted by technical specifications.

A CEDS internal wire change is required to permit temporary bypass of the automatic inhibit functions which: a.Inhibits the Regulating Groups from being withdrawn in the group modes of control when the Shutdown CEAs are not at their fully ,withdrawn position.b.Inhibits the Shutdown Groups from being inserted in the Manual Group mode of control when the Regulating CEAs are not at their fully inserted position.Separate independent inhibit logic is contained in the Metrascope rod block circuit to perform the above functions at selectable insertion limits.These Metrascope insertion limits will be selected to allow proposed, CEA insertions while assuring that all automatic'inhibit.functions previously provided are maintained.

The Metrascope rod block functions for: a.Power Dependent Insertion Limits (PDIL)b.Single rod deviation, and"c.Out-of-sequence insertion and withdrawal are unaffected.

Implementation of these modifications is proceeding under the provisions of 10 CFR 50.59.Discussions with the vendor have indicated their belief that these modifications do not constitute an unreviewed safety question and will not affect any conclusions of the safety analyses.

Q~ll St.Lucie Unit 1 Docket No.50-335 CEA Position Pa e Three V.Conclusions Based on the considerations described above, (l)the proposed change does not increase the probability or consequences of accidents or malfunctions of equipment important to safety and does not reduce the margin of safety as defined in the basis for any technical specification, therefore,'he change does not.involve a significant hazards consideration,,(2) there is reasonable assurance that'the health and safety of the public will not be endangered by operation in the proposed manner, and (3)such activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense'nd security or to the health and safety of the public.

STATE OF FLORIDA)=)COUNTY OF DADE)ss Robert E.Uhrig, being first, duly sworn, deposes and says: That he is a Vice President of Florida Power&Light Company, the Licensee herein;That he has executed the foregoing document;that.the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.Robert E.Uhrig Subscribed and sworn to before me this z/~day of l9 rZ NOTARY PUBLIC, in and for the County of Dade, State of Florida~1Y COlP!AlS.i"~<My commission expires:

!E1I j I ,jr',.l~~',.(q 476~g-'h: E'I i~

STATE OF FLORIDA)~)COUNTY OF DADE)ss Robert E.Uhrig, being first duly sworn, deposes and says: That he is a Vice President, of Florida Power 6 Light Company, the Licensee herein;That he has executed the foregoing document;that the state-ments made in this'said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.Robert E.Uhrig Subscribed and sworn to before me this day of 1 19)Z NOTARY PUBLIC, in and for the County of Dade, State of Florida 5PTQRY PUSLIQ STATE OF FlORIOA et lARGE QY COMMISSION EXPIRES AUGUST 24, 1%1 My commission expires: RoeoEo mRu MAYHAR0 EGRGIRQ AGB'cY C I RECElVEO opCUME~~T~~"-"."-Sl.-"" u~,~r D<<gpss'>p E C'I 4 h C I L f'r4"