ML18139B992

From kanterella
Revision as of 22:21, 19 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Spec 6.4.E.4 Re Assistant Health Physics Supervisor or Health Physicist
ML18139B992
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/09/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B991 List:
References
NUDOCS 8208120289
Download: ML18139B992 (1)


Text

e TS 6.4-4 D. All procedures described in A and B above shall be followed.

E. Temporary changes to procedures described in A and B above which do not change the intent of the original procedure may be made, provided such changes are approved prior to implementation by the persons signated below based on the type of procedure to be changed: 1. Administrative

2. Abnormal 3. Annunciator
4. Health Physics 5. Emergency
6. Maintenance
7. Operating
8. Periodic Test 9. Start-up Test 10. Special Test 11. Quality Assurance
12. Chemistry Cognizant Supervisor Shift Supervisor or Assistant Shift Supervisor Shift Supervisor or Assistant Shift Supervisor
  • Assistant HP Supervisor or Health Physicists Shift Supervisor or Assistant Shift Supervisor
  • Cognizant Supervisor Shift Supervisor or Assistant Shift Supervisor
  • Cognizant Supervisor
  • Engineering Supervisor
  • Engineering Supervisor Manager Quality Assurance or Supervisor Quality Control, O&M *Chemist *These procedures must have the approval of a licensed Senior Reactor Operator.

Such changes will be documented and subsequently reviewed by the Station Nuclear Safety and Operating Committee and approved by the Station Manager within fourteen days. 8208120289 820809 PDR ADOCK 05000280 P PDR