Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML18066A3251998-11-0909 November 1998 Application for Amend to License DPR-20,deleting CVCS Operability Requirements Currently in LCOs 3.2 & 3.17.6 & Associated Testing Requirements in SRs 4.2 & 4.17 ML18066A1981998-06-17017 June 1998 Application for Amend to License DPR-20,updating TS to Reflect Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1831998-03-13013 March 1998 Revised Application for Amend to License DPR-20,requesting Relocation of TS Section 4.16 Snubber Testing Requirements to Plant Operating Requirements Manual (Orm).Affected Orm Pages Encl ML18065B1781998-03-13013 March 1998 Application for Amend to License DPR-20,changing Auxiliary Feedwater TS to Allow Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A7051997-10-0101 October 1997 Application for Amend to License DPR-20,proposing That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note Re Insp at End of Cycle 12 ML18067A6751997-09-0303 September 1997 Application for Amend to License DPR-20,deleting Snubber Operability Requirements in LCO 3.20 & Snubber Testing Requirements in Surveillance Requirement 4.16 ML18067A6711997-09-0303 September 1997 Application for Amend to License DPR-20,reflecting Capabilities of Installed CR Ventilation Equipment & Emulate Std Tech Specs,C-E Plants,Per NUREG-1432 Requirements for Sys ML18067A4511997-03-26026 March 1997 Application for Amend to License DPR-20,allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065A4891996-02-0606 February 1996 Application for Amend to License DPR-20,requesting to Remove cross-train Testing Requirements from LCO Action Statements ML18065A4381996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS to Allow Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas,To Suppl 951211 Administrative Controls Change Request ML18065A4341996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS Re Primary Coolant Pump Flywheel Insp.Rev 1 to Structural Integrity Assoc,Inc Rept SIR-94-080, Relaxation of Reactor Coolant Pump Flywheel Insp Requirements Encl ML18065A4051996-01-10010 January 1996 Application for Amend to License DPR-20,requesting Exemption from 10CFR50 App J TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3821996-01-0505 January 1996 Application for Amend to License DPR-20,revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3751995-12-27027 December 1995 Application for Amend to License DPR-20,rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3461995-12-11011 December 1995 Application for Amend to License DPR-20,revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 from TS ML18065A3321995-12-0606 December 1995 Application for Amend to License DPR-20,relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1741995-10-17017 October 1995 Application for Amend to License DPR-20,changing Paragraph 2.B.(2) to Ref 10CFR40 & to Allow Use of Source Matls as Reactor Fuel,Rewording Paragraph 2.E & Deleting Paragraph 2.7 & Revising TS Pressurizer Cooldown Limit ML18064A8391995-07-0505 July 1995 Application for Amend to License DPR-20,deleting TS 6.4, Training & Revising TS 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7591995-05-0101 May 1995 Application for Amend to License DPR-20.Amend Would Place Requirements in TS Section 4.7 for Periodic DG Peak Load Tests ML18064A6121995-02-10010 February 1995 Application for Amend to License DPR-20,proposing One Time Deferral of 18-month Refueling Interval Surveillance Tests ML18064A5821995-01-13013 January 1995 Tech Specs Change Request to License DPR-20 Addressing Required Settings & Allowable as Found & as Left Tolerances for Primary & Secondary Safety Valves ML18064A5341994-12-29029 December 1994 Application for Amend to License DPR-20,revising TSs Re Iodine Removal Sys ML18064A5061994-12-13013 December 1994 Application for Amend to License DPR-20,adding Third High Thermal Performance DNB Correlation to Safety Limit 2.1 ML18064A4081994-10-0505 October 1994 Application for Amend to License DPR-20,revising TS Relating to Primary Coolant Sys pressure-temp Limits.Rev 0 to Engineering Analysis EA-A-PAL-92-095-01 & Excerpts from Rosemount Instruction Manual 4515,dtd Jan 1988 Encl ML18059B0961994-07-0707 July 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Intended to Resolve Concerns Arose During NRC Review of Change Request ML18059A9751994-05-0505 May 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Necessary Due to Intervening Amends Containing Listed Differences from Pages Submitted on 930519 ML18059A9321994-04-0707 April 1994 Application for Amend to License DPR-20,requesting TS Change Re Instrumentation & Control Section ML18059A9411994-04-0707 April 1994 Application for Amend to License DPR-20,relocating Cycle Specific Operating Limits to Colr,Per Guidance of GL 88-16, Removal of Cycle-Specific Parameter Limits from Ts. Proposed COLR Encl ML18059A8851994-03-11011 March 1994 Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17 ML18059A3721993-09-0303 September 1993 Changes to 930129 Application for Amend to License DPR-20, Modifying Radial Peaking Factor Limits in TS Table 3.23-2 to Incorporate Appropriate Limits for Modified L Fuel Assemblies Recently Installed in Reactor for Cycle 11 ML18058B8991993-06-25025 June 1993 Revises 921208 Application for Amend to License DPR-20 & Brings Proposed Specifications Closer to Model Tech Specs, While Retaining Necessary plant-specific Differences & Updating Proposed Pages to Reflect Amends 147 & 149 ML18058B7421993-03-29029 March 1993 Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks ML18058B3881993-01-29029 January 1993 Application for Amend to License DPR-20,consisting of Proposed TS Changes to Table 3.23-2, Radiation Peaking Factor Limits for Cycle 11. Offsite Dose Calculations & EMF-92-178, Palisades Cycle 11:Disposition & ... Encl ML18058B3481993-01-19019 January 1993 Application for Amend to License DPR-20,changing Surveillance Interval for Testing Control Rod Drive mechanisms,CRD-20 & CRD-31 from Every Two Wks to Once in Mar 1993 ML18058A5631992-06-22022 June 1992 Suppl to 920317 Application for Amend to License DPR-20, Consisting of Revised Page 3-82 Re Shutdown Cooling ML18058A5561992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Better Coordinate Required Action Statement of Electrical Sys Spec W/Lco to Allow Testing & Loading of DG When Plant Above 325 F But Not Yet Critical ML18058A5491992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Delete Requirements Re Iodine Removal Sys Hydrazine Storage Tank Since Use of Hydrazine No Longer Considered in Current Rev of SRP ML18058A3631992-04-15015 April 1992 Application for Amend to License DPR-20,changing TSs to Incorporate Generic Ltr 90-06 PORV Requirements for Power Operation & Modifying Pcs Overpressure Protection Spec Venting Requirements ML18058A2921992-03-18018 March 1992 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling ML18058A1541992-02-0303 February 1992 Application for Amend to License DPR-20,deleting Three Primary Coolant Pump Testing Requirements & Revising Safety Limits & Limiting Safety Sys Settings Specs to Enhance Clarity of Subj Requirements ML18057B3711991-11-12012 November 1991 Application for Amend to License DPR-20,revising Tech Specs to Remove Schedule for Withdrawal of Reactor Vessel Matl Specimens,Per Generic Ltr 91-01 ML18057B3481991-11-0101 November 1991 Application for Amend to License DPR-20,changing TS for Operation During Cycle 10 as Results of Changes to Fuel Design (Reload N) & Fuel Mgt Scheme for Low Leakage Core. Siemens Repts EMF-91-176 & EMF-91-177 Encl ML18057B3061991-09-27027 September 1991 Application for Amend to License DPR-20,proposing Change to Tech Spec 5.2.3.a Re Containment Air Cooler Design,Per 861020 & 870430 Requests ML18057B3021991-09-26026 September 1991 Application for Amend to License DPR-20,consisting of Rev 2 to 890628 Request,In Response to Recommendations of Generic Ltr 88-17 to Add Shutdown Cooling Sys Operability Requirements to Tech Specs ML18057B1681991-07-15015 July 1991 Application for Amend to License DPR-20,requesting Tech Spec Changes in Administrative Controls W/Emphasis on Changes in Engineering ML18057A9821991-06-13013 June 1991 Application for Amend to License DPR-20,revising Tech Specs to Incorporate Change to Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A9631991-05-30030 May 1991 Application for Amend to License DPR-20,changing Tech Specs to Incorporate Change to Reactor Variable High Power Trip setpoint.ANF-90-181, Review & Analysis of SRP Chapter 15 Events for Palisades W/15% Variable High Power... Encl ML18057A9551991-05-28028 May 1991 Application for Amend to License DPR-20,changing Tech Specs Re Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A8881991-05-0101 May 1991 Rev 1 to Application for Amend to License DPR-20,changing TS Re Shutdown Cooling Sys Per Generic Ltr 88-17,by Adding Operability Requirements for Shutdown Cooling Sys & Steam Generators ML18057A8291991-03-25025 March 1991 Application for Amend to License DPR-20,changing Tech Specs Section 4.5.2a(2) & 4.5.2b(3) 1998-06-17
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18066A3251998-11-0909 November 1998 Application for Amend to License DPR-20,deleting CVCS Operability Requirements Currently in LCOs 3.2 & 3.17.6 & Associated Testing Requirements in SRs 4.2 & 4.17 ML18066A1981998-06-17017 June 1998 Application for Amend to License DPR-20,updating TS to Reflect Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1831998-03-13013 March 1998 Revised Application for Amend to License DPR-20,requesting Relocation of TS Section 4.16 Snubber Testing Requirements to Plant Operating Requirements Manual (Orm).Affected Orm Pages Encl ML18065B1781998-03-13013 March 1998 Application for Amend to License DPR-20,changing Auxiliary Feedwater TS to Allow Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A7051997-10-0101 October 1997 Application for Amend to License DPR-20,proposing That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note Re Insp at End of Cycle 12 ML18067A6751997-09-0303 September 1997 Application for Amend to License DPR-20,deleting Snubber Operability Requirements in LCO 3.20 & Snubber Testing Requirements in Surveillance Requirement 4.16 ML18067A6711997-09-0303 September 1997 Application for Amend to License DPR-20,reflecting Capabilities of Installed CR Ventilation Equipment & Emulate Std Tech Specs,C-E Plants,Per NUREG-1432 Requirements for Sys ML18067A4511997-03-26026 March 1997 Application for Amend to License DPR-20,allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065A4891996-02-0606 February 1996 Application for Amend to License DPR-20,requesting to Remove cross-train Testing Requirements from LCO Action Statements ML18065A4381996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS to Allow Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas,To Suppl 951211 Administrative Controls Change Request ML18065A4341996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS Re Primary Coolant Pump Flywheel Insp.Rev 1 to Structural Integrity Assoc,Inc Rept SIR-94-080, Relaxation of Reactor Coolant Pump Flywheel Insp Requirements Encl ML18065A4051996-01-10010 January 1996 Application for Amend to License DPR-20,requesting Exemption from 10CFR50 App J TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3821996-01-0505 January 1996 Application for Amend to License DPR-20,revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3751995-12-27027 December 1995 Application for Amend to License DPR-20,rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3461995-12-11011 December 1995 Application for Amend to License DPR-20,revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 from TS ML18065A3321995-12-0606 December 1995 Application for Amend to License DPR-20,relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1741995-10-17017 October 1995 Application for Amend to License DPR-20,changing Paragraph 2.B.(2) to Ref 10CFR40 & to Allow Use of Source Matls as Reactor Fuel,Rewording Paragraph 2.E & Deleting Paragraph 2.7 & Revising TS Pressurizer Cooldown Limit ML18064A8391995-07-0505 July 1995 Application for Amend to License DPR-20,deleting TS 6.4, Training & Revising TS 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7591995-05-0101 May 1995 Application for Amend to License DPR-20.Amend Would Place Requirements in TS Section 4.7 for Periodic DG Peak Load Tests ML18064A6121995-02-10010 February 1995 Application for Amend to License DPR-20,proposing One Time Deferral of 18-month Refueling Interval Surveillance Tests ML18064A5821995-01-13013 January 1995 Tech Specs Change Request to License DPR-20 Addressing Required Settings & Allowable as Found & as Left Tolerances for Primary & Secondary Safety Valves ML18064A5341994-12-29029 December 1994 Application for Amend to License DPR-20,revising TSs Re Iodine Removal Sys ML18064A5061994-12-13013 December 1994 Application for Amend to License DPR-20,adding Third High Thermal Performance DNB Correlation to Safety Limit 2.1 ML18064A4081994-10-0505 October 1994 Application for Amend to License DPR-20,revising TS Relating to Primary Coolant Sys pressure-temp Limits.Rev 0 to Engineering Analysis EA-A-PAL-92-095-01 & Excerpts from Rosemount Instruction Manual 4515,dtd Jan 1988 Encl ML18059B0961994-07-0707 July 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Intended to Resolve Concerns Arose During NRC Review of Change Request ML18059A9751994-05-0505 May 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Necessary Due to Intervening Amends Containing Listed Differences from Pages Submitted on 930519 ML18059A9321994-04-0707 April 1994 Application for Amend to License DPR-20,requesting TS Change Re Instrumentation & Control Section ML18059A9411994-04-0707 April 1994 Application for Amend to License DPR-20,relocating Cycle Specific Operating Limits to Colr,Per Guidance of GL 88-16, Removal of Cycle-Specific Parameter Limits from Ts. Proposed COLR Encl ML18059A8851994-03-11011 March 1994 Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17 ML18059A3721993-09-0303 September 1993 Changes to 930129 Application for Amend to License DPR-20, Modifying Radial Peaking Factor Limits in TS Table 3.23-2 to Incorporate Appropriate Limits for Modified L Fuel Assemblies Recently Installed in Reactor for Cycle 11 ML18058B8991993-06-25025 June 1993 Revises 921208 Application for Amend to License DPR-20 & Brings Proposed Specifications Closer to Model Tech Specs, While Retaining Necessary plant-specific Differences & Updating Proposed Pages to Reflect Amends 147 & 149 ML18058B7421993-03-29029 March 1993 Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks ML18058B3881993-01-29029 January 1993 Application for Amend to License DPR-20,consisting of Proposed TS Changes to Table 3.23-2, Radiation Peaking Factor Limits for Cycle 11. Offsite Dose Calculations & EMF-92-178, Palisades Cycle 11:Disposition & ... Encl ML18058B3481993-01-19019 January 1993 Application for Amend to License DPR-20,changing Surveillance Interval for Testing Control Rod Drive mechanisms,CRD-20 & CRD-31 from Every Two Wks to Once in Mar 1993 ML18058A5631992-06-22022 June 1992 Suppl to 920317 Application for Amend to License DPR-20, Consisting of Revised Page 3-82 Re Shutdown Cooling ML18058A5561992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Better Coordinate Required Action Statement of Electrical Sys Spec W/Lco to Allow Testing & Loading of DG When Plant Above 325 F But Not Yet Critical ML18058A5491992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Delete Requirements Re Iodine Removal Sys Hydrazine Storage Tank Since Use of Hydrazine No Longer Considered in Current Rev of SRP ML18058A3631992-04-15015 April 1992 Application for Amend to License DPR-20,changing TSs to Incorporate Generic Ltr 90-06 PORV Requirements for Power Operation & Modifying Pcs Overpressure Protection Spec Venting Requirements ML18058A2921992-03-18018 March 1992 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling ML18058A1541992-02-0303 February 1992 Application for Amend to License DPR-20,deleting Three Primary Coolant Pump Testing Requirements & Revising Safety Limits & Limiting Safety Sys Settings Specs to Enhance Clarity of Subj Requirements ML18057B3711991-11-12012 November 1991 Application for Amend to License DPR-20,revising Tech Specs to Remove Schedule for Withdrawal of Reactor Vessel Matl Specimens,Per Generic Ltr 91-01 ML18057B3481991-11-0101 November 1991 Application for Amend to License DPR-20,changing TS for Operation During Cycle 10 as Results of Changes to Fuel Design (Reload N) & Fuel Mgt Scheme for Low Leakage Core. Siemens Repts EMF-91-176 & EMF-91-177 Encl ML18057B3061991-09-27027 September 1991 Application for Amend to License DPR-20,proposing Change to Tech Spec 5.2.3.a Re Containment Air Cooler Design,Per 861020 & 870430 Requests ML18057B3021991-09-26026 September 1991 Application for Amend to License DPR-20,consisting of Rev 2 to 890628 Request,In Response to Recommendations of Generic Ltr 88-17 to Add Shutdown Cooling Sys Operability Requirements to Tech Specs ML18057B1681991-07-15015 July 1991 Application for Amend to License DPR-20,requesting Tech Spec Changes in Administrative Controls W/Emphasis on Changes in Engineering ML18057A9821991-06-13013 June 1991 Application for Amend to License DPR-20,revising Tech Specs to Incorporate Change to Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A9631991-05-30030 May 1991 Application for Amend to License DPR-20,changing Tech Specs to Incorporate Change to Reactor Variable High Power Trip setpoint.ANF-90-181, Review & Analysis of SRP Chapter 15 Events for Palisades W/15% Variable High Power... Encl ML18057A9551991-05-28028 May 1991 Application for Amend to License DPR-20,changing Tech Specs Re Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A8881991-05-0101 May 1991 Rev 1 to Application for Amend to License DPR-20,changing TS Re Shutdown Cooling Sys Per Generic Ltr 88-17,by Adding Operability Requirements for Shutdown Cooling Sys & Steam Generators ML18057A8291991-03-25025 March 1991 Application for Amend to License DPR-20,changing Tech Specs Section 4.5.2a(2) & 4.5.2b(3) 1998-06-17
[Table view] |
Text
.... ' ..
- consumers Power POW ERIN&
- MICHl&AN'S PROGRESS . Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 November 20, 1990 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 LICENSE DPR-20 -PALISADES PLANT GB Slade General Manager TECHNICAL SPECIFICATIONS CHANGE REQUEST -CONTAINMENT PENETRATIONS DESCRIPTION
-REVISION 1 Enclosed is a request for change to the Palisades Technical Specifications which modifies the descriptions of the steam generator blowdown lines and the line sizes. The original change, submitted September 20, 1990, has been modified to incorporate verbal comments from the NRC Project Manager. This revision adds a footnote denoting that the penetration valves for the affected penetrations have remained at their original size and modifies the discussion and No Significant Hazards Determination.
No Technical Specifications Limiting Conditions for Operation or Survei 11 ances have been altered by th i.s change request. The blowdown lines will be modified in the 1990 refueling outage. Consumers Power Company requests the amendment become effective upon issuance.
() Pl ant Manager CC Administrator, Region Ill, USNRC NRC Resident Inspector
-Palisades Attachment 9(111 -::*:=:0022 901120 -ADOCK 05000255 --F_' -------------PDC I ---\j;.-, -,.-*":; .--,\ Al A CMS' ENERC7Y COMPANY CONSUMERS POWER COMPANY Docket 50-255 Request for -change-to the Technical S-pecifications License DPR-20 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section I below: I. Changes In Table 3.6.1, Containment Penetrations and Valves, make the following changes: A. For Penetrations No. 5 and 6, change the system name and service size from " .. BOTTOM SLOWDOWN (2")" to " .. SLOWDOWN (4") *",-and add footnote"*
penetration line size; isolation Yalves*are B. For Penetrations 16, and 55 change system name and service line size from " .. SURFACE SLOWDOWN (2n) to -. " .. RECIRCULATION (4") *", and tdd footnote"*
penetration line size;-isolation are 2-inch.".
II. Discuss1on The above proposed Technical Specifications are requested due to modifications being made during.the The existing steam generator bottom blowdown 2-inch piping from the steam generators up to the containment isolation valves, outside cdntainment, is 'being replaced with 4-inch piping. The existing*
steam generator surface blowdown 2-inch piping from the steam generators up to-the containment.isolation valver outside containment, is also being replaced with 4-inch piping. The steam generator's*
surface blowdown function will. no longer be used as the line will only be used for recirculation during cold shutdown, hence the changes in the line name to steam generator recirculatio_n*system.
Since the "bottom" blowdown lines will serve the only steam blowdown lines the has been removed. ---As noted above, the containment isolation valves will remain at their current 2-inch size. The modifications being performed during the 1990 refueling outage are the initial changes planned to increase the capacity of both the steam generator blowdown.
and retirculation capabilities.
The modifications to these lines extending from the containment isolation valves, outside containment, are presently planned to be made at a future outage . . The changes to the Technical Specifications only affect the system name and line size designations in the containment penetration and valve table. The actual modifications to the plant are being made under Consumers Power Company approved facility changes and 10 CFR 50.59 safety evaluations.
1 Analysis of No Significant Hazards Consideration (1). Does the change involve a significant increase in the probability or consequences of an accident previously evaluated?
No. The proposed changes to the containment penetration lines are being made under CPCo approved facility changes in accordance with 10 CFR 50.59. Changes to the Technical Specifications are to.the system name and service line size and have identified that the isolation valves have not changed size. The containment penetration lines and penetrations are being designed, installed and tested in accordance with existing design and licensing basis requirements, including, but not limited to seismic and High Energy Line Break (HELB) requirements.
The operability and surveillance requirements for the containment isolation valves and functional requirements also have not changed due to the modifications.
Therefore, the change does not involve a significant increase in the probability of an accident previously evaluated.
'The change does not involve a significant increase in the consequences of an accident because a break in the new 4-inch pipe inside or outside containment is no more severe than other breaks that could occur. Also an ILRT will be performed following the.modifications to the containment penetrations to ensure 10 CFR 50, Appendix J, requirements are met. (2) Does this change create the possibility of a new or different kind of accident from any previously evaluated?
No. The modifications only affect changing the existing piping and penetrations from 2-inches to *4-inches.
No.hew design features or parameters are introduced.
The FSAR design considerations including seismic and HELB remain the same. The function of the containment isolation valves remains the same as do the Technical operability and surveilla.nce requirements._
TbereJore, a new or different kind of accident has not *been created. (3) Does this change involve a significant reduction in a margin of safety? No. The functional requirements and Technical Specifications requirements for the isolation valves remain the same. The design of the lines and penetrations meet the same requirements as specified in the licensing basis. The consequences of a break in the lines are not greater than previously analyzed events. Therefore, the change does not involve a significant reduction in the margin of safety. 2 III. Conclusion The Palisades Plant Review Committee has reviewed this Technical Specification Change Request and has determined that this change does not involve an unreviewed safety question and, therefore, involves no significant hazards consideration
.. This change has been reviewed by the Nuclear Safety Services Department.
A copy of.this Technical Specification Change Request has been sent to the State of Michigan official designated to receive such Amendments to the Operating License. CONSUMERS POWER COMPANY To the best of my knowledge, information and belief, the contents of this. Technical Specification Change Request are truthful and complete.
__ ___, Nuclear Sworn *and subscribed to before me 1990.
Elaine E Buehrer, Notary Public Jackson County, Michigan My commission expires October 11,. 1993 3