ML18057A595

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Modifying Descriptions of Steam Generator Blowdown Lines & Line Sizes.Footnote Denoting Penetration Valves Remained at Original Size
ML18057A595
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/20/1990
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18057A594 List:
References
NUDOCS 9011280024
Download: ML18057A595 (6)


Text

(

I 9611280024 901120 PDR ADOCK 05000255*

i I P

PDC J

ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PAGE CHANGES November 20, 1990 2 Pages

~~* ~.

TABLE 3 *. 6. I CONTAINMENT PENETRATIONS AND VALVES SYSTEM NAME AND VALVE PEN NUMBER SERVICE LINE SIZE ID NO REMARKS IA PURGE AIR EXHAUST CV-I805 Auto isolation. valve;

.(8")

CV-I806 required closure time = 25 seconds IC PURGE AIR EXHAUST CV-I807 Auto isolation valve; (8")

CV-I808 required closure time = 25 seconds 5

S/G (E-50A) cv:..0161 Auto isolation valve; e

SLOWDOWN CV-0771 required closure I

( 4")

  • time ~ 25 seconds 6

S/G (E-508)

CV-0768 Auto isolation valve; SLOWDOWN CV-0770 required closure

( 4")

  • time.= 25 seconds 11 CONDENSATE TO CV-0939 Auto isolation valve; SHIELD COOLING CK-CD40l required closure SURGE TANK time = 25 seconds (I %")

14 COMPONENT COOLING CV-09IO Auto isolation valve; WATER IN (IO")

CK-CC09IO required closure time = 25 seconds I5 COMPONENT COOLING CV-0911 Auto isolation valve; WATER OUT (IO")

CV-0940 required closure time = 25 seconds 16 S/G (E-50A)

CV-0739.

Auto isolation valve; RECIRCULATION required *closure

( 4")

  • time = 25 seconds
  • Penetration line size; isolation valves are 2-inch.

3-40b Amendment No. Ji~,

TSPR9007

SYSTEM NAME AND PEN NUMBER SERVICE LINE SIZE 47 49 52 55 67 68 69 PRIMARY SYSTEM DRAIN TANK PUMP SUCTION ( 4"}

CLEAN WASTE RECEIVER TANK CIRCULATION PUMP SUCTION (3"}

CONTAINMENT SUMP DRAIN TO DIRTY.WASTE TANK (4"}

S/G (E-SOB}

RECIRCULATION (4"}*

CLEAN WASTE RECEIVER TANK PUMP RECIRC (3"}

AIR SUPPLY TO A IR ROOM ( 12 II }

CLEAN WASTE RECEIVER TANK PUMP SUCTION ( 4.}

TABLE 3.6.1 CONTAINMENT PENETRATIONS AND VALVES VALVE ID NO CV-1002 CV-1007.

CV-1038 CV-1036 CV-1103 CV-1104 CV-0738 CV-1037 CK-CRW408 CV-1813 CV-1814 CV-1045 CV-1044 REMARKS Auto isolation valve; required closure time = 25 seconds Auto isolation valve; required closure time = 25 seconds Auto isolation valve; required closure time = 25 seconds Auto isolation valve; required closure time = 25 seconds Auto isolation valve; required closure time = 25 seconds Auto isolation valve; required closure time = 25 seconds Auto isolation valve; required closure time = 25 seconds

  • Penetration line size; isolation valves are 2-inch.

3-40e TSPR9007 Amendment No. Ji~,

  • I ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255
    • MARKED UP,TECHNICAL SPEC1~ICATION PAGES

_November 20, 1990 2 Pages

PEN NUMBER 1A 5

6 11 14 15 16 TABLE 3.6.1 CONTAINMENT PENETRATIONS AND VALVES SYS'lEH NAME AND SERVICE LINE SIZE PURGE* AIR ~UST (8")

S/G (E-50B)

Bm'TeH BLOWDOWN

(.2d)(~4")

  • CONDENSAD TO SHIELD COOLING SURGE IANK (1 1/211 )

COMPONEN'I COOLING WADR IN (1011)

OOHPONENT COOLING WAl'ER OU'r ( 10")

VALVE ID NO CV-1805 CV-1806 CV-1807 CV-1808 CV-0767 CV-0771 CV-0768 CV-0770 CV-0939 CK-CD401 CV-0910.

CK-CC0910 CV-0911 CV-0940 S/G (E-50A)

CV-0739 SURF#££ BbeWBeWN Jl£L:,,/ ~~L~T"l'O~

. CY> C~) ~

REMARKS Auto isolation valve;*

required closure*

time

  • 25 seconds Auto isolation valve; required closure time
  • 25 seconds Auto isolation valve; required closure time
  • 25 seconds Auto isolation va,lve; required closure time
  • 25 seconds Auto isolation valve; required closure time
  • 25 seconds Auto isolation valve; required closure*

tiine

  • 25 seconds Auto isolation valve; required closure time
  • 25 seconds Auto isolation valve; required closure time
  • 25 seconds 3-40b
  • ~... *0689-0136-NL04
  • Amendment No.,(Zg' September §, 1989 I

I 1

I

TABLE 3.6.1 CONTAINMENT PENETRATIONS AND VALVES PEN NUMBER 47 49 52 55 67 68 69 SYSTEM NAME AND SERVICE LINE. SIZE

,l ;*,

CLEAN WAS'IE RECEIVEJ( TANK CIRCULAnON'PUMP.

SUC'IlON (3) '. :

CONTAINMENT SUMP DRAIN TO DIRTY WASl'E TANK (411 )

I VALVE ID NO cv-1002 CV-1007 CV-1038 CV-103~

CV-1103 CV-1104 S/G (E-50B) :S\\JR¥MB!

  • CV-0738

==BOOl1IOOWlt (21 '

~~.if!!.C.U<:.-4-TlD~.

(¥"")*

CLEAN WAS1'E RECEIVER TANK PUMP RECIRC (3").

. AIR SUPPLY TO AIR ROOM (1211)

CLEAN WASTE RECEIVER TANK PUMP SUC'l'ION (4")

cv-1031*

CK-cRW408 CV-1813 cv-J114 CV-1045 CV-l041t TSP0689-0136-NL04 REMARKS Auto isolation valve; required closure time

  • 25 seconds Auto isolation*valve;
  • re9uired closure tlme
  • 25 seconds

. Auto isolation valve;.

required closure time - 25 seCO?dS Auto isolatiQn valve; required cl0sure time* *2~.s~q~~s

. Auto isolation' valve; required ~l~~ure

  • time
  • 25.seconds Auto isol~~ton valve;
required closure time
  • 25
  • s~cond~

Au.to isolation* valve;

. required closure.

  • t~
  • 25 seconds

.3-40e Amendment No. lf3E

--5eptemlleF §, 1989'-

e*