MONTHYEARML18066A3251998-11-0909 November 1998 Application for Amend to License DPR-20,deleting CVCS Operability Requirements Currently in LCOs 3.2 & 3.17.6 & Associated Testing Requirements in SRs 4.2 & 4.17 ML18066A1981998-06-17017 June 1998 Application for Amend to License DPR-20,updating TS to Reflect Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1831998-03-13013 March 1998 Revised Application for Amend to License DPR-20,requesting Relocation of TS Section 4.16 Snubber Testing Requirements to Plant Operating Requirements Manual (Orm).Affected Orm Pages Encl ML18065B1781998-03-13013 March 1998 Application for Amend to License DPR-20,changing Auxiliary Feedwater TS to Allow Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A7051997-10-0101 October 1997 Application for Amend to License DPR-20,proposing That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note Re Insp at End of Cycle 12 ML18067A6751997-09-0303 September 1997 Application for Amend to License DPR-20,deleting Snubber Operability Requirements in LCO 3.20 & Snubber Testing Requirements in Surveillance Requirement 4.16 ML18067A6711997-09-0303 September 1997 Application for Amend to License DPR-20,reflecting Capabilities of Installed CR Ventilation Equipment & Emulate Std Tech Specs,C-E Plants,Per NUREG-1432 Requirements for Sys ML18067A4511997-03-26026 March 1997 Application for Amend to License DPR-20,allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065A4891996-02-0606 February 1996 Application for Amend to License DPR-20,requesting to Remove cross-train Testing Requirements from LCO Action Statements ML18065A4381996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS to Allow Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas,To Suppl 951211 Administrative Controls Change Request ML18065A4341996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS Re Primary Coolant Pump Flywheel Insp.Rev 1 to Structural Integrity Assoc,Inc Rept SIR-94-080, Relaxation of Reactor Coolant Pump Flywheel Insp Requirements Encl ML18065A4051996-01-10010 January 1996 Application for Amend to License DPR-20,requesting Exemption from 10CFR50 App J TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3821996-01-0505 January 1996 Application for Amend to License DPR-20,revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3751995-12-27027 December 1995 Application for Amend to License DPR-20,rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3461995-12-11011 December 1995 Application for Amend to License DPR-20,revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 from TS ML18065A3321995-12-0606 December 1995 Application for Amend to License DPR-20,relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1741995-10-17017 October 1995 Application for Amend to License DPR-20,changing Paragraph 2.B.(2) to Ref 10CFR40 & to Allow Use of Source Matls as Reactor Fuel,Rewording Paragraph 2.E & Deleting Paragraph 2.7 & Revising TS Pressurizer Cooldown Limit ML18064A8391995-07-0505 July 1995 Application for Amend to License DPR-20,deleting TS 6.4, Training & Revising TS 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7591995-05-0101 May 1995 Application for Amend to License DPR-20.Amend Would Place Requirements in TS Section 4.7 for Periodic DG Peak Load Tests ML18064A6121995-02-10010 February 1995 Application for Amend to License DPR-20,proposing One Time Deferral of 18-month Refueling Interval Surveillance Tests ML18064A5821995-01-13013 January 1995 Tech Specs Change Request to License DPR-20 Addressing Required Settings & Allowable as Found & as Left Tolerances for Primary & Secondary Safety Valves ML18064A5341994-12-29029 December 1994 Application for Amend to License DPR-20,revising TSs Re Iodine Removal Sys ML18064A5061994-12-13013 December 1994 Application for Amend to License DPR-20,adding Third High Thermal Performance DNB Correlation to Safety Limit 2.1 ML18064A4081994-10-0505 October 1994 Application for Amend to License DPR-20,revising TS Relating to Primary Coolant Sys pressure-temp Limits.Rev 0 to Engineering Analysis EA-A-PAL-92-095-01 & Excerpts from Rosemount Instruction Manual 4515,dtd Jan 1988 Encl ML18059B0961994-07-0707 July 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Intended to Resolve Concerns Arose During NRC Review of Change Request ML18059A9751994-05-0505 May 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Necessary Due to Intervening Amends Containing Listed Differences from Pages Submitted on 930519 ML18059A9321994-04-0707 April 1994 Application for Amend to License DPR-20,requesting TS Change Re Instrumentation & Control Section ML18059A9411994-04-0707 April 1994 Application for Amend to License DPR-20,relocating Cycle Specific Operating Limits to Colr,Per Guidance of GL 88-16, Removal of Cycle-Specific Parameter Limits from Ts. Proposed COLR Encl ML18059A8851994-03-11011 March 1994 Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17 ML18059A3721993-09-0303 September 1993 Changes to 930129 Application for Amend to License DPR-20, Modifying Radial Peaking Factor Limits in TS Table 3.23-2 to Incorporate Appropriate Limits for Modified L Fuel Assemblies Recently Installed in Reactor for Cycle 11 ML18058B8991993-06-25025 June 1993 Revises 921208 Application for Amend to License DPR-20 & Brings Proposed Specifications Closer to Model Tech Specs, While Retaining Necessary plant-specific Differences & Updating Proposed Pages to Reflect Amends 147 & 149 ML18058B7421993-03-29029 March 1993 Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks ML18058B3881993-01-29029 January 1993 Application for Amend to License DPR-20,consisting of Proposed TS Changes to Table 3.23-2, Radiation Peaking Factor Limits for Cycle 11. Offsite Dose Calculations & EMF-92-178, Palisades Cycle 11:Disposition & ... Encl ML18058B3481993-01-19019 January 1993 Application for Amend to License DPR-20,changing Surveillance Interval for Testing Control Rod Drive mechanisms,CRD-20 & CRD-31 from Every Two Wks to Once in Mar 1993 ML18058A5631992-06-22022 June 1992 Suppl to 920317 Application for Amend to License DPR-20, Consisting of Revised Page 3-82 Re Shutdown Cooling ML18058A5561992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Better Coordinate Required Action Statement of Electrical Sys Spec W/Lco to Allow Testing & Loading of DG When Plant Above 325 F But Not Yet Critical ML18058A5491992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Delete Requirements Re Iodine Removal Sys Hydrazine Storage Tank Since Use of Hydrazine No Longer Considered in Current Rev of SRP ML18058A3631992-04-15015 April 1992 Application for Amend to License DPR-20,changing TSs to Incorporate Generic Ltr 90-06 PORV Requirements for Power Operation & Modifying Pcs Overpressure Protection Spec Venting Requirements ML18058A2921992-03-18018 March 1992 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling ML18058A1541992-02-0303 February 1992 Application for Amend to License DPR-20,deleting Three Primary Coolant Pump Testing Requirements & Revising Safety Limits & Limiting Safety Sys Settings Specs to Enhance Clarity of Subj Requirements ML18057B3711991-11-12012 November 1991 Application for Amend to License DPR-20,revising Tech Specs to Remove Schedule for Withdrawal of Reactor Vessel Matl Specimens,Per Generic Ltr 91-01 ML18057B3481991-11-0101 November 1991 Application for Amend to License DPR-20,changing TS for Operation During Cycle 10 as Results of Changes to Fuel Design (Reload N) & Fuel Mgt Scheme for Low Leakage Core. Siemens Repts EMF-91-176 & EMF-91-177 Encl ML18057B3061991-09-27027 September 1991 Application for Amend to License DPR-20,proposing Change to Tech Spec 5.2.3.a Re Containment Air Cooler Design,Per 861020 & 870430 Requests ML18057B3021991-09-26026 September 1991 Application for Amend to License DPR-20,consisting of Rev 2 to 890628 Request,In Response to Recommendations of Generic Ltr 88-17 to Add Shutdown Cooling Sys Operability Requirements to Tech Specs ML18057B1681991-07-15015 July 1991 Application for Amend to License DPR-20,requesting Tech Spec Changes in Administrative Controls W/Emphasis on Changes in Engineering ML18057A9821991-06-13013 June 1991 Application for Amend to License DPR-20,revising Tech Specs to Incorporate Change to Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A9631991-05-30030 May 1991 Application for Amend to License DPR-20,changing Tech Specs to Incorporate Change to Reactor Variable High Power Trip setpoint.ANF-90-181, Review & Analysis of SRP Chapter 15 Events for Palisades W/15% Variable High Power... Encl ML18057A9551991-05-28028 May 1991 Application for Amend to License DPR-20,changing Tech Specs Re Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A8881991-05-0101 May 1991 Rev 1 to Application for Amend to License DPR-20,changing TS Re Shutdown Cooling Sys Per Generic Ltr 88-17,by Adding Operability Requirements for Shutdown Cooling Sys & Steam Generators ML18057A8291991-03-25025 March 1991 Application for Amend to License DPR-20,changing Tech Specs Section 4.5.2a(2) & 4.5.2b(3) 1998-06-17
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18066A3251998-11-0909 November 1998 Application for Amend to License DPR-20,deleting CVCS Operability Requirements Currently in LCOs 3.2 & 3.17.6 & Associated Testing Requirements in SRs 4.2 & 4.17 ML18066A1981998-06-17017 June 1998 Application for Amend to License DPR-20,updating TS to Reflect Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18065B1831998-03-13013 March 1998 Revised Application for Amend to License DPR-20,requesting Relocation of TS Section 4.16 Snubber Testing Requirements to Plant Operating Requirements Manual (Orm).Affected Orm Pages Encl ML18065B1781998-03-13013 March 1998 Application for Amend to License DPR-20,changing Auxiliary Feedwater TS to Allow Installation of Plant Mod W/O Requiring Plant Shutdown ML18067A7051997-10-0101 October 1997 Application for Amend to License DPR-20,proposing That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note Re Insp at End of Cycle 12 ML18067A6751997-09-0303 September 1997 Application for Amend to License DPR-20,deleting Snubber Operability Requirements in LCO 3.20 & Snubber Testing Requirements in Surveillance Requirement 4.16 ML18067A6711997-09-0303 September 1997 Application for Amend to License DPR-20,reflecting Capabilities of Installed CR Ventilation Equipment & Emulate Std Tech Specs,C-E Plants,Per NUREG-1432 Requirements for Sys ML18067A4511997-03-26026 March 1997 Application for Amend to License DPR-20,allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18065A4891996-02-0606 February 1996 Application for Amend to License DPR-20,requesting to Remove cross-train Testing Requirements from LCO Action Statements ML18065A4381996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS to Allow Use of 10CFR50 App J Option B Containment Testing & Use of Warning Light to Identify Certain High Radiation Areas,To Suppl 951211 Administrative Controls Change Request ML18065A4341996-01-18018 January 1996 Application for Amend to License DPR-20,revising TS Re Primary Coolant Pump Flywheel Insp.Rev 1 to Structural Integrity Assoc,Inc Rept SIR-94-080, Relaxation of Reactor Coolant Pump Flywheel Insp Requirements Encl ML18065A4051996-01-10010 January 1996 Application for Amend to License DPR-20,requesting Exemption from 10CFR50 App J TS Change Request Concerning Local Leak Test Requirements for Emergency Escape Airlock in Plant Containment Bldg ML18065A3821996-01-0505 January 1996 Application for Amend to License DPR-20,revising SDC Requirements & Bases for TS Section 3.1.9.3 Prior to 1996 Refueling Outage ML18065A3751995-12-27027 December 1995 Application for Amend to License DPR-20,rewriting Electrical Power Sys Sections of TS & Bases to Closely Emulate STS ML18065A3461995-12-11011 December 1995 Application for Amend to License DPR-20,revising Administrative Controls Section to Emulate CE STS by Removing Review & Audit Requirements of Section 6.5 & Record Retention Requirements of Section 6.10 from TS ML18065A3321995-12-0606 December 1995 Application for Amend to License DPR-20,relocating Crane Operation & Movement of Heavy Loads Requirements & Bases from TS to Other Plant Documents Prior to 1996 Refueling Outage ML18065A1741995-10-17017 October 1995 Application for Amend to License DPR-20,changing Paragraph 2.B.(2) to Ref 10CFR40 & to Allow Use of Source Matls as Reactor Fuel,Rewording Paragraph 2.E & Deleting Paragraph 2.7 & Revising TS Pressurizer Cooldown Limit ML18064A8391995-07-0505 July 1995 Application for Amend to License DPR-20,deleting TS 6.4, Training & Revising TS 6.5.1.2 on Plant Review Committee Composition & 6.5.3.1 & 6.5.3.2,clarifying & Modifying Function & Composition of Plant Safety & Licensing Staff ML18064A7591995-05-0101 May 1995 Application for Amend to License DPR-20.Amend Would Place Requirements in TS Section 4.7 for Periodic DG Peak Load Tests ML18064A6121995-02-10010 February 1995 Application for Amend to License DPR-20,proposing One Time Deferral of 18-month Refueling Interval Surveillance Tests ML18064A5821995-01-13013 January 1995 Tech Specs Change Request to License DPR-20 Addressing Required Settings & Allowable as Found & as Left Tolerances for Primary & Secondary Safety Valves ML18064A5341994-12-29029 December 1994 Application for Amend to License DPR-20,revising TSs Re Iodine Removal Sys ML18064A5061994-12-13013 December 1994 Application for Amend to License DPR-20,adding Third High Thermal Performance DNB Correlation to Safety Limit 2.1 ML18064A4081994-10-0505 October 1994 Application for Amend to License DPR-20,revising TS Relating to Primary Coolant Sys pressure-temp Limits.Rev 0 to Engineering Analysis EA-A-PAL-92-095-01 & Excerpts from Rosemount Instruction Manual 4515,dtd Jan 1988 Encl ML18059B0961994-07-0707 July 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Intended to Resolve Concerns Arose During NRC Review of Change Request ML18059A9751994-05-0505 May 1994 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling.Changes Necessary Due to Intervening Amends Containing Listed Differences from Pages Submitted on 930519 ML18059A9321994-04-0707 April 1994 Application for Amend to License DPR-20,requesting TS Change Re Instrumentation & Control Section ML18059A9411994-04-0707 April 1994 Application for Amend to License DPR-20,relocating Cycle Specific Operating Limits to Colr,Per Guidance of GL 88-16, Removal of Cycle-Specific Parameter Limits from Ts. Proposed COLR Encl ML18059A8851994-03-11011 March 1994 Rev to 940222 I&C TS Change Request to License DPR-20,adding Surveillance Item 10 to Table 4.2.1 Which Require Verifying SIT Level & Pressure Each Shift & Adding Three Paragraphs to Basis for Proposed Section 3.17 ML18059A3721993-09-0303 September 1993 Changes to 930129 Application for Amend to License DPR-20, Modifying Radial Peaking Factor Limits in TS Table 3.23-2 to Incorporate Appropriate Limits for Modified L Fuel Assemblies Recently Installed in Reactor for Cycle 11 ML18058B8991993-06-25025 June 1993 Revises 921208 Application for Amend to License DPR-20 & Brings Proposed Specifications Closer to Model Tech Specs, While Retaining Necessary plant-specific Differences & Updating Proposed Pages to Reflect Amends 147 & 149 ML18058B7421993-03-29029 March 1993 Application for Amend to License DPR-20,changing TS to Required Frequency for Surveillance Test Which Requires Moving Each Control Rod to Once Each 92 Days Instead of Once Every 2 Wks ML18058B3881993-01-29029 January 1993 Application for Amend to License DPR-20,consisting of Proposed TS Changes to Table 3.23-2, Radiation Peaking Factor Limits for Cycle 11. Offsite Dose Calculations & EMF-92-178, Palisades Cycle 11:Disposition & ... Encl ML18058B3481993-01-19019 January 1993 Application for Amend to License DPR-20,changing Surveillance Interval for Testing Control Rod Drive mechanisms,CRD-20 & CRD-31 from Every Two Wks to Once in Mar 1993 ML18058A5631992-06-22022 June 1992 Suppl to 920317 Application for Amend to License DPR-20, Consisting of Revised Page 3-82 Re Shutdown Cooling ML18058A5561992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Better Coordinate Required Action Statement of Electrical Sys Spec W/Lco to Allow Testing & Loading of DG When Plant Above 325 F But Not Yet Critical ML18058A5491992-06-12012 June 1992 Application for Amend to License DPR-20,changing TS to Delete Requirements Re Iodine Removal Sys Hydrazine Storage Tank Since Use of Hydrazine No Longer Considered in Current Rev of SRP ML18058A3631992-04-15015 April 1992 Application for Amend to License DPR-20,changing TSs to Incorporate Generic Ltr 90-06 PORV Requirements for Power Operation & Modifying Pcs Overpressure Protection Spec Venting Requirements ML18058A2921992-03-18018 March 1992 Application for Amend to License DPR-20,revising TS Re Shutdown Cooling ML18058A1541992-02-0303 February 1992 Application for Amend to License DPR-20,deleting Three Primary Coolant Pump Testing Requirements & Revising Safety Limits & Limiting Safety Sys Settings Specs to Enhance Clarity of Subj Requirements ML18057B3711991-11-12012 November 1991 Application for Amend to License DPR-20,revising Tech Specs to Remove Schedule for Withdrawal of Reactor Vessel Matl Specimens,Per Generic Ltr 91-01 ML18057B3481991-11-0101 November 1991 Application for Amend to License DPR-20,changing TS for Operation During Cycle 10 as Results of Changes to Fuel Design (Reload N) & Fuel Mgt Scheme for Low Leakage Core. Siemens Repts EMF-91-176 & EMF-91-177 Encl ML18057B3061991-09-27027 September 1991 Application for Amend to License DPR-20,proposing Change to Tech Spec 5.2.3.a Re Containment Air Cooler Design,Per 861020 & 870430 Requests ML18057B3021991-09-26026 September 1991 Application for Amend to License DPR-20,consisting of Rev 2 to 890628 Request,In Response to Recommendations of Generic Ltr 88-17 to Add Shutdown Cooling Sys Operability Requirements to Tech Specs ML18057B1681991-07-15015 July 1991 Application for Amend to License DPR-20,requesting Tech Spec Changes in Administrative Controls W/Emphasis on Changes in Engineering ML18057A9821991-06-13013 June 1991 Application for Amend to License DPR-20,revising Tech Specs to Incorporate Change to Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A9631991-05-30030 May 1991 Application for Amend to License DPR-20,changing Tech Specs to Incorporate Change to Reactor Variable High Power Trip setpoint.ANF-90-181, Review & Analysis of SRP Chapter 15 Events for Palisades W/15% Variable High Power... Encl ML18057A9551991-05-28028 May 1991 Application for Amend to License DPR-20,changing Tech Specs Re Inservice Insp Program for Shock Suppressors (Snubbers) ML18057A8881991-05-0101 May 1991 Rev 1 to Application for Amend to License DPR-20,changing TS Re Shutdown Cooling Sys Per Generic Ltr 88-17,by Adding Operability Requirements for Shutdown Cooling Sys & Steam Generators ML18057A8291991-03-25025 March 1991 Application for Amend to License DPR-20,changing Tech Specs Section 4.5.2a(2) & 4.5.2b(3) 1998-06-17
[Table view] |
Text
consumers Power KurtM. Haas Plant Safety and Licensing Director POWERING MICHlliAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 Nuclear Regulatory Commission May 1, 1995 Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - TECHNICAL SPECIFICATIONS CHANGE REQUEST - DIESEL GENERATOR TESTING A request for a change to the Palisades Technical Specifications {TS) is enclosed. This change proposes requirements in TS section 4.7 for periodic Diesel Generator (DG) peak load tests. The existing DG load testing requirements, unaltered since the initial issue of the operating license in 1971, stipulate a testing load range which does not verify that the DG is capable of supplying the calculated peak accident loads.
- The attached change request provides a description and discussion of each proposed change. In addition to the change request, two attachments have been included.
- 1) The Proposed Technical Specifications page.
- 2) Existing Technical Specifications page, marked to show the changes.
In order to provide time for procedure preparation and completion of the newly proposed surveillance testing, it is requested that the Amendment associated with this Technical Specification change request not be required to be fully implemented before December 1, 1995.
SUMMARY
OF COMMITMENTS This letter completes the commitment discussed in our February 13, 1995 letter on this subject.
I~
Kurt M. Haas, Plant Safety and Licensing Director CC Administrator, Region III, USNRC Resident Inspector, - -
Palisades - -
_ _,... ,.... ,...._ r /""'\_~-:. ~ -
9505120009 950501 PDR ADOCK 05000255 Attachments P PDR A CMS' ENER6Y COMPANY *f\OD' I
~ CONSUMERS POWER COMPANY ~
Docket 50-255 Request for Change to the Technical Specifications License DPR-20 It is requested that the Technical Specifications contained in the Facility Operating License DPR-20, Docket 50-255, issued to Consumers Power Company* on February 21, 1991, for the Palisades Plant be changed as d.escribed below:
I. Changes Proposed:
A. The "Applicability" and "Objective" statements have been deleted.
B. The monthly DG testing requirement, 4.7.la, has been revised to require a demonstration that each DG can supply the predicted peak accident loads.
C. The wording of requirement 4.7.ld was altered to clarify the intent of that requirement.
II. Discussion of Proposed Changes:
A. The existing "Applicability" (Applies to periodic testing and surveillance requirements of the emergency power system) and "Objective" (To verify that the emergency power system wi 11 respond promptly and properly when required) statements were deleted since they prov.i de no useful benefit.
No similar statements appear in the STS. The conditions under which the specified testing must be performed, which are not discussed in the existing "Applic~bility" statement, are specified in the existing general surveillance requirement 4.0.1:
Surveillance requirements shall be applicable during the reactor operating conditions associated with individual Limiting Conditions for Operation unless otherwise stated in an individual surveillance requirement.
B. The existing monthly DG testing requirement is unchanged from initial issuance of the Facility Operating License in 1971. Since that time, the predicted .accident loads imposed on the DGs have increased to the point where the required monthly testing no longer demonstrates that each DG can carry its predicted accident loading.
Existing requirement 4.7.la contains three parts:
Each diesel generator shall be manually started each month and demonstrated to be ready for loading within 10 seconds.
The signal initiated to start the diesel shall be varied from one test -to another to verify that A and B starting circuits are operable.
The generator shall be synchronized from the control room, and loaded to 2400 +/-100 kW The requirements of the first and third sentences are contained within the revised wording, with the exceptions of th~ specified manual
2 starting and synchronization from the control room. These two details are not ~pecified in the proposed wording (nor in the STS) because no other practical alternative exists.
The requirements of the second sentence are not included in the proposed wording. Since the DG is not assumed to be single failure proof, the detail of verifying that both of the starting circuits function will be left to the testing procedure, as is done in STS.
The proposed testing requirement is taken from the Standard Technical Specifications, NUREG 1432, (STS).with only slight changes .. The proposed wording combines STS surveillance requirements (SRs) 3.8.1.2, 3.8.1.3, and 3.8.1.7.
- The achievement of 2000 Volts in 10 seconds is specified since that is the setting of the voltage sensing relays which initiate DG breaker closure, and which are used to time successful starting.
The proposed voltage range is based on the DG rating of 2400 +/-5%
Volts. This provides adequate margin for the switchgear and the safeguards motors.
The proposed minimum frequency is based on the accident analyses, rather than on electrical limitations. The accident analyses made no specific allowance for the safeguards pumps being operated at other than design speed. When analytical results are avail able to confirm the acceptability of reduced. frequency operation, a ~hange to this limit may be proposed.
The proposed maximum frequency is based on the STS, and conform to the guidance of Regulatory Guide 1.9.
The proposed testing load requirement wording was chosen because the peak predicted accident load is different for each DG, and includes not only automatically connected loads, but those operator connected loads which might be necessary under some circumstances. The predicted accident load profile, when potential operator connected loads are included, exceeds the continuous rating of the DG (but remains within the overload ratings) for a short period of time early in th.e event. By specifying that the DG be "loaded above the peak accident loading" for 15 minutes, the ability of the engine to supply this possible peak load is demonstrated, yet the DG is not routinely loaded over its continuous rating for a lengthy period. The 2300 to 2500 kW load range proposed for the balance of the monthly test is unchanged from the existing requirements.
The proposed DG load testing interval is unchanged from existing requirements.
C. The wording of *requirement 4.7.ld was clarified. The existing wording could have been interpreted to be a prohibition of ever loading the DG above its continuous loading .. This item is intended to provide the same requirement as ttem 4.8.1.1.2.d.9 of the fo~mer STS, NUREG 0212.
The wording was altered to clarify that the requirement was a periodic test, that it was to be accomplished by analytical means rather than by physical testing, and that it was to be performed each 18 months.
The proposed frequency is the same as that in NUREG 0212.
3 I'V. Analysis of No Significant Hazards Consideration Consumers Power Company finds the activities associated with this proposed Technical Specifications change involve no significant hazards and accordingly, a no significant hazards determination per IOCFR50.92(c) is justified .
. The following evaluation supports the finding that operation of the facility in accordance with the proposed change to the Technical Specifications would not:
- 1. Involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed change does not alter any plant operating conditions, operating practices, equipment settings, or equipment capabilities.
Therefore, operation of the facility in accordance with the proposed change will not involve an increase in the probability of an accident.
The proposed change involves requiring more rigorous testing of the DGs than required by the existing Technical Specifications. The more rigorous testing is intended to provide additional assurance that the DGs are capable of performing their design function and should, therefore~ involve a reduction, rather than an increase, in the consequences of those accidents previously evaluated.
- 2. Create the possibility of a new or different kind of accident from any previously evaluated.
The proposed change does not alter any plant operating conditions, operating practices, equipment settings, or equipment capabilities.
Therefore; operation of the facility in accordance with the proposed change will not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Involve a significant reduction in a margin of safety.
The proposed change involves requiring more rigorous testing of the DGs than required by the existing Technical Specifications. The more rigorous testing is intended to provide additional assurance that the DGs are CQpable of performing their design function and should, therefore, involve an increase, rather than a reduction, in the margin of safety.
V. Conclusion The Palisades Plant Review Committee has reviewed this Technical Specifications Change Request and has determined that proposing this change does not involve an unreviewed safety question. Further, the change fovolves no significant hazards consideration. This change has been reviewed by the Nuclear Performance Assessment Department.
e E:ONSUMERS POWER COMPANY 4
To the best of my kn.owledge, the contents of this Technical Specifications change request, describing proposed changes which proposes requirements in TS section 4.7 for periodic Diesel Generator load tests, are truthful and complete.
By 241- cl. ~ ' ~ .
RobertA: Fenech ,f;ce President Nuclear Operations
..sl Sworn and subscribed to before me this _I_ day of __M~--'-<AY,___,,,__ 1995.
~*WI~~
Alora M. Davis, Notary Public Berrien County, Michigan (Acting in Van Buren County, Michigan)
My commission expires August 26, 1999
[SEAL]