|
---|
Category:License-Operator
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20294A1372020-08-26026 August 2020 08 Public Forms ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 2024-09-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20294A1372020-08-26026 August 2020 08 Public Forms IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15225A5222015-09-14014 September 2015 2015-09 Draft Written Exam and Revised Outlines 2024-09-03
[Table view] |
Text
W ater f or d I I I D r af t Outl i ne C om m ents 1.
Sce na r io 1 Even t 3: Sh ou ld R W SP be RW ST?2.
Sc ena r i o 1 E v ent 4: S hou l d B OP r ec ei v e c r edi t for t hi s as c om pon ent fai l ur e?3.
Sc ena r i o 2: W hat c om m on f aul t w oul d k eep bo t h c har gi ng pum ps fr om au t o s t ar t i ng?4.
W hi c h S c ena r i os ar e n ew or m odi f i ed?5.
Adm i n J PM R O C onduct of Oper ati ons: I s ther e a l ess on obj ect i ve or J T A f or R O kno wl ed ge of overti me cal culations?
6.
Adm i n J PM R O C ontr ol of Equi pm ent: H ow does C ontai nm ent Pr ess ur e C al cul ati on f i t e q u ipme n t co n tro l?7.
Si m ul at or J PM s J PM h: W hat s y s t em do es t hi s i nt er f ac e w i t h i n S afety func t i on 8 cate go r y?8.
On l y t w o m odi f i ed J PM's. N eed t o s ee or i gi nal an d m odi f i ed v er s i ons t o v er i f y t hey meet requ ir emen ts.9.
W r i t t en ex am ou t l i ne l ook s go od.
Waterford III 2006 SRO/RO In itial License Examination Justifications for changes from Initial Approved Outlines.
Written Examination RO Written:
- 1. Question 14; Tier 1/1 4.1-055-G 2.4.20 Knowledge of operational implications of EOP warnings, cautions and notes. No credible discriminatory RO level tie exists; OP-902-005 Station Blackout notes and cautions are very limited. Replaced with Generic 2.4.12 Knowledge of general operating crew responsibilities during emergency operations. 2. Question 33 Tier 2/1 RO 007/A1.01 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the PRTS controls including: Maintaining Quench Tank water level within limits.
Rejected due to this K/A being too similar to question 87 on the SRO portion of this exam. Replaced system with 013, but maintained A1.01. 3. Question 47; Tier 2/1 3.6-063-A4.03 Battery discharge rate cannot be monitored in the Control room the only indication available is DC bus voltage which is not a true indicator of discharge rate. Overlap between other written questions dealing with reducing DC loads in the event of a SBO. Replaced with 3.4-005-A4.01 Controls and indications for RHR pump. 4. Question 50, Typo - changed CFR 43.12 to 41.12 5. Question 55; Tier 2/1 3.5-103-G2.1.29; Knowledge of how to conduct and verify valve lineups. The only credible discriminatory tie to be made would be for containment integrity or closure which is used on previous questions. Replaced with 2.1.27 Knowledge of system purpose and or function. 6. Question 57, Typo - changed A4.03 to A4.02. Description accurate, mis-numbered K/A. 7. Question 61; 2/2 3.8-029-A2.04 A2.04 - Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Purge System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Health physics sampling of containment atmosphere No discriminatory RO level tie for malfunction of HP sampling of containment effect of Containment Purge (CFR: 41.9) Replaced with 3.1-014-A2.07 RPIS loss of reed switch. 8. Question 70; Tier 3 2.2.34 Knowledge of the process for determining the internal and external effects on core reactivity. Duplicated for Question 2 Replaced with: 2.2.22 Knowledge for limiting conditions for operations and Safety Limits.
Waterford III 2006 SRO/RO In itial License Examination Justifications for changes from Initial Approved Outlines.
SRO written:
- 1. SRO Question 81; Tier 1/1. Rejecting E55/2.2.25: Knowledge of bases in technical specifications for limiting conditions for operations and safety limits Rejected due to no technical specification bases relating to SBO. Replaced with 2.4.47 Ability to diagnose and recognize trends in an accurate and timely manner utilizing the appropriate control room reference material. (kept E55). 2. SRO Question 88: Tier 2/1. Rejecting 3.2-013-A2.04: Ability to (a) predict the impacts of the following malfunctions or operations on the ESFAS; and (b) based Ability on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of instrument bus)
Rejected due to topic being too similar to question 16. Replaced with A2.06: Inadvertent ESFAS actuation (kept 013). 3. SRO Question 91: Tier 2/2. Rejecting 3.8-034-K5.02, Fuel Handling Equipment Knowledge of the operational implications of the following concepts as they apply to the fuel handling system: Limiting of Load.
Rejected due to topic being too similar to question 69. Replaced with A2.01: Ability to (a) predict the impacts of the following malfunctions or operations on the Fuel Handling System; and (b) based Ability on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Dropped fuel element.
- 4. SRO Question 99: Tier 3. Rejecting 2.3.6: Knowledge of requirements for reviewing and approving release permits.
Rejected due to being too similar to question 23. Replaced with 2.3.9: Knowledge of the process for performing a containment purge.
Waterford III 2006 SRO/RO In itial License Examination Justifications for changes from Initial Approved Outlines.
Operating Test RO Admin JPM
- 1. RO Admin JPM 2; Evaluate proposed Work Schedule against Established Overtime Guidelines. Could not be written to a discriminatory RO level more of an SRO task. Replaced with Calculate Shutdown Margin. 2. RO Admin JPM 4; Radiation control; Determine Stay Times to Operate Equipment in a High Dose Field. Duplication of written question. Changed to Review RWP prior to entering the CAA.
SRO Admin JPM
- 1. SRO Admin JPM 4; Changed from perform OP-901-131 Attachment 1 Containment closure checklist. Unable to develop discriminatory SRO level conditions. Changed to Review and approve Gaseous release permit.
Control Room/In-plant JPM
- 1. RO JPM H; Restoration from Control Room isolation, did not meet requirements for safety function 8. Changed to perform actions in response to CCW leakage. New JPM, JPM acceptance criteria verified.
- 2. RO JPM C changed from Alternate Path to non-faulted. Alternate path designation chosen for fire in the control room which is covered in the procedure and does not justify alternate path. Verified required number of alternate path JPMs within acceptable limits.
Simulator Scenario 1 Added EFW B fails to auto start in event 8 to provide verifiable action for critical task. After EDG B breaker is closed sequencer will run and auto start EFW B and begin feeding S/Gs this provides identifiable actions for the crew to meet Heat sink safety function.
Scenario 3 Replaced EFW B failure to autostart with Main Generator Exciter Field Breaker fail to open on trip. EFW B fail to start added to Scenario 1 for critical task swapped to prevent duplication between Scenarios.