ML071210295

From kanterella
Revision as of 03:11, 24 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Susquehanna - Units 1 & 2, Technical Specifications, Correct Administrative Errors in in Condition B of Limiting Condition for Operation (LCO) 3.8.1 & Correct the Routing of Interstate 80 (I-80) on Figure 4.1-2 in the SSES 1 and 2 TSs Secti
ML071210295
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/26/2007
From:
NRC/NRR/ADRO/DORL/LPLA
To:
Guzman R V, NRR/DORL, 415-1030
References
TAC MD2142, TAC MD2143
Download: ML071210295 (5)


Text

-3-(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified.

Attachment 1 is hereby incorporated into this license.(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 243, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-1 4, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.(3) Conduct of Work Activities During Fuel Load and Initial Startup The operating licensee shall review by committee all facility construction, Preoperational Testing, and System Demonstration activities performed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +48, +7-0, , +88, +94, 2-5, 2-36, 237, %3,-24e, 24+, 242 243 PPL Rev.AC Sources -Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued)

B.3.1 Determine OPERABLE DGs are 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> not inoperable due to common cause failure.OR B.3.2 Perform SR 3.8.1.7 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE DGs.OR 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to entering Condition B AND B.4 Restore required DG to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.AND 6 days from discovery of failure to meet LCO C. Two offsite circuits C.1 Restore one offsite circuit to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable.

OPERABLE status.D. One offsite circuit --NOTE ---------------.....

inoperable.

Enter applicable Conditions and Required Actions of LCO 3.8.7, "Distribution AND Systems-Operating," when Condition D is entered with no AC power source to any One required DG 4.16 kV ESS bus.inoperable.

-- -.... ............----------------

D.1 Restore offsite circuit to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status.OR D.2 Restore required DG to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status.(continued)

SUSQUEHANNA

-UNIT 1 TS / 3.8-3 Amendment 1,78 2143 243 PPL Rev.Design Features 4.0 Low Population Zone Figure 4.1-2 SUSQUEHANNA

-UNIT 1 TS / 4.0-4 Amendment 1/8, 243 (4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified.

Attachment 1 is hereby incorporated into this license.(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 221, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.For Surveillance Requirements (SRs) that are new in Amendment 151 to Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.2.C.(3) PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fireprotection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. +, 2, 4+ý3, +50, +5-t-, -+-53, 462, +69, 2-+2, 2-1-3, 1, 2-+-5, 2+-9 221 221 PPL Rev.Design Features 4.0 ITE.CHC_4_1-2UIi Low Population Zone Figure 4.1-2 SUSQUEHANNA

-UNIT 2 TS / 4.0-4 Amendment 1x1, 221