ML072850076

From kanterella
Revision as of 05:38, 22 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Palisades, Tech Spec Page for Amendment 228 Proposal to Revise Containment Sump Surveillance Requirement to Verify Strainer Integrity
ML072850076
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/04/2007
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Chawla M, NRR/DORL/LPL3-1, 301-415-8371
Shared Package
ML072550053 List:
References
TAC MD5259
Download: ML072850076 (1)


Text

ECCS -Operating 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.6 Verify each ECCS pump starts automatically on an 18 months actual or simulated actuation signal.SR 3.5.2.7 Verify each LPSI pump stops on an actual or 18 months simulated actuation signal.SR 3.5.2.8 Verify, for each ECCS throttle valve listed below, 18 months each position stop is in the correct position.Valve Number Function MO-3008 LPSI to Cold leg 1A MO-3010 LPSI to Cold leg 1B MO-3012 LPSI to Cold leg 2A MO-3014 LPSI to Cold leg 2B MO-3082 HPSI to Hot leg 1 MO-3083 HPSI to Hot leg 1 SR 3.5.2.9 Verify, by visual inspection, the containment sump 18 months passive strainer assemblies are not restricted by debris, and the containment sump passive strainer assemblies and other containment sump entrance pathways show no evidence of structural distress or abnormal corrosion.

Palisades Nuclear Plant 3.5.2-3 Amendment No. 4849w 228